Setting Up Assets and PM Schedules (PPP04)
PMs Procedures and Projects Track
1 Open Internet Explorer 2 Type into the address bar wwwmaintenanceconnectioncom 3 Click Log In button 4 Enter the following
Member ID PPP_CHECKPOINT Password Checkpoint2014
Note During the seminar please do not ldquoSaverdquo while following along with a specific example unless directed to do so by your course instructor
Wireless SSID CHECKPOINT Wireless Password CHECKPOINT
Logon Instructions
Presenter Name Brandon Palana
Background information
bull Role and expertise at Maintenance Connection
bull Fun Fact
Presenter Bio
PM Assets Tab Defined
Fields and Columns
Adding Assets to Schedule
Agenda
PM Assets Tab Overview
Repair Center Filter
Use Asset Defaults
Header Action Bar
PM Assets Tab Defined
Provides a list of Assets Locations associated with the selected PM schedule
Assets added will be used for generation of Work Orders
PM Assets Tab Overview
Filters Assets displayed to specific Repair Centers
Repair Center specified on PM Asset record
Repair Center Filter
Control designates fields of Asset record that should be referenced for generation
If selected the following options will appear to choose from
Use Asset Defaults
If Indicator is not checked
bull Asset attributes from PM Asset record regardless of current value on Asset
bull Value stored with Asset at time of record creation
If Indicator is checked
bull Attributes of Asset at time of Work Order generation
Use Asset Defaults (contrsquod)
Addhellip Asset to schedule
bull Asset Lookup is used
bull Asset Location Popup for entering organizational attribute fields
Header Action Bar
Updatehellip button
bull Update same information on multiple Assets
bull Fields left blank will not be affected
Header Action Bar (contrsquod)
Removehellip Assets from schedule
bull Select single or multiple Assets and remove from PM schedule
Header Action Bar (contrsquod)
In this example the PM Assets Tab will be explored by filtering Assets by Repair Center as well as removing Assets from the schedule
Exploring the PM Assets Tab Example
PM Assets Tab is selected and Asset is populated for Assets with associated Repair Centers
Exploring the PM Assets Tab Example (contrsquod)
Repair Center filter is updated to include All Assets for this PM schedule
Exploring the PM Assets Tab Example (contrsquod)
Asset is removed from schedule
Exploring the PM Assets Tab Example (contrsquod)
Selection Box
Name
Parent Location
Route Order
Next Scheduled
Next Procedure
Enabled
Fields and Columns
Select one or more Assets from list to update or remove
Provides revert control capability
Selection Box
Name and ID of designated Asset displayed
Work Order generation information
Asset In-Service and PM Schedule Disabled notification
Name
Location of Asset in the Asset Hierarchy
Field lists all locations listed above Asset Location
Parent Location
Determines the order of Work Order generation
bull Also determines order displayed in list
bull Useful for print order
Route Order
Displays the next scheduled date or next scheduled meter interval
bull Date can change if based on Work Order completion
Next Scheduled
Displays next scheduled procedure to be performed for Asset
bull Helpful with multiple scheduled procedures
Next Procedure
Indicates if schedule is enabled for individual Asset
Enabled
Adding Assets Overview
Asset Location Module Lookup
Asset Location Popup
Adding Assets to Schedule
Enabled Assets added to Assets tab will have Work Orders generated
Procedures also can determine which Assets will be associated with PM
Adding Assets Overview
Addhellip button opens Asset Location Module Lookup
Use controls to find Asset(s) to be added
Asset Location Module Lookup
Example of adding Assets to PM
Asset Location Module Lookup (contrsquod)
Displays information to determine next scheduled maintenance
bull Route Order
bull Last Generated and Last Completed
Asset Location Popup
bull Meter Intervals
bull Occurrence Counter and Next Scheduled Interval Counter
Asset Location Popup (contrsquod)
Example of Last Generated and Last Completed date
Asset Location Popup (contrsquod)
Displays organizational attributes
bull Repair Center stock room and tool room
bull Shift
Asset Location Popup (contrsquod)
bull Supervisor
bull Shop department account etc
bull Enabled
Asset Location Popup (contrsquod)
Example of field values retrieved from Asset
Asset Location Popup (contrsquod)
Now letrsquos practice creating a test Asset and adding the Asset to an existing PM schedule
Add Asset to Schedule Hands-On
Locate the Root Asset (top Asset of the Tree)
Right mouse click directly on the Root Asset and select Add Asset Locationhellip
Add Asset to Schedule Hands-On (contrsquod)
Fill in the required details for the Asset (highlighted in blue)
bull Enter PPP04TEST_YOURINITIALS for the Asset ID
bull Enter PPP04Test_YourName for the Asset Name
Save the Asset
Add Asset to Schedule Hands-On (contrsquod)
Navigate to PM ID PPP04TEST in the Preventive Maint Explorer
Select the PM to open it in the Work Center
Navigate to the Assets Tab
Add Asset to Schedule Hands-On (contrsquod)
Click the Addhellip button in the Action Header Bar
Add your newly created Test Asset
Add Asset to Schedule Hands-On (contrsquod)
Review Asset generation details
Click Apply Close
Save the PM
Asset will be added to Schedule
Add Asset to Schedule Hands-On (contrsquod)
You have now successfully completed creating a test Asset and adding it to an existing PM Schedule
Add Asset to Schedule Hands-On (contrsquod)
For access to documentation and tutorials reference wwwmcuserconnectcom
MC User Connect
MCUC Documentation Tutorials Article PDF Video Tutorial
User Guide
Setup Basic PM Schedule
Attach Assets to PM Schedule
Assets Tab (PM Module)
Add Asset to Schedule
Additional Resources
Did you know you can take a Quiz to test your knowledge of todayrsquos content
bull Check it out on MC User Connect (wwwmcuserconnectcom)
bull Located in the MC eLearning folder PMs Procedures and Projects Course Quizzes
Test Your Knowledgehellip
1 Open Internet Explorer 2 Type into the address bar wwwmaintenanceconnectioncom 3 Click Log In button 4 Enter the following
Member ID PPP_CHECKPOINT Password Checkpoint2014
Note During the seminar please do not ldquoSaverdquo while following along with a specific example unless directed to do so by your course instructor
Wireless SSID CHECKPOINT Wireless Password CHECKPOINT
Logon Instructions
Presenter Name Brandon Palana
Background information
bull Role and expertise at Maintenance Connection
bull Fun Fact
Presenter Bio
PM Assets Tab Defined
Fields and Columns
Adding Assets to Schedule
Agenda
PM Assets Tab Overview
Repair Center Filter
Use Asset Defaults
Header Action Bar
PM Assets Tab Defined
Provides a list of Assets Locations associated with the selected PM schedule
Assets added will be used for generation of Work Orders
PM Assets Tab Overview
Filters Assets displayed to specific Repair Centers
Repair Center specified on PM Asset record
Repair Center Filter
Control designates fields of Asset record that should be referenced for generation
If selected the following options will appear to choose from
Use Asset Defaults
If Indicator is not checked
bull Asset attributes from PM Asset record regardless of current value on Asset
bull Value stored with Asset at time of record creation
If Indicator is checked
bull Attributes of Asset at time of Work Order generation
Use Asset Defaults (contrsquod)
Addhellip Asset to schedule
bull Asset Lookup is used
bull Asset Location Popup for entering organizational attribute fields
Header Action Bar
Updatehellip button
bull Update same information on multiple Assets
bull Fields left blank will not be affected
Header Action Bar (contrsquod)
Removehellip Assets from schedule
bull Select single or multiple Assets and remove from PM schedule
Header Action Bar (contrsquod)
In this example the PM Assets Tab will be explored by filtering Assets by Repair Center as well as removing Assets from the schedule
Exploring the PM Assets Tab Example
PM Assets Tab is selected and Asset is populated for Assets with associated Repair Centers
Exploring the PM Assets Tab Example (contrsquod)
Repair Center filter is updated to include All Assets for this PM schedule
Exploring the PM Assets Tab Example (contrsquod)
Asset is removed from schedule
Exploring the PM Assets Tab Example (contrsquod)
Selection Box
Name
Parent Location
Route Order
Next Scheduled
Next Procedure
Enabled
Fields and Columns
Select one or more Assets from list to update or remove
Provides revert control capability
Selection Box
Name and ID of designated Asset displayed
Work Order generation information
Asset In-Service and PM Schedule Disabled notification
Name
Location of Asset in the Asset Hierarchy
Field lists all locations listed above Asset Location
Parent Location
Determines the order of Work Order generation
bull Also determines order displayed in list
bull Useful for print order
Route Order
Displays the next scheduled date or next scheduled meter interval
bull Date can change if based on Work Order completion
Next Scheduled
Displays next scheduled procedure to be performed for Asset
bull Helpful with multiple scheduled procedures
Next Procedure
Indicates if schedule is enabled for individual Asset
Enabled
Adding Assets Overview
Asset Location Module Lookup
Asset Location Popup
Adding Assets to Schedule
Enabled Assets added to Assets tab will have Work Orders generated
Procedures also can determine which Assets will be associated with PM
Adding Assets Overview
Addhellip button opens Asset Location Module Lookup
Use controls to find Asset(s) to be added
Asset Location Module Lookup
Example of adding Assets to PM
Asset Location Module Lookup (contrsquod)
Displays information to determine next scheduled maintenance
bull Route Order
bull Last Generated and Last Completed
Asset Location Popup
bull Meter Intervals
bull Occurrence Counter and Next Scheduled Interval Counter
Asset Location Popup (contrsquod)
Example of Last Generated and Last Completed date
Asset Location Popup (contrsquod)
Displays organizational attributes
bull Repair Center stock room and tool room
bull Shift
Asset Location Popup (contrsquod)
bull Supervisor
bull Shop department account etc
bull Enabled
Asset Location Popup (contrsquod)
Example of field values retrieved from Asset
Asset Location Popup (contrsquod)
Now letrsquos practice creating a test Asset and adding the Asset to an existing PM schedule
Add Asset to Schedule Hands-On
Locate the Root Asset (top Asset of the Tree)
Right mouse click directly on the Root Asset and select Add Asset Locationhellip
Add Asset to Schedule Hands-On (contrsquod)
Fill in the required details for the Asset (highlighted in blue)
bull Enter PPP04TEST_YOURINITIALS for the Asset ID
bull Enter PPP04Test_YourName for the Asset Name
Save the Asset
Add Asset to Schedule Hands-On (contrsquod)
Navigate to PM ID PPP04TEST in the Preventive Maint Explorer
Select the PM to open it in the Work Center
Navigate to the Assets Tab
Add Asset to Schedule Hands-On (contrsquod)
Click the Addhellip button in the Action Header Bar
Add your newly created Test Asset
Add Asset to Schedule Hands-On (contrsquod)
Review Asset generation details
Click Apply Close
Save the PM
Asset will be added to Schedule
Add Asset to Schedule Hands-On (contrsquod)
You have now successfully completed creating a test Asset and adding it to an existing PM Schedule
Add Asset to Schedule Hands-On (contrsquod)
For access to documentation and tutorials reference wwwmcuserconnectcom
MC User Connect
MCUC Documentation Tutorials Article PDF Video Tutorial
User Guide
Setup Basic PM Schedule
Attach Assets to PM Schedule
Assets Tab (PM Module)
Add Asset to Schedule
Additional Resources
Did you know you can take a Quiz to test your knowledge of todayrsquos content
bull Check it out on MC User Connect (wwwmcuserconnectcom)
bull Located in the MC eLearning folder PMs Procedures and Projects Course Quizzes
Test Your Knowledgehellip
Presenter Name Brandon Palana
Background information
bull Role and expertise at Maintenance Connection
bull Fun Fact
Presenter Bio
PM Assets Tab Defined
Fields and Columns
Adding Assets to Schedule
Agenda
PM Assets Tab Overview
Repair Center Filter
Use Asset Defaults
Header Action Bar
PM Assets Tab Defined
Provides a list of Assets Locations associated with the selected PM schedule
Assets added will be used for generation of Work Orders
PM Assets Tab Overview
Filters Assets displayed to specific Repair Centers
Repair Center specified on PM Asset record
Repair Center Filter
Control designates fields of Asset record that should be referenced for generation
If selected the following options will appear to choose from
Use Asset Defaults
If Indicator is not checked
bull Asset attributes from PM Asset record regardless of current value on Asset
bull Value stored with Asset at time of record creation
If Indicator is checked
bull Attributes of Asset at time of Work Order generation
Use Asset Defaults (contrsquod)
Addhellip Asset to schedule
bull Asset Lookup is used
bull Asset Location Popup for entering organizational attribute fields
Header Action Bar
Updatehellip button
bull Update same information on multiple Assets
bull Fields left blank will not be affected
Header Action Bar (contrsquod)
Removehellip Assets from schedule
bull Select single or multiple Assets and remove from PM schedule
Header Action Bar (contrsquod)
In this example the PM Assets Tab will be explored by filtering Assets by Repair Center as well as removing Assets from the schedule
Exploring the PM Assets Tab Example
PM Assets Tab is selected and Asset is populated for Assets with associated Repair Centers
Exploring the PM Assets Tab Example (contrsquod)
Repair Center filter is updated to include All Assets for this PM schedule
Exploring the PM Assets Tab Example (contrsquod)
Asset is removed from schedule
Exploring the PM Assets Tab Example (contrsquod)
Selection Box
Name
Parent Location
Route Order
Next Scheduled
Next Procedure
Enabled
Fields and Columns
Select one or more Assets from list to update or remove
Provides revert control capability
Selection Box
Name and ID of designated Asset displayed
Work Order generation information
Asset In-Service and PM Schedule Disabled notification
Name
Location of Asset in the Asset Hierarchy
Field lists all locations listed above Asset Location
Parent Location
Determines the order of Work Order generation
bull Also determines order displayed in list
bull Useful for print order
Route Order
Displays the next scheduled date or next scheduled meter interval
bull Date can change if based on Work Order completion
Next Scheduled
Displays next scheduled procedure to be performed for Asset
bull Helpful with multiple scheduled procedures
Next Procedure
Indicates if schedule is enabled for individual Asset
Enabled
Adding Assets Overview
Asset Location Module Lookup
Asset Location Popup
Adding Assets to Schedule
Enabled Assets added to Assets tab will have Work Orders generated
Procedures also can determine which Assets will be associated with PM
Adding Assets Overview
Addhellip button opens Asset Location Module Lookup
Use controls to find Asset(s) to be added
Asset Location Module Lookup
Example of adding Assets to PM
Asset Location Module Lookup (contrsquod)
Displays information to determine next scheduled maintenance
bull Route Order
bull Last Generated and Last Completed
Asset Location Popup
bull Meter Intervals
bull Occurrence Counter and Next Scheduled Interval Counter
Asset Location Popup (contrsquod)
Example of Last Generated and Last Completed date
Asset Location Popup (contrsquod)
Displays organizational attributes
bull Repair Center stock room and tool room
bull Shift
Asset Location Popup (contrsquod)
bull Supervisor
bull Shop department account etc
bull Enabled
Asset Location Popup (contrsquod)
Example of field values retrieved from Asset
Asset Location Popup (contrsquod)
Now letrsquos practice creating a test Asset and adding the Asset to an existing PM schedule
Add Asset to Schedule Hands-On
Locate the Root Asset (top Asset of the Tree)
Right mouse click directly on the Root Asset and select Add Asset Locationhellip
Add Asset to Schedule Hands-On (contrsquod)
Fill in the required details for the Asset (highlighted in blue)
bull Enter PPP04TEST_YOURINITIALS for the Asset ID
bull Enter PPP04Test_YourName for the Asset Name
Save the Asset
Add Asset to Schedule Hands-On (contrsquod)
Navigate to PM ID PPP04TEST in the Preventive Maint Explorer
Select the PM to open it in the Work Center
Navigate to the Assets Tab
Add Asset to Schedule Hands-On (contrsquod)
Click the Addhellip button in the Action Header Bar
Add your newly created Test Asset
Add Asset to Schedule Hands-On (contrsquod)
Review Asset generation details
Click Apply Close
Save the PM
Asset will be added to Schedule
Add Asset to Schedule Hands-On (contrsquod)
You have now successfully completed creating a test Asset and adding it to an existing PM Schedule
Add Asset to Schedule Hands-On (contrsquod)
For access to documentation and tutorials reference wwwmcuserconnectcom
MC User Connect
MCUC Documentation Tutorials Article PDF Video Tutorial
User Guide
Setup Basic PM Schedule
Attach Assets to PM Schedule
Assets Tab (PM Module)
Add Asset to Schedule
Additional Resources
Did you know you can take a Quiz to test your knowledge of todayrsquos content
bull Check it out on MC User Connect (wwwmcuserconnectcom)
bull Located in the MC eLearning folder PMs Procedures and Projects Course Quizzes
Test Your Knowledgehellip
PM Assets Tab Defined
Fields and Columns
Adding Assets to Schedule
Agenda
PM Assets Tab Overview
Repair Center Filter
Use Asset Defaults
Header Action Bar
PM Assets Tab Defined
Provides a list of Assets Locations associated with the selected PM schedule
Assets added will be used for generation of Work Orders
PM Assets Tab Overview
Filters Assets displayed to specific Repair Centers
Repair Center specified on PM Asset record
Repair Center Filter
Control designates fields of Asset record that should be referenced for generation
If selected the following options will appear to choose from
Use Asset Defaults
If Indicator is not checked
bull Asset attributes from PM Asset record regardless of current value on Asset
bull Value stored with Asset at time of record creation
If Indicator is checked
bull Attributes of Asset at time of Work Order generation
Use Asset Defaults (contrsquod)
Addhellip Asset to schedule
bull Asset Lookup is used
bull Asset Location Popup for entering organizational attribute fields
Header Action Bar
Updatehellip button
bull Update same information on multiple Assets
bull Fields left blank will not be affected
Header Action Bar (contrsquod)
Removehellip Assets from schedule
bull Select single or multiple Assets and remove from PM schedule
Header Action Bar (contrsquod)
In this example the PM Assets Tab will be explored by filtering Assets by Repair Center as well as removing Assets from the schedule
Exploring the PM Assets Tab Example
PM Assets Tab is selected and Asset is populated for Assets with associated Repair Centers
Exploring the PM Assets Tab Example (contrsquod)
Repair Center filter is updated to include All Assets for this PM schedule
Exploring the PM Assets Tab Example (contrsquod)
Asset is removed from schedule
Exploring the PM Assets Tab Example (contrsquod)
Selection Box
Name
Parent Location
Route Order
Next Scheduled
Next Procedure
Enabled
Fields and Columns
Select one or more Assets from list to update or remove
Provides revert control capability
Selection Box
Name and ID of designated Asset displayed
Work Order generation information
Asset In-Service and PM Schedule Disabled notification
Name
Location of Asset in the Asset Hierarchy
Field lists all locations listed above Asset Location
Parent Location
Determines the order of Work Order generation
bull Also determines order displayed in list
bull Useful for print order
Route Order
Displays the next scheduled date or next scheduled meter interval
bull Date can change if based on Work Order completion
Next Scheduled
Displays next scheduled procedure to be performed for Asset
bull Helpful with multiple scheduled procedures
Next Procedure
Indicates if schedule is enabled for individual Asset
Enabled
Adding Assets Overview
Asset Location Module Lookup
Asset Location Popup
Adding Assets to Schedule
Enabled Assets added to Assets tab will have Work Orders generated
Procedures also can determine which Assets will be associated with PM
Adding Assets Overview
Addhellip button opens Asset Location Module Lookup
Use controls to find Asset(s) to be added
Asset Location Module Lookup
Example of adding Assets to PM
Asset Location Module Lookup (contrsquod)
Displays information to determine next scheduled maintenance
bull Route Order
bull Last Generated and Last Completed
Asset Location Popup
bull Meter Intervals
bull Occurrence Counter and Next Scheduled Interval Counter
Asset Location Popup (contrsquod)
Example of Last Generated and Last Completed date
Asset Location Popup (contrsquod)
Displays organizational attributes
bull Repair Center stock room and tool room
bull Shift
Asset Location Popup (contrsquod)
bull Supervisor
bull Shop department account etc
bull Enabled
Asset Location Popup (contrsquod)
Example of field values retrieved from Asset
Asset Location Popup (contrsquod)
Now letrsquos practice creating a test Asset and adding the Asset to an existing PM schedule
Add Asset to Schedule Hands-On
Locate the Root Asset (top Asset of the Tree)
Right mouse click directly on the Root Asset and select Add Asset Locationhellip
Add Asset to Schedule Hands-On (contrsquod)
Fill in the required details for the Asset (highlighted in blue)
bull Enter PPP04TEST_YOURINITIALS for the Asset ID
bull Enter PPP04Test_YourName for the Asset Name
Save the Asset
Add Asset to Schedule Hands-On (contrsquod)
Navigate to PM ID PPP04TEST in the Preventive Maint Explorer
Select the PM to open it in the Work Center
Navigate to the Assets Tab
Add Asset to Schedule Hands-On (contrsquod)
Click the Addhellip button in the Action Header Bar
Add your newly created Test Asset
Add Asset to Schedule Hands-On (contrsquod)
Review Asset generation details
Click Apply Close
Save the PM
Asset will be added to Schedule
Add Asset to Schedule Hands-On (contrsquod)
You have now successfully completed creating a test Asset and adding it to an existing PM Schedule
Add Asset to Schedule Hands-On (contrsquod)
For access to documentation and tutorials reference wwwmcuserconnectcom
MC User Connect
MCUC Documentation Tutorials Article PDF Video Tutorial
User Guide
Setup Basic PM Schedule
Attach Assets to PM Schedule
Assets Tab (PM Module)
Add Asset to Schedule
Additional Resources
Did you know you can take a Quiz to test your knowledge of todayrsquos content
bull Check it out on MC User Connect (wwwmcuserconnectcom)
bull Located in the MC eLearning folder PMs Procedures and Projects Course Quizzes
Test Your Knowledgehellip
PM Assets Tab Overview
Repair Center Filter
Use Asset Defaults
Header Action Bar
PM Assets Tab Defined
Provides a list of Assets Locations associated with the selected PM schedule
Assets added will be used for generation of Work Orders
PM Assets Tab Overview
Filters Assets displayed to specific Repair Centers
Repair Center specified on PM Asset record
Repair Center Filter
Control designates fields of Asset record that should be referenced for generation
If selected the following options will appear to choose from
Use Asset Defaults
If Indicator is not checked
bull Asset attributes from PM Asset record regardless of current value on Asset
bull Value stored with Asset at time of record creation
If Indicator is checked
bull Attributes of Asset at time of Work Order generation
Use Asset Defaults (contrsquod)
Addhellip Asset to schedule
bull Asset Lookup is used
bull Asset Location Popup for entering organizational attribute fields
Header Action Bar
Updatehellip button
bull Update same information on multiple Assets
bull Fields left blank will not be affected
Header Action Bar (contrsquod)
Removehellip Assets from schedule
bull Select single or multiple Assets and remove from PM schedule
Header Action Bar (contrsquod)
In this example the PM Assets Tab will be explored by filtering Assets by Repair Center as well as removing Assets from the schedule
Exploring the PM Assets Tab Example
PM Assets Tab is selected and Asset is populated for Assets with associated Repair Centers
Exploring the PM Assets Tab Example (contrsquod)
Repair Center filter is updated to include All Assets for this PM schedule
Exploring the PM Assets Tab Example (contrsquod)
Asset is removed from schedule
Exploring the PM Assets Tab Example (contrsquod)
Selection Box
Name
Parent Location
Route Order
Next Scheduled
Next Procedure
Enabled
Fields and Columns
Select one or more Assets from list to update or remove
Provides revert control capability
Selection Box
Name and ID of designated Asset displayed
Work Order generation information
Asset In-Service and PM Schedule Disabled notification
Name
Location of Asset in the Asset Hierarchy
Field lists all locations listed above Asset Location
Parent Location
Determines the order of Work Order generation
bull Also determines order displayed in list
bull Useful for print order
Route Order
Displays the next scheduled date or next scheduled meter interval
bull Date can change if based on Work Order completion
Next Scheduled
Displays next scheduled procedure to be performed for Asset
bull Helpful with multiple scheduled procedures
Next Procedure
Indicates if schedule is enabled for individual Asset
Enabled
Adding Assets Overview
Asset Location Module Lookup
Asset Location Popup
Adding Assets to Schedule
Enabled Assets added to Assets tab will have Work Orders generated
Procedures also can determine which Assets will be associated with PM
Adding Assets Overview
Addhellip button opens Asset Location Module Lookup
Use controls to find Asset(s) to be added
Asset Location Module Lookup
Example of adding Assets to PM
Asset Location Module Lookup (contrsquod)
Displays information to determine next scheduled maintenance
bull Route Order
bull Last Generated and Last Completed
Asset Location Popup
bull Meter Intervals
bull Occurrence Counter and Next Scheduled Interval Counter
Asset Location Popup (contrsquod)
Example of Last Generated and Last Completed date
Asset Location Popup (contrsquod)
Displays organizational attributes
bull Repair Center stock room and tool room
bull Shift
Asset Location Popup (contrsquod)
bull Supervisor
bull Shop department account etc
bull Enabled
Asset Location Popup (contrsquod)
Example of field values retrieved from Asset
Asset Location Popup (contrsquod)
Now letrsquos practice creating a test Asset and adding the Asset to an existing PM schedule
Add Asset to Schedule Hands-On
Locate the Root Asset (top Asset of the Tree)
Right mouse click directly on the Root Asset and select Add Asset Locationhellip
Add Asset to Schedule Hands-On (contrsquod)
Fill in the required details for the Asset (highlighted in blue)
bull Enter PPP04TEST_YOURINITIALS for the Asset ID
bull Enter PPP04Test_YourName for the Asset Name
Save the Asset
Add Asset to Schedule Hands-On (contrsquod)
Navigate to PM ID PPP04TEST in the Preventive Maint Explorer
Select the PM to open it in the Work Center
Navigate to the Assets Tab
Add Asset to Schedule Hands-On (contrsquod)
Click the Addhellip button in the Action Header Bar
Add your newly created Test Asset
Add Asset to Schedule Hands-On (contrsquod)
Review Asset generation details
Click Apply Close
Save the PM
Asset will be added to Schedule
Add Asset to Schedule Hands-On (contrsquod)
You have now successfully completed creating a test Asset and adding it to an existing PM Schedule
Add Asset to Schedule Hands-On (contrsquod)
For access to documentation and tutorials reference wwwmcuserconnectcom
MC User Connect
MCUC Documentation Tutorials Article PDF Video Tutorial
User Guide
Setup Basic PM Schedule
Attach Assets to PM Schedule
Assets Tab (PM Module)
Add Asset to Schedule
Additional Resources
Did you know you can take a Quiz to test your knowledge of todayrsquos content
bull Check it out on MC User Connect (wwwmcuserconnectcom)
bull Located in the MC eLearning folder PMs Procedures and Projects Course Quizzes
Test Your Knowledgehellip
Provides a list of Assets Locations associated with the selected PM schedule
Assets added will be used for generation of Work Orders
PM Assets Tab Overview
Filters Assets displayed to specific Repair Centers
Repair Center specified on PM Asset record
Repair Center Filter
Control designates fields of Asset record that should be referenced for generation
If selected the following options will appear to choose from
Use Asset Defaults
If Indicator is not checked
bull Asset attributes from PM Asset record regardless of current value on Asset
bull Value stored with Asset at time of record creation
If Indicator is checked
bull Attributes of Asset at time of Work Order generation
Use Asset Defaults (contrsquod)
Addhellip Asset to schedule
bull Asset Lookup is used
bull Asset Location Popup for entering organizational attribute fields
Header Action Bar
Updatehellip button
bull Update same information on multiple Assets
bull Fields left blank will not be affected
Header Action Bar (contrsquod)
Removehellip Assets from schedule
bull Select single or multiple Assets and remove from PM schedule
Header Action Bar (contrsquod)
In this example the PM Assets Tab will be explored by filtering Assets by Repair Center as well as removing Assets from the schedule
Exploring the PM Assets Tab Example
PM Assets Tab is selected and Asset is populated for Assets with associated Repair Centers
Exploring the PM Assets Tab Example (contrsquod)
Repair Center filter is updated to include All Assets for this PM schedule
Exploring the PM Assets Tab Example (contrsquod)
Asset is removed from schedule
Exploring the PM Assets Tab Example (contrsquod)
Selection Box
Name
Parent Location
Route Order
Next Scheduled
Next Procedure
Enabled
Fields and Columns
Select one or more Assets from list to update or remove
Provides revert control capability
Selection Box
Name and ID of designated Asset displayed
Work Order generation information
Asset In-Service and PM Schedule Disabled notification
Name
Location of Asset in the Asset Hierarchy
Field lists all locations listed above Asset Location
Parent Location
Determines the order of Work Order generation
bull Also determines order displayed in list
bull Useful for print order
Route Order
Displays the next scheduled date or next scheduled meter interval
bull Date can change if based on Work Order completion
Next Scheduled
Displays next scheduled procedure to be performed for Asset
bull Helpful with multiple scheduled procedures
Next Procedure
Indicates if schedule is enabled for individual Asset
Enabled
Adding Assets Overview
Asset Location Module Lookup
Asset Location Popup
Adding Assets to Schedule
Enabled Assets added to Assets tab will have Work Orders generated
Procedures also can determine which Assets will be associated with PM
Adding Assets Overview
Addhellip button opens Asset Location Module Lookup
Use controls to find Asset(s) to be added
Asset Location Module Lookup
Example of adding Assets to PM
Asset Location Module Lookup (contrsquod)
Displays information to determine next scheduled maintenance
bull Route Order
bull Last Generated and Last Completed
Asset Location Popup
bull Meter Intervals
bull Occurrence Counter and Next Scheduled Interval Counter
Asset Location Popup (contrsquod)
Example of Last Generated and Last Completed date
Asset Location Popup (contrsquod)
Displays organizational attributes
bull Repair Center stock room and tool room
bull Shift
Asset Location Popup (contrsquod)
bull Supervisor
bull Shop department account etc
bull Enabled
Asset Location Popup (contrsquod)
Example of field values retrieved from Asset
Asset Location Popup (contrsquod)
Now letrsquos practice creating a test Asset and adding the Asset to an existing PM schedule
Add Asset to Schedule Hands-On
Locate the Root Asset (top Asset of the Tree)
Right mouse click directly on the Root Asset and select Add Asset Locationhellip
Add Asset to Schedule Hands-On (contrsquod)
Fill in the required details for the Asset (highlighted in blue)
bull Enter PPP04TEST_YOURINITIALS for the Asset ID
bull Enter PPP04Test_YourName for the Asset Name
Save the Asset
Add Asset to Schedule Hands-On (contrsquod)
Navigate to PM ID PPP04TEST in the Preventive Maint Explorer
Select the PM to open it in the Work Center
Navigate to the Assets Tab
Add Asset to Schedule Hands-On (contrsquod)
Click the Addhellip button in the Action Header Bar
Add your newly created Test Asset
Add Asset to Schedule Hands-On (contrsquod)
Review Asset generation details
Click Apply Close
Save the PM
Asset will be added to Schedule
Add Asset to Schedule Hands-On (contrsquod)
You have now successfully completed creating a test Asset and adding it to an existing PM Schedule
Add Asset to Schedule Hands-On (contrsquod)
For access to documentation and tutorials reference wwwmcuserconnectcom
MC User Connect
MCUC Documentation Tutorials Article PDF Video Tutorial
User Guide
Setup Basic PM Schedule
Attach Assets to PM Schedule
Assets Tab (PM Module)
Add Asset to Schedule
Additional Resources
Did you know you can take a Quiz to test your knowledge of todayrsquos content
bull Check it out on MC User Connect (wwwmcuserconnectcom)
bull Located in the MC eLearning folder PMs Procedures and Projects Course Quizzes
Test Your Knowledgehellip
Filters Assets displayed to specific Repair Centers
Repair Center specified on PM Asset record
Repair Center Filter
Control designates fields of Asset record that should be referenced for generation
If selected the following options will appear to choose from
Use Asset Defaults
If Indicator is not checked
bull Asset attributes from PM Asset record regardless of current value on Asset
bull Value stored with Asset at time of record creation
If Indicator is checked
bull Attributes of Asset at time of Work Order generation
Use Asset Defaults (contrsquod)
Addhellip Asset to schedule
bull Asset Lookup is used
bull Asset Location Popup for entering organizational attribute fields
Header Action Bar
Updatehellip button
bull Update same information on multiple Assets
bull Fields left blank will not be affected
Header Action Bar (contrsquod)
Removehellip Assets from schedule
bull Select single or multiple Assets and remove from PM schedule
Header Action Bar (contrsquod)
In this example the PM Assets Tab will be explored by filtering Assets by Repair Center as well as removing Assets from the schedule
Exploring the PM Assets Tab Example
PM Assets Tab is selected and Asset is populated for Assets with associated Repair Centers
Exploring the PM Assets Tab Example (contrsquod)
Repair Center filter is updated to include All Assets for this PM schedule
Exploring the PM Assets Tab Example (contrsquod)
Asset is removed from schedule
Exploring the PM Assets Tab Example (contrsquod)
Selection Box
Name
Parent Location
Route Order
Next Scheduled
Next Procedure
Enabled
Fields and Columns
Select one or more Assets from list to update or remove
Provides revert control capability
Selection Box
Name and ID of designated Asset displayed
Work Order generation information
Asset In-Service and PM Schedule Disabled notification
Name
Location of Asset in the Asset Hierarchy
Field lists all locations listed above Asset Location
Parent Location
Determines the order of Work Order generation
bull Also determines order displayed in list
bull Useful for print order
Route Order
Displays the next scheduled date or next scheduled meter interval
bull Date can change if based on Work Order completion
Next Scheduled
Displays next scheduled procedure to be performed for Asset
bull Helpful with multiple scheduled procedures
Next Procedure
Indicates if schedule is enabled for individual Asset
Enabled
Adding Assets Overview
Asset Location Module Lookup
Asset Location Popup
Adding Assets to Schedule
Enabled Assets added to Assets tab will have Work Orders generated
Procedures also can determine which Assets will be associated with PM
Adding Assets Overview
Addhellip button opens Asset Location Module Lookup
Use controls to find Asset(s) to be added
Asset Location Module Lookup
Example of adding Assets to PM
Asset Location Module Lookup (contrsquod)
Displays information to determine next scheduled maintenance
bull Route Order
bull Last Generated and Last Completed
Asset Location Popup
bull Meter Intervals
bull Occurrence Counter and Next Scheduled Interval Counter
Asset Location Popup (contrsquod)
Example of Last Generated and Last Completed date
Asset Location Popup (contrsquod)
Displays organizational attributes
bull Repair Center stock room and tool room
bull Shift
Asset Location Popup (contrsquod)
bull Supervisor
bull Shop department account etc
bull Enabled
Asset Location Popup (contrsquod)
Example of field values retrieved from Asset
Asset Location Popup (contrsquod)
Now letrsquos practice creating a test Asset and adding the Asset to an existing PM schedule
Add Asset to Schedule Hands-On
Locate the Root Asset (top Asset of the Tree)
Right mouse click directly on the Root Asset and select Add Asset Locationhellip
Add Asset to Schedule Hands-On (contrsquod)
Fill in the required details for the Asset (highlighted in blue)
bull Enter PPP04TEST_YOURINITIALS for the Asset ID
bull Enter PPP04Test_YourName for the Asset Name
Save the Asset
Add Asset to Schedule Hands-On (contrsquod)
Navigate to PM ID PPP04TEST in the Preventive Maint Explorer
Select the PM to open it in the Work Center
Navigate to the Assets Tab
Add Asset to Schedule Hands-On (contrsquod)
Click the Addhellip button in the Action Header Bar
Add your newly created Test Asset
Add Asset to Schedule Hands-On (contrsquod)
Review Asset generation details
Click Apply Close
Save the PM
Asset will be added to Schedule
Add Asset to Schedule Hands-On (contrsquod)
You have now successfully completed creating a test Asset and adding it to an existing PM Schedule
Add Asset to Schedule Hands-On (contrsquod)
For access to documentation and tutorials reference wwwmcuserconnectcom
MC User Connect
MCUC Documentation Tutorials Article PDF Video Tutorial
User Guide
Setup Basic PM Schedule
Attach Assets to PM Schedule
Assets Tab (PM Module)
Add Asset to Schedule
Additional Resources
Did you know you can take a Quiz to test your knowledge of todayrsquos content
bull Check it out on MC User Connect (wwwmcuserconnectcom)
bull Located in the MC eLearning folder PMs Procedures and Projects Course Quizzes
Test Your Knowledgehellip
Control designates fields of Asset record that should be referenced for generation
If selected the following options will appear to choose from
Use Asset Defaults
If Indicator is not checked
bull Asset attributes from PM Asset record regardless of current value on Asset
bull Value stored with Asset at time of record creation
If Indicator is checked
bull Attributes of Asset at time of Work Order generation
Use Asset Defaults (contrsquod)
Addhellip Asset to schedule
bull Asset Lookup is used
bull Asset Location Popup for entering organizational attribute fields
Header Action Bar
Updatehellip button
bull Update same information on multiple Assets
bull Fields left blank will not be affected
Header Action Bar (contrsquod)
Removehellip Assets from schedule
bull Select single or multiple Assets and remove from PM schedule
Header Action Bar (contrsquod)
In this example the PM Assets Tab will be explored by filtering Assets by Repair Center as well as removing Assets from the schedule
Exploring the PM Assets Tab Example
PM Assets Tab is selected and Asset is populated for Assets with associated Repair Centers
Exploring the PM Assets Tab Example (contrsquod)
Repair Center filter is updated to include All Assets for this PM schedule
Exploring the PM Assets Tab Example (contrsquod)
Asset is removed from schedule
Exploring the PM Assets Tab Example (contrsquod)
Selection Box
Name
Parent Location
Route Order
Next Scheduled
Next Procedure
Enabled
Fields and Columns
Select one or more Assets from list to update or remove
Provides revert control capability
Selection Box
Name and ID of designated Asset displayed
Work Order generation information
Asset In-Service and PM Schedule Disabled notification
Name
Location of Asset in the Asset Hierarchy
Field lists all locations listed above Asset Location
Parent Location
Determines the order of Work Order generation
bull Also determines order displayed in list
bull Useful for print order
Route Order
Displays the next scheduled date or next scheduled meter interval
bull Date can change if based on Work Order completion
Next Scheduled
Displays next scheduled procedure to be performed for Asset
bull Helpful with multiple scheduled procedures
Next Procedure
Indicates if schedule is enabled for individual Asset
Enabled
Adding Assets Overview
Asset Location Module Lookup
Asset Location Popup
Adding Assets to Schedule
Enabled Assets added to Assets tab will have Work Orders generated
Procedures also can determine which Assets will be associated with PM
Adding Assets Overview
Addhellip button opens Asset Location Module Lookup
Use controls to find Asset(s) to be added
Asset Location Module Lookup
Example of adding Assets to PM
Asset Location Module Lookup (contrsquod)
Displays information to determine next scheduled maintenance
bull Route Order
bull Last Generated and Last Completed
Asset Location Popup
bull Meter Intervals
bull Occurrence Counter and Next Scheduled Interval Counter
Asset Location Popup (contrsquod)
Example of Last Generated and Last Completed date
Asset Location Popup (contrsquod)
Displays organizational attributes
bull Repair Center stock room and tool room
bull Shift
Asset Location Popup (contrsquod)
bull Supervisor
bull Shop department account etc
bull Enabled
Asset Location Popup (contrsquod)
Example of field values retrieved from Asset
Asset Location Popup (contrsquod)
Now letrsquos practice creating a test Asset and adding the Asset to an existing PM schedule
Add Asset to Schedule Hands-On
Locate the Root Asset (top Asset of the Tree)
Right mouse click directly on the Root Asset and select Add Asset Locationhellip
Add Asset to Schedule Hands-On (contrsquod)
Fill in the required details for the Asset (highlighted in blue)
bull Enter PPP04TEST_YOURINITIALS for the Asset ID
bull Enter PPP04Test_YourName for the Asset Name
Save the Asset
Add Asset to Schedule Hands-On (contrsquod)
Navigate to PM ID PPP04TEST in the Preventive Maint Explorer
Select the PM to open it in the Work Center
Navigate to the Assets Tab
Add Asset to Schedule Hands-On (contrsquod)
Click the Addhellip button in the Action Header Bar
Add your newly created Test Asset
Add Asset to Schedule Hands-On (contrsquod)
Review Asset generation details
Click Apply Close
Save the PM
Asset will be added to Schedule
Add Asset to Schedule Hands-On (contrsquod)
You have now successfully completed creating a test Asset and adding it to an existing PM Schedule
Add Asset to Schedule Hands-On (contrsquod)
For access to documentation and tutorials reference wwwmcuserconnectcom
MC User Connect
MCUC Documentation Tutorials Article PDF Video Tutorial
User Guide
Setup Basic PM Schedule
Attach Assets to PM Schedule
Assets Tab (PM Module)
Add Asset to Schedule
Additional Resources
Did you know you can take a Quiz to test your knowledge of todayrsquos content
bull Check it out on MC User Connect (wwwmcuserconnectcom)
bull Located in the MC eLearning folder PMs Procedures and Projects Course Quizzes
Test Your Knowledgehellip
If Indicator is not checked
bull Asset attributes from PM Asset record regardless of current value on Asset
bull Value stored with Asset at time of record creation
If Indicator is checked
bull Attributes of Asset at time of Work Order generation
Use Asset Defaults (contrsquod)
Addhellip Asset to schedule
bull Asset Lookup is used
bull Asset Location Popup for entering organizational attribute fields
Header Action Bar
Updatehellip button
bull Update same information on multiple Assets
bull Fields left blank will not be affected
Header Action Bar (contrsquod)
Removehellip Assets from schedule
bull Select single or multiple Assets and remove from PM schedule
Header Action Bar (contrsquod)
In this example the PM Assets Tab will be explored by filtering Assets by Repair Center as well as removing Assets from the schedule
Exploring the PM Assets Tab Example
PM Assets Tab is selected and Asset is populated for Assets with associated Repair Centers
Exploring the PM Assets Tab Example (contrsquod)
Repair Center filter is updated to include All Assets for this PM schedule
Exploring the PM Assets Tab Example (contrsquod)
Asset is removed from schedule
Exploring the PM Assets Tab Example (contrsquod)
Selection Box
Name
Parent Location
Route Order
Next Scheduled
Next Procedure
Enabled
Fields and Columns
Select one or more Assets from list to update or remove
Provides revert control capability
Selection Box
Name and ID of designated Asset displayed
Work Order generation information
Asset In-Service and PM Schedule Disabled notification
Name
Location of Asset in the Asset Hierarchy
Field lists all locations listed above Asset Location
Parent Location
Determines the order of Work Order generation
bull Also determines order displayed in list
bull Useful for print order
Route Order
Displays the next scheduled date or next scheduled meter interval
bull Date can change if based on Work Order completion
Next Scheduled
Displays next scheduled procedure to be performed for Asset
bull Helpful with multiple scheduled procedures
Next Procedure
Indicates if schedule is enabled for individual Asset
Enabled
Adding Assets Overview
Asset Location Module Lookup
Asset Location Popup
Adding Assets to Schedule
Enabled Assets added to Assets tab will have Work Orders generated
Procedures also can determine which Assets will be associated with PM
Adding Assets Overview
Addhellip button opens Asset Location Module Lookup
Use controls to find Asset(s) to be added
Asset Location Module Lookup
Example of adding Assets to PM
Asset Location Module Lookup (contrsquod)
Displays information to determine next scheduled maintenance
bull Route Order
bull Last Generated and Last Completed
Asset Location Popup
bull Meter Intervals
bull Occurrence Counter and Next Scheduled Interval Counter
Asset Location Popup (contrsquod)
Example of Last Generated and Last Completed date
Asset Location Popup (contrsquod)
Displays organizational attributes
bull Repair Center stock room and tool room
bull Shift
Asset Location Popup (contrsquod)
bull Supervisor
bull Shop department account etc
bull Enabled
Asset Location Popup (contrsquod)
Example of field values retrieved from Asset
Asset Location Popup (contrsquod)
Now letrsquos practice creating a test Asset and adding the Asset to an existing PM schedule
Add Asset to Schedule Hands-On
Locate the Root Asset (top Asset of the Tree)
Right mouse click directly on the Root Asset and select Add Asset Locationhellip
Add Asset to Schedule Hands-On (contrsquod)
Fill in the required details for the Asset (highlighted in blue)
bull Enter PPP04TEST_YOURINITIALS for the Asset ID
bull Enter PPP04Test_YourName for the Asset Name
Save the Asset
Add Asset to Schedule Hands-On (contrsquod)
Navigate to PM ID PPP04TEST in the Preventive Maint Explorer
Select the PM to open it in the Work Center
Navigate to the Assets Tab
Add Asset to Schedule Hands-On (contrsquod)
Click the Addhellip button in the Action Header Bar
Add your newly created Test Asset
Add Asset to Schedule Hands-On (contrsquod)
Review Asset generation details
Click Apply Close
Save the PM
Asset will be added to Schedule
Add Asset to Schedule Hands-On (contrsquod)
You have now successfully completed creating a test Asset and adding it to an existing PM Schedule
Add Asset to Schedule Hands-On (contrsquod)
For access to documentation and tutorials reference wwwmcuserconnectcom
MC User Connect
MCUC Documentation Tutorials Article PDF Video Tutorial
User Guide
Setup Basic PM Schedule
Attach Assets to PM Schedule
Assets Tab (PM Module)
Add Asset to Schedule
Additional Resources
Did you know you can take a Quiz to test your knowledge of todayrsquos content
bull Check it out on MC User Connect (wwwmcuserconnectcom)
bull Located in the MC eLearning folder PMs Procedures and Projects Course Quizzes
Test Your Knowledgehellip
Addhellip Asset to schedule
bull Asset Lookup is used
bull Asset Location Popup for entering organizational attribute fields
Header Action Bar
Updatehellip button
bull Update same information on multiple Assets
bull Fields left blank will not be affected
Header Action Bar (contrsquod)
Removehellip Assets from schedule
bull Select single or multiple Assets and remove from PM schedule
Header Action Bar (contrsquod)
In this example the PM Assets Tab will be explored by filtering Assets by Repair Center as well as removing Assets from the schedule
Exploring the PM Assets Tab Example
PM Assets Tab is selected and Asset is populated for Assets with associated Repair Centers
Exploring the PM Assets Tab Example (contrsquod)
Repair Center filter is updated to include All Assets for this PM schedule
Exploring the PM Assets Tab Example (contrsquod)
Asset is removed from schedule
Exploring the PM Assets Tab Example (contrsquod)
Selection Box
Name
Parent Location
Route Order
Next Scheduled
Next Procedure
Enabled
Fields and Columns
Select one or more Assets from list to update or remove
Provides revert control capability
Selection Box
Name and ID of designated Asset displayed
Work Order generation information
Asset In-Service and PM Schedule Disabled notification
Name
Location of Asset in the Asset Hierarchy
Field lists all locations listed above Asset Location
Parent Location
Determines the order of Work Order generation
bull Also determines order displayed in list
bull Useful for print order
Route Order
Displays the next scheduled date or next scheduled meter interval
bull Date can change if based on Work Order completion
Next Scheduled
Displays next scheduled procedure to be performed for Asset
bull Helpful with multiple scheduled procedures
Next Procedure
Indicates if schedule is enabled for individual Asset
Enabled
Adding Assets Overview
Asset Location Module Lookup
Asset Location Popup
Adding Assets to Schedule
Enabled Assets added to Assets tab will have Work Orders generated
Procedures also can determine which Assets will be associated with PM
Adding Assets Overview
Addhellip button opens Asset Location Module Lookup
Use controls to find Asset(s) to be added
Asset Location Module Lookup
Example of adding Assets to PM
Asset Location Module Lookup (contrsquod)
Displays information to determine next scheduled maintenance
bull Route Order
bull Last Generated and Last Completed
Asset Location Popup
bull Meter Intervals
bull Occurrence Counter and Next Scheduled Interval Counter
Asset Location Popup (contrsquod)
Example of Last Generated and Last Completed date
Asset Location Popup (contrsquod)
Displays organizational attributes
bull Repair Center stock room and tool room
bull Shift
Asset Location Popup (contrsquod)
bull Supervisor
bull Shop department account etc
bull Enabled
Asset Location Popup (contrsquod)
Example of field values retrieved from Asset
Asset Location Popup (contrsquod)
Now letrsquos practice creating a test Asset and adding the Asset to an existing PM schedule
Add Asset to Schedule Hands-On
Locate the Root Asset (top Asset of the Tree)
Right mouse click directly on the Root Asset and select Add Asset Locationhellip
Add Asset to Schedule Hands-On (contrsquod)
Fill in the required details for the Asset (highlighted in blue)
bull Enter PPP04TEST_YOURINITIALS for the Asset ID
bull Enter PPP04Test_YourName for the Asset Name
Save the Asset
Add Asset to Schedule Hands-On (contrsquod)
Navigate to PM ID PPP04TEST in the Preventive Maint Explorer
Select the PM to open it in the Work Center
Navigate to the Assets Tab
Add Asset to Schedule Hands-On (contrsquod)
Click the Addhellip button in the Action Header Bar
Add your newly created Test Asset
Add Asset to Schedule Hands-On (contrsquod)
Review Asset generation details
Click Apply Close
Save the PM
Asset will be added to Schedule
Add Asset to Schedule Hands-On (contrsquod)
You have now successfully completed creating a test Asset and adding it to an existing PM Schedule
Add Asset to Schedule Hands-On (contrsquod)
For access to documentation and tutorials reference wwwmcuserconnectcom
MC User Connect
MCUC Documentation Tutorials Article PDF Video Tutorial
User Guide
Setup Basic PM Schedule
Attach Assets to PM Schedule
Assets Tab (PM Module)
Add Asset to Schedule
Additional Resources
Did you know you can take a Quiz to test your knowledge of todayrsquos content
bull Check it out on MC User Connect (wwwmcuserconnectcom)
bull Located in the MC eLearning folder PMs Procedures and Projects Course Quizzes
Test Your Knowledgehellip
Updatehellip button
bull Update same information on multiple Assets
bull Fields left blank will not be affected
Header Action Bar (contrsquod)
Removehellip Assets from schedule
bull Select single or multiple Assets and remove from PM schedule
Header Action Bar (contrsquod)
In this example the PM Assets Tab will be explored by filtering Assets by Repair Center as well as removing Assets from the schedule
Exploring the PM Assets Tab Example
PM Assets Tab is selected and Asset is populated for Assets with associated Repair Centers
Exploring the PM Assets Tab Example (contrsquod)
Repair Center filter is updated to include All Assets for this PM schedule
Exploring the PM Assets Tab Example (contrsquod)
Asset is removed from schedule
Exploring the PM Assets Tab Example (contrsquod)
Selection Box
Name
Parent Location
Route Order
Next Scheduled
Next Procedure
Enabled
Fields and Columns
Select one or more Assets from list to update or remove
Provides revert control capability
Selection Box
Name and ID of designated Asset displayed
Work Order generation information
Asset In-Service and PM Schedule Disabled notification
Name
Location of Asset in the Asset Hierarchy
Field lists all locations listed above Asset Location
Parent Location
Determines the order of Work Order generation
bull Also determines order displayed in list
bull Useful for print order
Route Order
Displays the next scheduled date or next scheduled meter interval
bull Date can change if based on Work Order completion
Next Scheduled
Displays next scheduled procedure to be performed for Asset
bull Helpful with multiple scheduled procedures
Next Procedure
Indicates if schedule is enabled for individual Asset
Enabled
Adding Assets Overview
Asset Location Module Lookup
Asset Location Popup
Adding Assets to Schedule
Enabled Assets added to Assets tab will have Work Orders generated
Procedures also can determine which Assets will be associated with PM
Adding Assets Overview
Addhellip button opens Asset Location Module Lookup
Use controls to find Asset(s) to be added
Asset Location Module Lookup
Example of adding Assets to PM
Asset Location Module Lookup (contrsquod)
Displays information to determine next scheduled maintenance
bull Route Order
bull Last Generated and Last Completed
Asset Location Popup
bull Meter Intervals
bull Occurrence Counter and Next Scheduled Interval Counter
Asset Location Popup (contrsquod)
Example of Last Generated and Last Completed date
Asset Location Popup (contrsquod)
Displays organizational attributes
bull Repair Center stock room and tool room
bull Shift
Asset Location Popup (contrsquod)
bull Supervisor
bull Shop department account etc
bull Enabled
Asset Location Popup (contrsquod)
Example of field values retrieved from Asset
Asset Location Popup (contrsquod)
Now letrsquos practice creating a test Asset and adding the Asset to an existing PM schedule
Add Asset to Schedule Hands-On
Locate the Root Asset (top Asset of the Tree)
Right mouse click directly on the Root Asset and select Add Asset Locationhellip
Add Asset to Schedule Hands-On (contrsquod)
Fill in the required details for the Asset (highlighted in blue)
bull Enter PPP04TEST_YOURINITIALS for the Asset ID
bull Enter PPP04Test_YourName for the Asset Name
Save the Asset
Add Asset to Schedule Hands-On (contrsquod)
Navigate to PM ID PPP04TEST in the Preventive Maint Explorer
Select the PM to open it in the Work Center
Navigate to the Assets Tab
Add Asset to Schedule Hands-On (contrsquod)
Click the Addhellip button in the Action Header Bar
Add your newly created Test Asset
Add Asset to Schedule Hands-On (contrsquod)
Review Asset generation details
Click Apply Close
Save the PM
Asset will be added to Schedule
Add Asset to Schedule Hands-On (contrsquod)
You have now successfully completed creating a test Asset and adding it to an existing PM Schedule
Add Asset to Schedule Hands-On (contrsquod)
For access to documentation and tutorials reference wwwmcuserconnectcom
MC User Connect
MCUC Documentation Tutorials Article PDF Video Tutorial
User Guide
Setup Basic PM Schedule
Attach Assets to PM Schedule
Assets Tab (PM Module)
Add Asset to Schedule
Additional Resources
Did you know you can take a Quiz to test your knowledge of todayrsquos content
bull Check it out on MC User Connect (wwwmcuserconnectcom)
bull Located in the MC eLearning folder PMs Procedures and Projects Course Quizzes
Test Your Knowledgehellip
Removehellip Assets from schedule
bull Select single or multiple Assets and remove from PM schedule
Header Action Bar (contrsquod)
In this example the PM Assets Tab will be explored by filtering Assets by Repair Center as well as removing Assets from the schedule
Exploring the PM Assets Tab Example
PM Assets Tab is selected and Asset is populated for Assets with associated Repair Centers
Exploring the PM Assets Tab Example (contrsquod)
Repair Center filter is updated to include All Assets for this PM schedule
Exploring the PM Assets Tab Example (contrsquod)
Asset is removed from schedule
Exploring the PM Assets Tab Example (contrsquod)
Selection Box
Name
Parent Location
Route Order
Next Scheduled
Next Procedure
Enabled
Fields and Columns
Select one or more Assets from list to update or remove
Provides revert control capability
Selection Box
Name and ID of designated Asset displayed
Work Order generation information
Asset In-Service and PM Schedule Disabled notification
Name
Location of Asset in the Asset Hierarchy
Field lists all locations listed above Asset Location
Parent Location
Determines the order of Work Order generation
bull Also determines order displayed in list
bull Useful for print order
Route Order
Displays the next scheduled date or next scheduled meter interval
bull Date can change if based on Work Order completion
Next Scheduled
Displays next scheduled procedure to be performed for Asset
bull Helpful with multiple scheduled procedures
Next Procedure
Indicates if schedule is enabled for individual Asset
Enabled
Adding Assets Overview
Asset Location Module Lookup
Asset Location Popup
Adding Assets to Schedule
Enabled Assets added to Assets tab will have Work Orders generated
Procedures also can determine which Assets will be associated with PM
Adding Assets Overview
Addhellip button opens Asset Location Module Lookup
Use controls to find Asset(s) to be added
Asset Location Module Lookup
Example of adding Assets to PM
Asset Location Module Lookup (contrsquod)
Displays information to determine next scheduled maintenance
bull Route Order
bull Last Generated and Last Completed
Asset Location Popup
bull Meter Intervals
bull Occurrence Counter and Next Scheduled Interval Counter
Asset Location Popup (contrsquod)
Example of Last Generated and Last Completed date
Asset Location Popup (contrsquod)
Displays organizational attributes
bull Repair Center stock room and tool room
bull Shift
Asset Location Popup (contrsquod)
bull Supervisor
bull Shop department account etc
bull Enabled
Asset Location Popup (contrsquod)
Example of field values retrieved from Asset
Asset Location Popup (contrsquod)
Now letrsquos practice creating a test Asset and adding the Asset to an existing PM schedule
Add Asset to Schedule Hands-On
Locate the Root Asset (top Asset of the Tree)
Right mouse click directly on the Root Asset and select Add Asset Locationhellip
Add Asset to Schedule Hands-On (contrsquod)
Fill in the required details for the Asset (highlighted in blue)
bull Enter PPP04TEST_YOURINITIALS for the Asset ID
bull Enter PPP04Test_YourName for the Asset Name
Save the Asset
Add Asset to Schedule Hands-On (contrsquod)
Navigate to PM ID PPP04TEST in the Preventive Maint Explorer
Select the PM to open it in the Work Center
Navigate to the Assets Tab
Add Asset to Schedule Hands-On (contrsquod)
Click the Addhellip button in the Action Header Bar
Add your newly created Test Asset
Add Asset to Schedule Hands-On (contrsquod)
Review Asset generation details
Click Apply Close
Save the PM
Asset will be added to Schedule
Add Asset to Schedule Hands-On (contrsquod)
You have now successfully completed creating a test Asset and adding it to an existing PM Schedule
Add Asset to Schedule Hands-On (contrsquod)
For access to documentation and tutorials reference wwwmcuserconnectcom
MC User Connect
MCUC Documentation Tutorials Article PDF Video Tutorial
User Guide
Setup Basic PM Schedule
Attach Assets to PM Schedule
Assets Tab (PM Module)
Add Asset to Schedule
Additional Resources
Did you know you can take a Quiz to test your knowledge of todayrsquos content
bull Check it out on MC User Connect (wwwmcuserconnectcom)
bull Located in the MC eLearning folder PMs Procedures and Projects Course Quizzes
Test Your Knowledgehellip
In this example the PM Assets Tab will be explored by filtering Assets by Repair Center as well as removing Assets from the schedule
Exploring the PM Assets Tab Example
PM Assets Tab is selected and Asset is populated for Assets with associated Repair Centers
Exploring the PM Assets Tab Example (contrsquod)
Repair Center filter is updated to include All Assets for this PM schedule
Exploring the PM Assets Tab Example (contrsquod)
Asset is removed from schedule
Exploring the PM Assets Tab Example (contrsquod)
Selection Box
Name
Parent Location
Route Order
Next Scheduled
Next Procedure
Enabled
Fields and Columns
Select one or more Assets from list to update or remove
Provides revert control capability
Selection Box
Name and ID of designated Asset displayed
Work Order generation information
Asset In-Service and PM Schedule Disabled notification
Name
Location of Asset in the Asset Hierarchy
Field lists all locations listed above Asset Location
Parent Location
Determines the order of Work Order generation
bull Also determines order displayed in list
bull Useful for print order
Route Order
Displays the next scheduled date or next scheduled meter interval
bull Date can change if based on Work Order completion
Next Scheduled
Displays next scheduled procedure to be performed for Asset
bull Helpful with multiple scheduled procedures
Next Procedure
Indicates if schedule is enabled for individual Asset
Enabled
Adding Assets Overview
Asset Location Module Lookup
Asset Location Popup
Adding Assets to Schedule
Enabled Assets added to Assets tab will have Work Orders generated
Procedures also can determine which Assets will be associated with PM
Adding Assets Overview
Addhellip button opens Asset Location Module Lookup
Use controls to find Asset(s) to be added
Asset Location Module Lookup
Example of adding Assets to PM
Asset Location Module Lookup (contrsquod)
Displays information to determine next scheduled maintenance
bull Route Order
bull Last Generated and Last Completed
Asset Location Popup
bull Meter Intervals
bull Occurrence Counter and Next Scheduled Interval Counter
Asset Location Popup (contrsquod)
Example of Last Generated and Last Completed date
Asset Location Popup (contrsquod)
Displays organizational attributes
bull Repair Center stock room and tool room
bull Shift
Asset Location Popup (contrsquod)
bull Supervisor
bull Shop department account etc
bull Enabled
Asset Location Popup (contrsquod)
Example of field values retrieved from Asset
Asset Location Popup (contrsquod)
Now letrsquos practice creating a test Asset and adding the Asset to an existing PM schedule
Add Asset to Schedule Hands-On
Locate the Root Asset (top Asset of the Tree)
Right mouse click directly on the Root Asset and select Add Asset Locationhellip
Add Asset to Schedule Hands-On (contrsquod)
Fill in the required details for the Asset (highlighted in blue)
bull Enter PPP04TEST_YOURINITIALS for the Asset ID
bull Enter PPP04Test_YourName for the Asset Name
Save the Asset
Add Asset to Schedule Hands-On (contrsquod)
Navigate to PM ID PPP04TEST in the Preventive Maint Explorer
Select the PM to open it in the Work Center
Navigate to the Assets Tab
Add Asset to Schedule Hands-On (contrsquod)
Click the Addhellip button in the Action Header Bar
Add your newly created Test Asset
Add Asset to Schedule Hands-On (contrsquod)
Review Asset generation details
Click Apply Close
Save the PM
Asset will be added to Schedule
Add Asset to Schedule Hands-On (contrsquod)
You have now successfully completed creating a test Asset and adding it to an existing PM Schedule
Add Asset to Schedule Hands-On (contrsquod)
For access to documentation and tutorials reference wwwmcuserconnectcom
MC User Connect
MCUC Documentation Tutorials Article PDF Video Tutorial
User Guide
Setup Basic PM Schedule
Attach Assets to PM Schedule
Assets Tab (PM Module)
Add Asset to Schedule
Additional Resources
Did you know you can take a Quiz to test your knowledge of todayrsquos content
bull Check it out on MC User Connect (wwwmcuserconnectcom)
bull Located in the MC eLearning folder PMs Procedures and Projects Course Quizzes
Test Your Knowledgehellip
PM Assets Tab is selected and Asset is populated for Assets with associated Repair Centers
Exploring the PM Assets Tab Example (contrsquod)
Repair Center filter is updated to include All Assets for this PM schedule
Exploring the PM Assets Tab Example (contrsquod)
Asset is removed from schedule
Exploring the PM Assets Tab Example (contrsquod)
Selection Box
Name
Parent Location
Route Order
Next Scheduled
Next Procedure
Enabled
Fields and Columns
Select one or more Assets from list to update or remove
Provides revert control capability
Selection Box
Name and ID of designated Asset displayed
Work Order generation information
Asset In-Service and PM Schedule Disabled notification
Name
Location of Asset in the Asset Hierarchy
Field lists all locations listed above Asset Location
Parent Location
Determines the order of Work Order generation
bull Also determines order displayed in list
bull Useful for print order
Route Order
Displays the next scheduled date or next scheduled meter interval
bull Date can change if based on Work Order completion
Next Scheduled
Displays next scheduled procedure to be performed for Asset
bull Helpful with multiple scheduled procedures
Next Procedure
Indicates if schedule is enabled for individual Asset
Enabled
Adding Assets Overview
Asset Location Module Lookup
Asset Location Popup
Adding Assets to Schedule
Enabled Assets added to Assets tab will have Work Orders generated
Procedures also can determine which Assets will be associated with PM
Adding Assets Overview
Addhellip button opens Asset Location Module Lookup
Use controls to find Asset(s) to be added
Asset Location Module Lookup
Example of adding Assets to PM
Asset Location Module Lookup (contrsquod)
Displays information to determine next scheduled maintenance
bull Route Order
bull Last Generated and Last Completed
Asset Location Popup
bull Meter Intervals
bull Occurrence Counter and Next Scheduled Interval Counter
Asset Location Popup (contrsquod)
Example of Last Generated and Last Completed date
Asset Location Popup (contrsquod)
Displays organizational attributes
bull Repair Center stock room and tool room
bull Shift
Asset Location Popup (contrsquod)
bull Supervisor
bull Shop department account etc
bull Enabled
Asset Location Popup (contrsquod)
Example of field values retrieved from Asset
Asset Location Popup (contrsquod)
Now letrsquos practice creating a test Asset and adding the Asset to an existing PM schedule
Add Asset to Schedule Hands-On
Locate the Root Asset (top Asset of the Tree)
Right mouse click directly on the Root Asset and select Add Asset Locationhellip
Add Asset to Schedule Hands-On (contrsquod)
Fill in the required details for the Asset (highlighted in blue)
bull Enter PPP04TEST_YOURINITIALS for the Asset ID
bull Enter PPP04Test_YourName for the Asset Name
Save the Asset
Add Asset to Schedule Hands-On (contrsquod)
Navigate to PM ID PPP04TEST in the Preventive Maint Explorer
Select the PM to open it in the Work Center
Navigate to the Assets Tab
Add Asset to Schedule Hands-On (contrsquod)
Click the Addhellip button in the Action Header Bar
Add your newly created Test Asset
Add Asset to Schedule Hands-On (contrsquod)
Review Asset generation details
Click Apply Close
Save the PM
Asset will be added to Schedule
Add Asset to Schedule Hands-On (contrsquod)
You have now successfully completed creating a test Asset and adding it to an existing PM Schedule
Add Asset to Schedule Hands-On (contrsquod)
For access to documentation and tutorials reference wwwmcuserconnectcom
MC User Connect
MCUC Documentation Tutorials Article PDF Video Tutorial
User Guide
Setup Basic PM Schedule
Attach Assets to PM Schedule
Assets Tab (PM Module)
Add Asset to Schedule
Additional Resources
Did you know you can take a Quiz to test your knowledge of todayrsquos content
bull Check it out on MC User Connect (wwwmcuserconnectcom)
bull Located in the MC eLearning folder PMs Procedures and Projects Course Quizzes
Test Your Knowledgehellip
Repair Center filter is updated to include All Assets for this PM schedule
Exploring the PM Assets Tab Example (contrsquod)
Asset is removed from schedule
Exploring the PM Assets Tab Example (contrsquod)
Selection Box
Name
Parent Location
Route Order
Next Scheduled
Next Procedure
Enabled
Fields and Columns
Select one or more Assets from list to update or remove
Provides revert control capability
Selection Box
Name and ID of designated Asset displayed
Work Order generation information
Asset In-Service and PM Schedule Disabled notification
Name
Location of Asset in the Asset Hierarchy
Field lists all locations listed above Asset Location
Parent Location
Determines the order of Work Order generation
bull Also determines order displayed in list
bull Useful for print order
Route Order
Displays the next scheduled date or next scheduled meter interval
bull Date can change if based on Work Order completion
Next Scheduled
Displays next scheduled procedure to be performed for Asset
bull Helpful with multiple scheduled procedures
Next Procedure
Indicates if schedule is enabled for individual Asset
Enabled
Adding Assets Overview
Asset Location Module Lookup
Asset Location Popup
Adding Assets to Schedule
Enabled Assets added to Assets tab will have Work Orders generated
Procedures also can determine which Assets will be associated with PM
Adding Assets Overview
Addhellip button opens Asset Location Module Lookup
Use controls to find Asset(s) to be added
Asset Location Module Lookup
Example of adding Assets to PM
Asset Location Module Lookup (contrsquod)
Displays information to determine next scheduled maintenance
bull Route Order
bull Last Generated and Last Completed
Asset Location Popup
bull Meter Intervals
bull Occurrence Counter and Next Scheduled Interval Counter
Asset Location Popup (contrsquod)
Example of Last Generated and Last Completed date
Asset Location Popup (contrsquod)
Displays organizational attributes
bull Repair Center stock room and tool room
bull Shift
Asset Location Popup (contrsquod)
bull Supervisor
bull Shop department account etc
bull Enabled
Asset Location Popup (contrsquod)
Example of field values retrieved from Asset
Asset Location Popup (contrsquod)
Now letrsquos practice creating a test Asset and adding the Asset to an existing PM schedule
Add Asset to Schedule Hands-On
Locate the Root Asset (top Asset of the Tree)
Right mouse click directly on the Root Asset and select Add Asset Locationhellip
Add Asset to Schedule Hands-On (contrsquod)
Fill in the required details for the Asset (highlighted in blue)
bull Enter PPP04TEST_YOURINITIALS for the Asset ID
bull Enter PPP04Test_YourName for the Asset Name
Save the Asset
Add Asset to Schedule Hands-On (contrsquod)
Navigate to PM ID PPP04TEST in the Preventive Maint Explorer
Select the PM to open it in the Work Center
Navigate to the Assets Tab
Add Asset to Schedule Hands-On (contrsquod)
Click the Addhellip button in the Action Header Bar
Add your newly created Test Asset
Add Asset to Schedule Hands-On (contrsquod)
Review Asset generation details
Click Apply Close
Save the PM
Asset will be added to Schedule
Add Asset to Schedule Hands-On (contrsquod)
You have now successfully completed creating a test Asset and adding it to an existing PM Schedule
Add Asset to Schedule Hands-On (contrsquod)
For access to documentation and tutorials reference wwwmcuserconnectcom
MC User Connect
MCUC Documentation Tutorials Article PDF Video Tutorial
User Guide
Setup Basic PM Schedule
Attach Assets to PM Schedule
Assets Tab (PM Module)
Add Asset to Schedule
Additional Resources
Did you know you can take a Quiz to test your knowledge of todayrsquos content
bull Check it out on MC User Connect (wwwmcuserconnectcom)
bull Located in the MC eLearning folder PMs Procedures and Projects Course Quizzes
Test Your Knowledgehellip
Asset is removed from schedule
Exploring the PM Assets Tab Example (contrsquod)
Selection Box
Name
Parent Location
Route Order
Next Scheduled
Next Procedure
Enabled
Fields and Columns
Select one or more Assets from list to update or remove
Provides revert control capability
Selection Box
Name and ID of designated Asset displayed
Work Order generation information
Asset In-Service and PM Schedule Disabled notification
Name
Location of Asset in the Asset Hierarchy
Field lists all locations listed above Asset Location
Parent Location
Determines the order of Work Order generation
bull Also determines order displayed in list
bull Useful for print order
Route Order
Displays the next scheduled date or next scheduled meter interval
bull Date can change if based on Work Order completion
Next Scheduled
Displays next scheduled procedure to be performed for Asset
bull Helpful with multiple scheduled procedures
Next Procedure
Indicates if schedule is enabled for individual Asset
Enabled
Adding Assets Overview
Asset Location Module Lookup
Asset Location Popup
Adding Assets to Schedule
Enabled Assets added to Assets tab will have Work Orders generated
Procedures also can determine which Assets will be associated with PM
Adding Assets Overview
Addhellip button opens Asset Location Module Lookup
Use controls to find Asset(s) to be added
Asset Location Module Lookup
Example of adding Assets to PM
Asset Location Module Lookup (contrsquod)
Displays information to determine next scheduled maintenance
bull Route Order
bull Last Generated and Last Completed
Asset Location Popup
bull Meter Intervals
bull Occurrence Counter and Next Scheduled Interval Counter
Asset Location Popup (contrsquod)
Example of Last Generated and Last Completed date
Asset Location Popup (contrsquod)
Displays organizational attributes
bull Repair Center stock room and tool room
bull Shift
Asset Location Popup (contrsquod)
bull Supervisor
bull Shop department account etc
bull Enabled
Asset Location Popup (contrsquod)
Example of field values retrieved from Asset
Asset Location Popup (contrsquod)
Now letrsquos practice creating a test Asset and adding the Asset to an existing PM schedule
Add Asset to Schedule Hands-On
Locate the Root Asset (top Asset of the Tree)
Right mouse click directly on the Root Asset and select Add Asset Locationhellip
Add Asset to Schedule Hands-On (contrsquod)
Fill in the required details for the Asset (highlighted in blue)
bull Enter PPP04TEST_YOURINITIALS for the Asset ID
bull Enter PPP04Test_YourName for the Asset Name
Save the Asset
Add Asset to Schedule Hands-On (contrsquod)
Navigate to PM ID PPP04TEST in the Preventive Maint Explorer
Select the PM to open it in the Work Center
Navigate to the Assets Tab
Add Asset to Schedule Hands-On (contrsquod)
Click the Addhellip button in the Action Header Bar
Add your newly created Test Asset
Add Asset to Schedule Hands-On (contrsquod)
Review Asset generation details
Click Apply Close
Save the PM
Asset will be added to Schedule
Add Asset to Schedule Hands-On (contrsquod)
You have now successfully completed creating a test Asset and adding it to an existing PM Schedule
Add Asset to Schedule Hands-On (contrsquod)
For access to documentation and tutorials reference wwwmcuserconnectcom
MC User Connect
MCUC Documentation Tutorials Article PDF Video Tutorial
User Guide
Setup Basic PM Schedule
Attach Assets to PM Schedule
Assets Tab (PM Module)
Add Asset to Schedule
Additional Resources
Did you know you can take a Quiz to test your knowledge of todayrsquos content
bull Check it out on MC User Connect (wwwmcuserconnectcom)
bull Located in the MC eLearning folder PMs Procedures and Projects Course Quizzes
Test Your Knowledgehellip
Selection Box
Name
Parent Location
Route Order
Next Scheduled
Next Procedure
Enabled
Fields and Columns
Select one or more Assets from list to update or remove
Provides revert control capability
Selection Box
Name and ID of designated Asset displayed
Work Order generation information
Asset In-Service and PM Schedule Disabled notification
Name
Location of Asset in the Asset Hierarchy
Field lists all locations listed above Asset Location
Parent Location
Determines the order of Work Order generation
bull Also determines order displayed in list
bull Useful for print order
Route Order
Displays the next scheduled date or next scheduled meter interval
bull Date can change if based on Work Order completion
Next Scheduled
Displays next scheduled procedure to be performed for Asset
bull Helpful with multiple scheduled procedures
Next Procedure
Indicates if schedule is enabled for individual Asset
Enabled
Adding Assets Overview
Asset Location Module Lookup
Asset Location Popup
Adding Assets to Schedule
Enabled Assets added to Assets tab will have Work Orders generated
Procedures also can determine which Assets will be associated with PM
Adding Assets Overview
Addhellip button opens Asset Location Module Lookup
Use controls to find Asset(s) to be added
Asset Location Module Lookup
Example of adding Assets to PM
Asset Location Module Lookup (contrsquod)
Displays information to determine next scheduled maintenance
bull Route Order
bull Last Generated and Last Completed
Asset Location Popup
bull Meter Intervals
bull Occurrence Counter and Next Scheduled Interval Counter
Asset Location Popup (contrsquod)
Example of Last Generated and Last Completed date
Asset Location Popup (contrsquod)
Displays organizational attributes
bull Repair Center stock room and tool room
bull Shift
Asset Location Popup (contrsquod)
bull Supervisor
bull Shop department account etc
bull Enabled
Asset Location Popup (contrsquod)
Example of field values retrieved from Asset
Asset Location Popup (contrsquod)
Now letrsquos practice creating a test Asset and adding the Asset to an existing PM schedule
Add Asset to Schedule Hands-On
Locate the Root Asset (top Asset of the Tree)
Right mouse click directly on the Root Asset and select Add Asset Locationhellip
Add Asset to Schedule Hands-On (contrsquod)
Fill in the required details for the Asset (highlighted in blue)
bull Enter PPP04TEST_YOURINITIALS for the Asset ID
bull Enter PPP04Test_YourName for the Asset Name
Save the Asset
Add Asset to Schedule Hands-On (contrsquod)
Navigate to PM ID PPP04TEST in the Preventive Maint Explorer
Select the PM to open it in the Work Center
Navigate to the Assets Tab
Add Asset to Schedule Hands-On (contrsquod)
Click the Addhellip button in the Action Header Bar
Add your newly created Test Asset
Add Asset to Schedule Hands-On (contrsquod)
Review Asset generation details
Click Apply Close
Save the PM
Asset will be added to Schedule
Add Asset to Schedule Hands-On (contrsquod)
You have now successfully completed creating a test Asset and adding it to an existing PM Schedule
Add Asset to Schedule Hands-On (contrsquod)
For access to documentation and tutorials reference wwwmcuserconnectcom
MC User Connect
MCUC Documentation Tutorials Article PDF Video Tutorial
User Guide
Setup Basic PM Schedule
Attach Assets to PM Schedule
Assets Tab (PM Module)
Add Asset to Schedule
Additional Resources
Did you know you can take a Quiz to test your knowledge of todayrsquos content
bull Check it out on MC User Connect (wwwmcuserconnectcom)
bull Located in the MC eLearning folder PMs Procedures and Projects Course Quizzes
Test Your Knowledgehellip
Select one or more Assets from list to update or remove
Provides revert control capability
Selection Box
Name and ID of designated Asset displayed
Work Order generation information
Asset In-Service and PM Schedule Disabled notification
Name
Location of Asset in the Asset Hierarchy
Field lists all locations listed above Asset Location
Parent Location
Determines the order of Work Order generation
bull Also determines order displayed in list
bull Useful for print order
Route Order
Displays the next scheduled date or next scheduled meter interval
bull Date can change if based on Work Order completion
Next Scheduled
Displays next scheduled procedure to be performed for Asset
bull Helpful with multiple scheduled procedures
Next Procedure
Indicates if schedule is enabled for individual Asset
Enabled
Adding Assets Overview
Asset Location Module Lookup
Asset Location Popup
Adding Assets to Schedule
Enabled Assets added to Assets tab will have Work Orders generated
Procedures also can determine which Assets will be associated with PM
Adding Assets Overview
Addhellip button opens Asset Location Module Lookup
Use controls to find Asset(s) to be added
Asset Location Module Lookup
Example of adding Assets to PM
Asset Location Module Lookup (contrsquod)
Displays information to determine next scheduled maintenance
bull Route Order
bull Last Generated and Last Completed
Asset Location Popup
bull Meter Intervals
bull Occurrence Counter and Next Scheduled Interval Counter
Asset Location Popup (contrsquod)
Example of Last Generated and Last Completed date
Asset Location Popup (contrsquod)
Displays organizational attributes
bull Repair Center stock room and tool room
bull Shift
Asset Location Popup (contrsquod)
bull Supervisor
bull Shop department account etc
bull Enabled
Asset Location Popup (contrsquod)
Example of field values retrieved from Asset
Asset Location Popup (contrsquod)
Now letrsquos practice creating a test Asset and adding the Asset to an existing PM schedule
Add Asset to Schedule Hands-On
Locate the Root Asset (top Asset of the Tree)
Right mouse click directly on the Root Asset and select Add Asset Locationhellip
Add Asset to Schedule Hands-On (contrsquod)
Fill in the required details for the Asset (highlighted in blue)
bull Enter PPP04TEST_YOURINITIALS for the Asset ID
bull Enter PPP04Test_YourName for the Asset Name
Save the Asset
Add Asset to Schedule Hands-On (contrsquod)
Navigate to PM ID PPP04TEST in the Preventive Maint Explorer
Select the PM to open it in the Work Center
Navigate to the Assets Tab
Add Asset to Schedule Hands-On (contrsquod)
Click the Addhellip button in the Action Header Bar
Add your newly created Test Asset
Add Asset to Schedule Hands-On (contrsquod)
Review Asset generation details
Click Apply Close
Save the PM
Asset will be added to Schedule
Add Asset to Schedule Hands-On (contrsquod)
You have now successfully completed creating a test Asset and adding it to an existing PM Schedule
Add Asset to Schedule Hands-On (contrsquod)
For access to documentation and tutorials reference wwwmcuserconnectcom
MC User Connect
MCUC Documentation Tutorials Article PDF Video Tutorial
User Guide
Setup Basic PM Schedule
Attach Assets to PM Schedule
Assets Tab (PM Module)
Add Asset to Schedule
Additional Resources
Did you know you can take a Quiz to test your knowledge of todayrsquos content
bull Check it out on MC User Connect (wwwmcuserconnectcom)
bull Located in the MC eLearning folder PMs Procedures and Projects Course Quizzes
Test Your Knowledgehellip
Name and ID of designated Asset displayed
Work Order generation information
Asset In-Service and PM Schedule Disabled notification
Name
Location of Asset in the Asset Hierarchy
Field lists all locations listed above Asset Location
Parent Location
Determines the order of Work Order generation
bull Also determines order displayed in list
bull Useful for print order
Route Order
Displays the next scheduled date or next scheduled meter interval
bull Date can change if based on Work Order completion
Next Scheduled
Displays next scheduled procedure to be performed for Asset
bull Helpful with multiple scheduled procedures
Next Procedure
Indicates if schedule is enabled for individual Asset
Enabled
Adding Assets Overview
Asset Location Module Lookup
Asset Location Popup
Adding Assets to Schedule
Enabled Assets added to Assets tab will have Work Orders generated
Procedures also can determine which Assets will be associated with PM
Adding Assets Overview
Addhellip button opens Asset Location Module Lookup
Use controls to find Asset(s) to be added
Asset Location Module Lookup
Example of adding Assets to PM
Asset Location Module Lookup (contrsquod)
Displays information to determine next scheduled maintenance
bull Route Order
bull Last Generated and Last Completed
Asset Location Popup
bull Meter Intervals
bull Occurrence Counter and Next Scheduled Interval Counter
Asset Location Popup (contrsquod)
Example of Last Generated and Last Completed date
Asset Location Popup (contrsquod)
Displays organizational attributes
bull Repair Center stock room and tool room
bull Shift
Asset Location Popup (contrsquod)
bull Supervisor
bull Shop department account etc
bull Enabled
Asset Location Popup (contrsquod)
Example of field values retrieved from Asset
Asset Location Popup (contrsquod)
Now letrsquos practice creating a test Asset and adding the Asset to an existing PM schedule
Add Asset to Schedule Hands-On
Locate the Root Asset (top Asset of the Tree)
Right mouse click directly on the Root Asset and select Add Asset Locationhellip
Add Asset to Schedule Hands-On (contrsquod)
Fill in the required details for the Asset (highlighted in blue)
bull Enter PPP04TEST_YOURINITIALS for the Asset ID
bull Enter PPP04Test_YourName for the Asset Name
Save the Asset
Add Asset to Schedule Hands-On (contrsquod)
Navigate to PM ID PPP04TEST in the Preventive Maint Explorer
Select the PM to open it in the Work Center
Navigate to the Assets Tab
Add Asset to Schedule Hands-On (contrsquod)
Click the Addhellip button in the Action Header Bar
Add your newly created Test Asset
Add Asset to Schedule Hands-On (contrsquod)
Review Asset generation details
Click Apply Close
Save the PM
Asset will be added to Schedule
Add Asset to Schedule Hands-On (contrsquod)
You have now successfully completed creating a test Asset and adding it to an existing PM Schedule
Add Asset to Schedule Hands-On (contrsquod)
For access to documentation and tutorials reference wwwmcuserconnectcom
MC User Connect
MCUC Documentation Tutorials Article PDF Video Tutorial
User Guide
Setup Basic PM Schedule
Attach Assets to PM Schedule
Assets Tab (PM Module)
Add Asset to Schedule
Additional Resources
Did you know you can take a Quiz to test your knowledge of todayrsquos content
bull Check it out on MC User Connect (wwwmcuserconnectcom)
bull Located in the MC eLearning folder PMs Procedures and Projects Course Quizzes
Test Your Knowledgehellip
Location of Asset in the Asset Hierarchy
Field lists all locations listed above Asset Location
Parent Location
Determines the order of Work Order generation
bull Also determines order displayed in list
bull Useful for print order
Route Order
Displays the next scheduled date or next scheduled meter interval
bull Date can change if based on Work Order completion
Next Scheduled
Displays next scheduled procedure to be performed for Asset
bull Helpful with multiple scheduled procedures
Next Procedure
Indicates if schedule is enabled for individual Asset
Enabled
Adding Assets Overview
Asset Location Module Lookup
Asset Location Popup
Adding Assets to Schedule
Enabled Assets added to Assets tab will have Work Orders generated
Procedures also can determine which Assets will be associated with PM
Adding Assets Overview
Addhellip button opens Asset Location Module Lookup
Use controls to find Asset(s) to be added
Asset Location Module Lookup
Example of adding Assets to PM
Asset Location Module Lookup (contrsquod)
Displays information to determine next scheduled maintenance
bull Route Order
bull Last Generated and Last Completed
Asset Location Popup
bull Meter Intervals
bull Occurrence Counter and Next Scheduled Interval Counter
Asset Location Popup (contrsquod)
Example of Last Generated and Last Completed date
Asset Location Popup (contrsquod)
Displays organizational attributes
bull Repair Center stock room and tool room
bull Shift
Asset Location Popup (contrsquod)
bull Supervisor
bull Shop department account etc
bull Enabled
Asset Location Popup (contrsquod)
Example of field values retrieved from Asset
Asset Location Popup (contrsquod)
Now letrsquos practice creating a test Asset and adding the Asset to an existing PM schedule
Add Asset to Schedule Hands-On
Locate the Root Asset (top Asset of the Tree)
Right mouse click directly on the Root Asset and select Add Asset Locationhellip
Add Asset to Schedule Hands-On (contrsquod)
Fill in the required details for the Asset (highlighted in blue)
bull Enter PPP04TEST_YOURINITIALS for the Asset ID
bull Enter PPP04Test_YourName for the Asset Name
Save the Asset
Add Asset to Schedule Hands-On (contrsquod)
Navigate to PM ID PPP04TEST in the Preventive Maint Explorer
Select the PM to open it in the Work Center
Navigate to the Assets Tab
Add Asset to Schedule Hands-On (contrsquod)
Click the Addhellip button in the Action Header Bar
Add your newly created Test Asset
Add Asset to Schedule Hands-On (contrsquod)
Review Asset generation details
Click Apply Close
Save the PM
Asset will be added to Schedule
Add Asset to Schedule Hands-On (contrsquod)
You have now successfully completed creating a test Asset and adding it to an existing PM Schedule
Add Asset to Schedule Hands-On (contrsquod)
For access to documentation and tutorials reference wwwmcuserconnectcom
MC User Connect
MCUC Documentation Tutorials Article PDF Video Tutorial
User Guide
Setup Basic PM Schedule
Attach Assets to PM Schedule
Assets Tab (PM Module)
Add Asset to Schedule
Additional Resources
Did you know you can take a Quiz to test your knowledge of todayrsquos content
bull Check it out on MC User Connect (wwwmcuserconnectcom)
bull Located in the MC eLearning folder PMs Procedures and Projects Course Quizzes
Test Your Knowledgehellip
Determines the order of Work Order generation
bull Also determines order displayed in list
bull Useful for print order
Route Order
Displays the next scheduled date or next scheduled meter interval
bull Date can change if based on Work Order completion
Next Scheduled
Displays next scheduled procedure to be performed for Asset
bull Helpful with multiple scheduled procedures
Next Procedure
Indicates if schedule is enabled for individual Asset
Enabled
Adding Assets Overview
Asset Location Module Lookup
Asset Location Popup
Adding Assets to Schedule
Enabled Assets added to Assets tab will have Work Orders generated
Procedures also can determine which Assets will be associated with PM
Adding Assets Overview
Addhellip button opens Asset Location Module Lookup
Use controls to find Asset(s) to be added
Asset Location Module Lookup
Example of adding Assets to PM
Asset Location Module Lookup (contrsquod)
Displays information to determine next scheduled maintenance
bull Route Order
bull Last Generated and Last Completed
Asset Location Popup
bull Meter Intervals
bull Occurrence Counter and Next Scheduled Interval Counter
Asset Location Popup (contrsquod)
Example of Last Generated and Last Completed date
Asset Location Popup (contrsquod)
Displays organizational attributes
bull Repair Center stock room and tool room
bull Shift
Asset Location Popup (contrsquod)
bull Supervisor
bull Shop department account etc
bull Enabled
Asset Location Popup (contrsquod)
Example of field values retrieved from Asset
Asset Location Popup (contrsquod)
Now letrsquos practice creating a test Asset and adding the Asset to an existing PM schedule
Add Asset to Schedule Hands-On
Locate the Root Asset (top Asset of the Tree)
Right mouse click directly on the Root Asset and select Add Asset Locationhellip
Add Asset to Schedule Hands-On (contrsquod)
Fill in the required details for the Asset (highlighted in blue)
bull Enter PPP04TEST_YOURINITIALS for the Asset ID
bull Enter PPP04Test_YourName for the Asset Name
Save the Asset
Add Asset to Schedule Hands-On (contrsquod)
Navigate to PM ID PPP04TEST in the Preventive Maint Explorer
Select the PM to open it in the Work Center
Navigate to the Assets Tab
Add Asset to Schedule Hands-On (contrsquod)
Click the Addhellip button in the Action Header Bar
Add your newly created Test Asset
Add Asset to Schedule Hands-On (contrsquod)
Review Asset generation details
Click Apply Close
Save the PM
Asset will be added to Schedule
Add Asset to Schedule Hands-On (contrsquod)
You have now successfully completed creating a test Asset and adding it to an existing PM Schedule
Add Asset to Schedule Hands-On (contrsquod)
For access to documentation and tutorials reference wwwmcuserconnectcom
MC User Connect
MCUC Documentation Tutorials Article PDF Video Tutorial
User Guide
Setup Basic PM Schedule
Attach Assets to PM Schedule
Assets Tab (PM Module)
Add Asset to Schedule
Additional Resources
Did you know you can take a Quiz to test your knowledge of todayrsquos content
bull Check it out on MC User Connect (wwwmcuserconnectcom)
bull Located in the MC eLearning folder PMs Procedures and Projects Course Quizzes
Test Your Knowledgehellip
Displays the next scheduled date or next scheduled meter interval
bull Date can change if based on Work Order completion
Next Scheduled
Displays next scheduled procedure to be performed for Asset
bull Helpful with multiple scheduled procedures
Next Procedure
Indicates if schedule is enabled for individual Asset
Enabled
Adding Assets Overview
Asset Location Module Lookup
Asset Location Popup
Adding Assets to Schedule
Enabled Assets added to Assets tab will have Work Orders generated
Procedures also can determine which Assets will be associated with PM
Adding Assets Overview
Addhellip button opens Asset Location Module Lookup
Use controls to find Asset(s) to be added
Asset Location Module Lookup
Example of adding Assets to PM
Asset Location Module Lookup (contrsquod)
Displays information to determine next scheduled maintenance
bull Route Order
bull Last Generated and Last Completed
Asset Location Popup
bull Meter Intervals
bull Occurrence Counter and Next Scheduled Interval Counter
Asset Location Popup (contrsquod)
Example of Last Generated and Last Completed date
Asset Location Popup (contrsquod)
Displays organizational attributes
bull Repair Center stock room and tool room
bull Shift
Asset Location Popup (contrsquod)
bull Supervisor
bull Shop department account etc
bull Enabled
Asset Location Popup (contrsquod)
Example of field values retrieved from Asset
Asset Location Popup (contrsquod)
Now letrsquos practice creating a test Asset and adding the Asset to an existing PM schedule
Add Asset to Schedule Hands-On
Locate the Root Asset (top Asset of the Tree)
Right mouse click directly on the Root Asset and select Add Asset Locationhellip
Add Asset to Schedule Hands-On (contrsquod)
Fill in the required details for the Asset (highlighted in blue)
bull Enter PPP04TEST_YOURINITIALS for the Asset ID
bull Enter PPP04Test_YourName for the Asset Name
Save the Asset
Add Asset to Schedule Hands-On (contrsquod)
Navigate to PM ID PPP04TEST in the Preventive Maint Explorer
Select the PM to open it in the Work Center
Navigate to the Assets Tab
Add Asset to Schedule Hands-On (contrsquod)
Click the Addhellip button in the Action Header Bar
Add your newly created Test Asset
Add Asset to Schedule Hands-On (contrsquod)
Review Asset generation details
Click Apply Close
Save the PM
Asset will be added to Schedule
Add Asset to Schedule Hands-On (contrsquod)
You have now successfully completed creating a test Asset and adding it to an existing PM Schedule
Add Asset to Schedule Hands-On (contrsquod)
For access to documentation and tutorials reference wwwmcuserconnectcom
MC User Connect
MCUC Documentation Tutorials Article PDF Video Tutorial
User Guide
Setup Basic PM Schedule
Attach Assets to PM Schedule
Assets Tab (PM Module)
Add Asset to Schedule
Additional Resources
Did you know you can take a Quiz to test your knowledge of todayrsquos content
bull Check it out on MC User Connect (wwwmcuserconnectcom)
bull Located in the MC eLearning folder PMs Procedures and Projects Course Quizzes
Test Your Knowledgehellip
Displays next scheduled procedure to be performed for Asset
bull Helpful with multiple scheduled procedures
Next Procedure
Indicates if schedule is enabled for individual Asset
Enabled
Adding Assets Overview
Asset Location Module Lookup
Asset Location Popup
Adding Assets to Schedule
Enabled Assets added to Assets tab will have Work Orders generated
Procedures also can determine which Assets will be associated with PM
Adding Assets Overview
Addhellip button opens Asset Location Module Lookup
Use controls to find Asset(s) to be added
Asset Location Module Lookup
Example of adding Assets to PM
Asset Location Module Lookup (contrsquod)
Displays information to determine next scheduled maintenance
bull Route Order
bull Last Generated and Last Completed
Asset Location Popup
bull Meter Intervals
bull Occurrence Counter and Next Scheduled Interval Counter
Asset Location Popup (contrsquod)
Example of Last Generated and Last Completed date
Asset Location Popup (contrsquod)
Displays organizational attributes
bull Repair Center stock room and tool room
bull Shift
Asset Location Popup (contrsquod)
bull Supervisor
bull Shop department account etc
bull Enabled
Asset Location Popup (contrsquod)
Example of field values retrieved from Asset
Asset Location Popup (contrsquod)
Now letrsquos practice creating a test Asset and adding the Asset to an existing PM schedule
Add Asset to Schedule Hands-On
Locate the Root Asset (top Asset of the Tree)
Right mouse click directly on the Root Asset and select Add Asset Locationhellip
Add Asset to Schedule Hands-On (contrsquod)
Fill in the required details for the Asset (highlighted in blue)
bull Enter PPP04TEST_YOURINITIALS for the Asset ID
bull Enter PPP04Test_YourName for the Asset Name
Save the Asset
Add Asset to Schedule Hands-On (contrsquod)
Navigate to PM ID PPP04TEST in the Preventive Maint Explorer
Select the PM to open it in the Work Center
Navigate to the Assets Tab
Add Asset to Schedule Hands-On (contrsquod)
Click the Addhellip button in the Action Header Bar
Add your newly created Test Asset
Add Asset to Schedule Hands-On (contrsquod)
Review Asset generation details
Click Apply Close
Save the PM
Asset will be added to Schedule
Add Asset to Schedule Hands-On (contrsquod)
You have now successfully completed creating a test Asset and adding it to an existing PM Schedule
Add Asset to Schedule Hands-On (contrsquod)
For access to documentation and tutorials reference wwwmcuserconnectcom
MC User Connect
MCUC Documentation Tutorials Article PDF Video Tutorial
User Guide
Setup Basic PM Schedule
Attach Assets to PM Schedule
Assets Tab (PM Module)
Add Asset to Schedule
Additional Resources
Did you know you can take a Quiz to test your knowledge of todayrsquos content
bull Check it out on MC User Connect (wwwmcuserconnectcom)
bull Located in the MC eLearning folder PMs Procedures and Projects Course Quizzes
Test Your Knowledgehellip
Indicates if schedule is enabled for individual Asset
Enabled
Adding Assets Overview
Asset Location Module Lookup
Asset Location Popup
Adding Assets to Schedule
Enabled Assets added to Assets tab will have Work Orders generated
Procedures also can determine which Assets will be associated with PM
Adding Assets Overview
Addhellip button opens Asset Location Module Lookup
Use controls to find Asset(s) to be added
Asset Location Module Lookup
Example of adding Assets to PM
Asset Location Module Lookup (contrsquod)
Displays information to determine next scheduled maintenance
bull Route Order
bull Last Generated and Last Completed
Asset Location Popup
bull Meter Intervals
bull Occurrence Counter and Next Scheduled Interval Counter
Asset Location Popup (contrsquod)
Example of Last Generated and Last Completed date
Asset Location Popup (contrsquod)
Displays organizational attributes
bull Repair Center stock room and tool room
bull Shift
Asset Location Popup (contrsquod)
bull Supervisor
bull Shop department account etc
bull Enabled
Asset Location Popup (contrsquod)
Example of field values retrieved from Asset
Asset Location Popup (contrsquod)
Now letrsquos practice creating a test Asset and adding the Asset to an existing PM schedule
Add Asset to Schedule Hands-On
Locate the Root Asset (top Asset of the Tree)
Right mouse click directly on the Root Asset and select Add Asset Locationhellip
Add Asset to Schedule Hands-On (contrsquod)
Fill in the required details for the Asset (highlighted in blue)
bull Enter PPP04TEST_YOURINITIALS for the Asset ID
bull Enter PPP04Test_YourName for the Asset Name
Save the Asset
Add Asset to Schedule Hands-On (contrsquod)
Navigate to PM ID PPP04TEST in the Preventive Maint Explorer
Select the PM to open it in the Work Center
Navigate to the Assets Tab
Add Asset to Schedule Hands-On (contrsquod)
Click the Addhellip button in the Action Header Bar
Add your newly created Test Asset
Add Asset to Schedule Hands-On (contrsquod)
Review Asset generation details
Click Apply Close
Save the PM
Asset will be added to Schedule
Add Asset to Schedule Hands-On (contrsquod)
You have now successfully completed creating a test Asset and adding it to an existing PM Schedule
Add Asset to Schedule Hands-On (contrsquod)
For access to documentation and tutorials reference wwwmcuserconnectcom
MC User Connect
MCUC Documentation Tutorials Article PDF Video Tutorial
User Guide
Setup Basic PM Schedule
Attach Assets to PM Schedule
Assets Tab (PM Module)
Add Asset to Schedule
Additional Resources
Did you know you can take a Quiz to test your knowledge of todayrsquos content
bull Check it out on MC User Connect (wwwmcuserconnectcom)
bull Located in the MC eLearning folder PMs Procedures and Projects Course Quizzes
Test Your Knowledgehellip
Adding Assets Overview
Asset Location Module Lookup
Asset Location Popup
Adding Assets to Schedule
Enabled Assets added to Assets tab will have Work Orders generated
Procedures also can determine which Assets will be associated with PM
Adding Assets Overview
Addhellip button opens Asset Location Module Lookup
Use controls to find Asset(s) to be added
Asset Location Module Lookup
Example of adding Assets to PM
Asset Location Module Lookup (contrsquod)
Displays information to determine next scheduled maintenance
bull Route Order
bull Last Generated and Last Completed
Asset Location Popup
bull Meter Intervals
bull Occurrence Counter and Next Scheduled Interval Counter
Asset Location Popup (contrsquod)
Example of Last Generated and Last Completed date
Asset Location Popup (contrsquod)
Displays organizational attributes
bull Repair Center stock room and tool room
bull Shift
Asset Location Popup (contrsquod)
bull Supervisor
bull Shop department account etc
bull Enabled
Asset Location Popup (contrsquod)
Example of field values retrieved from Asset
Asset Location Popup (contrsquod)
Now letrsquos practice creating a test Asset and adding the Asset to an existing PM schedule
Add Asset to Schedule Hands-On
Locate the Root Asset (top Asset of the Tree)
Right mouse click directly on the Root Asset and select Add Asset Locationhellip
Add Asset to Schedule Hands-On (contrsquod)
Fill in the required details for the Asset (highlighted in blue)
bull Enter PPP04TEST_YOURINITIALS for the Asset ID
bull Enter PPP04Test_YourName for the Asset Name
Save the Asset
Add Asset to Schedule Hands-On (contrsquod)
Navigate to PM ID PPP04TEST in the Preventive Maint Explorer
Select the PM to open it in the Work Center
Navigate to the Assets Tab
Add Asset to Schedule Hands-On (contrsquod)
Click the Addhellip button in the Action Header Bar
Add your newly created Test Asset
Add Asset to Schedule Hands-On (contrsquod)
Review Asset generation details
Click Apply Close
Save the PM
Asset will be added to Schedule
Add Asset to Schedule Hands-On (contrsquod)
You have now successfully completed creating a test Asset and adding it to an existing PM Schedule
Add Asset to Schedule Hands-On (contrsquod)
For access to documentation and tutorials reference wwwmcuserconnectcom
MC User Connect
MCUC Documentation Tutorials Article PDF Video Tutorial
User Guide
Setup Basic PM Schedule
Attach Assets to PM Schedule
Assets Tab (PM Module)
Add Asset to Schedule
Additional Resources
Did you know you can take a Quiz to test your knowledge of todayrsquos content
bull Check it out on MC User Connect (wwwmcuserconnectcom)
bull Located in the MC eLearning folder PMs Procedures and Projects Course Quizzes
Test Your Knowledgehellip
Enabled Assets added to Assets tab will have Work Orders generated
Procedures also can determine which Assets will be associated with PM
Adding Assets Overview
Addhellip button opens Asset Location Module Lookup
Use controls to find Asset(s) to be added
Asset Location Module Lookup
Example of adding Assets to PM
Asset Location Module Lookup (contrsquod)
Displays information to determine next scheduled maintenance
bull Route Order
bull Last Generated and Last Completed
Asset Location Popup
bull Meter Intervals
bull Occurrence Counter and Next Scheduled Interval Counter
Asset Location Popup (contrsquod)
Example of Last Generated and Last Completed date
Asset Location Popup (contrsquod)
Displays organizational attributes
bull Repair Center stock room and tool room
bull Shift
Asset Location Popup (contrsquod)
bull Supervisor
bull Shop department account etc
bull Enabled
Asset Location Popup (contrsquod)
Example of field values retrieved from Asset
Asset Location Popup (contrsquod)
Now letrsquos practice creating a test Asset and adding the Asset to an existing PM schedule
Add Asset to Schedule Hands-On
Locate the Root Asset (top Asset of the Tree)
Right mouse click directly on the Root Asset and select Add Asset Locationhellip
Add Asset to Schedule Hands-On (contrsquod)
Fill in the required details for the Asset (highlighted in blue)
bull Enter PPP04TEST_YOURINITIALS for the Asset ID
bull Enter PPP04Test_YourName for the Asset Name
Save the Asset
Add Asset to Schedule Hands-On (contrsquod)
Navigate to PM ID PPP04TEST in the Preventive Maint Explorer
Select the PM to open it in the Work Center
Navigate to the Assets Tab
Add Asset to Schedule Hands-On (contrsquod)
Click the Addhellip button in the Action Header Bar
Add your newly created Test Asset
Add Asset to Schedule Hands-On (contrsquod)
Review Asset generation details
Click Apply Close
Save the PM
Asset will be added to Schedule
Add Asset to Schedule Hands-On (contrsquod)
You have now successfully completed creating a test Asset and adding it to an existing PM Schedule
Add Asset to Schedule Hands-On (contrsquod)
For access to documentation and tutorials reference wwwmcuserconnectcom
MC User Connect
MCUC Documentation Tutorials Article PDF Video Tutorial
User Guide
Setup Basic PM Schedule
Attach Assets to PM Schedule
Assets Tab (PM Module)
Add Asset to Schedule
Additional Resources
Did you know you can take a Quiz to test your knowledge of todayrsquos content
bull Check it out on MC User Connect (wwwmcuserconnectcom)
bull Located in the MC eLearning folder PMs Procedures and Projects Course Quizzes
Test Your Knowledgehellip
Addhellip button opens Asset Location Module Lookup
Use controls to find Asset(s) to be added
Asset Location Module Lookup
Example of adding Assets to PM
Asset Location Module Lookup (contrsquod)
Displays information to determine next scheduled maintenance
bull Route Order
bull Last Generated and Last Completed
Asset Location Popup
bull Meter Intervals
bull Occurrence Counter and Next Scheduled Interval Counter
Asset Location Popup (contrsquod)
Example of Last Generated and Last Completed date
Asset Location Popup (contrsquod)
Displays organizational attributes
bull Repair Center stock room and tool room
bull Shift
Asset Location Popup (contrsquod)
bull Supervisor
bull Shop department account etc
bull Enabled
Asset Location Popup (contrsquod)
Example of field values retrieved from Asset
Asset Location Popup (contrsquod)
Now letrsquos practice creating a test Asset and adding the Asset to an existing PM schedule
Add Asset to Schedule Hands-On
Locate the Root Asset (top Asset of the Tree)
Right mouse click directly on the Root Asset and select Add Asset Locationhellip
Add Asset to Schedule Hands-On (contrsquod)
Fill in the required details for the Asset (highlighted in blue)
bull Enter PPP04TEST_YOURINITIALS for the Asset ID
bull Enter PPP04Test_YourName for the Asset Name
Save the Asset
Add Asset to Schedule Hands-On (contrsquod)
Navigate to PM ID PPP04TEST in the Preventive Maint Explorer
Select the PM to open it in the Work Center
Navigate to the Assets Tab
Add Asset to Schedule Hands-On (contrsquod)
Click the Addhellip button in the Action Header Bar
Add your newly created Test Asset
Add Asset to Schedule Hands-On (contrsquod)
Review Asset generation details
Click Apply Close
Save the PM
Asset will be added to Schedule
Add Asset to Schedule Hands-On (contrsquod)
You have now successfully completed creating a test Asset and adding it to an existing PM Schedule
Add Asset to Schedule Hands-On (contrsquod)
For access to documentation and tutorials reference wwwmcuserconnectcom
MC User Connect
MCUC Documentation Tutorials Article PDF Video Tutorial
User Guide
Setup Basic PM Schedule
Attach Assets to PM Schedule
Assets Tab (PM Module)
Add Asset to Schedule
Additional Resources
Did you know you can take a Quiz to test your knowledge of todayrsquos content
bull Check it out on MC User Connect (wwwmcuserconnectcom)
bull Located in the MC eLearning folder PMs Procedures and Projects Course Quizzes
Test Your Knowledgehellip
Example of adding Assets to PM
Asset Location Module Lookup (contrsquod)
Displays information to determine next scheduled maintenance
bull Route Order
bull Last Generated and Last Completed
Asset Location Popup
bull Meter Intervals
bull Occurrence Counter and Next Scheduled Interval Counter
Asset Location Popup (contrsquod)
Example of Last Generated and Last Completed date
Asset Location Popup (contrsquod)
Displays organizational attributes
bull Repair Center stock room and tool room
bull Shift
Asset Location Popup (contrsquod)
bull Supervisor
bull Shop department account etc
bull Enabled
Asset Location Popup (contrsquod)
Example of field values retrieved from Asset
Asset Location Popup (contrsquod)
Now letrsquos practice creating a test Asset and adding the Asset to an existing PM schedule
Add Asset to Schedule Hands-On
Locate the Root Asset (top Asset of the Tree)
Right mouse click directly on the Root Asset and select Add Asset Locationhellip
Add Asset to Schedule Hands-On (contrsquod)
Fill in the required details for the Asset (highlighted in blue)
bull Enter PPP04TEST_YOURINITIALS for the Asset ID
bull Enter PPP04Test_YourName for the Asset Name
Save the Asset
Add Asset to Schedule Hands-On (contrsquod)
Navigate to PM ID PPP04TEST in the Preventive Maint Explorer
Select the PM to open it in the Work Center
Navigate to the Assets Tab
Add Asset to Schedule Hands-On (contrsquod)
Click the Addhellip button in the Action Header Bar
Add your newly created Test Asset
Add Asset to Schedule Hands-On (contrsquod)
Review Asset generation details
Click Apply Close
Save the PM
Asset will be added to Schedule
Add Asset to Schedule Hands-On (contrsquod)
You have now successfully completed creating a test Asset and adding it to an existing PM Schedule
Add Asset to Schedule Hands-On (contrsquod)
For access to documentation and tutorials reference wwwmcuserconnectcom
MC User Connect
MCUC Documentation Tutorials Article PDF Video Tutorial
User Guide
Setup Basic PM Schedule
Attach Assets to PM Schedule
Assets Tab (PM Module)
Add Asset to Schedule
Additional Resources
Did you know you can take a Quiz to test your knowledge of todayrsquos content
bull Check it out on MC User Connect (wwwmcuserconnectcom)
bull Located in the MC eLearning folder PMs Procedures and Projects Course Quizzes
Test Your Knowledgehellip
Displays information to determine next scheduled maintenance
bull Route Order
bull Last Generated and Last Completed
Asset Location Popup
bull Meter Intervals
bull Occurrence Counter and Next Scheduled Interval Counter
Asset Location Popup (contrsquod)
Example of Last Generated and Last Completed date
Asset Location Popup (contrsquod)
Displays organizational attributes
bull Repair Center stock room and tool room
bull Shift
Asset Location Popup (contrsquod)
bull Supervisor
bull Shop department account etc
bull Enabled
Asset Location Popup (contrsquod)
Example of field values retrieved from Asset
Asset Location Popup (contrsquod)
Now letrsquos practice creating a test Asset and adding the Asset to an existing PM schedule
Add Asset to Schedule Hands-On
Locate the Root Asset (top Asset of the Tree)
Right mouse click directly on the Root Asset and select Add Asset Locationhellip
Add Asset to Schedule Hands-On (contrsquod)
Fill in the required details for the Asset (highlighted in blue)
bull Enter PPP04TEST_YOURINITIALS for the Asset ID
bull Enter PPP04Test_YourName for the Asset Name
Save the Asset
Add Asset to Schedule Hands-On (contrsquod)
Navigate to PM ID PPP04TEST in the Preventive Maint Explorer
Select the PM to open it in the Work Center
Navigate to the Assets Tab
Add Asset to Schedule Hands-On (contrsquod)
Click the Addhellip button in the Action Header Bar
Add your newly created Test Asset
Add Asset to Schedule Hands-On (contrsquod)
Review Asset generation details
Click Apply Close
Save the PM
Asset will be added to Schedule
Add Asset to Schedule Hands-On (contrsquod)
You have now successfully completed creating a test Asset and adding it to an existing PM Schedule
Add Asset to Schedule Hands-On (contrsquod)
For access to documentation and tutorials reference wwwmcuserconnectcom
MC User Connect
MCUC Documentation Tutorials Article PDF Video Tutorial
User Guide
Setup Basic PM Schedule
Attach Assets to PM Schedule
Assets Tab (PM Module)
Add Asset to Schedule
Additional Resources
Did you know you can take a Quiz to test your knowledge of todayrsquos content
bull Check it out on MC User Connect (wwwmcuserconnectcom)
bull Located in the MC eLearning folder PMs Procedures and Projects Course Quizzes
Test Your Knowledgehellip
bull Meter Intervals
bull Occurrence Counter and Next Scheduled Interval Counter
Asset Location Popup (contrsquod)
Example of Last Generated and Last Completed date
Asset Location Popup (contrsquod)
Displays organizational attributes
bull Repair Center stock room and tool room
bull Shift
Asset Location Popup (contrsquod)
bull Supervisor
bull Shop department account etc
bull Enabled
Asset Location Popup (contrsquod)
Example of field values retrieved from Asset
Asset Location Popup (contrsquod)
Now letrsquos practice creating a test Asset and adding the Asset to an existing PM schedule
Add Asset to Schedule Hands-On
Locate the Root Asset (top Asset of the Tree)
Right mouse click directly on the Root Asset and select Add Asset Locationhellip
Add Asset to Schedule Hands-On (contrsquod)
Fill in the required details for the Asset (highlighted in blue)
bull Enter PPP04TEST_YOURINITIALS for the Asset ID
bull Enter PPP04Test_YourName for the Asset Name
Save the Asset
Add Asset to Schedule Hands-On (contrsquod)
Navigate to PM ID PPP04TEST in the Preventive Maint Explorer
Select the PM to open it in the Work Center
Navigate to the Assets Tab
Add Asset to Schedule Hands-On (contrsquod)
Click the Addhellip button in the Action Header Bar
Add your newly created Test Asset
Add Asset to Schedule Hands-On (contrsquod)
Review Asset generation details
Click Apply Close
Save the PM
Asset will be added to Schedule
Add Asset to Schedule Hands-On (contrsquod)
You have now successfully completed creating a test Asset and adding it to an existing PM Schedule
Add Asset to Schedule Hands-On (contrsquod)
For access to documentation and tutorials reference wwwmcuserconnectcom
MC User Connect
MCUC Documentation Tutorials Article PDF Video Tutorial
User Guide
Setup Basic PM Schedule
Attach Assets to PM Schedule
Assets Tab (PM Module)
Add Asset to Schedule
Additional Resources
Did you know you can take a Quiz to test your knowledge of todayrsquos content
bull Check it out on MC User Connect (wwwmcuserconnectcom)
bull Located in the MC eLearning folder PMs Procedures and Projects Course Quizzes
Test Your Knowledgehellip
Example of Last Generated and Last Completed date
Asset Location Popup (contrsquod)
Displays organizational attributes
bull Repair Center stock room and tool room
bull Shift
Asset Location Popup (contrsquod)
bull Supervisor
bull Shop department account etc
bull Enabled
Asset Location Popup (contrsquod)
Example of field values retrieved from Asset
Asset Location Popup (contrsquod)
Now letrsquos practice creating a test Asset and adding the Asset to an existing PM schedule
Add Asset to Schedule Hands-On
Locate the Root Asset (top Asset of the Tree)
Right mouse click directly on the Root Asset and select Add Asset Locationhellip
Add Asset to Schedule Hands-On (contrsquod)
Fill in the required details for the Asset (highlighted in blue)
bull Enter PPP04TEST_YOURINITIALS for the Asset ID
bull Enter PPP04Test_YourName for the Asset Name
Save the Asset
Add Asset to Schedule Hands-On (contrsquod)
Navigate to PM ID PPP04TEST in the Preventive Maint Explorer
Select the PM to open it in the Work Center
Navigate to the Assets Tab
Add Asset to Schedule Hands-On (contrsquod)
Click the Addhellip button in the Action Header Bar
Add your newly created Test Asset
Add Asset to Schedule Hands-On (contrsquod)
Review Asset generation details
Click Apply Close
Save the PM
Asset will be added to Schedule
Add Asset to Schedule Hands-On (contrsquod)
You have now successfully completed creating a test Asset and adding it to an existing PM Schedule
Add Asset to Schedule Hands-On (contrsquod)
For access to documentation and tutorials reference wwwmcuserconnectcom
MC User Connect
MCUC Documentation Tutorials Article PDF Video Tutorial
User Guide
Setup Basic PM Schedule
Attach Assets to PM Schedule
Assets Tab (PM Module)
Add Asset to Schedule
Additional Resources
Did you know you can take a Quiz to test your knowledge of todayrsquos content
bull Check it out on MC User Connect (wwwmcuserconnectcom)
bull Located in the MC eLearning folder PMs Procedures and Projects Course Quizzes
Test Your Knowledgehellip
Displays organizational attributes
bull Repair Center stock room and tool room
bull Shift
Asset Location Popup (contrsquod)
bull Supervisor
bull Shop department account etc
bull Enabled
Asset Location Popup (contrsquod)
Example of field values retrieved from Asset
Asset Location Popup (contrsquod)
Now letrsquos practice creating a test Asset and adding the Asset to an existing PM schedule
Add Asset to Schedule Hands-On
Locate the Root Asset (top Asset of the Tree)
Right mouse click directly on the Root Asset and select Add Asset Locationhellip
Add Asset to Schedule Hands-On (contrsquod)
Fill in the required details for the Asset (highlighted in blue)
bull Enter PPP04TEST_YOURINITIALS for the Asset ID
bull Enter PPP04Test_YourName for the Asset Name
Save the Asset
Add Asset to Schedule Hands-On (contrsquod)
Navigate to PM ID PPP04TEST in the Preventive Maint Explorer
Select the PM to open it in the Work Center
Navigate to the Assets Tab
Add Asset to Schedule Hands-On (contrsquod)
Click the Addhellip button in the Action Header Bar
Add your newly created Test Asset
Add Asset to Schedule Hands-On (contrsquod)
Review Asset generation details
Click Apply Close
Save the PM
Asset will be added to Schedule
Add Asset to Schedule Hands-On (contrsquod)
You have now successfully completed creating a test Asset and adding it to an existing PM Schedule
Add Asset to Schedule Hands-On (contrsquod)
For access to documentation and tutorials reference wwwmcuserconnectcom
MC User Connect
MCUC Documentation Tutorials Article PDF Video Tutorial
User Guide
Setup Basic PM Schedule
Attach Assets to PM Schedule
Assets Tab (PM Module)
Add Asset to Schedule
Additional Resources
Did you know you can take a Quiz to test your knowledge of todayrsquos content
bull Check it out on MC User Connect (wwwmcuserconnectcom)
bull Located in the MC eLearning folder PMs Procedures and Projects Course Quizzes
Test Your Knowledgehellip
bull Supervisor
bull Shop department account etc
bull Enabled
Asset Location Popup (contrsquod)
Example of field values retrieved from Asset
Asset Location Popup (contrsquod)
Now letrsquos practice creating a test Asset and adding the Asset to an existing PM schedule
Add Asset to Schedule Hands-On
Locate the Root Asset (top Asset of the Tree)
Right mouse click directly on the Root Asset and select Add Asset Locationhellip
Add Asset to Schedule Hands-On (contrsquod)
Fill in the required details for the Asset (highlighted in blue)
bull Enter PPP04TEST_YOURINITIALS for the Asset ID
bull Enter PPP04Test_YourName for the Asset Name
Save the Asset
Add Asset to Schedule Hands-On (contrsquod)
Navigate to PM ID PPP04TEST in the Preventive Maint Explorer
Select the PM to open it in the Work Center
Navigate to the Assets Tab
Add Asset to Schedule Hands-On (contrsquod)
Click the Addhellip button in the Action Header Bar
Add your newly created Test Asset
Add Asset to Schedule Hands-On (contrsquod)
Review Asset generation details
Click Apply Close
Save the PM
Asset will be added to Schedule
Add Asset to Schedule Hands-On (contrsquod)
You have now successfully completed creating a test Asset and adding it to an existing PM Schedule
Add Asset to Schedule Hands-On (contrsquod)
For access to documentation and tutorials reference wwwmcuserconnectcom
MC User Connect
MCUC Documentation Tutorials Article PDF Video Tutorial
User Guide
Setup Basic PM Schedule
Attach Assets to PM Schedule
Assets Tab (PM Module)
Add Asset to Schedule
Additional Resources
Did you know you can take a Quiz to test your knowledge of todayrsquos content
bull Check it out on MC User Connect (wwwmcuserconnectcom)
bull Located in the MC eLearning folder PMs Procedures and Projects Course Quizzes
Test Your Knowledgehellip
Example of field values retrieved from Asset
Asset Location Popup (contrsquod)
Now letrsquos practice creating a test Asset and adding the Asset to an existing PM schedule
Add Asset to Schedule Hands-On
Locate the Root Asset (top Asset of the Tree)
Right mouse click directly on the Root Asset and select Add Asset Locationhellip
Add Asset to Schedule Hands-On (contrsquod)
Fill in the required details for the Asset (highlighted in blue)
bull Enter PPP04TEST_YOURINITIALS for the Asset ID
bull Enter PPP04Test_YourName for the Asset Name
Save the Asset
Add Asset to Schedule Hands-On (contrsquod)
Navigate to PM ID PPP04TEST in the Preventive Maint Explorer
Select the PM to open it in the Work Center
Navigate to the Assets Tab
Add Asset to Schedule Hands-On (contrsquod)
Click the Addhellip button in the Action Header Bar
Add your newly created Test Asset
Add Asset to Schedule Hands-On (contrsquod)
Review Asset generation details
Click Apply Close
Save the PM
Asset will be added to Schedule
Add Asset to Schedule Hands-On (contrsquod)
You have now successfully completed creating a test Asset and adding it to an existing PM Schedule
Add Asset to Schedule Hands-On (contrsquod)
For access to documentation and tutorials reference wwwmcuserconnectcom
MC User Connect
MCUC Documentation Tutorials Article PDF Video Tutorial
User Guide
Setup Basic PM Schedule
Attach Assets to PM Schedule
Assets Tab (PM Module)
Add Asset to Schedule
Additional Resources
Did you know you can take a Quiz to test your knowledge of todayrsquos content
bull Check it out on MC User Connect (wwwmcuserconnectcom)
bull Located in the MC eLearning folder PMs Procedures and Projects Course Quizzes
Test Your Knowledgehellip
Now letrsquos practice creating a test Asset and adding the Asset to an existing PM schedule
Add Asset to Schedule Hands-On
Locate the Root Asset (top Asset of the Tree)
Right mouse click directly on the Root Asset and select Add Asset Locationhellip
Add Asset to Schedule Hands-On (contrsquod)
Fill in the required details for the Asset (highlighted in blue)
bull Enter PPP04TEST_YOURINITIALS for the Asset ID
bull Enter PPP04Test_YourName for the Asset Name
Save the Asset
Add Asset to Schedule Hands-On (contrsquod)
Navigate to PM ID PPP04TEST in the Preventive Maint Explorer
Select the PM to open it in the Work Center
Navigate to the Assets Tab
Add Asset to Schedule Hands-On (contrsquod)
Click the Addhellip button in the Action Header Bar
Add your newly created Test Asset
Add Asset to Schedule Hands-On (contrsquod)
Review Asset generation details
Click Apply Close
Save the PM
Asset will be added to Schedule
Add Asset to Schedule Hands-On (contrsquod)
You have now successfully completed creating a test Asset and adding it to an existing PM Schedule
Add Asset to Schedule Hands-On (contrsquod)
For access to documentation and tutorials reference wwwmcuserconnectcom
MC User Connect
MCUC Documentation Tutorials Article PDF Video Tutorial
User Guide
Setup Basic PM Schedule
Attach Assets to PM Schedule
Assets Tab (PM Module)
Add Asset to Schedule
Additional Resources
Did you know you can take a Quiz to test your knowledge of todayrsquos content
bull Check it out on MC User Connect (wwwmcuserconnectcom)
bull Located in the MC eLearning folder PMs Procedures and Projects Course Quizzes
Test Your Knowledgehellip
Locate the Root Asset (top Asset of the Tree)
Right mouse click directly on the Root Asset and select Add Asset Locationhellip
Add Asset to Schedule Hands-On (contrsquod)
Fill in the required details for the Asset (highlighted in blue)
bull Enter PPP04TEST_YOURINITIALS for the Asset ID
bull Enter PPP04Test_YourName for the Asset Name
Save the Asset
Add Asset to Schedule Hands-On (contrsquod)
Navigate to PM ID PPP04TEST in the Preventive Maint Explorer
Select the PM to open it in the Work Center
Navigate to the Assets Tab
Add Asset to Schedule Hands-On (contrsquod)
Click the Addhellip button in the Action Header Bar
Add your newly created Test Asset
Add Asset to Schedule Hands-On (contrsquod)
Review Asset generation details
Click Apply Close
Save the PM
Asset will be added to Schedule
Add Asset to Schedule Hands-On (contrsquod)
You have now successfully completed creating a test Asset and adding it to an existing PM Schedule
Add Asset to Schedule Hands-On (contrsquod)
For access to documentation and tutorials reference wwwmcuserconnectcom
MC User Connect
MCUC Documentation Tutorials Article PDF Video Tutorial
User Guide
Setup Basic PM Schedule
Attach Assets to PM Schedule
Assets Tab (PM Module)
Add Asset to Schedule
Additional Resources
Did you know you can take a Quiz to test your knowledge of todayrsquos content
bull Check it out on MC User Connect (wwwmcuserconnectcom)
bull Located in the MC eLearning folder PMs Procedures and Projects Course Quizzes
Test Your Knowledgehellip
Fill in the required details for the Asset (highlighted in blue)
bull Enter PPP04TEST_YOURINITIALS for the Asset ID
bull Enter PPP04Test_YourName for the Asset Name
Save the Asset
Add Asset to Schedule Hands-On (contrsquod)
Navigate to PM ID PPP04TEST in the Preventive Maint Explorer
Select the PM to open it in the Work Center
Navigate to the Assets Tab
Add Asset to Schedule Hands-On (contrsquod)
Click the Addhellip button in the Action Header Bar
Add your newly created Test Asset
Add Asset to Schedule Hands-On (contrsquod)
Review Asset generation details
Click Apply Close
Save the PM
Asset will be added to Schedule
Add Asset to Schedule Hands-On (contrsquod)
You have now successfully completed creating a test Asset and adding it to an existing PM Schedule
Add Asset to Schedule Hands-On (contrsquod)
For access to documentation and tutorials reference wwwmcuserconnectcom
MC User Connect
MCUC Documentation Tutorials Article PDF Video Tutorial
User Guide
Setup Basic PM Schedule
Attach Assets to PM Schedule
Assets Tab (PM Module)
Add Asset to Schedule
Additional Resources
Did you know you can take a Quiz to test your knowledge of todayrsquos content
bull Check it out on MC User Connect (wwwmcuserconnectcom)
bull Located in the MC eLearning folder PMs Procedures and Projects Course Quizzes
Test Your Knowledgehellip
Navigate to PM ID PPP04TEST in the Preventive Maint Explorer
Select the PM to open it in the Work Center
Navigate to the Assets Tab
Add Asset to Schedule Hands-On (contrsquod)
Click the Addhellip button in the Action Header Bar
Add your newly created Test Asset
Add Asset to Schedule Hands-On (contrsquod)
Review Asset generation details
Click Apply Close
Save the PM
Asset will be added to Schedule
Add Asset to Schedule Hands-On (contrsquod)
You have now successfully completed creating a test Asset and adding it to an existing PM Schedule
Add Asset to Schedule Hands-On (contrsquod)
For access to documentation and tutorials reference wwwmcuserconnectcom
MC User Connect
MCUC Documentation Tutorials Article PDF Video Tutorial
User Guide
Setup Basic PM Schedule
Attach Assets to PM Schedule
Assets Tab (PM Module)
Add Asset to Schedule
Additional Resources
Did you know you can take a Quiz to test your knowledge of todayrsquos content
bull Check it out on MC User Connect (wwwmcuserconnectcom)
bull Located in the MC eLearning folder PMs Procedures and Projects Course Quizzes
Test Your Knowledgehellip
Click the Addhellip button in the Action Header Bar
Add your newly created Test Asset
Add Asset to Schedule Hands-On (contrsquod)
Review Asset generation details
Click Apply Close
Save the PM
Asset will be added to Schedule
Add Asset to Schedule Hands-On (contrsquod)
You have now successfully completed creating a test Asset and adding it to an existing PM Schedule
Add Asset to Schedule Hands-On (contrsquod)
For access to documentation and tutorials reference wwwmcuserconnectcom
MC User Connect
MCUC Documentation Tutorials Article PDF Video Tutorial
User Guide
Setup Basic PM Schedule
Attach Assets to PM Schedule
Assets Tab (PM Module)
Add Asset to Schedule
Additional Resources
Did you know you can take a Quiz to test your knowledge of todayrsquos content
bull Check it out on MC User Connect (wwwmcuserconnectcom)
bull Located in the MC eLearning folder PMs Procedures and Projects Course Quizzes
Test Your Knowledgehellip
Review Asset generation details
Click Apply Close
Save the PM
Asset will be added to Schedule
Add Asset to Schedule Hands-On (contrsquod)
You have now successfully completed creating a test Asset and adding it to an existing PM Schedule
Add Asset to Schedule Hands-On (contrsquod)
For access to documentation and tutorials reference wwwmcuserconnectcom
MC User Connect
MCUC Documentation Tutorials Article PDF Video Tutorial
User Guide
Setup Basic PM Schedule
Attach Assets to PM Schedule
Assets Tab (PM Module)
Add Asset to Schedule
Additional Resources
Did you know you can take a Quiz to test your knowledge of todayrsquos content
bull Check it out on MC User Connect (wwwmcuserconnectcom)
bull Located in the MC eLearning folder PMs Procedures and Projects Course Quizzes
Test Your Knowledgehellip
You have now successfully completed creating a test Asset and adding it to an existing PM Schedule
Add Asset to Schedule Hands-On (contrsquod)
For access to documentation and tutorials reference wwwmcuserconnectcom
MC User Connect
MCUC Documentation Tutorials Article PDF Video Tutorial
User Guide
Setup Basic PM Schedule
Attach Assets to PM Schedule
Assets Tab (PM Module)
Add Asset to Schedule
Additional Resources
Did you know you can take a Quiz to test your knowledge of todayrsquos content
bull Check it out on MC User Connect (wwwmcuserconnectcom)
bull Located in the MC eLearning folder PMs Procedures and Projects Course Quizzes
Test Your Knowledgehellip
For access to documentation and tutorials reference wwwmcuserconnectcom
MC User Connect
MCUC Documentation Tutorials Article PDF Video Tutorial
User Guide
Setup Basic PM Schedule
Attach Assets to PM Schedule
Assets Tab (PM Module)
Add Asset to Schedule
Additional Resources
Did you know you can take a Quiz to test your knowledge of todayrsquos content
bull Check it out on MC User Connect (wwwmcuserconnectcom)
bull Located in the MC eLearning folder PMs Procedures and Projects Course Quizzes
Test Your Knowledgehellip
MCUC Documentation Tutorials Article PDF Video Tutorial
User Guide
Setup Basic PM Schedule
Attach Assets to PM Schedule
Assets Tab (PM Module)
Add Asset to Schedule
Additional Resources
Did you know you can take a Quiz to test your knowledge of todayrsquos content
bull Check it out on MC User Connect (wwwmcuserconnectcom)
bull Located in the MC eLearning folder PMs Procedures and Projects Course Quizzes
Test Your Knowledgehellip
Did you know you can take a Quiz to test your knowledge of todayrsquos content
bull Check it out on MC User Connect (wwwmcuserconnectcom)
bull Located in the MC eLearning folder PMs Procedures and Projects Course Quizzes
Test Your Knowledgehellip