Powell Construction Project Update Prepared: January 27, 2017 Project Details Architects IStudio Architects General Contractor: MCN Build DGS Project Manager: Jennifer Battle Project Completion: Building D - March 2017 Planned Work through February 10, 2017: Interior Work:
● Install Rubber Flooring (1st Floor)
● Install Kitchen Cooler / Freezer
● Install Remaining Kitchen Equipment
● Install Flooring (2nd Floor)
● Install Lighting Fixtures (2nd Floor)
Exterior Work :
● Exterior Stair pans
● Continue roof installation
● Finish installation of curtain wall and windows
● Installation of roof monitors
● Installation of stair guardrails and brick supports is going
● Installation of brick screen wall is ongoing
Progress Photos are on the next page.
1200 First Street, NE | Washington, DC 20002 | T 202.442.5885 | F 202.442.5026 | dcps.dc.gov
1
Media Center
1200 First Street, NE | Washington, DC 20002 | T 202.442.5885 | F 202.442.5026 | dcps.dc.gov
2
Cafeteria Ceiling Grid
1200 First Street, NE | Washington, DC 20002 | T 202.442.5885 | F 202.442.5026 | dcps.dc.gov
3
Ground Floor Corridor
1200 First Street, NE | Washington, DC 20002 | T 202.442.5885 | F 202.442.5026 | dcps.dc.gov
4
Exterior Brick Screen Wall