BHANES ST EEL ST RUT ECH ENGINEERING
P.O.BOX: 504043 CHENNAI
DUBAI – UAE INDIA
T EL: 04-268 2208 FAX 04-268 2207 PHONE: +91 94867 60528
[email protected] [email protected]
www.bhanessteel.com www.strutechengg.com
![Page 2: PRE-QUALIFICATION FOR STRUCTURAL STEEL DETAILING](https://reader030.vdocuments.us/reader030/viewer/2022020703/61fb3ff82e268c58cd5bf05a/html5/thumbnails/2.jpg)
INTRODUCTION
About us
Infra Structure
PROJECTS EXECUTED
SAMPLE MODELS
INDEX
![Page 3: PRE-QUALIFICATION FOR STRUCTURAL STEEL DETAILING](https://reader030.vdocuments.us/reader030/viewer/2022020703/61fb3ff82e268c58cd5bf05a/html5/thumbnails/3.jpg)
INTRODUCTION
![Page 4: PRE-QUALIFICATION FOR STRUCTURAL STEEL DETAILING](https://reader030.vdocuments.us/reader030/viewer/2022020703/61fb3ff82e268c58cd5bf05a/html5/thumbnails/4.jpg)
About us
Bhanes Steel initially started with two experienced Xsteel modelers jointly
working with one of the engineering & fabrication company three y ears ago.
Today Bhanes Steel hav ing well trained and experienced Xsteel modelers with
Tekla Licenses Head office based in Dubai-UAE and Back Office in
Chennai – T am il Nadu - India.
Bhanes Steel, have excellent experience as an indiv idual detailing company
serv ing to support the Engineering & Fabrication companies in Oil & Gas, Power,
Petrochemical, Process Industries, Cement Plants and also Commercial Projects.
Our Engineering solutions contribute to better business outcome for clients.
With our dedicated staff of Engineers & Designers we have the capability of
handling projects of all sizes. The serv ices afford by us are Good in the industry
in the field of any kind of Structural Engineering
![Page 5: PRE-QUALIFICATION FOR STRUCTURAL STEEL DETAILING](https://reader030.vdocuments.us/reader030/viewer/2022020703/61fb3ff82e268c58cd5bf05a/html5/thumbnails/5.jpg)
Infra Structure
Dubai Office
500 Sqft Office Space
High Configured Work Stations with 1 Gbps Network
A3 Printer and Scanner
24 hrs 512 kbps Internet
Unlimited FTP Server
5000 E-mail Id’s
India Office
2000 Sqft Office Space
High Configured Work Stations with 2 Gbps Network
A3 Printer and Scanner
24 hrs 512 kbps Internet
Unlimited FTP Server
5000 E-mail Id’s
Standby Power Generator
![Page 6: PRE-QUALIFICATION FOR STRUCTURAL STEEL DETAILING](https://reader030.vdocuments.us/reader030/viewer/2022020703/61fb3ff82e268c58cd5bf05a/html5/thumbnails/6.jpg)
PROJECT EXECUTED
![Page 7: PRE-QUALIFICATION FOR STRUCTURAL STEEL DETAILING](https://reader030.vdocuments.us/reader030/viewer/2022020703/61fb3ff82e268c58cd5bf05a/html5/thumbnails/7.jpg)
TURKMENGAS DEVELOPMENT – PETROFAC
Pipe Racks/Tech Structures/Sub Station Bldgs. /
Circular/Horizontal Platforms/ Pipe supports and
Misc etc., 2010-2011
QP – PETROFAC
Pipe Racks/Tech Structures/Misc. etc.
BOROUGE 3 – UTILITIES & OFFSITE PROJECTS - HYUNDAI
Pipe Racks 2010-2011
NATIONAL UNIVERSITY HOSPITAL – TYLIN INTL
19 STORY UNIV. HOSPITALS - SINGAPORE 2010-2011
WWTPP – BAHRAIN – GS ENGG & CONSTRCTION
Pipe Racks/shelters and Misc. etc. 2010-
2011
CAR PARKING STRUCTURE – DUBAI – AL HIKMA TOWER
Building structure incl Stair case 2010-2011
STRATEGIC GRAIN RESERVE STRUCTURE – FUJAIRAH
Packing tower, Silo support Structures 2010-2011
Project Name/EPC contractor Tonnage Year
![Page 8: PRE-QUALIFICATION FOR STRUCTURAL STEEL DETAILING](https://reader030.vdocuments.us/reader030/viewer/2022020703/61fb3ff82e268c58cd5bf05a/html5/thumbnails/8.jpg)
DUBAI METRO – GREEN LINE/ATKINS
Foot Bridges - 11 stations 2009-2010
Entrance Pods – 11 stations
Entrance Pod Canopy – Narrow & Wide
EL-MERK – ALGERIA – PETROFAC
Pipe Racks/Tech Structures/Sub Station Bldgs. etc.
2009-2010
COMMERCIAL PROJECTS - UAE
U-Bora Tower - Dubai 650 2009-2010
TRA buildings - Dubai 250 2009-2010
Platinum Tower - Jumeirah 350 2009-2010
Park Tower – Dubai 235 2009-2010
Zamalek Tower - Dubai 155 2009-2010
Pinnacle Tower - Dubai 100 2009-2010
PROJECT– TECHNIP
Pipe Racks 850 2009-2010
ADCO – ABU DHABI – PETROFAC
Pipe Racks/Tech Structures/Sub Station Bldgs. etc.
2009-2010
Project Name/EPC contractor Tonnage Year
![Page 9: PRE-QUALIFICATION FOR STRUCTURAL STEEL DETAILING](https://reader030.vdocuments.us/reader030/viewer/2022020703/61fb3ff82e268c58cd5bf05a/html5/thumbnails/9.jpg)
QATALUM – QATAR / FATA – KHOME
Anode Baking Plant 2008-2009
Cast House 1 – 7 (Phase 1)
Cast House 7 -14 (Phase 2)
DUBAI METRO – RED LINE /ATKINS
Foot Bridges - 15 stations 2008-2009
Entrance Pods – 15 stations
Station Extensions – 15 stations
Entrance Pod Canopy – Narrow & Wide
WASTE TO ENERGY PLANT/QATAR – KEPPEL SEGHERS/ANSALDO
Boiler Structure 2008-2009
MARINA BAY HOTEL TOWER/SINGAPORE– ARUP
2008-2009
Project Name/EPC contractor Tonnage Year
![Page 10: PRE-QUALIFICATION FOR STRUCTURAL STEEL DETAILING](https://reader030.vdocuments.us/reader030/viewer/2022020703/61fb3ff82e268c58cd5bf05a/html5/thumbnails/10.jpg)
QURRAYYAH SEAWATER PLANT/SAUDI – SNAMPROGETTI
2007-2008
ARAMCO – KHURAIS DEVLOPMENT/SAUDI–SNAMPROGETTI
2007-2008
QATAR RASGAS TRAIN 6&7 – CHIYODA – CTJV
2007-2008
OLEFINES PLANT/YANBU – TECHNIP ITALY 2007-2008
YEMEN LNG – TECHNIP ITALY 2007-2008
FPSO TOPSIDE MODULES – SAIPEM/SBM 2007-2008
AWEER GAS TURBINE POWER STATION – FICHTNER GMBH
(STATION H – PHASE III) 2007-2008
RABIGH EXPANSION – TECHNIP ITALY
MISC STEEL DETAILING 2007-2008
NORTH BELUT ACCOM MODULE – CONOCCO PHILLIPS
2007-2008
QATAR GAS – DODSAL
Pipe Bridges 2007-2008
CHIYODA PROJECT 2007-2007
QNCC PROJECT - IHI 2007-2008
FCC SEAWATER SCRUBBER -ALSTOM 2007-2008
EMIRATES ENGG HANGER – ADPI/DAR
Project Name/EPC contractor Tonnage Year
![Page 11: PRE-QUALIFICATION FOR STRUCTURAL STEEL DETAILING](https://reader030.vdocuments.us/reader030/viewer/2022020703/61fb3ff82e268c58cd5bf05a/html5/thumbnails/11.jpg)
MISC STEEL DETAILING 2007-2008
LAYYAH POWER STATION – EXP - SIDEM
250 2006-2007
RASLAFFAN – QP – KIRCHNER ITALY
400 2006-2007
RAG AND FLARE MITIGATION - PETROFAC
250 2006-2007
SOHAR ALUMINIUM - BECHTEL
2006-2007
AISC DETAILING
Buffalo public schools – Hillery Park elementary – Buffalo, New york
Walgreens Pharmacy – Michigan
Orchard Park High School –New York
Buffalo Public School – Addition/renovation – Buffalo, New york.
Borgess Lee Memorial Hospital – Michigan
Fox Ford/Mazda – Michigan
- 800 TONS
Project Name/EPC contractor Tonnage Year
![Page 12: PRE-QUALIFICATION FOR STRUCTURAL STEEL DETAILING](https://reader030.vdocuments.us/reader030/viewer/2022020703/61fb3ff82e268c58cd5bf05a/html5/thumbnails/12.jpg)
SAMPLE MODELS
![Page 13: PRE-QUALIFICATION FOR STRUCTURAL STEEL DETAILING](https://reader030.vdocuments.us/reader030/viewer/2022020703/61fb3ff82e268c58cd5bf05a/html5/thumbnails/13.jpg)
AL-ZAMALEK TOWER – AJMAN - 50 TONS
PARK TOWER – DUBAI – 100
![Page 14: PRE-QUALIFICATION FOR STRUCTURAL STEEL DETAILING](https://reader030.vdocuments.us/reader030/viewer/2022020703/61fb3ff82e268c58cd5bf05a/html5/thumbnails/14.jpg)
U BORA– BUSINESS BAY DUBAI- 550 TONS
WAVF ROOF – NATION TOWER – ABU DHABI –225 TONS
![Page 15: PRE-QUALIFICATION FOR STRUCTURAL STEEL DETAILING](https://reader030.vdocuments.us/reader030/viewer/2022020703/61fb3ff82e268c58cd5bf05a/html5/thumbnails/15.jpg)
WWT PLANT– ABU DHABI - 125 TONS
PLATINIUM TOWER – JLT DUBAI –250 TONS
![Page 16: PRE-QUALIFICATION FOR STRUCTURAL STEEL DETAILING](https://reader030.vdocuments.us/reader030/viewer/2022020703/61fb3ff82e268c58cd5bf05a/html5/thumbnails/16.jpg)
HILLERY PARK SCHOOL BLDG
WALGREENS PHARMACY
![Page 17: PRE-QUALIFICATION FOR STRUCTURAL STEEL DETAILING](https://reader030.vdocuments.us/reader030/viewer/2022020703/61fb3ff82e268c58cd5bf05a/html5/thumbnails/17.jpg)
ORCHARD PARK HIGH SCHOOL AREA-C
THE CHEESECAKE FACTORY - NEW JERSEY
![Page 18: PRE-QUALIFICATION FOR STRUCTURAL STEEL DETAILING](https://reader030.vdocuments.us/reader030/viewer/2022020703/61fb3ff82e268c58cd5bf05a/html5/thumbnails/18.jpg)
TECHNICAL STRUCTURE - 14
SUBSTATION BUILDING-1
![Page 19: PRE-QUALIFICATION FOR STRUCTURAL STEEL DETAILING](https://reader030.vdocuments.us/reader030/viewer/2022020703/61fb3ff82e268c58cd5bf05a/html5/thumbnails/19.jpg)
QATALUM – QATAR - FATA/KHOME - ANODE BAKING PLANT
QATALUM – QATAR - FATA/KHOME - CAST HOUSE - 1
![Page 20: PRE-QUALIFICATION FOR STRUCTURAL STEEL DETAILING](https://reader030.vdocuments.us/reader030/viewer/2022020703/61fb3ff82e268c58cd5bf05a/html5/thumbnails/20.jpg)
DUBAI METRO – FOOT BRIDGES - ATKINS
QATALUM – QATAR - FATA/KHOME - CAST HOUSE - 2
![Page 21: PRE-QUALIFICATION FOR STRUCTURAL STEEL DETAILING](https://reader030.vdocuments.us/reader030/viewer/2022020703/61fb3ff82e268c58cd5bf05a/html5/thumbnails/21.jpg)
![Page 22: PRE-QUALIFICATION FOR STRUCTURAL STEEL DETAILING](https://reader030.vdocuments.us/reader030/viewer/2022020703/61fb3ff82e268c58cd5bf05a/html5/thumbnails/22.jpg)
DUBAI METRO - ENTRANCE PODS - ATKINS
![Page 23: PRE-QUALIFICATION FOR STRUCTURAL STEEL DETAILING](https://reader030.vdocuments.us/reader030/viewer/2022020703/61fb3ff82e268c58cd5bf05a/html5/thumbnails/23.jpg)
DUBAI METRO - STATION EXTENTIONS - ATKINS
![Page 24: PRE-QUALIFICATION FOR STRUCTURAL STEEL DETAILING](https://reader030.vdocuments.us/reader030/viewer/2022020703/61fb3ff82e268c58cd5bf05a/html5/thumbnails/24.jpg)
DUBAI METRO - ENTRANCE POD WIDE CANOPY - ATKINS
DUBAI METRO - ENTRANCE POD NARROW CANOPY - ATKINS
![Page 25: PRE-QUALIFICATION FOR STRUCTURAL STEEL DETAILING](https://reader030.vdocuments.us/reader030/viewer/2022020703/61fb3ff82e268c58cd5bf05a/html5/thumbnails/25.jpg)
SANDS MARINA BAY TOWER 1 – ARUP SINGAPORE
![Page 26: PRE-QUALIFICATION FOR STRUCTURAL STEEL DETAILING](https://reader030.vdocuments.us/reader030/viewer/2022020703/61fb3ff82e268c58cd5bf05a/html5/thumbnails/26.jpg)
WASTE TO ENERGY PLANT – QATAR - KEPPEL/ANSALDO
![Page 27: PRE-QUALIFICATION FOR STRUCTURAL STEEL DETAILING](https://reader030.vdocuments.us/reader030/viewer/2022020703/61fb3ff82e268c58cd5bf05a/html5/thumbnails/27.jpg)
QURRAYYAH SEAWATER PLANT/SAUDI - SNAMPROGETTI
![Page 28: PRE-QUALIFICATION FOR STRUCTURAL STEEL DETAILING](https://reader030.vdocuments.us/reader030/viewer/2022020703/61fb3ff82e268c58cd5bf05a/html5/thumbnails/28.jpg)
![Page 29: PRE-QUALIFICATION FOR STRUCTURAL STEEL DETAILING](https://reader030.vdocuments.us/reader030/viewer/2022020703/61fb3ff82e268c58cd5bf05a/html5/thumbnails/29.jpg)
ARAMCO - KHURAIS DEVELOPMENT – SAUDI - SNAMPROGETTI
![Page 30: PRE-QUALIFICATION FOR STRUCTURAL STEEL DETAILING](https://reader030.vdocuments.us/reader030/viewer/2022020703/61fb3ff82e268c58cd5bf05a/html5/thumbnails/30.jpg)
![Page 31: PRE-QUALIFICATION FOR STRUCTURAL STEEL DETAILING](https://reader030.vdocuments.us/reader030/viewer/2022020703/61fb3ff82e268c58cd5bf05a/html5/thumbnails/31.jpg)
QATAR RAS GAS TRAIN 6 & 7 - CHIYODA CTJV
![Page 32: PRE-QUALIFICATION FOR STRUCTURAL STEEL DETAILING](https://reader030.vdocuments.us/reader030/viewer/2022020703/61fb3ff82e268c58cd5bf05a/html5/thumbnails/32.jpg)
![Page 33: PRE-QUALIFICATION FOR STRUCTURAL STEEL DETAILING](https://reader030.vdocuments.us/reader030/viewer/2022020703/61fb3ff82e268c58cd5bf05a/html5/thumbnails/33.jpg)
QATAR RAS GAS TRAIN 6&7/CHIYODA
![Page 34: PRE-QUALIFICATION FOR STRUCTURAL STEEL DETAILING](https://reader030.vdocuments.us/reader030/viewer/2022020703/61fb3ff82e268c58cd5bf05a/html5/thumbnails/34.jpg)
OLEFINS PLANT/YANBU – TECHNIP ITALY
![Page 35: PRE-QUALIFICATION FOR STRUCTURAL STEEL DETAILING](https://reader030.vdocuments.us/reader030/viewer/2022020703/61fb3ff82e268c58cd5bf05a/html5/thumbnails/35.jpg)
![Page 36: PRE-QUALIFICATION FOR STRUCTURAL STEEL DETAILING](https://reader030.vdocuments.us/reader030/viewer/2022020703/61fb3ff82e268c58cd5bf05a/html5/thumbnails/36.jpg)
YEMEN LNG - TECHNIP ITALY
![Page 37: PRE-QUALIFICATION FOR STRUCTURAL STEEL DETAILING](https://reader030.vdocuments.us/reader030/viewer/2022020703/61fb3ff82e268c58cd5bf05a/html5/thumbnails/37.jpg)
![Page 38: PRE-QUALIFICATION FOR STRUCTURAL STEEL DETAILING](https://reader030.vdocuments.us/reader030/viewer/2022020703/61fb3ff82e268c58cd5bf05a/html5/thumbnails/38.jpg)
![Page 39: PRE-QUALIFICATION FOR STRUCTURAL STEEL DETAILING](https://reader030.vdocuments.us/reader030/viewer/2022020703/61fb3ff82e268c58cd5bf05a/html5/thumbnails/39.jpg)
FPSO TOPSIDE MODULES – SBM/SAIPEM
![Page 40: PRE-QUALIFICATION FOR STRUCTURAL STEEL DETAILING](https://reader030.vdocuments.us/reader030/viewer/2022020703/61fb3ff82e268c58cd5bf05a/html5/thumbnails/40.jpg)
![Page 41: PRE-QUALIFICATION FOR STRUCTURAL STEEL DETAILING](https://reader030.vdocuments.us/reader030/viewer/2022020703/61fb3ff82e268c58cd5bf05a/html5/thumbnails/41.jpg)
AWEER GAS TURBINE POWER STATION- FICHTNER GMBH
![Page 42: PRE-QUALIFICATION FOR STRUCTURAL STEEL DETAILING](https://reader030.vdocuments.us/reader030/viewer/2022020703/61fb3ff82e268c58cd5bf05a/html5/thumbnails/42.jpg)
![Page 43: PRE-QUALIFICATION FOR STRUCTURAL STEEL DETAILING](https://reader030.vdocuments.us/reader030/viewer/2022020703/61fb3ff82e268c58cd5bf05a/html5/thumbnails/43.jpg)
NORTH BELUT ACCOMADATION MODULE – CONOCCO PHILLIPS
![Page 44: PRE-QUALIFICATION FOR STRUCTURAL STEEL DETAILING](https://reader030.vdocuments.us/reader030/viewer/2022020703/61fb3ff82e268c58cd5bf05a/html5/thumbnails/44.jpg)
SOHAR ALUMINIUM - BECHTEL
![Page 45: PRE-QUALIFICATION FOR STRUCTURAL STEEL DETAILING](https://reader030.vdocuments.us/reader030/viewer/2022020703/61fb3ff82e268c58cd5bf05a/html5/thumbnails/45.jpg)