PROJECT 102 FINAL PRESENTATIONCLIENT: DR. MICHAEL GROSSMAN TEAM 102. TUTORIAL 0101.
The Rainbow Experiment
Image Source: http://www.thedenverchannel.com/news/investigations/teacher-in-methanol-fire-not-adequately-trained-
investigating-agency-finds
The Rainbow Experiment
Video Source: www.youtube.com/watch?v=NY-bnY0yjWw
The Problem?
Excessive Use of Methanol
Lack of Safety Measures
Lack of Mechanism to Control Explosions
Flow of PresentationFunnel Design
Components
Mechanism
Safety
Objectives
Implementation Requirements
Cost Breakdown
THE DESIGNAMBROSE CHU
The Funnel Design
Holding Container
Funnel System
Recipients
Airflow
Side Latches
Carbon Monoxide Detector
MATERIAL & DESIGN CHOICESDIEGO SIMON
Photo Source: http://image.made-in-china.com/
Overall DesignLightweight Refractory Concrete
1mm Stainless Steel Plate
Curved Quartz Glass Sheet
Stainless Steel Funnels
Gas Input at the bottom
Safety FeaturesRecipient Separation
Quartz Glass
Stainless Steel and Concrete Mixture
Latches
Carbon Monoxide Detector
Recipient System
Quartz Glass & Steel-Concrete Mixture
Latches & Carbon Monoxide Detector
Reducing Human Error
Enclosed Experiment
Methanol Usage
Airflow
Holding Container and Airflow
OBJECTIVES & SAFETY FEATURESAPURV KAUSHIK
Safety StandardsScience Safety Checklist - Council of Ontario Directors of Education Health and Safety committee
Chemical Safety for Teachers and their Supervisors - American Chemical Society
Reducing risks to Students and Educators from Hazardous Chemicals in a Secondary School Chemical Inventory - American Chemical Society
O1: InstructionalPurpose of an experiment?
Interactive, tangible elements
Clearly visible and interesting components
Involves students
Sparks creativity and promotes learning
O2: Compelling
How do we share knowledge?
Connection
Visual and dynamic appeal
O3: Expedient
How do we facilitate the learning process?
Convenience and ease of use
One-time setup
Ease of disposal
Radar Diagram
IMPLEMENTATION REQUIREMENTSTIAN-YUAN ZHAO
Image Source: http://dimensionnxg.com
Implementation10 Stages summarized roughly as follows:
Product Design and Development
Legalities and Business Development
Manufacturing and Logistics
Distribution and Sales
Customer Experience and Maintenance
Cost Breakdown
CONCLUSION