Download - Progress Report- Apr'2011
-
8/6/2019 Progress Report- Apr'2011
1/55
A/T Status of Earth auditCircle SSA VendorS.N
o.Site/ Location W.O. No.&
date, ifapplicable
Type ofExchanges( CDOT/ NT/CDMA BTS
etc).
Type of Earthingsystem
Offeredfor A/T(Yes/No)
A/Tcompleted (Yes/
No)
ExchangeEarth
measuredvalue
DaCo
Spikeearth
Plateearth
Ringearth
Total No. of ExchangesA/Ted(Positive Output)
-
8/6/2019 Progress Report- Apr'2011
2/55
1). Nielsen Coverage report
From 16/01/2009 to 29/01/2009 Reference letter no: BSNL Corporate office Lett
2). Verification of BTS Outage & Alarm Extension status reported by Circle
From 16/02/2009 to 18/02/2009 Reference letter no: BSNL Corporate office Lett
Circle SSA Site/ Location Project/ Scheme
May '2009
1 UPW Etah Sakrauli TE GSM PH-V.1
2 UPW Etah Pondri TE GSM PH-V.1
3 UPW Etah Unchagaon TE GSM PH-V.1
4 UPW Etah Bahanpur TE GSM PH-V.1
5 UPW Etah Mohanpur TE GSM PH-V.16 UPW Etah Bilsad TE GSM PH-V.1
7 UPW Etawah Muradganj TE GSM PH-V.1
8 UPW Etawah Purwasujan TE GSM PH-V.1
9 UPWEtah Mission Hospital Kasganj
GSM PH-V.1
10 UPWEtah Ismailpur Road Kasganj
GSM PH-V.1
11 UPW Agra Manas Nagar GSM PH-V.1
June '2009
1 UPW Etah Bilram Tel Exch GSM PH-V.1
2 UPW Etah Ismailpur Road Kasganj GSM PH-V.1
3 UPW Etah Mission Hospital Kasganj GSM PH-V.1
4 UPW Agra Manas Nagar GSM PH-V.1
March'2010
1 UPW Agra Signals, Air Force Station
2 UPW Agra Tropo, Air Force Station
3 UPW Agra TAX Bhawan
Aug'2010
1 UPW Agra Arjun Nagar TE
2 UPW Agra Idgah TE
Sep'2010
1 UPW Agra Jaipur House TE
3 UPW Agra TAX Bhawan
3 UPW Agra TAX Bhawan
Oct'2010
1 UPW Agra DayalBagh TE
2 UPW Agra DayalBagh TE
Mar'2011
1 UPW Etawah Main TE- OCB TAX
2 UPW Etawah Main TE- AXE DTAX
S.No.
-
8/6/2019 Progress Report- Apr'2011
3/55
3 UPW Etawah Friends Colony TE
4 UPW Agra Tajnagri TE
5 UPW Agra Saheed NagarTE
-
8/6/2019 Progress Report- Apr'2011
4/55
er no. MOB-14/QOS- survey-2007-08/24 dated 24-12-2008.
er no. MOB-35/ BTS-2009 dated 12-02-2009 from GM (WS- O&M)
P.O. No.& date Vendor/ Technology Type of equipment etc
Ericsson BTS Tower
Ericsson BTS Tower
Ericsson BTS Tower
Ericsson BTS Tower
Ericsson BTS Tower Ericsson BTS Tower
Ericsson BTS Tower
Ericsson BTS Tower
Ericsson Power Plant
Ericsson Power Plant
Ericsson Power Plant
Ericsson BTS Tower
Ericsson BTS Tower
Ericsson BTS Tower
Ericsson BTS Tower
Sainico Engineers Engine Alternator
Sainico Engineers Engine Alternator
PO. No:- IT/PO/013/2008-09 Dated 15-1-09 & 22-1-09 ZTE Battery of 1000AH (2 set)
Microtex Battery of 1000AH (2 set)
Microtex Battery of 1000AH (2 set)
Microtex Battery of 1000AH (2 set)
PO. No:- IT/PO/013/2008-09 Dated 15-1-09 & 22-1-09 ZTE INVERTER
PO. No:- IT/PO/013/2008-09 Dated 15-1-09 & 22-1-09 ZTE INVERTER
Microtex Battery of 1000AH (2 set)
Exi Power Plant (3+1 module)
Amar Raja Battery of 4000AH (1 set)
Microtex Battery of 1000AH (1 set)
(MSC/ BSC/ BTS/ Coverageetc.
-
8/6/2019 Progress Report- Apr'2011
5/55
Microtex Battery of 1000AH (2 set)
HBL Battery of 1000AH (1 set)
Microtex Battery of 1000AH (1 set)
-
8/6/2019 Progress Report- Apr'2011
6/55
Installed Capacity (K lines) Date or Month of Offering
GSM 40M GBT Yes 15-Nov-2008 Yes
GSM 40M GBT Yes 19-Sep-2008 Yes
GSM 40M GBT Yes 30-Aug-2008 Yes
GSM 40M GBT Yes 19-Sep-2008 Yes
GSM 40M GBT Yes 18-Oct-2008 Yes
GSM 40M GBT Yes 19-Sep-2008 Yes
GSM 40M GBT Yes 21-Jul-2008 Yes
GSM 40M GBT Yes 21-Jul-2008 Yes
GSMYes
19-Sep-2008Yes
GSMYes
19-Sep-2008Yes
GSMYes
20-Sep-2008Yes
GSM 40M GBT Yes 31-Oct-2008 Yes
GSM 40M GBT Yes 19-Sep-2008 Yes
GSM 15M RTT Yes 19-Sep-2008 Yes
GSM 15M RTT Yes 31-Oct-2008 Yes
Sainico Engineers 62.5KVA Yes Yes
Sainico Engineers 62.5KVA Yes Yes
Make- HBL 1000 AH Yes Yes
Make- Microtex 1000 AH Yes 29-Jul-2010 Yes
Make- Microtex 1000 AH Yes 29-Jul-2010 Yes
Make- Microtex 1000 AH Yes Yes
2KVA Yes Yes
1KVA Yes Yes
Make- Microtex 1000 AH Yes Yes
Make- Exicom 300A Yes Yes
Amar Raja 4000 AH Yes Yes
Microtex 1000 AH Yes Yes
Offered forA/T (Yes/
No)
A/Tcompleted(Yes/ No)New/ Redploy/
Swap/ Expn. etc.
-
8/6/2019 Progress Report- Apr'2011
7/55
Microtex 1000 AH Yes Yes
HBL 1000 AH Yes Yes
Microtex 1000 AH Yes Yes
-
8/6/2019 Progress Report- Apr'2011
8/55
1-May-09
2-May-09
4-May-09
5-May-09
6-May-098-May-09
11-May-09
11-May-09
26-May-09
27-May-09
28-May-09
29-May-09
29-Jan-10
12-Mar-10
13-Sep-10
14-Sep-10
8-Oct-10
24-02-2011
24-02-2011
Date of A/TCompletion
Vendor Nilstatusreports
issued(Yes/
No)
Date ofissue of
vendor Nilstatus
report
ATC issued(Yes/No)
Date ofissue of
ATC
5/12/2009 to5/13/2009
5/14/2009 to5/15/2009
5/16/2009 to5/17/2009
22-Mar-10 & 23-Mar-10
06-Aug-2010 & 07-Aug-2010
11-Aug-2010 & 12-Aug-2010
23-Aug-2010 & 08-Sep-2010
06-Oct-2010 & 07-Oct-2010
-
8/6/2019 Progress Report- Apr'2011
9/55
10-Mar-2011
10-Mar-2011
03-Mar-2011 & 05-Mar-2011
-
8/6/2019 Progress Report- Apr'2011
10/55
BSNL pending points Vendor pending points
Alarms- i/p low, frequency out of range & reverse polarity are pending
Alarms- i/p low, frequency out of range & reverse polarity are pending
-
8/6/2019 Progress Report- Apr'2011
11/55
-
8/6/2019 Progress Report- Apr'2011
12/55
Staff Deployment Remarks
Neeraj Singh T & D Circle
Neeraj Singh T & D Circle
Neeraj Singh T & D Circle
Neeraj Singh T & D Circle
Neeraj Singh T & D CircleNeeraj Singh T & D Circle
Neeraj Singh T & D Circle
Neeraj Singh T & D Circle
Neeraj Singh T & D Circle
Neeraj Singh T & D Circle
Neeraj Singh T & D Circle
Neeraj Singh T & D Circle
Neeraj Singh T & D Circle
Neeraj Singh T & D Circle
Neeraj Singh T & D Circle
Neeraj Singh T & D Circle
Neeraj Singh T & D Circle
Neeraj Singh T & D Circle
Neeraj Singh T & D Circle
Neeraj Singh T & D Circle
Neeraj Singh T & D Circle
Neeraj Singh T & D Circle
Neeraj Singh T & D Circle
Neeraj Singh T & D Circle
Neeraj Singh T & D Circle
Neeraj Singh T & D Circle
Neeraj Singh T & D Circle
Name of theofficer conducting
A/T
From T&DCircle/
TerritorialCircle
-
8/6/2019 Progress Report- Apr'2011
13/55
Neeraj Singh T & D Circle
Neeraj Singh T & D Circle
Neeraj Singh T & D Circle
-
8/6/2019 Progress Report- Apr'2011
14/55
Circle SSA Site/ Location Project/ Scheme
December' 2008
1 UPW Etawah Main TE, Etawah GSM PH-V.1
January'2009
1 UPW Mainpuri Aron NBSNL GSM PH-IV+++
2 UPW Mainpuri Nagla Manjh TE GSM PH-IV+++
3 UPW Mainpuri Nouner TE GSM PH-IV+++
4 UPW Mainpuri Jyoti TE GSM PH-IV+++
5 UPW Mainpuri Alipur Khera TE GSM PH-IV+++
6 UPW Etawah Dewarpur TE GSM PH-IV+++
7 UPW Etawah Kudarkot TE GSM PH-IV+++
8 UPW Etawah Barhalokpur TE GSM PH-IV+++
9 UPW Etah Dhumri TE GSM PH-IV+++
10 UPW Etah Thanadariaganj TE GSM PH-IV+++
11 UPW Etah Sarai Aghat TE GSM PH-IV+++
February'2009
S.No.
-
8/6/2019 Progress Report- Apr'2011
15/55
1 UPW Agra TAX Bhawan, Agra GSM PH-V.1
-
8/6/2019 Progress Report- Apr'2011
16/55
-
8/6/2019 Progress Report- Apr'2011
17/55
-
8/6/2019 Progress Report- Apr'2011
18/55
P.O. No.& date Vendor/ Technology
Ericsson
Ericsson
Ericsson
Ericsson
Ericsson
Ericsson
Ericsson
Ericsson
Ericsson
Ericsson
Ericsson
Ericsson
-
8/6/2019 Progress Report- Apr'2011
19/55
Ericsson
-
8/6/2019 Progress Report- Apr'2011
20/55
-
8/6/2019 Progress Report- Apr'2011
21/55
-
8/6/2019 Progress Report- Apr'2011
22/55
A/T Status of CMTS
Type of equipment etc Date or Month of Offering
(MSC/ BSC/ BTS/ Coverage etc.
BSC New Yes Yes
Coverage New Yes 21.07.2008 Yes
Coverage New Yes 21.07.2008 Yes
Coverage New Yes 21.07.2008 Yes
Coverage New Yes 21.07.2008 Yes
Coverage New Yes 21.07.2008 Yes
Coverage New Yes 21.07.2008 Yes
Coverage New Yes 21.07.2008 Yes
Coverage New Yes 21.07.2008 Yes
Coverage New Yes 24.01.2008 Yes
Coverage New Yes 24.01.2008 Yes
Coverage New Yes 21.07.2008 Yes
InstalledCapacity
(K lines)
Offeredfor A/T(Yes/No)
A/Tcompled (Ye
No)
New/ Redploy/ Swap/Expn. etc.
-
8/6/2019 Progress Report- Apr'2011
23/55
MGW02 New Yes 29.01.2009 Yes
-
8/6/2019 Progress Report- Apr'2011
24/55
-
8/6/2019 Progress Report- Apr'2011
25/55
-
8/6/2019 Progress Report- Apr'2011
26/55
Date of A/T Completion
19.12.2008
06.01.2009
06.01.2009
07.01.2009
07.01.2009
09.01.2009
12.01.2009
12.01.2009
14.01.2009
13.01.2009
13.01.2009
14.01.2009
VendorNil
statusreports
issued(Yes/No)
Date ofissue ofvendor
Nilstatusreport
ATCissued
(Yes/No)
Date ofissue of
ATC
-
8/6/2019 Progress Report- Apr'2011
27/55
04.02.2009
-
8/6/2019 Progress Report- Apr'2011
28/55
-
8/6/2019 Progress Report- Apr'2011
29/55
-
8/6/2019 Progress Report- Apr'2011
30/55
BSNL pending points Staff D
Neeraj Sing
SACFA certification pending Neeraj Sing
SACFA certification pending Neeraj Sing
SACFA certification pending Neeraj Sing
SACFA certification pending Neeraj Sing
SACFA certification pending Neeraj Sing
SACFA certification pending Neeraj Sing
SACFA certification pending Neeraj Sing
SACFA certification pending Neeraj Sing
SACFA certification pending Neeraj Sing
SACFA certification pending Neeraj Sing
SACFA certification pending Neeraj Sing
Vendorpendingpoints
Name of thofficer
conductinA/T
Approved C Module not provided.Approved Software Version List for reference not provided.TEST no. 6.4 Intra BSC Handover is PENDING.TEST no. 6.5 MMS Testing is PENDING.TEST no. 14 Inter working with LBS is PENDING.TEST no. 17 Test of Codecs is PENDING.TEST no. 20 3 G RELATED TESTS is PENDING.Documents pending.
-
8/6/2019 Progress Report- Apr'2011
31/55
Neeraj Sing
GENERAL POINTS
P.O. not providedBOM not providedHumidity Meter not installed in switch room.Approved I.P. and Soft Version of Eqpt. To be provided.PCM & Fiber Test Report.All PCs not installed.All Logs & Screen Shots are to be submitted.
INFRASTRUCTURE TEST
Approved Layout and floor plan not provide for Eqpt and DDF.Approved Trunking Diagram not provided.Approved earth layout plan not providedNeither earth is measured nor any earth certificate is providedUPS/Inverter not Offered for AT
-
8/6/2019 Progress Report- Apr'2011
32/55
PRE & POST SWITCH ON TEST
Approved Layout and floor plan not provide.QA Inspection certificate not issuedAll documents are with planning section. None is available on site.
Approved DDF Layout Not Provided.Emergency light not provided.Installation of PC Monitor and printer is pendingApproved Connectivity diagram not provided
Jumper taken is not through proper path.Voltage drop is 1.2 V.
CDR yet to be providedConnectivity of OSS from MPBN is not throughApproved C module not provided. Cable laying on the DDF is not proper.No provision of Emergency light & there isno provision for measuring humidity in the switch roomNo Connectivity diagram present at site.Approved Software list not providedNo redundancy available for ET-C41 cardOnly one clock is available from Nokia MSC Agra.No second option is availableET-MC 41 card is not available4.3.1.6.1 LSL Out of 16 LSL with BSC1 only 8 are Working.4.3.1.6.2 HSL over TDM Not defined4.3.1.6.3 HSL over ATM Not defined4.3.1.6.4 HSL over NNI-SAAL Not defined4.5.6.2 No HSL with POI
-
8/6/2019 Progress Report- Apr'2011
33/55
Test case no 4. QA certificate of all equipmentTest case no 5. Check of Documentation, Hard / soft copyTest case no 6. Network connectivity diagram2) POST SWITCH ON TESTFollowing are the test which are still pending:Test case no 4.2.1.4 ET-C41 pair redundancyTest case no 4.2.2 Clock SynchronizationTest case no 4.3.1.4 Verification of TDM Cross ConnectionsTest case no 4.3.1.8 Verification of Protection GroupTest case no 4.3.1.9 Coding schemes supportTest case no 4.5.2 Verification of E1 Physical Path Termination Point Status (ET-MC1)
Test case no 4.5.4 Verification of TDM Cross ConnectionsTest case no 4.5.8 Verification of Protection GroupTest case no 4.6.1 Verification of ATM Layer (User Part)Test case no 4.6.2 Verification of ATM Layer (Signaling Part)Test case no 4.6.3 Verification of IP Layer (SIGTRAN)Test case no 4.7.1 Verification of Media Stream Device Pool Data- Pending for UMTS servicesTest case no 4.7.2 Verification of Interactive Messaging- Pending for UMTS servicesTest case no 4.8.1.3Test case no 4.8.1.5Test case no 4.8.1.7Test case no 4.8.2 Load measurement
-
8/6/2019 Progress Report- Apr'2011
34/55
loyment Remarks
IN Circle
IN Circle
IN Circle
IN Circle
IN Circle
IN Circle
IN Circle
IN Circle
IN Circle
IN Circle
IN Circle
IN Circle
From T&DCircle/
TerritorialCircle
-
8/6/2019 Progress Report- Apr'2011
35/55
IN Circle
-
8/6/2019 Progress Report- Apr'2011
36/55
-
8/6/2019 Progress Report- Apr'2011
37/55
-
8/6/2019 Progress Report- Apr'2011
38/55
S.No. Circle SSA Site/ Location Type of equipment
December'2008
1 UPW Agra Baroli Ahir TE DSLAM 108 Yes2 UPW Agra Samsabad TE DSLAM 108 Yes
3 UPW Agra Kagarol TE DSLAM 64 Yes
4 UPW Etah Kasganj TE DSLAM 432 Yes
5 UPW Mathura Township TE DSLAM 432 Yes
6 UPW Mathura Dampier Nagar TE DSLAM 432 Yes
7 UPW Mathura Krishna Nagar TE DSLAM Yes
Nov '2009
1 UPW Aligarh Main TE Switch (RPR Tier I) Yes
Project/Scheme
P.O. No.&date
Vendor/Technology
InstalledCapacity
( No. ofPorts.)
Offerfor A(YesNo)
(Switch/ Node/Router/ DSLAM)
Main/Expn
-
8/6/2019 Progress Report- Apr'2011
39/55
Staff Deployment Remarks
Neeraj Singh T & D Circle A/T of pending point done. Letter send to offNeeraj Singh T & D Circle A/T of pending point done. Letter send to off
Neeraj Singh T & D Circle A/T of pending point done. Letter send to off
Neeraj Singh T & D Circle
Neeraj Singh T & D Circle
Neeraj Singh T & D Circle
Neeraj Singh T & D Circle A/T of pending point done. Letter send to off
Neeraj Singh IN Circle Pending point detail & Undertaking Letter se
Name of theofficer deputedfor A/T
From T&DCircle/TerritorialCircle
-
8/6/2019 Progress Report- Apr'2011
40/55
Circle SSA Site/ Location Type of equipment etc
January'2009
1 UPW Agra Tax Bhawan UTL/ ZTE BSCB
March'2009
1 UPW Aliagarh Main TE UTL/ ZTE BTS New
2 UPW Aliagarh Kasimpur TE UTL/ ZTE BTS New
3 UPW Aliagarh MCC UTL/ ZTE BTS New
4 UPW Aliagarh Dhanipur Mandi UTL/ ZTE BTS New
5 UPW Aliagarh Delhi Gate UTL/ ZTE BTS New
6 UPW Aliagarh Sasni Gate UTL/ ZTE BTS New
7 UPW Aliagarh Nagla Nai (MainTE), Hathras UTL/ ZTE BTS New
February'2010
1 UPW Agra Tax Bhawan ITI / ZTE BSCB Expn 50K to 100K Type
March'2010
1 UPW Agra Tax Bhawan UTL/ ZTE BSCB
April'2010
1 UPW Agra Tax Bhawan UTL/ ZTE BSCB
S.No.
Project/Scheme
P.O. No.&date
Vendor/Technology
Installed Capacit( No. K lines)(MSC/
BSC/ BTS/Coverage
etc.)
New/Redeploy/
Swap/ Expn.
Pendingpoints
Pendingpoints
-
8/6/2019 Progress Report- Apr'2011
41/55
BSNL pending points Sta
EVDO service is still pending Neeraj S
All documents pending
Neeraj S
Neeraj S
Neeraj S
Neeraj S
Neeraj S
Neeraj S
Neeraj S
Full report with pending point sent by mail Neeraj S
Full report with pending point sent by mail Neeraj S
Full report with pending point sent by mail Neeraj S
A/TCertific
ateissued(yes or
No)
Date ofissue of A/TCertificate
Vendorpendingpoints
Name oofficerdeputedA/T
-
8/6/2019 Progress Report- Apr'2011
42/55
A/T Status of Transmission Systems/SchemesS. No. SSA Site/ Location Project/ Sc
December'2008
1UPW Aligarh Mazupur Subkara to Andala TE SSA depth (Sche
UPW Aligarh Mazupur Subkara to Andala TE SSA fiber (Schem
2UPW Aligarh Barauli Khas to Amrauli TE SSA depth (Sche
3
UPW Aligarh
Gadrana UHF to Panethi Road
SSA depth (Sche
September'2009
1 UPW Kanpur Chibramau-Kannauj-Chaubepur-Kanpur (Part of Agra- Kanpur DWDM 40 Chl Scheme) Project Schem
Circle /Project
-
8/6/2019 Progress Report- Apr'2011
43/55
RKM (Fibre A/T KM) No of System
Yes 26.12.2008 Yes 30.12.2008
5.456 KM (approx) Yes 26.12.2008 Yes 30.12.2008
Yes 26.12.2008 Yes 30.12.2008
Yes 26.12.2008 Yes 30.12.2008
Yes 17.08.2009 Yes 29.08.2009
SKM (System A/TKM -per Fibre pair)
Offered for A/T(Yes/ No)
Date of A/Toffering
A/T Completed(Yes /No)
Date Of A/TCompletion
-
8/6/2019 Progress Report- Apr'2011
44/55
A/T Status of EP (Poleless)Circle SSA Site/ Location Vendor Detail of Eqpmt(Lines)S.N
o.W.O. No.&
dateOfferedfor A/T(Yes/No)
Date orMonth ofOfferingfor A/T
A/Tcompleted (Yes/
No)
Date of CompletioNo. of
DELOfferedfor A/T
No. ofDELA/Ted
No. ofDELCleared
Total Line A/Ted:(Positive Output)
-
8/6/2019 Progress Report- Apr'2011
45/55
S.No. Circle SSA Site/ Location P.O. No.& date Vendor Type of equipment
Main/ Expn.
April'2009
1 UPW NTR Sanjay Place, Agra TAX EWSD ExpansionMarch'2010
1 UPW NTR Tax Bhawan, Agra ZTE IPTAX ZTE Main 2
May'2010
1 UPW Agra Tax Bhawan, Agra ZTE IPTAX ZTE Pending Points 2
July'2010
1 UPW Agra Tax Bhawan, Agra ZTE IPTAX ZTE Pending Points 2
Aug'2010
1 UPW Agra Tax Bhawan, Agra ZTE IPTAX ZTE Pending Points 2
2 UPW Aligarh Main TE, Aligarh ZTE IPTAX ZTE New
Sep'2010
1 UPW Agra Tax Bhawan, Agra ZTE IPTAX ZTE Pending Points 2
Dec'2010
1 UPW Agra Tax Bhawan, Agra ZTE IPTAX ZTE Pending Points 2
InsCapac
(Nli
( Local/TAX/RSU)etc.
Technology (OCB/EWSD/AXE etc.)
-
8/6/2019 Progress Report- Apr'2011
46/55
Pending points Staff Deployment
All Documents Pending Neeeraj Singh T & D Circle
Details to be sent in IPTAX PP performa Neeeraj Singh T & D Circle
Details to be sent in IPTAX PP performa Neeeraj Singh T & D Circle
Details to be sent in IPTAX PP performa Neeeraj Singh T & D Circle
Details to be sent in IPTAX PP performa Neeeraj Singh T & D Circle
Details to be sent in IPTAX PP performa Neeeraj Singh T & D Circle
Details to be sent in IPTAX PP performa Neeeraj Singh T & D Circle
Details to be sent in IPTAX PP performa Neeeraj Singh T & D Circle
Name of theofficer deputedfor A/T
From T&D CTerritorial C
-
8/6/2019 Progress Report- Apr'2011
47/55
A/T Status of POIS.No. Circle SSA Site/ Location W.O. No.& date Vendor /Operator Type of equipment
April'2010
7 UPW Mathura TTSL POI NLD MAIN
July'2010
8 UPW Etawah POI CMTS MAIN 2 E1s
Aug'2010
9 UPW Etawah POI CMTS MAIN 2 E1s
Sep'2010
10 UPW Etawah TTSL POI NLD MAIN 1 E1s
11 UPW Etawah TTSL POI NLD MAIN 1 E1s
12 UPW AGRA VIDEOCON POI CMTS MAIN 4 E1 (ISD
Oct'2010
13 UPW Etawah AIRCEL POI CMTS MAIN 2 E1s
Nov'2010
14 UPW Etawah TTSL POI NLD MAIN 1 E1s
Dec'2010
15 UPW Etawah TTSL POI NLD MAIN 1 E1s
16 UPW Mainpuri SSTL POI CMTS MAIN 1 E1s
17 UPW Aligarh SSTL POI CMTS MAIN 1 E1s
18 UPW Etah SSTL POI CMTS MAIN 1 E1s
Jan'201119 UPW Etah SSTL POI CMTS MAIN 1 E1s
Apr'2011
20 UPW AGRA IDEA POI CMTS EXP
21 UPW AGRA IDEA POI CMTS EXP
InstalleCapacity
( No.E1s )
Type ofSwitch(MSC/GMSC/Local/TAX)
Type of POI(NLD/ ILD/Basic/CMTSetc.)
Main/Expn
C-DOT Exch, DampierNagar, Mathura
1 E1s (Aclink)
AXE10 Exch, Main TE,Etawah
UNINOR(UNITECH)
AXE10 Exch, Main TE,Mainpuri
UNINOR(UNITECH)
OCB Exch, Main TE,Etawah
OCB-RSU Exch,Bhartana
EWSD Exch, SanjayPlace, Agra
AXE10 Exch, Main TE,Etawah
CDOT Exch, Main TE,Auraiya
CDOT Exch, Main TE,Bidhuna
AXE10 Exch, Main TE,Mainpuri
L-2 EWSD Exch, MainTE, Aligarh
AXE10 Exch, Main TE,Etah
AXE10 Exch, Main TE,Etawah
EWSD Exch, SanjayPlace, Agra
54 E1- MAT
OCB TAX, TAXBhawan, Agra
30 E1- MAT
-
8/6/2019 Progress Report- Apr'2011
48/55
Staff Deployment
Neeraj Singh IN Circle
Neeraj Singh IN Circle
Neeraj Singh IN Circle
Neeraj Singh IN Circle
Neeraj Singh IN Circle
Neeraj Singh IN Circle
Neeraj Singh IN Circle
Neeraj Singh IN Circle
Neeraj Singh IN Circle
Neeraj Singh IN Circle
Neeraj Singh IN Circle
Neeraj Singh IN Circle
Neeraj Singh IN Circle
Neeraj Singh IN Circle
Neeraj Singh IN Circle
Name of theofficerdeputed forA/T
From INCircle/TerritorialCircle
-
8/6/2019 Progress Report- Apr'2011
49/55
S.No. Circle SSA Vendor Type of equipmentSite/Location
P.O.No.&date
Installed
Capacity( no. of
K lines)
Type ofequipment( Local/
TAX)
Technology(OCB/EWSD/
AXEetc.)
Main/expansion
-
8/6/2019 Progress Report- Apr'2011
50/55
Offeredfor A/T(Yes/No)
Date orMonthofOfferingfor A/T
A/Tcompleted (Yes/
No)
Date ofA/TCompletion
A/TCertific
ateissued(yes or
No)
Date ofissue of
A/TCertific
ate
Pendingpoints
Staff Conducting RemarksName of
theofficerdeputed
for A/T
FromT&DCircle/Territori
al Circle
-
8/6/2019 Progress Report- Apr'2011
51/55
S.No. Circle SSA Site/ Location Project/ Scheme P.O. No.& date Vendor/ Technology Installed CapacType of equipment
(MSC/ BSC/BTS/
Coverageetc.)
New/Redeploy/
Swap/ Expn.
-
8/6/2019 Progress Report- Apr'2011
52/55
A/T Status of WLLDate or Month of Offering for A/T A/T completed (Yes/ No) Date of A/T Completion A/T Certificate issued (yes or No) Date of is
-
8/6/2019 Progress Report- Apr'2011
53/55
Staff Deployment Remarks
From T&D Circle/ Territorial Circle
-
8/6/2019 Progress Report- Apr'2011
54/55
Month FEBRUARY_10
1 UPW AGRA SQoS of Basic, Broadband and CMTS Services at Agra SSA 21.12.09 to 24.12.09
MonthJune_10
1 UPW AGRA SQoS of Basic, Broadband and CMTS Services at Agra SSA 14.06.10 to 16.06.10
MonthJan_11
1 UPW AGRA SQoS of Basic, Broadband and CMTS Services at Agra SSA 12.01.11 to 15.01.11
-
8/6/2019 Progress Report- Apr'2011