Download - PROGRAMME OF WORK : STANDARDS
PROGRAMME OF WORK : STANDARDS2017-03-01Report Date :
Cost Centre(s) : 7135
1Page No : Of Total Count: 278 24
SABS/TC 002
SABS/TC 004
SABS/TC 021
SABS/TC021/SC 01
SABS/TC021/SC 03
2203223
2016-08-29
2017-12-31
2011-09-30
2016-05-31
Rolling bearings - Explanatory noteson ISO 281 Part 1: Basic dynamicload rating and basic rating life
Rolling bearings - Explanatory noteson ISO 281 Part 2: Modified ratinglife calculation, based on a systemsapproach to fatigue stressesStructural bearings - Bridgebearings - Materials, manufactureand installation
Community Protection Against Fire- Industrial Premises
Vehicle fire suppression systems
Automatic sprinkler installations forfire-fighting purposes
Fire detection and fire alarmsystems Part 1: Introduction
kitchen fire syppression systems
Kitchen fire syppression systems
Fire performance classification ofthermal insulated building envelopesystemsFire performance of externalcladding systems - Test method fornon-loadbearing external claddingsystems fixed to and supported by astructural steel frame.Fire performance of externalcladding systems - Test method fornon-loadbearing external claddingsystems applied to the masonryface of a building.Testing of valves - Fire type-testingrequirements
2009-06-08
2009-06-08
2010-03-05
2016-10-25
2016-09-09
2016-08-02
2016-09-06
2016-09-07
2014-01-15
2016-09-20
2017-02-16
2017-02-16
2015-06-25
SANS Number
CommitteeNumber
Work Order Number Title
TargetDate
Current StageDate
RECOMMENDED
Current StageCode Comment
10.00
10.00
10.00
00.30
20.00
30.20
50.60
00.30
00.30
10.00
00.30
00.30
00.30
DateProjectApproved
2016-09-09
2009-05-22
2016-02-12
DateStandardapproved
SUNDANI N
SUNDANI N
SUNDANI N
MABUNDA G
MABUNDA G
MABUNDA G
MABUNDA G
MABUNDA G
MABUNDA G
MABUNDA G
MABUNDA G
MABUNDA G
MABUNDA G
Standards Writer
Ed
1
1
1.04
1
1
2
3
1
1
3
1
1
1
SANS 1009-1/ISO/TR 1281-1:2008, IDT,Ed. 1
SANS 1009-2/ISO/TR 1281-2:2008, IDT,Ed. 1
SANS 1806
SANS 1911
SANS 10287
SANS 50054-1/EN 54-1:2011, IDT, Ed. 3
SANS 428
/BS 8414-2:2015, IDT
/BS 8414-1:2015, IDT
/ISO 10497:2010, IDT
(SABS 1806)
(SABS 0287)
(SABS EN 54-1)
PROGRAMME OF WORK : STANDARDS2017-03-01Report Date :
Cost Centre(s) : 7135
2Page No : Of Total Count: 278 24
SABS/TC021/SC 04
SABS/TC 022
2016-09-05
2018-05-31
2017-02-28
2018-09-30
2018-09-30
2018-09-30
2017-01-31
2017-08-30
2017-01-30
Portable rechargeable fireextinguishers - Halogenatedhydrocarbon type extinguishersThe production of reconditioned fire-fighting equipment Part 1: Portableand wheeled (mobile) rechargeablefire extinguishersThe production of reconditioned fire-fighting equipment Part 2: Fire hosereels and above-ground hydrantsPortable refillable fire extinguishers
The use and control of fire-fightingequipment Part 2: Fire hose reelsand above-ground hydrantsFire-fighting hoses for fixed systems
Minimum requirements for towingvehicles (tow trucks) - Category N1
Minimum requirements for towingvehicles (tow trucks) - Category N2
Minimum requirements for towingvehicles (tow trucks) - Category N3
Wheel flaps fitted to motor vehicles
Tachograph centres and mobileworkshops
Uniform provisions concerning theapproval of I. Safety-belts, restraintsystems, child restraint systemsand isofix child restraint systems foroccupants of power-driven vehiclesII. Vehicles equipped with safety-belts, safety-belt reminder, restraintsystems, child restraint systemsand isofix child restraint systemsUniform provisions concerning theapproval of rear fog lamps forpower-driven vehicles and theirtrailers
2013-04-03
2016-05-27
2016-12-08
2016-02-26
2016-11-07
2009-05-18
2016-10-21
2016-10-21
2016-10-21
2016-05-21
2011-01-13
2016-09-07
2016-07-01
SANS Number
CommitteeNumber
Work Order Number Title
TargetDate
Current StageDate
RECOMMENDED
RECOMMENDED
Current StageCode Comment
10.00
20.00
10.00
20.00
00.30
10.00
20.00
20.00
20.00
35.20
30.20
00.60
20.00
DateProjectApproved
2016-05-27
2016-02-26
2016-10-21
2016-10-21
2016-10-21
2013-07-05
2010-09-01
2016-07-01
DateStandardapproved
MABUNDA G
MABUNDA G
MABUNDA G
MABUNDA G
MABUNDA G
MABUNDA G
MALUMANE T
MALUMANE T
MALUMANE T
MALUMANE T
MALUMANE T
MALUMANE T
MALUMANE T
Standards Writer
Ed
3.03
4
5
2
4
1
1
1
1
2
2
4
1
SANS 1151
SANS 1475-1
SANS 1475-2
SANS 1910
SANS 10105-2
SANS 50694/EN 694:2001, IDT
SANS 1379-1
SANS 1379-2
SANS 1379-3
SANS 1496
SANS 10241
SANS 20016/ECE R16:2009, IDT, Ed. Rev6
SANS 20038/ECE R38:2011, IDT
(SABS 1151)
(SABS 1475-1)
(SABS 1475-2)
(SABS 0105-2)
(SABS 1496)
(SABS 0241)
(SABS ECE R 16)
PROGRAMME OF WORK : STANDARDS2017-03-01Report Date :
Cost Centre(s) : 7135
3Page No : Of Total Count: 278 24
SABS/TC 022
SABS/TC022/SC 01
Uniform provisions concerning theapproval of: i. Rear underrunprotective devices (rupds) ii.Rehicles with regard to theinstallation of an rupd of anapproved type iii. Vehicles withregard to their rear underrunprotection (rup)Uniform provisions concerning theapproval of: I. Specific componentsof motor vehicles using compressednatural gas (CNG) in theirpropulsion system; II. Vehicles withregard to the installation of specificcomponents of an approved type forthe use of compressed natural gas(CNG) in their propulsion systemUniform technical prescriptionsconcerning the burning behaviourand/or the capability to repel fuel orlubricant of materials used in theconstruction of certain categories ofmotor vehiclesUniform provisions concerning theapproval of vehicles with regard tothe protection of the occupants inthe event of a lateral collisionUniform provisions concerning theapproval of: i. Rear underrunprotective devices (rupds) ii.Vehicles with regard to theinstallation of an rupd of anapproved type iii. Vehicles withregard to their rear underrunprotection (rup).Uniform provisions concerning theapproval of large passengervehicles with regard to the strengthof their superstructure
Uniform provisions concerning theapproval of vehicles of categoriesM, N and O with regard to brakingUniform provisions concerning theapproval of passenger cars withregard to braking
2016-08-24
2011-02-02
2016-08-24
2016-07-29
2016-07-22
2016-05-24
2016-06-08
2015-11-19
2015-11-19
SANS Number
CommitteeNumber
Work Order Number Title
TargetDate
Current StageDate
RECOMMENDED
RECOMMENDED
RECOMMENDED
ON HOLD
ON HOLD
Current StageCode Comment
10.00
10.00
10.00
00.60
00.00
00.40
00.30
00.30
00.30
DateProjectApproved
DateStandardapproved
MALUMANE T
MALUMANE T
MALUMANE T
MALUMANE T
MALUMANE T
MALUMANE T
MALUMANE T
MALUMANE T
MALUMANE T
Standards Writer
Ed
1
2
1
1
1
1
4
3
1
SANS 20058/ECE R58:1111, IDT
SANS 20110/ECE R110:2008, IDT, Ed. 1
SANS 20118/ECE R 118:2012, IDT
/ECE R95:2011, IDT
/ECE R58:1111, IDT
/ECE R66:2010, IDT
SANS 20013/ECE R13:2011, IDT, Ed. 7
SANS 20013-H/ECE R13-H:2008, IDT, Ed.Rev 1
/ECE R34 REV 4:2012, IDT
(SABS ECE R 13)
PROGRAMME OF WORK : STANDARDS2017-03-01Report Date :
Cost Centre(s) : 7135
4Page No : Of Total Count: 278 24
SABS/TC022/SC 02
SABS/TC022/SC 03
SABS/TC022/SC 05
SABS/TC022/SC 08
SABS/TC022/SC 09
SABS/TC 031
2016-09-05
2016-08-29
Uniform provisions concerning theapproval of mechanical couplingcomponents of combinations ofvehicles
Automotive glass adhesivespecification for use in theinstalation of replacement glass bythe direct glazing methodAdhesion in peel of sealant
The overhaul of diesel fuel injectionequipment
Electrical connectors for towing andtowed vehicles (7-pole connectors)
Lights for motor vehicles Part 2:Headlights
Lights for motor vehicles Part 3:Secondary lights
Uniform provisions concerning theapproval of front and rear position(side) lamps, stop-lamps and end-outline marker lamps for power-driven vehicles and their trailersUniform provisions concerning theapproval of vehicles with regard tothe installation of lighting and light-signalling devices
Motor vehicle tyres and rims -Dimensions and loads Part 1:GeneralMotor vehicle tyres and rims -Dimensions and loads Part 3:Commercial vehicle tyres
2015-11-19
2016-02-02
2014-10-13
2016-03-15
2011-02-01
2016-03-15
2016-03-31
2016-08-24
2016-06-08
2016-09-07
2016-11-17
SANS Number
CommitteeNumber
Work Order Number Title
TargetDate
Current StageDate
Project was revived
Stage 50.20 anddates transferredfrom amendmentsstage codes table.Did appear on thewebsite for therequired period.
RECOMMENDED
Current StageCode Comment
00.30
00.60
10.00
00.00
50.20
10.00
10.00
10.00
00.30
30.20
30.20
DateProjectApproved
DateStandardapproved
CROSS P
MALUMANE T
CROSS P
CROSS P
MALUMANE T
MALUMANE T
MALUMANE T
MALUMANE T
MALUMANE T
SUNDANI N
SUNDANI N
Standards Writer
Ed
2
2
1.01
2
1.05
1.05
1.06
4
4
2.02
2.02
SANS 20055/ECE R55:2001, IDT, Ed. 2
SANS 1591
SANS 6216
SANS 1327
SANS 1376-2
SANS 1376-3
SANS 20007/ECE R7:2006, IDT, Ed. Rev 4
SANS 20048/ECE R48:2008, IDT, Ed. Rev5
SANS 1550-1
SANS 1550-3
(SABS 1591)
(SABS SM 1216)
(SABS 1327)
(SABS 1376-2)
(SABS 1376-3)
(SABS ECE R 7)
(SABS ECE R 48)
(SABS 1550-1)
(SABS 1550-3)
PROGRAMME OF WORK : STANDARDS2017-03-01Report Date :
Cost Centre(s) : 7135
5Page No : Of Total Count: 278 24
SABS/TC 031
SABS/TC 044
SABS/TC 045
SABS/TC045/SC 01
SABS/TC 058
SABS/TC 059
SABS/TC059/SC 01
2016-04-30
2016-09-30
2016-10-30
2018-06-30
2016-09-30
2018-06-29
2017-07-31
2016-12-31
2016-07-31
Part-worn tyres fitted to vehicles
Repairs to tyres for motor vehicles,tubes and valves
Uniform provisions concerning theapproval for the production ofretreaded pneumatic tyres forcommercial vehicles and theirtrailers
Thermoplastics hoses, textile-reinforced, for general -purposewater applications - Specification
Categorization and conformityassessment criteria for all pressureequipmentTransportable pressure receptaclesfor compressed, dissolved andliquefied gases - Basic design,manufacture, use and maintenanceCriteria for the operation ofinspection authorities performinginspection in terms of the PressureEquipment RegulationsThe reconditioning of external LPGcylinder valves
Transportable gas cylinders -Periodic inspection and testing ofcomposite gas cylindersGas cylinders - Refillable weldedaluminium-alloy cylinders - Design,construction and testing
Energy efficiency in buildings
Rational designs and assessmentsfor energy usage in buildings interms of SANS 10400-XA: Amodelling and simulation protocol
2016-09-07
2014-08-18
2016-11-18
2015-10-22
2017-02-17
2015-12-22
2016-09-30
2016-11-07
2016-10-25
2017-02-25
2013-02-25
2014-08-08
SANS Number
CommitteeNumber
Work Order Number Title
TargetDate
Current StageDate
RECOMMENDED
Current StageCode Comment
35.20
30.20
50.60
10.00
20.00
30.20
20.00
00.30
00.30
50.60
00.99
20.00
DateProjectApproved
2013-08-02
2013-06-21
2016-06-10
2017-02-17
2013-06-07
2016-09-30
2016-12-09
2013-02-08
2014-08-08
DateStandardapproved
SUNDANI N
SUNDANI N
SUNDANI N
LUTCHMAN S
MATHEBULA B
MATHEBULA B
MATHEBULA B
MATHEBULA B
MATHEBULA B
MATHEBULA B
NGCOBO G
NGCOBO G
Standards Writer
Ed
1
2
2
3
3
8
3
2
2
1
2
1
SANS 1633
SANS 10408
SANS 20109/ECE R109:2010, IDT, Ed. 1
SANS 271/ISO 6224:2011, IDT
SANS 347
SANS 10019
SANS 10227
SANS 10297
SANS 11623/ISO 11623:2015, IDT, Ed. 1
SANS 20703/ISO 20703:2006, IDT
SANS 204
SATS 1705
(SABS ECE R 109)
(SABS 019)
(SABS 0227)
(SABS 0297)
PROGRAMME OF WORK : STANDARDS2017-03-01Report Date :
Cost Centre(s) : 7135
6Page No : Of Total Count: 278 24
SABS/TC059/SC 02
SABS/TC059/SC 03
SABS/TC059/SC 04
SABS/TC059/SC 05
SABS/TC 060
SABS/TC 078
2017-10-31
2017-03-31
2016-12-31
2018-05-31
2018-09-30
2016-12-31
2018-02-28
Safety of private swimming pools
The application of the NationalBuilding Regulations Part F: SiteoperationsThe application of the NationalBuilding Regulations Part G:ExcavationsThe application of the NationalBuilding Regulations Part H:FoundationsThe application of the NationalBuilding Regulations Part L: Roofs
The application of the NationalBuilding Regulations Part M:StairwaysThe application of the NationalBuilding Regulations Part O:Lighting and ventilationThe application of the NationalBuilding Regulations Part Q: Non-water-borne means of sanitarydisposalThe application of the NationalBuilding Regulations Part T: FireprotectionThe application of the NationalBuilding Regulations Part V: SpaceheatingThe application of the NationalBuilding Regulations Part W: FireinstallationThe application of the NationalBuilding Regulations Part X:Environmental sustainability PartXA: Energy usage in buildings
2015-09-01
2017-01-17
2017-01-17
2015-05-26
2016-08-20
2017-01-26
2017-02-21
2017-01-17
2016-12-02
2017-01-31
2014-11-11
2015-05-29
SANS Number
CommitteeNumber
Work Order Number Title
TargetDate
Current StageDate
Current StageCode Comment
50.60
50.60
50.60
50.60
30.20
10.00
10.00
50.60
20.00
10.00
50.60
20.00
DateProjectApproved
2013-11-08
2015-02-13
2016-12-02
2015-05-29
DateStandardapproved
NGCOBO G
RAMATLO D
RAMATLO D
RAMATLO D
RAMATLO D
RAMATLO D
RAMATLO D
RAMATLO D
RAMATLO D
RAMATLO D
RAMATLO D
RAMATLO D
Standards Writer
Ed
3
3.01
3.01
3.01
4
3.01
3.01
3.01
4
3.01
3.01
2
SANS 10134
SANS 10400-F
SANS 10400-G
SANS 10400-H
SANS 10400-L
SANS 10400-M
SANS 10400-O
SANS 10400-Q
SANS 10400-T
SANS 10400-V
SANS 10400-W
SANS 10400-XA
(SABS 0134)
PROGRAMME OF WORK : STANDARDS2017-03-01Report Date :
Cost Centre(s) : 7135
7Page No : Of Total Count: 278 24
SABS/TC 078
SABS/TC 081
SABS/TC081/SC 01
2012-06-30
2012-06-30
2012-06-30
2016-09-30
2016-09-30
2016-09-30
2016-09-30
2016-09-30
2016-09-30
2016-09-30
2017-02-17
2016-09-30
Road traffic law enforcementsystems Part 5: Data capturing andrecording devices for road traffic lawenforcementRoad traffic law enforcementsystems Part 6: Data capturing andrecording devices for toll roadviolation enforcementElectronic self-indicating roadvehicle mass measuring equipmentfor use by road traffic authoritiesPart 1: Non-automatic massmeasuring equipment for staticmass measurementVerification of non-automaticelectronic self-indicating roadvehicle mass measuring equipmentfor use by road traffic authorities
Civil engineering test methods PartCO1-2 : Sampling
Civil engineering test methods PartCO2-2: Making and curing of testspecimensCivil engineering test methods PartCO1-7: Density of compactedfreshly mixed concrete.Civil engineering test methods PartCO2-7: Initial drying shrinkage andwetting expansion of concreteCivil engineering test methods PartCO2-9: Mortar tests - Compressivestrength of mortarCivil engineerings test methods PartCO2-10:Mortar tests - Initial dryingshrinkage and wetting expansion ofmortarCivil engineering test methods -Part CO1-3: Consistence of freshlymixed concrete - Slump test Civil engineering test methods PartCO2-4: Compressive strength -Specification for testing machinesCivil engineering test methods PartCO2-6: Tensile splitting strength ofhardened concrete
2010-05-28
2013-09-18
2013-10-24
2015-02-18
2015-06-23
2016-07-24
2016-05-04
2016-07-24
2016-07-24
2016-07-24
2016-07-24
2016-05-20
2016-07-24
SANS Number
CommitteeNumber
Work Order Number Title
TargetDate
Current StageDate
Current StageCode Comment
20.00
10.00
30.20
30.20
50.60
30.60
30.20
30.60
30.60
30.20
30.60
20.00
30.60
DateProjectApproved
2010-05-28
2010-05-28
2010-05-28
2015-02-13
2015-02-13
2015-09-11
2015-09-11
2015-09-11
2015-09-11
2016-02-26
2016-05-20
2015-09-11
DateStandardapproved
CROSS P
CROSS P
CROSS P
CROSS P
BALOYI B
BALOYI B
BALOYI B
BALOYI B
BALOYI B
BALOYI B
BALOYI B
BALOYI B
BALOYI B
Standards Writer
Ed
2
1
2
2
1
1
1
1
1
1
1
1
1
SANS 1795-5
SATS 1795-6
SANS 1838-1
SANS 10343
SANS 3001-CO1-2/EN 12350-1:2009, IDT
SANS 3001-CO2-2
SANS 3001-CO1-7
SANS 3001-CO2-7
SANS 3001-CO2-9
SANS 3001-CO2-10
SANS 3001-CO1-3
SANS 3001-CO2-4/EN 12390-4:1111, IDT
SANS 3001-CO2-6
(SABS 1795-5)
(SABS 1838-1)
(SABS 0343)
PROGRAMME OF WORK : STANDARDS2017-03-01Report Date :
Cost Centre(s) : 7135
8Page No : Of Total Count: 278 24
SABS/TC081/SC 01
SABS/TC081/SC 02
SABS/TC081/SC 03
SABS/TC081/SC 04
2016-09-30
2016-09-30
2016-09-30
2016-09-30
2016-09-30
2016-09-30
2016-09-30
2016-09-30
2016-09-30
2016-09-30
2017-08-30
2016-12-10
Civil engineering test methods -Part CO2-3: Compressive strengthof hardened concreteCivil engineering test methods -Part CO1-1: Mixing fresh concretein the laboratoryCivil engineering test methods -Part CO2-1: Dimensions, tolerancesand uses of cast test specimensCivil engineering test methods PartCO1-6: Consistence of freshlymixed concrete - Flow table testCivil engineering test methods PartCO2-8: Density of hardenedconcreteCivil engineering test methods PartCO1-8: Air content of freshly mixedconcrete - Pressure methodCivil engineering test methods -Part CO1-4: Consistence of freshlymixed concrete - Vebe testCivil engineering test methods PartCO2-5: Flexural strength ofconcreteCivil engineering test methods PartCO3-5: The drilling, preparation,and testing for compressivestrength of cores taken fromhardened concreteConcrete masonry construction
The installation of glazing inbuildings
Civil engineering test methods PartGR 60: Determination of sulfatecontent of a soil paste and groundwaterSulfates content of fines inaggregates Part 1: Water-solublesulfates in fines in aggregates
2016-07-24
2016-07-24
2016-05-04
2016-07-24
2016-07-24
2016-05-04
2016-07-24
2016-07-24
2016-07-24
2015-05-22
2017-02-27
2016-05-31
2007-08-03
SANS Number
CommitteeNumber
Work Order Number Title
TargetDate
Current StageDate
RECOMMENDED
The standard isbeing revised byBryan Perrie,DaveWright and FrankNetterberg.
Current StageCode Comment
30.60
30.60
30.20
30.60
30.60
30.20
30.60
30.60
30.60
30.20
10.00
30.20
20.00
DateProjectApproved
2016-02-26
2016-02-26
2016-02-26
2015-09-11
2015-09-11
2015-09-11
2015-02-13
2015-07-10
2014-12-12
2014-05-09
2016-05-20
2007-08-03
DateStandardapproved
BALOYI B
BALOYI B
BALOYI B
BALOYI B
BALOYI B
BALOYI B
BALOYI B
BALOYI B
BALOYI B
NGCOBO G
MAHLANGU S
BALOYI B
BALOYI B
Standards Writer
Ed
1
1
1
1
1
1
1
1
1
2
5
1
3
SANS 3001-CO2-3
SANS 3001-CO1-1
SANS 3001-CO2-1
SANS 3001-CO1-6
SANS 3001-CO2-8
SANS 3001-CO1-8
SANS 3001-CO1-4
SANS 3001-CO2-5
SANS 3001-CO3-5
SANS 10145
SANS 10137
SANS 3001-GR60
SANS 5850-1
(SABS 0145)
(SABS 0137)
(SABS SM 850-1)
PROGRAMME OF WORK : STANDARDS2017-03-01Report Date :
Cost Centre(s) : 7135
9Page No : Of Total Count: 278 24
SABS/TC081/SC 04
SABS/TC081/SC 05
SABS/TC081/SC 06
SABS/TC081/SC 07
SABS/TC081/SC 08
SABS/TC081/SC 09
SABS/TC081/SC 10
SABS/TC 082
2016-12-10
2016-12-10
2017-12-30
2017-12-30
2016-10-31
2016-09-05
2016-08-26
2016-05-01
2016-05-01
2016-05-01
pH Value of fines in aggregates forbase-courses
Electric conductivity of fineaggregate
Geotextiles and geotextile-relatedproducts - Identification on site
Design, selection and installation ofgeomembranes
The waterproofing of buildings(including damp-proofing andvapour barrier installation)Weldable polymer membranesused to waterproof flat roofs,basements, tanks, gutters andwaterways
Civil engineering test methods PartAS24: Determination of themoisture susceptibility of asphaltmixes (modified Lottman)Civil engineering test methods -Part AS5: Determination of thedynamic creep of asphaltCivil engineering test methods PartAS3: Determination of thecompaction characteristics ofasphalt mixes using the Superpavegyratory compactorCivil engineering test methods PartAS4: Determination of the indirecttensile strength of asphaltPerformance Grade (PG)Specifications for Bitumen in SouthAfrica
2012-12-07
2012-12-07
2016-12-27
2016-05-06
2016-02-17
2015-09-01
2014-08-15
2016-02-02
2015-11-17
2015-11-16
2015-04-07
2017-01-20
SANS Number
CommitteeNumber
Work Order Number Title
TargetDate
Current StageDate
RECOMMENDED
Current StageCode Comment
20.00
20.00
50.60
20.00
30.20
00.30
10.00
30.20
30.20
30.20
50.60
10.00
DateProjectApproved
2012-12-07
2012-12-07
2016-09-09
2016-05-06
2013-03-15
2016-01-29
2015-09-11
2015-09-04
2014-10-03
DateStandardapproved
BALOYI B
BALOYI B
LUTCHMAN S
LUTCHMAN S
LUTCHMAN S
LUTCHMAN S
BALOYI B
BALOYI B
BALOYI B
BALOYI B
BALOYI B
BALOYI B
Standards Writer
Ed
3
2
1
2
4
1
4.05
1
1
1
1
1
SANS 5854
SANS 6240
SANS 1784/ISO 10320:1999, IDT
SANS 10409
SANS 10021
SANS 227
SANS 3001-AS24
SANS 3001-AS5
SANS 3001-AS3
SANS 3001-AS4
SATS 3208
(SABS SM 854)
(SABS SM 1240)
(SABS 021)
(SABS 227)
PROGRAMME OF WORK : STANDARDS2017-03-01Report Date :
Cost Centre(s) : 7135
10Page No : Of Total Count: 278 24
SABS/TC082/SC 01
SABS/TC082/SC 02
SABS/TC082/SC 04
SABS/TC082/SC 05
SABS/TC082/SC 06
SABS/TC 086
SABS/TC086/SC 01
SABS/TC 094
SABS/TC094/SC 01
SABS/TC094/SC 04
SABS/TC094/SC 06
SABS/TC094/SC 15
2016-11-30
2016-09-05
Insulation for special equipmentused in refrigerated transport -Requirements and test method
Safety helmets for pedal cyclists
Personal eye-protection - Opticaltest methods
Personal eye-protection - Non-optical test methods
Personal eye protection - Sunglarefilters for industrial use
Personal eye-protection - Ultravioletfilters - Transmittance requirementsand recommended usePersonal eye-protection -Specifications
Personal eye-protection - Infraredfilters - Transmittance requirementsand recommended use
Body-worn escape type breathingapparatus
2017-01-03
2015-10-21
2016-12-14
2016-12-14
2016-12-14
2016-12-14
2017-02-01
2016-12-14
2016-11-16
SANS Number
CommitteeNumber
Work Order Number Title
TargetDate
Current StageDate
Current StageCode Comment
50.60
10.00
00.30
00.30
00.30
00.30
00.00
00.30
30.20
DateProjectApproved
2015-10-16
DateStandardapproved
SUNDANI N
CROSS P
SUNDANI N
SUNDANI N
SUNDANI N
SUNDANI N
SUNDANI N
SUNDANI N
CROSS P
Standards Writer
Ed
1
1.02
1
1
1
1
1
1
1.04
SANS 1744
SANS 1542
SANS 50167/EN 167:2001, IDT, Ed. 2
SANS 50168/EN 168:2002, IDT, Ed. 2
/EN 172:1994, IDT
/EN 170:2002, IDT
/EN 166:2001, IDT
/EN 171:2002, IDT
SANS 1737
(SABS 1542)
(SABS 1737)
PROGRAMME OF WORK : STANDARDS2017-03-01Report Date :
Cost Centre(s) : 7135
11Page No : Of Total Count: 278 24
SABS/TC 096
SABS/TC 098
SABS/TC098/SC 01
SABS/TC098/SC 02
SABS/TC098/SC 03
SABS/TC098/SC 04
2017-03-31
2016-08-31
2017-03-31
2016-07-30
2016-09-30
2016-07-31
2016-08-31
2016-11-30
2016-05-30
2017-09-15
The inspection, testing andexamination of mobile cranes
Cranes Part 1: Cantilever/Slewingjib cranes
The inspection, testing andexamination of overhead cranes
Basis of structural design andactions for buildings and industrialstructures Part 1: Basis of structuraldesignBasis of structural design andactions for buildings and industrialstructures Part 3: Wind actions
The structural use of concrete Part3: Water retaining structures
Eurocode 2:The design of concretestructures-Part 1-1:General rulesand rules for buildingsDesign of concrete structures - Part1-1: General rules and rules forbuildings (SUPPLEMENT TO SANS51992-1-1)
Light steel frame building
Composite Poles for Electric Utilityand Communication Application
Design of steel transmission polestructures
The installation of wood andlaminate flooring
Timber buildings
2016-05-27
2014-07-24
2016-05-27
2017-01-18
2013-05-24
2015-03-03
2015-12-11
2016-08-11
2014-01-31
2016-10-21
2016-09-05
2014-01-22
2012-07-20
SANS Number
CommitteeNumber
Work Order Number Title
TargetDate
Current StageDate
This stage is closedas per the minutesof the meeting ofSABS TC 98-02held on the 3rd ofMarch 2015.
RECOMMENDED
Current StageCode Comment
20.00
10.00
20.00
10.00
20.00
30.60
20.00
30.20
20.00
20.00
00.60
30.20
20.00
DateProjectApproved
2016-05-27
2016-05-27
2013-05-24
2013-06-14
2015-12-11
2016-02-12
2014-01-31
2016-10-21
2011-07-04
2012-07-20
DateStandardapproved
MATHEBULA B
MATHEBULA B
MATHEBULA B
KHOMANI K
KHOMANI K
MAHLANGU S
MAHLANGU S
MAHLANGU S
MAHLANGU S
KHOMANI K
MAHLANGU S
MAHLANGU S
Standards Writer
Ed
2
1.05
2
1.02
2
1
1
1
2
1
1
5
5
SANS 19
SANS 1599-1
SANS 10375
SANS 10160-1
SANS 10160-3
SANS 10100-3
SANS 51992-1-1/EN 1992-1-1:2004, IDT
SANS 51992-1-1-1
SANS 517
SANS 1797
SANS 10043
SANS 10082
(SABS 1599-1)
(SABS 043)
(SABS 082)
PROGRAMME OF WORK : STANDARDS2017-03-01Report Date :
Cost Centre(s) : 7135
12Page No : Of Total Count: 278 24
SABS/TC098/SC 04
SABS/TC098/SC 05
SABS/TC098/SC 06
SABS/TC 1000
SABS/TC 1001
SABS/TC1001/SC 01
SABS/TC1001/SC 02
SABS/TC1001/SC 03
SABS/TC1001/SC 04
SABS/TC
2018-01-30
2016-06-30
2016-06-30
2016-06-30
2016-06-30
2016-08-01
2017-09-01
2017-12-01
2017-05-01
The structural use of timber Part 1:Limit-states design
Eurocode 6 - Design of masonrystructures - Part 1-1: General rulesfor reinforced and unreinforcedmasonry structuresEurocode 6 - Design of masonrystructures - Part 1-2: General rules -Structural fire designEurocode 6 - Design of masonrystructures - Part 2: Designconsiderations, selection ofmaterials and execution of masonryEurocode 6 - Design of masonrystructures - Part 3: Simplifiedcalculation methods forunreinforced masonry structures
The design and construction ofreinforced soils and fills
Geotechnical Design Code
Code of practice forstrengthened/reinforced soils andother fillsExecution of special geotechnicalworks - Reinforced fill
Nylon tubing for air-brakeapplications
2016-05-20
2016-02-12
2016-02-12
2016-02-12
2016-02-12
2014-03-14
2015-09-04
2016-11-04
2016-09-09
2016-11-28
SANS Number
CommitteeNumber
Work Order Number Title
TargetDate
Current StageDate
Current StageCode Comment
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
10.00
DateProjectApproved
2016-05-20
2016-02-12
2016-02-12
2016-02-12
2016-02-12
2014-03-14
2015-09-04
2016-11-04
2016-09-09
DateStandardapproved
KHOMANI K
KHOMANI K
KHOMANI K
KHOMANI K
KHOMANI K
KHOMANI K
KHOMANI K
KHOMANI K
KHOMANI K
MALUMANE T
Standards Writer
Ed
3
1
1
1
1
2
1
1
1
2.01
SANS 10163-1
SANS 51996-1-1/EN 1996-1-1:1111, IDT
SANS 51996-1-2/EN 1996-1-2:1111, IDT
SANS 51996-2/EN 1996-2:1111, IDT
SANS 51996-3/EN 1996-3:1111, IDT
SANS 207
SANS 1747
SANS 8006-1/BS 8006-1:2010, IDT
SANS 54475/EN 14475:2006, IDT
SANS 1194
(SABS 0163-1)
(SABS 1194)
PROGRAMME OF WORK : STANDARDS2017-03-01Report Date :
Cost Centre(s) : 7135
13Page No : Of Total Count: 278 24
SABS/TC1001/SC 06
1003
SABS/TC 1008
SABS/TC 1012
SABS/TC 1014
SABS/TC1014/SC 01
SABS/TC1014/SC 02
1014F
2016-12-31
2016-11-15
2014-07-31
2016-07-31
2016-07-31
2017-02-28
2017-02-28
2012-02-29
2017-01-31
2017-04-30
2011-09-30
Use of recycled plastic materialintended to come into contact withfood Part 1: PET
Wooden doors
Plywood and composite board
Structural timber Part 5 - 1 Stress-grade assessment
Structural timber Part 5 - 2 Qualityassurance of stress-grading
Structural timber - Characteristicvalues of strength-graded timber -Sampling, full-size testing andevaluationResistance of wooden doors to softbody impact
Resistance of wooden doors toslamming
Strongroom and vault doors
Storage of firearms and ammunitionPart 1: Safes
Safes for domestic use
Locks, latches, and associatedfurniture for doors (Domestic Type)
Padlocks
2017-01-26
2014-01-14
2012-10-26
2016-03-29
2015-03-25
2015-03-09
2015-02-26
2015-02-26
2010-10-22
2014-11-28
2016-06-14
2013-04-22
2016-10-25
SANS Number
CommitteeNumber
Work Order Number Title
TargetDate
Current StageDate
Doc to go out asCD
Current StageCode Comment
50.20
10.00
30.60
30.60
50.60
00.30
30.20
35.20
20.00
20.00
30.60
30.20
00.30
DateProjectApproved
2013-02-08
2012-08-03
2013-08-23
2013-08-23
2010-10-22
2014-11-28
2015-12-11
2009-08-28
DateStandardapproved
MALUMANE T
MAHLANGU S
MAHLANGU S
MAHLANGU S
MAHLANGU S
MAHLANGU S
MAHLANGU S
MAHLANGU S
MABUNDA G
MABUNDA G
MABUNDA G
MABUNDA G
MABUNDA G
Standards Writer
Ed
1
3.06
3
1
1
4
1.02
1.02
3
2
1
4
2
SANS 1548-1
SANS 545
SANS 929
SANS 1783-5-1
SANS 1783-5-2
SANS 6122
SANS 6126
SANS 6128
SANS 949
SANS 953-1
SANS 1761
SANS 4
SANS 1533
(SABS 545)
(SABS 929)
(SABS SM 1122)
(SABS SM 1126)
(SABS SM 1128)
(SABS 949)
(SABS 953-1)
(SABS 4)
(SABS 1533)
PROGRAMME OF WORK : STANDARDS2017-03-01Report Date :
Cost Centre(s) : 7135
14Page No : Of Total Count: 278 24
SABS/TC 1015
SABS/TC 1019
2016-09-05
2017-01-31
2017-01-31
2017-09-30
2016-10-30
2016-08-29
2017-05-31
2017-05-31
2018-10-31
Management and implementationrequirements for projects that usenon-metallic materials in hazardousor pressurized applicationsGlass-fibre-reinforced thermosettingplastics (GRP) pipes Part 2: Pipes,fittings and joint assemblies for theconveyance of hazardous chemicalsubstances in industrial applications
Industrial thermoprocessingequipment - Safety requirements forcombustion and fuel-handlingsystemsThe installation of pipes andappliances for use with natural gas
Gas vehicle propulsion system
Single-stage regulators for liquefiedpetroleum gas (LPG)
Rational use of energy - Thermalefficiency on gas appliances
Appliances operating on liquefiedpetroleum gas (LPG) or natural gas(NG) - Safety aspectsThe construction, installation,commissioning and maintenance ofany biogas plan, piping, controlsand equipment, Part 1: Domesticand Commercial use of Biogas(below 0.5 GJ/hr)The construction, installation,commissioning and maintenance ofany biogas plan, piping, controlsand equipment, Part 2: Commercialand Industrial use of Biogas (above0.5 GJ/hr)The handling, storage, distributionand maintenance of liquefiedpetroleum gas in domestic,commercial, and industrialinstallations Part 1: Liquefiedpetroleum gas installations involvinggas storage containers of individualwater capacity not exceeding 500 Land a combined water capacity not
2015-02-06
2015-07-07
2014-10-03
2013-08-23
2016-11-04
2016-01-22
2013-05-24
2016-12-13
2015-10-23
2015-10-23
2017-02-24
SANS Number
CommitteeNumber
Work Order Number Title
TargetDate
Current StageDate
Current StageCode Comment
30.20
00.30
20.00
20.00
30.20
20.00
20.00
35.20
20.00
20.00
20.00
DateProjectApproved
2014-10-03
2013-08-23
2015-05-08
2016-01-22
2013-05-24
2015-10-23
2015-10-23
2017-02-24
DateStandardapproved
MALUMANE T
MALUMANE T
MALUMANE T
MALUMANE T
MALUMANE T
MALUMANE T
MALUMANE T
MALUMANE T
MALUMANE T
MALUMANE T
MALUMANE T
Standards Writer
Ed
1.01
2
3
2
1
4
1
5.01
1
1
7
SANS 519
SANS 1748-2
SANS 329
SANS 827
SANS 1104
SANS 1237
SANS 1295
SANS 1539
SANS 1753-1
SANS 1753-2
SANS 10087-1
(SABS 1237)
(SABS 1539)
(SABS 087-1)
PROGRAMME OF WORK : STANDARDS2017-03-01Report Date :
Cost Centre(s) : 7135
15Page No : Of Total Count: 278 24
SABS/TC 1019
SABS/TC 102
2017-02-28
2016-06-30
2017-05-31
2016-06-30
2016-06-30
exceeding 3 000 L per installation
The handling, storage, distributionand maintenance of liquefiedpetroleum gas in domestic,commercial, and industrialinstallations Part 2: Installation ofLPG systems in mobile units,including but not limited tocaravans, motor homes, parkhomes and mobile kitchensIndustrial gas pipelines Part 1:Design, Construction, Installation,Operation, Examination andMaintenance (Excluding Acetylene)Road vehicles - Compressednatural gas (CNG) fuel systemcomponents Part 16: Rigid fuel linePressure regulators for medicalgases
Iron ores for blast furnacefeedstocks - Determination of low-temperature reduction-disintegrationindices by static method Part 1:Reduction with CO, CO2, H2 andN2Iron ores for blast furnacefeedstocks - Determination of thereducibility by the final degree ofreduction indexIron ores - Determination ofmagnesium - Flame atomicabsorption spectrometric methodIron ores for shaft direct-reductionfeedstocks - Determination of thelow-temperature reduction-disintegration index and degree ofmetallizationIron ores - Determination ofhygroscopic moisture in analyticalsamples - Grvimetric, Karl fisccherand mass-loss methodsPetroleum, petrochemical andnatural gas industries - Internalcoating and lining of steel storagetanks
2011-07-27
2017-01-25
2010-02-08
2012-07-05
2017-01-23
2016-11-25
2016-12-23
2016-02-26
2014-11-07
2017-02-28
SANS Number
CommitteeNumber
Work Order Number Title
TargetDate
Current StageDate
BATCH 32 (2014)
RECOMMENDED
Current StageCode Comment
10.00
30.20
10.00
10.00
50.60
20.00
50.60
50.60
00.60
10.00
DateProjectApproved
2014-11-07
2015-10-23
2016-11-25
2015-10-23
2014-11-28
DateStandardapproved
MALUMANE T
MALUMANE T
MALUMANE T
MALUMANE T
MATHEBULA B
MATHEBULA B
MATHEBULA B
MATHEBULA B
MATHEBULA B
MATHEBULA B
Standards Writer
Ed
4
2
1
1.01
1
1
1
1
1
1
SANS 10087-2
SANS 10260-1
SANS 15500-16/ISO 15500-16:2001, IDT
CKS 605
SANS 4696-1/ISO 4696-1:2015, IDT
SANS 7215/ISO 7215:2015, IDT
SANS 9623/ISO 10204:2015, IDT
SANS 11257/ISO 11257:2007, IDT
/ISO 2596:2006, IDT
SANS 16961/ISO 16961:2015, MOD
(SABS 087-2)
(SABS 0260-1)
(CKS 605)
PROGRAMME OF WORK : STANDARDS2017-03-01Report Date :
Cost Centre(s) : 7135
16Page No : Of Total Count: 278 24
SABS/TC 102
SABS/TC 1020
SABS/TC 1021
SABS/TC 1031
SABS/TC 1033
SABS/TC 1034
SABS/TC 1035
2012-03-31
2016-06-30
2016-12-31
2016-09-30
Iron Ores-Determination of total ironcontent-Part 1: Titrimetric methodafter tin (11) chloride reduction
Rail-bound rolling stock lifting jacksused for underground and industrialapplicationsBeam trolleys (crawls)
Lifting tackle - Inspections
Materials for thermal insulation ofbuildings Part 4: Reflective foillaminates (rolls, sheets andsections)Thermal insulation materials forindustrial applications Part 3:Bonded preformed mineral fibrepipe sectionsPortable insulated domestic foodcontainers
Uniform provisions concerning theapproval of motor cycles with regardto noiseUniform provisions concerning theapproval of category L3 vehicleswith regard to the installation oflighting and light-signalling devicesUniform provisions concerning theapproval of category L1 vehicleswith regard to the installation oflighting and light-signalling devicesUniform provisions concerning theapproval of pneumatic tyres formotor cycles and mopeds
Evaluation of vehicle test stations
Vehicle support stands
2014-11-07
2015-11-19
2017-02-02
2016-03-02
2016-02-19
2017-02-02
2017-02-10
2013-01-15
2015-11-19
2013-01-15
2013-01-15
2016-07-18
2015-10-21
SANS Number
CommitteeNumber
Work Order Number Title
TargetDate
Current StageDate
BATCH 32 (2014)
ON HOLD
Current StageCode Comment
00.60
35.20
10.00
35.20
20.00
10.00
10.00
10.00
00.30
10.00
10.00
50.60
10.00
DateProjectApproved
2010-03-05
2013-01-25
2016-02-19
2011-01-21
DateStandardapproved
MATHEBULA B
SUNDANI N
SUNDANI N
SUNDANI N
LUTCHMAN S
LUTCHMAN S
LUTCHMAN S
SUNDANI N
SUNDANI N
SUNDANI N
SUNDANI N
SUNDANI N
CROSS P
Standards Writer
Ed
1
1
1.01
1
3
1.02
1.02
2
2
2
2
6
1.01
/ISO 2597-1:2006, IDT
SANS 1035
SANS 1824
SANS 2972
SANS 1381-4
SANS 1445-3
SANS 1645
SANS 20041/ECE R41:2012, IDT, Ed. 3
SANS 20053/ECE R53:2008, IDT, Ed. Rev2
SANS 20074/ECE R74:2009, IDT, Ed. 3
SANS 20075/ECE R75:2012, IDT, Ed. 3
SANS 10216
SANS 1614
(SABS 1381-4)
(SABS 1445-3)
(SABS 1645)
(SABS ECE R 74)
(SABS 0216)
(SABS 1614)
PROGRAMME OF WORK : STANDARDS2017-03-01Report Date :
Cost Centre(s) : 7135
17Page No : Of Total Count: 278 24
SABS/TC 1041
1043
SABS/TC 1049
SABS/TC 1054
SABS/TC 1057
SABS/TC 1066
SABS/TC 1067
1069
SABS/TC 107
SABS/TC 1070
SABS/TC1070/SC 01
2016-10-30
2018-02-28
2016-12-30
2012-09-30
2016-12-31
Welding of thermoplastics -Welding rods, fillers and solvents
Domestic air source water heatingheat pump systems
Railway safety management Part 2-2-1: Technical requirements forengineering and operationalstandards - Track, civil andelectrical infrastructure - LevelcrossingsRailway safety management Part 2-3: Requirements for systemicengineering and operational safetystandards - Rolling stock
Requirements for webbing material,chains and ropes for cargosecurement
Anodizing of aluminium and itsalloys - Assessment of quality ofsealed anodic oxide coatings bymeasurement of the loss of massafter immersion in phosphoric-chromic acid solutionMetallic coatings - Electrodepositedcoatings of chromium forengineering purposesContinuous hot-dip 55%aluminium/zinc alloy-coated steelsheet of commercial, drawing andstructural qualities
Retro-reflective and fluorescentwarning signs for road vehicles Part4: Retro-reflective chevron signsand decals
2016-09-23
2016-04-05
2016-09-09
2016-11-11
2013-05-30
2015-02-11
2015-02-11
2013-10-22
2016-07-28
SANS Number
CommitteeNumber
Work Order Number Title
TargetDate
Current StageDate
REFINEJUSTIFICATION
Current StageCode Comment
10.00
50.60
20.00
50.60
30.20
00.30
00.30
10.20
30.20
DateProjectApproved
2014-04-11
2016-09-09
2014-06-20
2010-09-01
2015-09-23
DateStandardapproved
MALUMANE T
LUTCHMAN S
SUNDANI N
SUNDANI N
CROSS P
MABUNDA G
MABUNDA G
MABUNDA G
MALUMANE T
Standards Writer
Ed
1.03
1
2
2
1
2
3
3
4
SANS 1655
SANS 1687
SANS 3000-2-2-1
SANS 3000-2-3
SANS 1140
SANS 3210/ISO 3210:2010, IDT, Ed. 2
SANS 6158/ISO 6158:2011, IDT, Ed. 2
SANS 9364/ISO 9364:2011, IDT, Ed. 4
SANS 1329-4
(SABS 1655)
(SABS ISO 3210)
(SABS ISO 6158)
(SABS ISO 9364)
(SABS 1329-4)
PROGRAMME OF WORK : STANDARDS2017-03-01Report Date :
Cost Centre(s) : 7135
18Page No : Of Total Count: 278 24
SABS/TC1070/SC 02
SABS/TC 1077
SABS/TC 1078
SABS/TC 1080
SABS/TC 1082
2016-09-05
2016-09-05
2016-09-05
2016-09-05
2016-09-05
2017-02-28
Coiled wire for automatic balingmachines
Sheet steel furniture
Stainless steel cutlery
Stainless steelware for domesticand general use
Chain-link fencing and its wireaccessories
Flat products made of steels forpressure purposes Part 1: GeneralrequirementsFlat products made of steels forpressure purposes Part 7: Stainlesssteels
Unwrought tough pitch coppers:Electrolytic tough pitch highconductivity copper
Wooden handles for hammers
Safety rules for the construction andinstallation of lifts Part 4: Lifts forpersons with disabilities (verticallifting platforms)Safety rules for the construction andinstallation of lifts Part 5: Electricand hydraulic access, goods onlyliftsSafety rules for the construction andinstallation of lifts Part 6: Rack-and-pinion liftsElectric lifts with inclined path Part 8Guidance for the application ofSANS 50081-22Safety rules for the construction andinstallation of lifts - Lifts for thetransport of persons and goods -
2016-09-27
2016-09-23
2014-01-21
2013-11-29
2016-10-21
2011-02-07
2013-03-28
2013-11-05
2016-05-27
2016-10-11
2016-10-11
2016-03-27
2016-10-11
2016-01-08
SANS Number
CommitteeNumber
Work Order Number Title
TargetDate
Current StageDate
RECOMMENDED
RECOMMENDED
RECOMMENDED
Current StageCode Comment
30.20
30.20
10.00
00.30
30.20
10.00
90.70
10.00
10.00
10.00
10.00
50.60
10.00
50.60
DateProjectApproved
2015-10-16
DateStandardapproved
MABUNDA G
MABUNDA G
MABUNDA G
MABUNDA G
MABUNDA G
MABUNDA G
MABUNDA G
MABUNDA G
MABUNDA G
MATHEBULA B
MATHEBULA B
MATHEBULA B
MATHEBULA B
MATHEBULA B
Standards Writer
Ed
2.03
3.04
2.04
2
1.02
2
2
2.02
3.01
2
2
1.04
1
1
SANS 58
SANS 757
SANS 866
SANS 998
SANS 1373
SANS 50028-1/EN 10028-1:2007, IDT
SANS 50028-7/EN 10028-7:2007, IDT, Ed.1
SANS 804
SANS 292
SANS 1545-4
SANS 1545-5
SANS 1545-6
SANS 1545-8
SANS 50081-22/EN 81-22:2014, IDT
(SABS 58)
(SABS 757)
(SABS 866)
(SABS 998)
(SABS 1373)
(SABS 804)
(SABS 292)
PROGRAMME OF WORK : STANDARDS2017-03-01Report Date :
Cost Centre(s) : 7135
19Page No : Of Total Count: 278 24
SABS/TC 1082
SABS/TC 1089
SABS/TC 1092
SABS/TC 1098
2017-03-31
2016-09-30
2016-09-30
2016-11-30
2016-11-30
2016-11-30
2016-11-30
Part 22: Electric lifts with inclinedpath
Safety rules for the construction andinstallation of lifts - Examinationsand tests - Part 50: Design rules,calculations, examinations and testsof lift components
Construction and managementrequirements for works contractsPart 1: General engineering andconstruction worksConstruction and managementrequirements for works contractsPart 2: Accommodation of traffic onpublic roads occupied by thecontractorConstruction and managementrequirements for works contractsPart 3: Structural steelworkConstruction and managementrequirements for works contractsPart 4: Third-party managementsupport in works contractsConstruction works Part CC1:Concrete works (structural)
Construction works Part CC2:Concrete works (minor works)
Construction works Part DP1:Earthworks for buried pipelines andprefabricated culvertsConstruction works Part BG1: Piling
Construction works-PartCR3:Thatching
Construction works Part CS1:Structural steelwork
Construction Works:Part DP7-Sewers for buildings
2017-02-03
2016-04-28
2016-04-28
2016-04-28
2016-04-28
2015-08-28
2015-08-28
2011-07-11
2015-10-23
2015-10-12
2014-03-28
2015-10-16
SANS Number
CommitteeNumber
Work Order Number Title
TargetDate
Current StageDate
RECOMMENDED
Current StageCode Comment
50.60
10.00
10.00
10.00
10.00
20.00
20.00
10.00
20.00
10.00
10.00
20.00
DateProjectApproved
2016-06-24
2015-08-28
2015-08-28
2015-10-23
2015-10-16
DateStandardapproved
MATHEBULA B
NGCOBO G
NGCOBO G
NGCOBO G
NGCOBO G
NGCOBO G
NGCOBO G
NGCOBO G
NGCOBO G
NGCOBO G
NGCOBO G
NGCOBO G
Standards Writer
Ed
1
1.01
1.01
1.01
1.01
2
2
1.02
1
1
1.02
1
SANS 50081-50/EN 81-50:2014, IDT
SANS 1921-1
SANS 1921-2
SANS 1921-3
SANS 1921-4
SANS 2001-CC1
SANS 2001-CC2
SANS 2001-DP1
SANS 2001-BG1
SANS 2001-CR3
SANS 2001-CS1
SANS 2001-DP7
PROGRAMME OF WORK : STANDARDS2017-03-01Report Date :
Cost Centre(s) : 7135
20Page No : Of Total Count: 278 24
SABS/TC 1098
SABS/TC 110
SABS/TC 115
SABS/TC 122
SABS/TC 135
SABS/TC 136
SABS/TC 138
SABS/TC138/SC 01
2018-08-31
2017-03-31
2016-11-30
2016-11-30
2012-03-31
2017-06-15
2016-05-31
Construction works DR1: Kerbingand channelling
Construction works DR2:Segmented paving
Construction Works: Part EF3:Resilient thermoplastic and similarflexible floor coveringConstruction works: Part EJ:Joinery
Construction works CS2: Claddingand sheeting
Maintenance - Documentation formaintenance
The inspection and testing of lifttrucks
The requirements for the markingand identification of degradableplastics
Bed bases (spring upholstered)
The management of potable waterin distribution systems
Wastewater lifting plants forbuildings and sites - Part 3: Liftingplants for limited applicationsWastewater lifting plants forbuildings and sites - Part 1: Liftingplants for wastewater containingfaecal matterWastewater lifting plants forbuildings and sites - Part 4:Nonreturn valves for faecal-free
2016-09-30
2015-11-27
2015-10-16
2015-10-23
2015-04-15
2016-11-10
2015-08-17
2016-11-16
2014-09-12
2015-08-18
2015-05-08
2017-02-14
2017-02-14
2017-02-14
SANS Number
CommitteeNumber
Work Order Number Title
TargetDate
Current StageDate
RECOMMENDED
Current StageCode Comment
20.00
20.00
20.00
20.00
00.40
00.30
00.30
35.20
20.00
10.00
10.00
00.30
00.60
00.30
DateProjectApproved
2016-09-30
2015-11-27
2015-10-16
2015-10-23
2010-03-19
2014-09-12
DateStandardapproved
NGCOBO G
NGCOBO G
NGCOBO G
NGCOBO G
MGABINI M
MGABINI M
CROSS P
MALUMANE T
MAHLANGU S
LUTCHMAN S
LUTCHMAN S
LUTCHMAN S
LUTCHMAN S
Standards Writer
Ed
1
1
1
1
1
1
1
2
1
1.03
1.02
1
1
1
SANS 2001-DR1
SANS 2001-DR2
SANS 2001-EF3
SANS 2001-EJ
/BS EN 13460:2009, IDT
SANS 10388
SANS 1728
SANS 1420
SANS 10306
/EN 12050-3:2015, IDT
/EN 12050-1:2015, IDT
/EN 12050-4:2015, IDT
(SABS 1420)
(SABS 0306)
PROGRAMME OF WORK : STANDARDS2017-03-01Report Date :
Cost Centre(s) : 7135
21Page No : Of Total Count: 278 24
SABS/TC138/SC 01
SABS/TC138/SC 02
SABS/TC138/SC 03
SABS/TC138/SC 04
SABS/TC138/SC 05
SABS/TC138/SC 06
2017-04-30
2017-05-30
wastewater and wastewatercontaining faecal matter
Wastewater lifting plants forbuildings and sites - Part 2: Lifting plants for faecal-free wastewater
Servicing Valves For DomesticTerminal Water Fittings orAppliancesWater supply and distributionsystem components Part 2: Metalliccompression type pipe couplingsWater supply and drainage forbuildings Part 1: Water supplyinstallations for buildingsThe installation, maintenance,replacement and repair of fixedelectric storage water heatingsystemsWaterless urinals
Glass reinforced plastic (GRP)surface boxes and manhole andinspection covers and framesDuctile iron pipes, fittings,accessories and their joints, for usein high and low pressure systemsfor potable and foul waterThe reconditioning of valves for usewith pipelines
Cast iron pipes and fittings, theirjoints and accessories for theevacuation of water from buildings -Requirements, test methods andquality assurance
Steel mesh reinforced polyethylene(PE) pipe fittings for water supply
2017-02-14
2017-01-03
2015-11-04
2017-01-23
2017-02-21
2015-04-21
2016-09-30
2016-05-11
2017-02-02
2017-02-06
2017-01-31
SANS Number
CommitteeNumber
Work Order Number Title
TargetDate
Current StageDate
MINUTES NOTSUPPORTINGPROPOSAL
Current StageCode Comment
00.30
50.60
10.00
10.00
50.20
00.30
20.00
10.00
10.00
00.30
10.00
DateProjectApproved
2016-01-22
2016-09-30
DateStandardapproved
LUTCHMAN S
LUTCHMAN S
LUTCHMAN S
LUTCHMAN S
LUTCHMAN S
LUTCHMAN S
LUTCHMAN S
LUTCHMAN S
LUTCHMAN S
LUTCHMAN S
LUTCHMAN S
Standards Writer
Ed
1
1
1.05
3.02
4.01
1
1
1.02
1.03
1
1.02
/EN 12050-2:2015, IDT
SANS 1750
SANS 1808-2
SANS 10252-1
SANS 10254
SANS 1791
SANS 1835
SANS 10257
/EN 877:1999, IDT, Ed. 1
SANS 371
(SABS 1808-2)
(SABS 0252-1)
(SABS 0254)
(SABS 1835)
(SABS 0257)
PROGRAMME OF WORK : STANDARDS2017-03-01Report Date :
Cost Centre(s) : 7135
22Page No : Of Total Count: 278 24
SABS/TC138/SC 06
SABS/TC 164
SABS/TC 188
SABS/TC 214
2016-12-31
Structured wall pipes and fittings ofunplasticized poly(vinyl chloride)(PVC-U) for buried drainage andsewerage systemsPolyethylene storage tanks forwater and chemicals
Plastics piping systems -Mechanical fittings for pressurepiping systems - Specifications
Temporary stands
Light ladders Part 3: Portablealuminium ladders, steps andtrestles for industrial andcommercial useMobile access and working towers -Rules and guidelines for thepreparation of an instruction manualLadders. Requirements, testing,marking
Ladders. Single or multiple hinge-joint ladders
The design, erection, use andinspection of access scaffoldingPart 1: Steel access scaffoldingLadders. Telescopic ladders
Prefabricated tower scaffoldsoutside the scope of EN 1004, bututilizing components from suchsystems - SpecificationLadders. User instructions
The design, erection, use andinspection of access scaffoldingPart 1: Steel access scaffoldingLadders. Mobile ladders withplatform
2016-03-12
2016-01-27
2017-02-23
2016-09-29
2009-11-09
2016-09-08
2017-02-14
2017-02-14
2016-07-18
2017-02-27
2016-09-08
2017-02-14
2016-05-16
2017-02-27
SANS Number
CommitteeNumber
Work Order Number Title
TargetDate
Current StageDate
RECOMMENDED
Current StageCode Comment
10.00
30.20
00.30
10.00
10.00
00.30
00.30
00.30
00.30
00.30
00.30
00.30
00.30
00.30
DateProjectApproved
2015-05-22
DateStandardapproved
LUTCHMAN S
LUTCHMAN S
LUTCHMAN S
MABUNDA G
MABUNDA G
MABUNDA G
MABUNDA G
MABUNDA G
MABUNDA G
MABUNDA G
MABUNDA G
MABUNDA G
QWABI P
MABUNDA G
Standards Writer
Ed
2.03
1
1
2
1
1
1
1
2
1
1
1
2
1
SANS 1601
SANS 1731
/ISO 17885:2015, IDT
SANS 1169
SANS 1304-3
/BS EN 1298:1996, IDT
/EN 131-2:2012, IDT
/EN 131-4:2007, IDT
/EN 131-6:2015, IDT
/BS 1139-6:2014, IDT
/EN 131-3:2007, IDT
/EN 131-7:2013, IDT
(SABS 1601)
PROGRAMME OF WORK : STANDARDS2017-03-01Report Date :
Cost Centre(s) : 7135
23Page No : Of Total Count: 278 24
SABS/TC 214
SABS/TC 218
SABS/TC218/SC 01
SABS/TC218/SC 02
SABS/TC218/SC 03
224
SABS/TC 280
2016-10-31
2016-08-31
2018-08-31
2018-08-31
2016-09-30
2016-10-31
2017-09-30
Ladders. Terms, types, functionalsizes
Pine poles, cross-arms and spacersfor power distribution, telephonesystems and street lighting
Barrier protection systems fortreated wooden poles
Retention of preservative in timber(volume method)
Chromium detection in timber
Health, safety and environmentalguidelines for the construction andoperation of timber treatment plants
Timber preservative - Mixture ofazoles and permethrin
Timber preservative - Alkaline-copper-quaternary type
Mixtures of copper-chromium-arsenic compounds for timberpreservationTimber preservative - Tributyltinnaphthenate-permethrin
Mixtures of copper azolecompounds for timber preservation
CCA salts equivalent massconcentration of aqueous solutionsthat contain mixtures of copper-chromium-arsenic compounds usedfor timber preservation
Wooden poles, droppers, guardrailposts and spacer blocks Part 2:Softwood species
Greywater Reuse Systems -General Requirements
2017-02-14
2015-05-19
2015-09-18
2017-02-03
2017-02-03
2015-01-09
2016-12-08
2016-12-15
2016-12-13
2016-12-13
2016-12-08
2016-12-08
2014-04-15
2015-08-21
SANS Number
CommitteeNumber
Work Order Number Title
TargetDate
Current StageDate
Current StageCode Comment
00.30
30.20
30.20
20.00
20.00
30.20
10.00
10.00
10.00
10.00
10.00
10.00
30.20
20.00
DateProjectApproved
2015-03-13
2013-09-06
2017-02-03
2017-02-03
2014-03-20
2014-03-20
2015-08-21
DateStandardapproved
MABUNDA G
MAHLANGU S
MAHLANGU S
MAHLANGU S
MAHLANGU S
MAHLANGU S
MAHLANGU S
MAHLANGU S
RAMATSETSE J
MAHLANGU S
MAHLANGU S
MAHLANGU S
MAHLANGU S
KHOMANI K
Standards Writer
Ed
1
5
1
3
2
3
1.02
1.02
3.04
1.02
1.02
3.02
7
1
/EN 131-1:2015, IDT
SANS 753
SANS 1634
SANS 5967
SANS 5993
SANS 10255
SANS 441
SANS 506
SANS 673
SANS 1746
SANS 1920
SANS 6061
SANS 457-2
SANS 1732
(SABS 753)
(SABS SM 967)
(SABS SM 993)
(SABS 0255)
(SABS 673)
(SABS 1746)
(SABS SM 1061)
(SABS 457-2)
PROGRAMME OF WORK : STANDARDS2017-03-01Report Date :
Cost Centre(s) : 7135
24Page No : Of Total Count: 278 24
SABS/TC 280
8
86B
CKS 7135
2017-01-31
2018-06-30
2017-02-28
Glass-reinforced polyester-coatedsteel tanks for the undergroundstorage of hydrocarbons andoxygenated solvents and intendedfor burial horizontallyThe petroleum industry Part 3: Theinstallation, modification, anddecommissioning of undergroundstorage tanks, pumps/dispensersand pipework at service stationsand consumer installationsAbove-ground storage tanks forpetroleum products
2016-05-30
2016-06-24
2016-03-30
SANS Number
CommitteeNumber
Work Order Number Title
TargetDate
Current StageDate
Current StageCode Comment
10.00
20.00
30.20
DateProjectApproved
2015-12-11
2016-06-24
2016-03-04
DateStandardapproved
SUNDANI N
SUNDANI N
SUNDANI N
Standards Writer
Ed
3
5
2
SANS 1535
SANS 10089-3
SANS 10131
(SABS 1535)
(SABS 089-3)