![Page 1: PowerLogistics Asia 2013- "Using HLV ships in Offshore Wind Farm Project Installation - Present and Future."- Borge Fogh, Jumbo Shipping](https://reader034.vdocuments.us/reader034/viewer/2022051208/54794d53b47959a9098b4723/html5/thumbnails/1.jpg)
www.jumbomaritime.nl
Offshore Wind Farm Installation with a Heavy Lift Vessel on DP
![Page 2: PowerLogistics Asia 2013- "Using HLV ships in Offshore Wind Farm Project Installation - Present and Future."- Borge Fogh, Jumbo Shipping](https://reader034.vdocuments.us/reader034/viewer/2022051208/54794d53b47959a9098b4723/html5/thumbnails/2.jpg)
www.jumbomaritime.nl
• Facts & Figures
• Jumbo’s Hardware & Track record
• Offshore Wind Scope for DP2 HLVs
1. Offshore supply (feedering)
2. Installation of Transition Pieces
3. Installation of Pre-piles
4. Installation of Jackets + Tripods
• Software requirements
• Questions & Answers
Content
![Page 3: PowerLogistics Asia 2013- "Using HLV ships in Offshore Wind Farm Project Installation - Present and Future."- Borge Fogh, Jumbo Shipping](https://reader034.vdocuments.us/reader034/viewer/2022051208/54794d53b47959a9098b4723/html5/thumbnails/3.jpg)
www.jumbomaritime.nl www.jumbomaritime.nl
Facts & Figures
www.jumbomaritime.nl
• Privately owned, independent company
• Founded in 1968
• Personnel: 500 (130 in office)
• Head Office: Schiedam, The Netherlands
![Page 4: PowerLogistics Asia 2013- "Using HLV ships in Offshore Wind Farm Project Installation - Present and Future."- Borge Fogh, Jumbo Shipping](https://reader034.vdocuments.us/reader034/viewer/2022051208/54794d53b47959a9098b4723/html5/thumbnails/4.jpg)
www.jumbomaritime.nl
Jumbo’s Hardware The excisting fleet
![Page 5: PowerLogistics Asia 2013- "Using HLV ships in Offshore Wind Farm Project Installation - Present and Future."- Borge Fogh, Jumbo Shipping](https://reader034.vdocuments.us/reader034/viewer/2022051208/54794d53b47959a9098b4723/html5/thumbnails/5.jpg)
www.jumbomaritime.nl www.jumbomaritime.nl
Project : Walney Monopile Transport
Client : DONG Energy
Object : Monopiles up to 805t and 65m long
Transport : Rostock (DE) to Barrow-in-Furness (UK)
Comment : Transport of 8 monopiles per voyage
Track record
www.jumbomaritime.nl
![Page 6: PowerLogistics Asia 2013- "Using HLV ships in Offshore Wind Farm Project Installation - Present and Future."- Borge Fogh, Jumbo Shipping](https://reader034.vdocuments.us/reader034/viewer/2022051208/54794d53b47959a9098b4723/html5/thumbnails/6.jpg)
www.jumbomaritime.nl
Jumbo’s Hardware DP2 J-1800 class HLVs
Jumbo Javelin & Fairplayer
• DP2
• 2 x 900t mast cranes
• Large box-shaped hold, with multi-level adjustable tween decks (19,800m3)
• Transit speed of max. 17 knots
• Large flush deck (3,100m2)
• Versatile: expandable with project specific tools and systems
![Page 7: PowerLogistics Asia 2013- "Using HLV ships in Offshore Wind Farm Project Installation - Present and Future."- Borge Fogh, Jumbo Shipping](https://reader034.vdocuments.us/reader034/viewer/2022051208/54794d53b47959a9098b4723/html5/thumbnails/7.jpg)
www.jumbomaritime.nl www.jumbomaritime.nl
Track record
www.jumbomaritime.nl
Project : Greater Gabbard
Client : Fluor Ltd. / GGOWL
Object : 131 Transition Pieces of 280t each
Location : Southern North Sea, UK
Comment : Installation on pre-installed monopiles
![Page 8: PowerLogistics Asia 2013- "Using HLV ships in Offshore Wind Farm Project Installation - Present and Future."- Borge Fogh, Jumbo Shipping](https://reader034.vdocuments.us/reader034/viewer/2022051208/54794d53b47959a9098b4723/html5/thumbnails/8.jpg)
www.jumbomaritime.nl www.jumbomaritime.nl
Track record
www.jumbomaritime.nl
Project : Anholt
Client : MT Hojgaard / DONG Energy
Object : 111 Transition Pieces of 170t each
Location : Anholt, Denmark
Comment : Installation on pre-installed monopiles
![Page 9: PowerLogistics Asia 2013- "Using HLV ships in Offshore Wind Farm Project Installation - Present and Future."- Borge Fogh, Jumbo Shipping](https://reader034.vdocuments.us/reader034/viewer/2022051208/54794d53b47959a9098b4723/html5/thumbnails/9.jpg)
www.jumbomaritime.nl
Supporting the offshore wind market with
DP2 heavy lift vessels:
1. Offshore supply (feedering)
2. Installation of Transition Pieces
3. Installation of Pre-piles
4. Installation of Jackets + Tripods
5. Installation of WTGs (not addressed in this presentation)
Jumbo’s Offshore Wind Scope
![Page 10: PowerLogistics Asia 2013- "Using HLV ships in Offshore Wind Farm Project Installation - Present and Future."- Borge Fogh, Jumbo Shipping](https://reader034.vdocuments.us/reader034/viewer/2022051208/54794d53b47959a9098b4723/html5/thumbnails/10.jpg)
www.jumbomaritime.nl www.jumbomaritime.nl
1. Offshore supply (feedering)
• Optimize installation schedule
• Utilize cargo capacity of a HLV
• Employ economic sailing capacity of a HLV
• Minimize weather delays
Jumbo’s Offshore Wind Scope
www.jumbomaritime.nl
![Page 11: PowerLogistics Asia 2013- "Using HLV ships in Offshore Wind Farm Project Installation - Present and Future."- Borge Fogh, Jumbo Shipping](https://reader034.vdocuments.us/reader034/viewer/2022051208/54794d53b47959a9098b4723/html5/thumbnails/11.jpg)
www.jumbomaritime.nl www.jumbomaritime.nl
Jumbo’s Offshore Wind Scope
www.jumbomaritime.nl
2. Installation of Transition Pieces
• Optimize installation schedule
• Utilize cargo capacity of a HLV
• Employ economic sailing capacity of a HLV
• Minimize weather delays
![Page 12: PowerLogistics Asia 2013- "Using HLV ships in Offshore Wind Farm Project Installation - Present and Future."- Borge Fogh, Jumbo Shipping](https://reader034.vdocuments.us/reader034/viewer/2022051208/54794d53b47959a9098b4723/html5/thumbnails/12.jpg)
www.jumbomaritime.nl www.jumbomaritime.nl
3. Installation of Pre-piles:
• Utilize cargo capacity of a HLV
• Efficient sailing and in field shifts
• Robust and precise installation method
Jumbo’s Offshore Wind Scope
www.jumbomaritime.nl
![Page 13: PowerLogistics Asia 2013- "Using HLV ships in Offshore Wind Farm Project Installation - Present and Future."- Borge Fogh, Jumbo Shipping](https://reader034.vdocuments.us/reader034/viewer/2022051208/54794d53b47959a9098b4723/html5/thumbnails/13.jpg)
www.jumbomaritime.nl
Installation of Pre-piles: Vessel Lay-out
30 Piles 2,5 m. OD
![Page 14: PowerLogistics Asia 2013- "Using HLV ships in Offshore Wind Farm Project Installation - Present and Future."- Borge Fogh, Jumbo Shipping](https://reader034.vdocuments.us/reader034/viewer/2022051208/54794d53b47959a9098b4723/html5/thumbnails/14.jpg)
www.jumbomaritime.nl
Installation of Pre-piles: Template installation
![Page 15: PowerLogistics Asia 2013- "Using HLV ships in Offshore Wind Farm Project Installation - Present and Future."- Borge Fogh, Jumbo Shipping](https://reader034.vdocuments.us/reader034/viewer/2022051208/54794d53b47959a9098b4723/html5/thumbnails/15.jpg)
www.jumbomaritime.nl
Installation of Pre-piles: Pile upending
![Page 16: PowerLogistics Asia 2013- "Using HLV ships in Offshore Wind Farm Project Installation - Present and Future."- Borge Fogh, Jumbo Shipping](https://reader034.vdocuments.us/reader034/viewer/2022051208/54794d53b47959a9098b4723/html5/thumbnails/16.jpg)
www.jumbomaritime.nl
Installation of Pre-piles: Pile stabbing and vibrating
![Page 17: PowerLogistics Asia 2013- "Using HLV ships in Offshore Wind Farm Project Installation - Present and Future."- Borge Fogh, Jumbo Shipping](https://reader034.vdocuments.us/reader034/viewer/2022051208/54794d53b47959a9098b4723/html5/thumbnails/17.jpg)
www.jumbomaritime.nl
Installation of Pre-piles: Pile driving
![Page 18: PowerLogistics Asia 2013- "Using HLV ships in Offshore Wind Farm Project Installation - Present and Future."- Borge Fogh, Jumbo Shipping](https://reader034.vdocuments.us/reader034/viewer/2022051208/54794d53b47959a9098b4723/html5/thumbnails/18.jpg)
www.jumbomaritime.nl www.jumbomaritime.nl
4. Installation of Jackets / Tripods:
• Offer complete foundation transport and installation package (incl. pre-piling)
• Utilize cargo capacity of a HLV
• Efficient sailing and in field shifts
Jumbo’s Offshore Wind Scope
www.jumbomaritime.nl
![Page 19: PowerLogistics Asia 2013- "Using HLV ships in Offshore Wind Farm Project Installation - Present and Future."- Borge Fogh, Jumbo Shipping](https://reader034.vdocuments.us/reader034/viewer/2022051208/54794d53b47959a9098b4723/html5/thumbnails/19.jpg)
www.jumbomaritime.nl
Installation of Jackets / Tripods: Jumbo’s Hardware
Design criteria for the floating installation
vessel concept (XL-1800):
• Economic sailing at a transit high speed
• Feasible to carry multiple fully assembled jackets
• Shallow draught in port
• Fast and robust installation method
• High workability
• DP2 to avoid anchoring and/or jacking up/down
![Page 20: PowerLogistics Asia 2013- "Using HLV ships in Offshore Wind Farm Project Installation - Present and Future."- Borge Fogh, Jumbo Shipping](https://reader034.vdocuments.us/reader034/viewer/2022051208/54794d53b47959a9098b4723/html5/thumbnails/20.jpg)
www.jumbomaritime.nl
Installation of Jackets / Tripods: Jumbo's “XL-1800” Particulars
• Loa 183.00m (excl. Helideck)
• Boa 43.00m
• D 13.00m
• Deadweight 15,000t @ T = 7.00m
• Accomm. 135 PoB
• Main crane 1,800t @ 26m
• Free deck space 5,980 m2
![Page 21: PowerLogistics Asia 2013- "Using HLV ships in Offshore Wind Farm Project Installation - Present and Future."- Borge Fogh, Jumbo Shipping](https://reader034.vdocuments.us/reader034/viewer/2022051208/54794d53b47959a9098b4723/html5/thumbnails/21.jpg)
www.jumbomaritime.nl
Installation of Jackets / Tripods: Soil plug removal & pile cleaning
![Page 22: PowerLogistics Asia 2013- "Using HLV ships in Offshore Wind Farm Project Installation - Present and Future."- Borge Fogh, Jumbo Shipping](https://reader034.vdocuments.us/reader034/viewer/2022051208/54794d53b47959a9098b4723/html5/thumbnails/22.jpg)
www.jumbomaritime.nl
![Page 23: PowerLogistics Asia 2013- "Using HLV ships in Offshore Wind Farm Project Installation - Present and Future."- Borge Fogh, Jumbo Shipping](https://reader034.vdocuments.us/reader034/viewer/2022051208/54794d53b47959a9098b4723/html5/thumbnails/23.jpg)
www.jumbomaritime.nl
![Page 24: PowerLogistics Asia 2013- "Using HLV ships in Offshore Wind Farm Project Installation - Present and Future."- Borge Fogh, Jumbo Shipping](https://reader034.vdocuments.us/reader034/viewer/2022051208/54794d53b47959a9098b4723/html5/thumbnails/24.jpg)
www.jumbomaritime.nl
![Page 25: PowerLogistics Asia 2013- "Using HLV ships in Offshore Wind Farm Project Installation - Present and Future."- Borge Fogh, Jumbo Shipping](https://reader034.vdocuments.us/reader034/viewer/2022051208/54794d53b47959a9098b4723/html5/thumbnails/25.jpg)
www.jumbomaritime.nl
![Page 26: PowerLogistics Asia 2013- "Using HLV ships in Offshore Wind Farm Project Installation - Present and Future."- Borge Fogh, Jumbo Shipping](https://reader034.vdocuments.us/reader034/viewer/2022051208/54794d53b47959a9098b4723/html5/thumbnails/26.jpg)
www.jumbomaritime.nl
Market Approach
• Maintain high HSE & QA/QC standards in
all disciplines
• Add value to projects with knowhow, equipment and efficiency
• Take full project responsibility for transport and installation
• Strive to contract for T&I scope on LS basis
(to have same project incentive as the Client)
Jumbo’s Software
![Page 27: PowerLogistics Asia 2013- "Using HLV ships in Offshore Wind Farm Project Installation - Present and Future."- Borge Fogh, Jumbo Shipping](https://reader034.vdocuments.us/reader034/viewer/2022051208/54794d53b47959a9098b4723/html5/thumbnails/27.jpg)
www.jumbomaritime.nl
Knowhow
• In-depth knowledge of offshore lifting operations and heavy lift transport
• In-depth knowledge of offshore surface and subsea installation
• Highly experienced engineering and project management department
• Highly skilled and qualified crew
• Working conform the HSE & QA/QC standards in the offshore O&G industry
Jumbo’s Software
![Page 28: PowerLogistics Asia 2013- "Using HLV ships in Offshore Wind Farm Project Installation - Present and Future."- Borge Fogh, Jumbo Shipping](https://reader034.vdocuments.us/reader034/viewer/2022051208/54794d53b47959a9098b4723/html5/thumbnails/28.jpg)
www.jumbomaritime.nl
Jumbo’s Software
HSE & QA/QC
![Page 29: PowerLogistics Asia 2013- "Using HLV ships in Offshore Wind Farm Project Installation - Present and Future."- Borge Fogh, Jumbo Shipping](https://reader034.vdocuments.us/reader034/viewer/2022051208/54794d53b47959a9098b4723/html5/thumbnails/29.jpg)
www.jumbomaritime.nl
Thank you for your attention Any questions?
Jumbo Shipping (Singapore) Pte. Ltd
Borge Fogh
Regional Manager, South East Asia