www.eurofot-ip.eu
euroFOT – Optimised data retrieval process
for a large scale field test: manageable by
automation?
TRA 2010 - Brussels
Dipl.-Ing. Mohamed Benmimoun
07.06- 10.06.2010, Brussels
Institut für Kraftfahrzeuge (IKA)
www.eurofot-ip.eu
Agenda
Introduction
Data acquisition and upload
Data management
Current status and outlook
11.06.20102 Mohamed Benmimoun - TRA 2010, Brussels
www.eurofot-ip.eu
Introduction
Fleet coordination
11.06.20103 Mohamed Benmimoun - TRA 2010, Brussels
French-VMC• RENAULT
Italian-VMC• FIAT
Swedish-VMC• VOLVO Trucks
• VOLVO Cars
German1-VMC• FORD
• MAN
• VW/AUDI
German2-VMC• DAIMLER AG
• BMW Group
www.eurofot-ip.eu
Introduction
German1-VMC
11.06.20104 Mohamed Benmimoun - TRA 2010, Brussels
www.eurofot-ip.eu
Data acquisition and upload
1st step of automation (1/2) • All 240 vehicles have to be equipped with a data acquisition
system (DAS), which enables recording of all relevant signals
• Driver shall not be stressed with additional FOT specific tasks
Data upload procedure (upload of data from the DAS to a serversystem) is performed without any requirements and actions withregard to the driver
DAS system with integrated GPRS module (for wirelessdata upload, monitoring and re-configuration)
5 11.06.2010 Mohamed Benmimoun - TRA 2010, Brussels
www.eurofot-ip.eu
Data acquisition and upload
1st step of automation (2/2)
11.06.20106 Mohamed Benmimoun - TRA 2010, Brussels
• Process of data
acquisition and
upload is
designed to
work fully
autonomously
• No driver
interaction
required
www.eurofot-ip.eu
Data management
2nd step of automation (1/2)• Processing of uploaded data needs to be automated
• Expected amount of data adds up to 12 TB
• Different automated processing will be applied to adapt data to
specific needs of analysis
• Conversion
• Data quality analysis
• Enrichment with additional attributes
• Classification
• Data will be processed and afterwards stored in a SQL database
• Analysis of data will be conducted on the SQL database
11.06.20107 Mohamed Benmimoun - TRA 2010, Brussels
www.eurofot-ip.eu
Data management
2nd step of automation (2/2)
11.06.20108 Mohamed Benmimoun - TRA 2010, Brussels
www.eurofot-ip.eu
Data management
Graphic user interface
11.06.20109 Mohamed Benmimoun - TRA 2010, Brussels
www.eurofot-ip.eu
Data management
Final step for automation
11.06.201010 Mohamed Benmimoun - TRA 2010, Brussels
www.eurofot-ip.eu
Current status and Outlook
• Data upload and processing chain is defined and implemented at
ika for German1-VMC
• Required hardware infrastructure is installed and available
• Piloting almost completed
Data acquisition system
Data upload
Data processing
Pre-analysis
• Start of ramp-up by mid of June
Approximately 80 FOT vehicles already delivered and equipped with
data logger
11.06.201011 Mohamed Benmimoun - TRA 2010, Brussels
www.eurofot-ip.eu11.06.2010 Mohamed Benmimoun - TRA 2010, Brussels
Thank you for your attention…
www.eurofot-ip.eu12