STEEL WIRING FOR CONCRETE FLOORING FRONT VIEW(AT 4TH FLOOR)

CONCRETE FLOORING ON 4TH FLOOR

PREPARING FORPREPARING FORPREPARING FOR PREPARING FOR BUILDING NET AT SIDE OF BUILDING NET AT SIDE OF 

CONSTRUCTIONCONSTRUCTION

WALL FINISHING AND PREPARING OPENING FOR GLASS AND DOOR GLASS ON 1ST FLOOR FRONT FASADEAND DOOR GLASS ON 1ST FLOOR FRONT FASADE

COLOUMN BASEMENT WALL FILLER 1ST BASE PAINTINGCOLOUMN BASEMENT WALL FILLER 1ST BASE PAINTING

COLOUMN AND BEAM EXPOSED IN BASEMENT FLOOR COLOUMN AND BEAM EXPOSED IN BASEMENT FLOOR USING WALL FILLER 1ST BASE PAINTINGUSING WALL FILLER 1ST BASE PAINTINGUSING WALL FILLER 1ST BASE PAINTINGUSING WALL FILLER 1ST BASE PAINTING