Download - Presentation 5
![Page 1: Presentation 5](https://reader033.vdocuments.us/reader033/viewer/2022042903/568c52011a28ab4916b4f190/html5/thumbnails/1.jpg)
ASIA’s SOLAR VALLEY in CHUNGBUK
November 15, 2011
![Page 2: Presentation 5](https://reader033.vdocuments.us/reader033/viewer/2022042903/568c52011a28ab4916b4f190/html5/thumbnails/2.jpg)
II
I World PV Industry
PV Industry of CHUNGBUK
IV Incentives for Foreign Investors
Contents PV Industry of KOREA
III
II
III
![Page 3: Presentation 5](https://reader033.vdocuments.us/reader033/viewer/2022042903/568c52011a28ab4916b4f190/html5/thumbnails/3.jpg)
• PV Market Share of Major Countries
I. World PV Industry
Source: Mirae Asset Securities (2011)
EUR US Others CHN JPN CHN/USRising
![Page 4: Presentation 5](https://reader033.vdocuments.us/reader033/viewer/2022042903/568c52011a28ab4916b4f190/html5/thumbnails/4.jpg)
• Global Cell/Module Manufacturers
I. World PV Industry
Source: Solar & Energy (2011)
![Page 5: Presentation 5](https://reader033.vdocuments.us/reader033/viewer/2022042903/568c52011a28ab4916b4f190/html5/thumbnails/5.jpg)
충북기획단의 요즘 고민은?
II. PV Industry of KOREA
2.2
2.1
2.3
![Page 6: Presentation 5](https://reader033.vdocuments.us/reader033/viewer/2022042903/568c52011a28ab4916b4f190/html5/thumbnails/6.jpg)
- Population : 50 million (2011) - GDP Ranking : 15th (2010 by IMF) - Global Trade Ranking : 8th (US$ 728 BLN in 2007) - Expected GDP Growth Rate: 4~5% - OECD member since 1996 Source : Korea Statistical Information Service
World Ranking
- TFT-LCD· · · · · · · · · · · · · · · · · - Memory semiconductors · · · · · · · - Shipbuilding · · · · · · · · · · · · · · · - Info and Comm Technology · · · · · - Steel production · · · · · · · · · · · · - Automobile production · · · · · · · · - Comprehensive national power · · ·
1st 1st 1st 1st 5th 6th 9th
![Page 7: Presentation 5](https://reader033.vdocuments.us/reader033/viewer/2022042903/568c52011a28ab4916b4f190/html5/thumbnails/7.jpg)
![Page 8: Presentation 5](https://reader033.vdocuments.us/reader033/viewer/2022042903/568c52011a28ab4916b4f190/html5/thumbnails/8.jpg)
2.2 PV Industry Policy of Korea
<Domestic Market> 2004 2005 2006 2007 2008 2030F
Installation 2.6MW 6.8MW 22MW 48MW 278MW 3.5GW
<Source: KEMCO>
<NRE Output>
<Source: KEMCO>, Unit: MWh
2005 2006 2007 2008 2009
Solar 14,399 31,022 71,279 284,315 566,191
Wind 129,888 238,911 375,641 436,034 685,353
Hydro-Electric
3,674,015 3,468,233 3,632,089 3,070,457 2,821,530
Bio Gas - - - 3,363 6,814
LFG 129,595 154,521 307,299 412,996 448,728
Total 3,950,000 3,899,369 4,394,830 4,227,476 4,617,886
![Page 9: Presentation 5](https://reader033.vdocuments.us/reader033/viewer/2022042903/568c52011a28ab4916b4f190/html5/thumbnails/9.jpg)
II. PV Industry of Korea
• Solar Industry Growth Index 2007 2008 2009 2010 2011
Sales (million$) 440 1,548 2,376 5,899 10,423
Export (million$) 202 1,029 1,521 4,071 6,669
Employment 1,283 3,620 5,587 9,264 11,807
Source MKE Solar&Energy
MKE Solar & Energy
Korea Renewable Energy Association
MKE Solar&Energ
y
![Page 10: Presentation 5](https://reader033.vdocuments.us/reader033/viewer/2022042903/568c52011a28ab4916b4f190/html5/thumbnails/10.jpg)
Investor Invested Field Details Saint-Gobain (France)
Hyungdai Avancis (Chungbuk) Cell/Module USD353million by JV Avanci
s for thin-film solar cell
SunEdison (USA)
Busan Port Authority (Gyeongbuk)
System Installation 400MW solar power system
Dow Corning (USA)
Korea Dow Corning (Chungbuk) Material USD10million to build Solar
Power Tech Center
MEMC (USA)
Samsung Fine Chem (Ulsan)
Polysilicon USD20million to produce 10,000tons polysilicon
II. PV Industry of Korea
• Recent Foreign Investment
![Page 11: Presentation 5](https://reader033.vdocuments.us/reader033/viewer/2022042903/568c52011a28ab4916b4f190/html5/thumbnails/11.jpg)
2.2 PV Industry Policy of Korea
NationalStrategyof“GreenGrowth”Top7GreenLeadersby2020
Improveenergyefficiency Streamlineenergymarket&pricesystem
Copewithclimatechanges
Energy source unit : 0.347 0.185
Expandnewrenewableenergy Improvethesafetyofnuclearpower
New/renewable energy: 2.4% 11% Nuclear power facility : 26% 40.6%
Developtech&infraforgreenenergy Expandoverseasmarkets
Energy tech level: 60% highest in the world
Developoverseasresources Stabilizeenergysupply
Self-sufficiency: 3.2% 40% Energy poor group: 7.8% 0%
Enhanceenergywelfare
4 Visions / 10 Tasks
New/Renewable Energy Low energy consumption/low carbon
Green Energy for Growth Drive Self-reliance of Energy
![Page 12: Presentation 5](https://reader033.vdocuments.us/reader033/viewer/2022042903/568c52011a28ab4916b4f190/html5/thumbnails/12.jpg)
충북기획단의 요즘 고민은?
III. PV Industry of CHUNGBUK
3.3
3.2
3.5
3.1
![Page 13: Presentation 5](https://reader033.vdocuments.us/reader033/viewer/2022042903/568c52011a28ab4916b4f190/html5/thumbnails/13.jpg)
3.1 CHUNGBUK
(Delaware-6,452㎢)
![Page 14: Presentation 5](https://reader033.vdocuments.us/reader033/viewer/2022042903/568c52011a28ab4916b4f190/html5/thumbnails/14.jpg)
3.1 CHUNGBUK
Sejong
![Page 15: Presentation 5](https://reader033.vdocuments.us/reader033/viewer/2022042903/568c52011a28ab4916b4f190/html5/thumbnails/15.jpg)
Gateway to Sejong Admin Capital
Hub airport to China and Japan
Cheongju International Airport
![Page 16: Presentation 5](https://reader033.vdocuments.us/reader033/viewer/2022042903/568c52011a28ab4916b4f190/html5/thumbnails/16.jpg)
Who invested in CHUNGBUK?
![Page 17: Presentation 5](https://reader033.vdocuments.us/reader033/viewer/2022042903/568c52011a28ab4916b4f190/html5/thumbnails/17.jpg)
3.2 PV Infrastructure of CHUNGBUK
Semiconductor
Supporting Agency
Manpower
60 companies including Hynix, Dongbu Hitec,
MagnaChip, Semitech, Nepes, Terrasem
Testing center for semiconductor equipment/parts
Electronic Information Component Center
Korea Basic Science Institute
Environment-friendly Energy Parts & Materials Center
Next-Generation Battery H/R Education Center
Semiconductor R&D H/R Education - Chungbuk Univ, Chungju Univ, Cheongju Univ Semiconductor Equipment Operation Education - Chungcheong Univ, Juseong Univ Chungbuk Provincial College
“Solar Industry Special Belt” in April 2011
![Page 18: Presentation 5](https://reader033.vdocuments.us/reader033/viewer/2022042903/568c52011a28ab4916b4f190/html5/thumbnails/18.jpg)
HyundaiAvancis,JVofSaint‐GobainandHyundaHIinOchangITComplex→Totally2billionUSDinvest
mentwithits2ndProductionLine→ LargestinvestmentinKoreainPVparts
오창
HaesungSolar
DayouDMC Investment:120milUSD Cell/Module
Techwin A‐OneTech Investment:316milUSD Cell
KISCO Investment:450milUSD ThinfilmCell
Investment:200milUSD PolysiliconCell
Cell/Module
Module
PVSystem
PVSystem
Investment:1200milUSD(1billionUSDtotal) PolysiliconCell/Module
PVInverter
SehwaEnergy
Cheongju Airport
60% of Domestic Cell/Module Production
![Page 19: Presentation 5](https://reader033.vdocuments.us/reader033/viewer/2022042903/568c52011a28ab4916b4f190/html5/thumbnails/19.jpg)
Businesses by Value Chain
※Companiesinblue:HeadofficesinChungbuk
• DongyangChemicals
• KCC
• Siltron • WoongjinEngy
• SmartAce
• SKC
• HyundaiHeavyInd• KISCO
• ShinsungENG
• A‐OneTech
• KPE• MiliSolarnet
• HyundaiHeavy• KDSolar• HaesungSolar• LSIndustrial• MoinEnergy
• SymphonyEngy
• TechOne
• KDSolar• KEPE• SymphonyEngy
• SolarTech
Com
panie
s
• Highinvest‐ment• Technicalbarriers
• Securingvaluechain • Minimizingloss
• Differentiatedtechnology (highefficiency/lowprice)• p‐Sistablesupply
• Non‐conformityratio• Productuniformity
• A/S capabilityFeat
ures
• DassTech • BigTech• Paru• Willings
• HanyangElec• Eagon
• Inverters• Cables
35% 10% 15% 10% 4% 5%ProfitRatio
BasicMaterials System/ServiceUnit/Module
Poly‐silicon
Ingot/Wafer Cell Module
ProductionSystem
Facility
Specializingincellandmodulefields(60%ofnationalproduction)
![Page 20: Presentation 5](https://reader033.vdocuments.us/reader033/viewer/2022042903/568c52011a28ab4916b4f190/html5/thumbnails/20.jpg)
3.2 PV Infrastructure of CHUNGBUK
![Page 21: Presentation 5](https://reader033.vdocuments.us/reader033/viewer/2022042903/568c52011a28ab4916b4f190/html5/thumbnails/21.jpg)
Districts
Cheongju·Cheongwon(System) Jungpyong·Jincheon(Cell/Module) Eumsong·Chungju(Silicon/Wafer)
12,497 thousand㎡
2011 ~ 2015 (5years)
1.5 billion USD
Area
Period
Budget
21
3.3 Asia Solar Valley Project
Designated on April 2011 by MKE
![Page 22: Presentation 5](https://reader033.vdocuments.us/reader033/viewer/2022042903/568c52011a28ab4916b4f190/html5/thumbnails/22.jpg)
22
Asia Solar Valley Project
• R&D and Equipment support for next generation solar cell technology development
• Technical support for certification & test for solar cell & module
• Manpower training & Academia-Industrial Cooperation
• Location : Jungpyong, Chungbuk
• Scale : Land 33,000㎡, Building 9,600㎡
• Period : 2011~2015 (5years)
• Investment : 42 Million USD (Central Gov. 25M$ / Local Gov. 10M$)
![Page 23: Presentation 5](https://reader033.vdocuments.us/reader033/viewer/2022042903/568c52011a28ab4916b4f190/html5/thumbnails/23.jpg)
Network Local Governments, Chungbuk TP, Colleges
2011 ~ 2015 (5years)
20 million USD
Period
Budget
23
Asia Solar Valley Project
3. Training Network for Manpower Supply
Support for R&D Workforce
![Page 24: Presentation 5](https://reader033.vdocuments.us/reader033/viewer/2022042903/568c52011a28ab4916b4f190/html5/thumbnails/24.jpg)
Network Chungbuk, Chungbuk TP, Colleges, Business
2011 ~ 2015 (5years)
20 million USD
Period
Budget
24
Asia Solar Valley Project
4. R&D Support for High Efficiency and Low Cost``
Technology for Low Price DSSC
![Page 25: Presentation 5](https://reader033.vdocuments.us/reader033/viewer/2022042903/568c52011a28ab4916b4f190/html5/thumbnails/25.jpg)
Period 2012 ~ 2015 (4years)
21 Villages of 630 Households
30 million USD
Scale
Budget
25
Asia Solar Valley Project
5. Green Village , the Experiential Space
![Page 26: Presentation 5](https://reader033.vdocuments.us/reader033/viewer/2022042903/568c52011a28ab4916b4f190/html5/thumbnails/26.jpg)
Theme - Chungbuk, Land of Life and Sun -
October(36 days), 2014
30 million USD
Period
Budget
26
Asia Solar Valley Project
6. International Solar Expo
![Page 27: Presentation 5](https://reader033.vdocuments.us/reader033/viewer/2022042903/568c52011a28ab4916b4f190/html5/thumbnails/27.jpg)
Asia Solar Valley in CHUNGBUK
Manpower
Clustering
R&D
Distribution
Infrastructure
Implementpilotprojects VariousPVPromotionProjects
Solar‐cellTechnologyCenter PVIndustryCluster
Developnextgenerationtechnology
Expandcentral/localbudget
Attractrelatedbusinesses FreeLandforinvestors
Supportlaborforcedemand SupportR&Ddemand Re‐trainingon‐siteworkers
ThehubforPVpartsandmaterials
Networking Academia/IndustryCooperation PVEnergyPromotionCommittee
VisionsandGoals
![Page 28: Presentation 5](https://reader033.vdocuments.us/reader033/viewer/2022042903/568c52011a28ab4916b4f190/html5/thumbnails/28.jpg)
충북기획단의 요즘 고민은?
IV. Incentives for Foreign Investment
4.3
4.2
4.4
4.1
![Page 29: Presentation 5](https://reader033.vdocuments.us/reader033/viewer/2022042903/568c52011a28ab4916b4f190/html5/thumbnails/29.jpg)
Eligibility : over USD 30 million investment or USD 2 million in R&D
Additional benefits available for R&D: refer to the R&D section
National Tax
Local Tax
Corporate Tax / Income Tax
Customs Tariff, V.A.T, Special Excise Tax
Acquisition / Registration / Property Tax
100% 5yrs 50% 2yrs
100% 3yrs
100% 7yrs 50% 3yrs
Tax Benefits
![Page 30: Presentation 5](https://reader033.vdocuments.us/reader033/viewer/2022042903/568c52011a28ab4916b4f190/html5/thumbnails/30.jpg)
Hiring
Training
Usage Qualification Amount Period
More than 20 new local employees
Newly hired local employees ※ 20 at minimum
500 USD (person/month)
500 USD (person/month)
6months
6months
Each subsidy limited to USD1 million per company
Subsidies
![Page 31: Presentation 5](https://reader033.vdocuments.us/reader033/viewer/2022042903/568c52011a28ab4916b4f190/html5/thumbnails/31.jpg)
Eligibility : Foreign direct investment ratio over 30% Amount : more than 5% of FDI (negotiable) Usages : hiring and training, land purchase · lease, construction costs, equipment purchasing/installation, capital goods
Industry supporting service High-tech business
Qualification (over 30% of FDI)
USD 10 million in new factory construction
Investment Area
Parts and materials
R & D
USD 10 million in new factory construction
Over 10 full-time researchers with master's degree or bachelor's with 3 year experience
Cash Grants
![Page 32: Presentation 5](https://reader033.vdocuments.us/reader033/viewer/2022042903/568c52011a28ab4916b4f190/html5/thumbnails/32.jpg)
Thorough assistance from site selection
Consult on FDI incentives
Meeting arrangement with authorities
to Marketing and Commercialization
Administrative procedures
Project Manager
![Page 33: Presentation 5](https://reader033.vdocuments.us/reader033/viewer/2022042903/568c52011a28ab4916b4f190/html5/thumbnails/33.jpg)
Chungbuk goes together with you!
Contact: Jungmee Sohn Investment Promotion & Business Support
Chungcheongbuk-do, KOREA 82-43-220-3233; [email protected]