Cloud Technologies Limited 1
Online Shopping PortalFor
MyCompany.com
Project Code: PRJ-2014/101
![Page 2: Prj 2014-101 progress-presentation-0.2.0](https://reader034.vdocuments.us/reader034/viewer/2022042715/559c1d0f1a28abde298b456c/html5/thumbnails/2.jpg)
Cloud Technologies Limited 2
Project overview
Execution
Planning
Closing
Controlling
Initiating
![Page 3: Prj 2014-101 progress-presentation-0.2.0](https://reader034.vdocuments.us/reader034/viewer/2022042715/559c1d0f1a28abde298b456c/html5/thumbnails/3.jpg)
Cloud Technologies Limited 3
Initiating Planning Executing Controlling Closing
Team Setup
![Page 4: Prj 2014-101 progress-presentation-0.2.0](https://reader034.vdocuments.us/reader034/viewer/2022042715/559c1d0f1a28abde298b456c/html5/thumbnails/4.jpg)
Cloud Technologies Limited 4
Initiating Planning Executing Controlling Closing
Initiating Phase Defined business case Feasibility study Developed project
charter Assigned project
management team.
![Page 5: Prj 2014-101 progress-presentation-0.2.0](https://reader034.vdocuments.us/reader034/viewer/2022042715/559c1d0f1a28abde298b456c/html5/thumbnails/5.jpg)
Cloud Technologies Limited 5
PlanningInitiating Executing Controlling Closing
Scope
CostTime
Quality
Scope
Requirement doc Functional spec Define change request
![Page 6: Prj 2014-101 progress-presentation-0.2.0](https://reader034.vdocuments.us/reader034/viewer/2022042715/559c1d0f1a28abde298b456c/html5/thumbnails/6.jpg)
Cloud Technologies Limited 6
Initiating Planning Executing Controlling Closing
Scope
CostTime
Quality
Quality
Configuration Management(PRJ-2014-101_Configuration_Management_0.0.1)
Status review after every iteration Quality audit
(at the beginning of 3rd iteration) Security audit
(At the beginning of 4th iteration)
Initiating PlanningPlanningInitiating
![Page 7: Prj 2014-101 progress-presentation-0.2.0](https://reader034.vdocuments.us/reader034/viewer/2022042715/559c1d0f1a28abde298b456c/html5/thumbnails/7.jpg)
Cloud Technologies Limited 7
Initiating Planning Executing Controlling Closing
Scope
CostTime
Quality
Time
Defined phases, iterations and milestones.
Prepared a schedule
Iteration 1 Iteration 2 Iteration 3 Iteration 4
Project period
First phase Second phase
PlanningInitiating
![Page 8: Prj 2014-101 progress-presentation-0.2.0](https://reader034.vdocuments.us/reader034/viewer/2022042715/559c1d0f1a28abde298b456c/html5/thumbnails/8.jpg)
Cloud Technologies Limited 8
Initiating Planning Executing Controlling Closing
Scope
CostTime
Quality
PlanningInitiating
First Iteration:July 7th – July 9th
Second Iteration:July 10th – July 12th
Third Iteration:July 13th – July 14th
Fourth Iteration:July 15th – July 16th
![Page 9: Prj 2014-101 progress-presentation-0.2.0](https://reader034.vdocuments.us/reader034/viewer/2022042715/559c1d0f1a28abde298b456c/html5/thumbnails/9.jpg)
Cloud Technologies Limited 9
PlanningInitiating Executing Controlling Closing
https://docs.google.com/file/d/0B1bWsZvmMNDNWGozUXRfMVZKaFE/edit
![Page 10: Prj 2014-101 progress-presentation-0.2.0](https://reader034.vdocuments.us/reader034/viewer/2022042715/559c1d0f1a28abde298b456c/html5/thumbnails/10.jpg)
Cloud Technologies Limited 10
Work distribution
ExecutingPlanningInitiating Controlling Closing
![Page 11: Prj 2014-101 progress-presentation-0.2.0](https://reader034.vdocuments.us/reader034/viewer/2022042715/559c1d0f1a28abde298b456c/html5/thumbnails/11.jpg)
Cloud Technologies Limited 11
Collaboration for development
ExecutingPlanningInitiating Controlling Closing
![Page 12: Prj 2014-101 progress-presentation-0.2.0](https://reader034.vdocuments.us/reader034/viewer/2022042715/559c1d0f1a28abde298b456c/html5/thumbnails/12.jpg)
Cloud Technologies Limited 12
Development Progress Infrastructure setup Database design and implementation UI layout design Development status
− Registration and Login (for vendor and buyer)
− Payment Gateway:Credit card for newly registered user.
− Vendor: Add and list products
− Buyer: Browse products, view product detail
− Shopping cart (Remaining)
− Order: Enter billing and shopping address
− Order: Enter credit card details
− Order: Display shopping cart, address and cart details.
− Payment Gateway integration
− MyFinance.com integration
ExecutingPlanningInitiating Controlling Closing
![Page 13: Prj 2014-101 progress-presentation-0.2.0](https://reader034.vdocuments.us/reader034/viewer/2022042715/559c1d0f1a28abde298b456c/html5/thumbnails/13.jpg)
Cloud Technologies Limited 13
Quality Control− CM (Configuration Management) audit
At the beginning of Iteration 3− Security Audit
At the beginning of Iteration 4− Status review at the end of every iteration.
ControllingPlanningInitiating Executing Closing
![Page 14: Prj 2014-101 progress-presentation-0.2.0](https://reader034.vdocuments.us/reader034/viewer/2022042715/559c1d0f1a28abde298b456c/html5/thumbnails/14.jpg)
Cloud Technologies Limited 14
Milestones (for controlled progress)− Milestone 1 – Complete design document
− Milestone 2 – 35% development completion
− Milestone 3 – 85% development completion
− Milestone 4 – 100% development completion
ControllingPlanningInitiating Executing Closing
![Page 15: Prj 2014-101 progress-presentation-0.2.0](https://reader034.vdocuments.us/reader034/viewer/2022042715/559c1d0f1a28abde298b456c/html5/thumbnails/15.jpg)
Cloud Technologies Limited 15
Burndown chart
ControllingPlanningInitiating Executing Closing
![Page 16: Prj 2014-101 progress-presentation-0.2.0](https://reader034.vdocuments.us/reader034/viewer/2022042715/559c1d0f1a28abde298b456c/html5/thumbnails/16.jpg)
Cloud Technologies Limited 16
Closing− Release management
− Production release
− Post-production training
ClosingPlanningInitiating Executing Controlling
![Page 17: Prj 2014-101 progress-presentation-0.2.0](https://reader034.vdocuments.us/reader034/viewer/2022042715/559c1d0f1a28abde298b456c/html5/thumbnails/17.jpg)
Cloud Technologies Limited 17
A line of wisdom...
“Highest first”
Proper initial planning of the project leads to quality product and overall success of the project.
![Page 18: Prj 2014-101 progress-presentation-0.2.0](https://reader034.vdocuments.us/reader034/viewer/2022042715/559c1d0f1a28abde298b456c/html5/thumbnails/18.jpg)
Cloud Technologies Limited 18
Thank you!
Q&A