PRODUCTION… It is the process of effective
planning and regulating the operations of that
section of enterprise which is responsible for the
actual transformation of material into finished
products
![Page 3: Presentation on ppc](https://reader035.vdocuments.us/reader035/viewer/2022070516/58764f3e1a28ab0d198b6571/html5/thumbnails/3.jpg)
PLANNING… It can be defined as a
process of taking decisions for
future actions in order to achieve
pre-determined objectives by
optimum utilization of available
resources in a limited time
frame.
![Page 4: Presentation on ppc](https://reader035.vdocuments.us/reader035/viewer/2022070516/58764f3e1a28ab0d198b6571/html5/thumbnails/4.jpg)
CONTROLLING… Is determining
what is being accomplished i.e.,
evaluating the performance and if
necessary applying corrective
measures so that the performance
takes place according to plans.
![Page 5: Presentation on ppc](https://reader035.vdocuments.us/reader035/viewer/2022070516/58764f3e1a28ab0d198b6571/html5/thumbnails/5.jpg)
PRODUCTION PLANNING & CONTROL…
Production planning and control is the organization and planning of the manufacturing process.
It co-ordinates supply and movement of materials and labor, ensures economic and balanced utilization of machines and equipment as well as other activities related with production to achieve the desired manufacturing results in terms of quantity, quality, time and place.
![Page 6: Presentation on ppc](https://reader035.vdocuments.us/reader035/viewer/2022070516/58764f3e1a28ab0d198b6571/html5/thumbnails/6.jpg)
STAGES IN PPC…
Planning : The choice from several alternatives of the best utilizing the
available resources to achieve the desired
objective .
Operations: Performance in accordance with details set out in production plan.
Control: The monitoring of performance through
a feed back by comparing the results achieved with planned
targets so that performance can be
improved. .
![Page 7: Presentation on ppc](https://reader035.vdocuments.us/reader035/viewer/2022070516/58764f3e1a28ab0d198b6571/html5/thumbnails/7.jpg)
OBJECTIVES OF PPC… To deliver goods in required quantities to customers
in required delivery schedule. To ensure maximum utilization of all resources. To ensure production quality products. To minimize the product throughput time. To maintain optimum level inventory. To maintain flexibility in manufacturing operations. Coordinate between labor and machines and various
supporting departments.
![Page 8: Presentation on ppc](https://reader035.vdocuments.us/reader035/viewer/2022070516/58764f3e1a28ab0d198b6571/html5/thumbnails/8.jpg)
LEVELS OF PPC…Strategic Planning(Long range): It is process of thinking though the organizations current mission and environment and setting a guide for future decisions and results. e.g. Technology forecasting and choice of appropriate technology for the long range time horizon.
Tactical Planning(Intermediate Range): It is done over an intermediate term or medium range time horizon by middle level management. These plans focus on aggregate products rather than individual products.
Operational Planning(Short Range ): It is done over a short range time span developed by junior level management. It is concern with utilization of existing facilities rather than creation of new facilities.
![Page 9: Presentation on ppc](https://reader035.vdocuments.us/reader035/viewer/2022070516/58764f3e1a28ab0d198b6571/html5/thumbnails/9.jpg)
STAGES OR STEPS OF PPC
PRODUCTION PLANNING
ROUTINGSCHEDULING
![Page 10: Presentation on ppc](https://reader035.vdocuments.us/reader035/viewer/2022070516/58764f3e1a28ab0d198b6571/html5/thumbnails/10.jpg)
ROUTING… Routing can be defined as the process of deciding
the path (route) of work and the sequence of operations
Determines ‘what’, ‘how much’, ‘with which’, ‘how’ and ‘where’ to produce.
The main objective of routing is to determine (fix) the best and cheapest sequence of operations and to ensure that this sequence is followed in the factory.
Gives a very systematic method of converting raw-materials into finished goods.
![Page 11: Presentation on ppc](https://reader035.vdocuments.us/reader035/viewer/2022070516/58764f3e1a28ab0d198b6571/html5/thumbnails/11.jpg)
SCHEDULING… Scheduling is also done for materials, parts, machines.
Time element is given special importance in
scheduling. There are different types of schedules;
namely, Master schedule, Operation schedule and
Daily schedule.
Scheduling helps to make optimum use of time.
![Page 12: Presentation on ppc](https://reader035.vdocuments.us/reader035/viewer/2022070516/58764f3e1a28ab0d198b6571/html5/thumbnails/12.jpg)
DISPATCHING… Dispatching means starting the process of production.
It is based on route-sheets and schedule sheets.
Under centralized dispatching, orders are issued
directly by a centralized authority.
Under decentralized dispatching, orders are issued by
the concerned department.
![Page 13: Presentation on ppc](https://reader035.vdocuments.us/reader035/viewer/2022070516/58764f3e1a28ab0d198b6571/html5/thumbnails/13.jpg)
FOLLOW-UP… It is a controlling device.
It is concerned with evaluation of the results.
It measures the actual performance and compares it to
the expected performance.
Is performed by ‘expediters’ or ‘stock chasers’.
Removes these difficulties and allows a smooth
production
![Page 14: Presentation on ppc](https://reader035.vdocuments.us/reader035/viewer/2022070516/58764f3e1a28ab0d198b6571/html5/thumbnails/14.jpg)
BENEFITS OF PPC…
PPC coordinates all the phases of production /
Operating system
An efficient plan results in higher quality ,better
utilization of resources, reduced inventories, better
customer services.
An efficient plan enable the firm to improve its sales
turnover , market share and profitability.
![Page 15: Presentation on ppc](https://reader035.vdocuments.us/reader035/viewer/2022070516/58764f3e1a28ab0d198b6571/html5/thumbnails/15.jpg)
LIMITATIONS OF PPC
PPC function is based on certain assumptions or forecasts of customer’s demand, Plant capacity, availability of materials etc
Employee may resist change in production levels set as per production plans.
This process is time consuming when we need to carry out routing and scheduling function for large products.
This function become difficult when environmental factors changes rapidly.