Download - Polly Dawes: Architecture Portfolio
POLLY DAWESARCHITECTURAL GRADUATE
PORTFOLIO
Structure at Parco Della Musica
Colosseum Interior
Pantheon
Pollyanna DawesVictoria University of WellingtonBAS (Architecture) MArch (Prof.)
[email protected] 105 4230
Cover Page: Field trip to Rome
CONTENTS
ARCHITECTURE OF THE SONOROUS
PAGE | 4
CUBA 2035
PAGE | 8
LIVE|DISPLAY
PAGE | 12
EARTHQUAKE MUSEUM
PAGE | 14
MUSIC SCHOOL
PAGE | 16
| 4
ARCHITECTURE OF THE SONOROUS 2013ARCI591: Thesis ProjectSupervisors: Simon Twose + Natasha Perkins
The brief was to design a Glamorous Camping structure for the Ngã Põtiki Reserve, South Wairarapa. The design response utilises architecture as an extension of our auditory perception. The design operates as a lens or device that brings sonic aspects of site and occupation into focus by enhancing our sensory abilities. By countering familiar expectations of how landscape is understood it must be re-evaluated, forcing a more conscious awareness of what is being experienced.
Rather than presenting the view of landscape this design engages with its surroundings through manipulating the site’s soundscape, reintroducing auditory awareness to experiences of landscape and architecture. By prioritising sound over vision the project investigates how sonic considerations can invite participatory engagement between occupant and site, shifting architecture from a frame through which landscape is viewed to a framework within which landscape is experienced.
Cape Palliser
Palliser Bay
NgawiDesign Site
Lake OnokeRimutaka
Range
Aorangi Range
N
Conceptual Development
5 |
| 6
Water Tank
Grey Water Tank
Water Pump
Tankless Water Heater
Solar Battery Bank and Inverter
Gas Tank
Self Contained Waterless Composting Toilet
Secction
Kitchen Exploded Axonometric
Model
7 |
| 8
CUBA 2035 2012
ARCI 412: Integrated DesignTutor: Mark Southcombe
A Conversation Between the Apartment and the Street
In order to support intensification along Cuba St more residential developments will be required. While the design of these buildings should create a pleasant environment for the residents they also need to acknowledge their urban context. The design should also have a responsibility to create a pleasant an engaging environment for users of the street.
The aim of this design is to create a residential development that doesn’t present a blank face to the street but interacts and contributes to its urban surroundings. The built form should integrate and engage with its surroundings to positively contribute to the atmosphere of the area. This primary motivation developed as a reaction against residential developments that in no way engage with their urban environment, creating unpleasant spaces for other users of the city, specifically the façade of the building on the opposite side of Leeds St.
While this can be achieved by placing retail tenancies along the ground floor to allow for pedestrian engagement the residential units themselves can also contribute to their surroundings. Glimpses into semi-private spaces such as courtyards allows for interaction between the building and the city. Visibility into some of the living areas through the use of elements such as inhabited window boxes and rooftop gardens also show signs of the building’s entire function to the street.
Cuba 2035Unit 5: A Ghost in the Machine
Site: 34-38 Ghuznee St
Leeds St
Ghuznee St
Cuba St
Leed
s St
Ghuznee St
Cuba St
Leeds St
Ghuznee St
Courtenay Place
Cuba St
Leeds St
Ghuznee St
Courtenay Place
Cuba St
Medium Grain
Medium - Fine Grain
Fine Grain
Enhance Pedestrian Links Between Cuba, Ghuznee and Courtenay Place
Bring Ecclecticism of Cuba to activate street edge
Insertion of Semi-Public Courtyard to break up mass
Single Floor Unit
Project living space over street environmentCreate public/private gradient along edges
Double Fllor Unit
Retail/Commercial Space
Courtyard
Cuba 2035Unit 5: A Ghost in the Machine
Site: 34-38 Ghuznee St
Leeds St
Ghuznee St
Cuba St
Leed
s St
Ghuznee St
Cuba St
Leeds St
Ghuznee St
Courtenay Place
Cuba St
Leeds St
Ghuznee St
Courtenay Place
Cuba St
Medium Grain
Medium - Fine Grain
Fine Grain
Enhance Pedestrian Links Between Cuba, Ghuznee and Courtenay Place
Bring Ecclecticism of Cuba to activate street edge
Insertion of Semi-Public Courtyard to break up mass
Single Floor Unit
Project living space over street environmentCreate public/private gradient along edges
Double Fllor Unit
Retail/Commercial Space
Courtyard
NSite Plan 1:2000
9 |
N
Single Bedroom Unit 1:100
Two Bedroom Unit 1:100First Level
Two Bedroom Unit 1:100Second Level (Roof Garden Access)
Single Bedroom Unit 1:100
Two Bedroom Unit 1:100First Level
Two Bedroom Unit 1:100Second Level (Roof Garden Access)
Single Bedroom Unit 1:100
Two Bedroom Unit 1:100First Level
Two Bedroom Unit 1:100Second Level (Roof Garden Access)
Single Storey Apartment 1:200
Double Storey Apartment 1:200
Section 1:200
| 10
L I V I N G
URBAN
ARCI421 CONSTRUCTIONASSIGNMENT TWO
DRAWN BY POLLYANNA DAWES300160314
TUTOR: ANGELA AND SARAH
DECK DETAILS
SCALE: 1:5
OCTOBER 2012
38 LEEDS ST
SHEET 2
DRAWING NO: D1
Bituminous Waterproofing LayerNuraply 3P Double Layer SystemLaid over Precast Concrete flooring slab
SE5 Nurajacks Supporting Joists at 520 crsAttached to Joists with nurapads to provide level deck surface
Traydeck Ultra Span 80 Metal Decking150mm slab depth over metal profileFixed to supporting steel structure at 500crs with Nelson Shear Studs
Steel 530UB94.2 moment frame beamsSupported by 460Ub74.6 steel columns at 4000crs
Rebate into Topping concrete to allow for flushfinish between floor level and door sill
Fletcher Aluminium Eurostacker Top Roller Sliding DoorALTI Composite JoineryWith Metro Glass Tech Low E Double Glazing Units
Timber joinery attached to slab with dynabolts
25x130 JSC Vitex Hardwood Decking with 5mm SpacingTreated with Dryden Wood Oil as a coating and end sealScrewed to 45x75 H3.2 treated MSG8 Pinus Radiata Joists
Precast Concrete Floor slab to form deckconcrete sloped to 1.5° to comply withminimum slope defined by membrane manufacturer
Deck membrane extended under sill revealTurned up 100 mm at trimmers to comply with E2
Continuous air seal Sikaflex AT-20 Building Sealant
Line of 150UB140 Steel beam fillet welded to 530UB94.2Cantilevered from main structure to support deck
50x50 steel equal angle M8 fillet welded to steel beamProvides fixing point for external lining
Foamular FM 300 Rigid BoardMoisture Resistant Insulation
12mm minE2 Compliance
Base Guide for external blindprevents blowing in wind
Guide rail at edges of Warema Exterior Venetian BlindsScrewed at 500 crs into deck walls
Custom Shaped Cedar cover strip over top of balustrade5° slope along top to allow prevent water pooling
Cedar base plate5° slope for water run off
30x40 SHS at 500 crs to provide support for balustrade
20x60 H3.2 treated timber battens at 480 crscoach screwed to steel supporting structure
20mm Cedar Cover board for balustrade constructionScrewed to timber battens
20mm Cedar Cover board for balustrade constructionCoach screwed to SHS
Foamular 3M 400mm Insulating Foam BoardMoisture Resistant
Concrete slab with upstand at endallows water to run off through drain sloping to
downpipe in other direction
Deck membrane lapped over edge of deckCovered with Nuraply 3P Membrane flashing strip
Steel structure dynabolted into concrete slab at 500 crsBolts must not pass through membrane
JSC Western Red CedarVertical Shiplap Weatherboards
Cladding to extend over blind head to conceal top rail and motor
Waremar External Blind Motor system
100x170 Steel angle fillet welded to 150UB140provide fixing point for top rail of blind
Blind top rail screwed to Western Red Cedar Cover board beforefixing top rail to steel angle
Building Wrap to wrap over parapet top plate
20mm Sheet Aluminium End CapFace screwed to structure at edges
Allow for a minimum of 110mm upstand to comply with E2
H3.2 treated timber packers to provide 5° slopeSlope complies with E2
20mm cement mortar fillet at parapet roof junction
Line of 150UB140 Steel beam fillet welded to 530UB94.2Cantilevered from main structure to support deck
150UB140 Steel beam fillet welded to 150UB140
12mm Plytech Elitline Soffit LiningH3.1 LOSP treated pinus radiataV-groove finish
Nuraply 3P Membrane Flashing StripDressed over top of Parapet and roof membraneMinimum 100mm upstand
Precast concrete deck roof panelSloped to 1.5° to meet membrane manufacturers minimum slope
Waremar 60mm External Venetian blindCedar
JSC 20x45 H3.2 Pinus Radiata cavity battensHorizontal at 480mm centres
Building wrap
PBS Cavity Closer with vent slots
Flashing tape over head flashing35mm cover to cladding to comply with E2
Vantage Aluminium 110mm Flushglaze head profile
PBS Cavity Closer with vent slots
D1A
D1B End of Deck Detail
D1C Door Sill Deck Junction
Parapet over Blind Head
L I V I N G
URBAN
ARCI421 CONSTRUCTIONASSIGNMENT TWO
DRAWN BY POLLYANNA DAWES300160314
TUTOR: ANGELA AND SARAH
DECK DETAILS
SCALE: 1:5
OCTOBER 2012
38 LEEDS ST
SHEET 2
DRAWING NO: D1
Bituminous Waterproofing LayerNuraply 3P Double Layer SystemLaid over Precast Concrete flooring slab
SE5 Nurajacks Supporting Joists at 520 crsAttached to Joists with nurapads to provide level deck surface
Traydeck Ultra Span 80 Metal Decking150mm slab depth over metal profileFixed to supporting steel structure at 500crs with Nelson Shear Studs
Steel 530UB94.2 moment frame beamsSupported by 460Ub74.6 steel columns at 4000crs
Rebate into Topping concrete to allow for flushfinish between floor level and door sill
Fletcher Aluminium Eurostacker Top Roller Sliding DoorALTI Composite JoineryWith Metro Glass Tech Low E Double Glazing Units
Timber joinery attached to slab with dynabolts
25x130 JSC Vitex Hardwood Decking with 5mm SpacingTreated with Dryden Wood Oil as a coating and end sealScrewed to 45x75 H3.2 treated MSG8 Pinus Radiata Joists
Precast Concrete Floor slab to form deckconcrete sloped to 1.5° to comply withminimum slope defined by membrane manufacturer
Deck membrane extended under sill revealTurned up 100 mm at trimmers to comply with E2
Continuous air seal Sikaflex AT-20 Building Sealant
Line of 150UB140 Steel beam fillet welded to 530UB94.2Cantilevered from main structure to support deck
50x50 steel equal angle M8 fillet welded to steel beamProvides fixing point for external lining
Foamular FM 300 Rigid BoardMoisture Resistant Insulation
12mm minE2 Compliance
Base Guide for external blindprevents blowing in wind
Guide rail at edges of Warema Exterior Venetian BlindsScrewed at 500 crs into deck walls
Custom Shaped Cedar cover strip over top of balustrade5° slope along top to allow prevent water pooling
Cedar base plate5° slope for water run off
30x40 SHS at 500 crs to provide support for balustrade
20x60 H3.2 treated timber battens at 480 crscoach screwed to steel supporting structure
20mm Cedar Cover board for balustrade constructionScrewed to timber battens
20mm Cedar Cover board for balustrade constructionCoach screwed to SHS
Foamular 3M 400mm Insulating Foam BoardMoisture Resistant
Concrete slab with upstand at endallows water to run off through drain sloping to
downpipe in other direction
Deck membrane lapped over edge of deckCovered with Nuraply 3P Membrane flashing strip
Steel structure dynabolted into concrete slab at 500 crsBolts must not pass through membrane
JSC Western Red CedarVertical Shiplap Weatherboards
Cladding to extend over blind head to conceal top rail and motor
Waremar External Blind Motor system
100x170 Steel angle fillet welded to 150UB140provide fixing point for top rail of blind
Blind top rail screwed to Western Red Cedar Cover board beforefixing top rail to steel angle
Building Wrap to wrap over parapet top plate
20mm Sheet Aluminium End CapFace screwed to structure at edges
Allow for a minimum of 110mm upstand to comply with E2
H3.2 treated timber packers to provide 5° slopeSlope complies with E2
20mm cement mortar fillet at parapet roof junction
Line of 150UB140 Steel beam fillet welded to 530UB94.2Cantilevered from main structure to support deck
150UB140 Steel beam fillet welded to 150UB140
12mm Plytech Elitline Soffit LiningH3.1 LOSP treated pinus radiataV-groove finish
Nuraply 3P Membrane Flashing StripDressed over top of Parapet and roof membraneMinimum 100mm upstand
Precast concrete deck roof panelSloped to 1.5° to meet membrane manufacturers minimum slope
Waremar 60mm External Venetian blindCedar
JSC 20x45 H3.2 Pinus Radiata cavity battensHorizontal at 480mm centres
Building wrap
PBS Cavity Closer with vent slots
Flashing tape over head flashing35mm cover to cladding to comply with E2
Vantage Aluminium 110mm Flushglaze head profile
PBS Cavity Closer with vent slots
D1A
D1B End of Deck Detail
D1C Door Sill Deck Junction
Parapet over Blind Head
D1
D2
11 |
L I V I N G
URBAN
ARCI421 CONSTRUCTIONASSIGNMENT TWO
DRAWN BY POLLYANNA DAWES300160314
TUTOR: ANGELA AND SARAH
DECK DETAILS
SCALE: 1:5
OCTOBER 2012
38 LEEDS ST
SHEET 2
DRAWING NO: D1
Bituminous Waterproofing LayerNuraply 3P Double Layer SystemLaid over Precast Concrete flooring slab
SE5 Nurajacks Supporting Joists at 520 crsAttached to Joists with nurapads to provide level deck surface
Traydeck Ultra Span 80 Metal Decking150mm slab depth over metal profileFixed to supporting steel structure at 500crs with Nelson Shear Studs
Steel 530UB94.2 moment frame beamsSupported by 460Ub74.6 steel columns at 4000crs
Rebate into Topping concrete to allow for flushfinish between floor level and door sill
Fletcher Aluminium Eurostacker Top Roller Sliding DoorALTI Composite JoineryWith Metro Glass Tech Low E Double Glazing Units
Timber joinery attached to slab with dynabolts
25x130 JSC Vitex Hardwood Decking with 5mm SpacingTreated with Dryden Wood Oil as a coating and end sealScrewed to 45x75 H3.2 treated MSG8 Pinus Radiata Joists
Precast Concrete Floor slab to form deckconcrete sloped to 1.5° to comply withminimum slope defined by membrane manufacturer
Deck membrane extended under sill revealTurned up 100 mm at trimmers to comply with E2
Continuous air seal Sikaflex AT-20 Building Sealant
Line of 150UB140 Steel beam fillet welded to 530UB94.2Cantilevered from main structure to support deck
50x50 steel equal angle M8 fillet welded to steel beamProvides fixing point for external lining
Foamular FM 300 Rigid BoardMoisture Resistant Insulation
12mm minE2 Compliance
Base Guide for external blindprevents blowing in wind
Guide rail at edges of Warema Exterior Venetian BlindsScrewed at 500 crs into deck walls
Custom Shaped Cedar cover strip over top of balustrade5° slope along top to allow prevent water pooling
Cedar base plate5° slope for water run off
30x40 SHS at 500 crs to provide support for balustrade
20x60 H3.2 treated timber battens at 480 crscoach screwed to steel supporting structure
20mm Cedar Cover board for balustrade constructionScrewed to timber battens
20mm Cedar Cover board for balustrade constructionCoach screwed to SHS
Foamular 3M 400mm Insulating Foam BoardMoisture Resistant
Concrete slab with upstand at endallows water to run off through drain sloping to
downpipe in other direction
Deck membrane lapped over edge of deckCovered with Nuraply 3P Membrane flashing strip
Steel structure dynabolted into concrete slab at 500 crsBolts must not pass through membrane
JSC Western Red CedarVertical Shiplap Weatherboards
Cladding to extend over blind head to conceal top rail and motor
Waremar External Blind Motor system
100x170 Steel angle fillet welded to 150UB140provide fixing point for top rail of blind
Blind top rail screwed to Western Red Cedar Cover board beforefixing top rail to steel angle
Building Wrap to wrap over parapet top plate
20mm Sheet Aluminium End CapFace screwed to structure at edges
Allow for a minimum of 110mm upstand to comply with E2
H3.2 treated timber packers to provide 5° slopeSlope complies with E2
20mm cement mortar fillet at parapet roof junction
Line of 150UB140 Steel beam fillet welded to 530UB94.2Cantilevered from main structure to support deck
150UB140 Steel beam fillet welded to 150UB140
12mm Plytech Elitline Soffit LiningH3.1 LOSP treated pinus radiataV-groove finish
Nuraply 3P Membrane Flashing StripDressed over top of Parapet and roof membraneMinimum 100mm upstand
Precast concrete deck roof panelSloped to 1.5° to meet membrane manufacturers minimum slope
Waremar 60mm External Venetian blindCedar
JSC 20x45 H3.2 Pinus Radiata cavity battensHorizontal at 480mm centres
Building wrap
PBS Cavity Closer with vent slots
Flashing tape over head flashing35mm cover to cladding to comply with E2
Vantage Aluminium 110mm Flushglaze head profile
PBS Cavity Closer with vent slots
D1A
D1B End of Deck Detail
D1C Door Sill Deck Junction
Parapet over Blind Head
L I V I N G
URBAN
ARCI421 CONSTRUCTIONASSIGNMENT TWO
DRAWN BY POLLYANNA DAWES300160314
TUTOR: ANGELA AND SARAH
DECK DETAILS
SCALE: 1:5
OCTOBER 2012
38 LEEDS ST
SHEET 2
DRAWING NO: D1
Bituminous Waterproofing LayerNuraply 3P Double Layer SystemLaid over Precast Concrete flooring slab
SE5 Nurajacks Supporting Joists at 520 crsAttached to Joists with nurapads to provide level deck surface
Traydeck Ultra Span 80 Metal Decking150mm slab depth over metal profileFixed to supporting steel structure at 500crs with Nelson Shear Studs
Steel 530UB94.2 moment frame beamsSupported by 460Ub74.6 steel columns at 4000crs
Rebate into Topping concrete to allow for flushfinish between floor level and door sill
Fletcher Aluminium Eurostacker Top Roller Sliding DoorALTI Composite JoineryWith Metro Glass Tech Low E Double Glazing Units
Timber joinery attached to slab with dynabolts
25x130 JSC Vitex Hardwood Decking with 5mm SpacingTreated with Dryden Wood Oil as a coating and end sealScrewed to 45x75 H3.2 treated MSG8 Pinus Radiata Joists
Precast Concrete Floor slab to form deckconcrete sloped to 1.5° to comply withminimum slope defined by membrane manufacturer
Deck membrane extended under sill revealTurned up 100 mm at trimmers to comply with E2
Continuous air seal Sikaflex AT-20 Building Sealant
Line of 150UB140 Steel beam fillet welded to 530UB94.2Cantilevered from main structure to support deck
50x50 steel equal angle M8 fillet welded to steel beamProvides fixing point for external lining
Foamular FM 300 Rigid BoardMoisture Resistant Insulation
12mm minE2 Compliance
Base Guide for external blindprevents blowing in wind
Guide rail at edges of Warema Exterior Venetian BlindsScrewed at 500 crs into deck walls
Custom Shaped Cedar cover strip over top of balustrade5° slope along top to allow prevent water pooling
Cedar base plate5° slope for water run off
30x40 SHS at 500 crs to provide support for balustrade
20x60 H3.2 treated timber battens at 480 crscoach screwed to steel supporting structure
20mm Cedar Cover board for balustrade constructionScrewed to timber battens
20mm Cedar Cover board for balustrade constructionCoach screwed to SHS
Foamular 3M 400mm Insulating Foam BoardMoisture Resistant
Concrete slab with upstand at endallows water to run off through drain sloping to
downpipe in other direction
Deck membrane lapped over edge of deckCovered with Nuraply 3P Membrane flashing strip
Steel structure dynabolted into concrete slab at 500 crsBolts must not pass through membrane
JSC Western Red CedarVertical Shiplap Weatherboards
Cladding to extend over blind head to conceal top rail and motor
Waremar External Blind Motor system
100x170 Steel angle fillet welded to 150UB140provide fixing point for top rail of blind
Blind top rail screwed to Western Red Cedar Cover board beforefixing top rail to steel angle
Building Wrap to wrap over parapet top plate
20mm Sheet Aluminium End CapFace screwed to structure at edges
Allow for a minimum of 110mm upstand to comply with E2
H3.2 treated timber packers to provide 5° slopeSlope complies with E2
20mm cement mortar fillet at parapet roof junction
Line of 150UB140 Steel beam fillet welded to 530UB94.2Cantilevered from main structure to support deck
150UB140 Steel beam fillet welded to 150UB140
12mm Plytech Elitline Soffit LiningH3.1 LOSP treated pinus radiataV-groove finish
Nuraply 3P Membrane Flashing StripDressed over top of Parapet and roof membraneMinimum 100mm upstand
Precast concrete deck roof panelSloped to 1.5° to meet membrane manufacturers minimum slope
Waremar 60mm External Venetian blindCedar
JSC 20x45 H3.2 Pinus Radiata cavity battensHorizontal at 480mm centres
Building wrap
PBS Cavity Closer with vent slots
Flashing tape over head flashing35mm cover to cladding to comply with E2
Vantage Aluminium 110mm Flushglaze head profile
PBS Cavity Closer with vent slots
D1A
D1B End of Deck Detail
D1C Door Sill Deck Junction
Parapet over Blind Head
L I V I N G
URBAN
ARCI421 CONSTRUCTIONASSIGNMENT TWO
DRAWN BY POLLYANNA DAWES300160314
TUTOR: ANGELA AND SARAH
DECK ASSEMBLY
SCALE: --
OCTOBER 2012
SHEET 3
DRAWING NO: AXO 1
38 LEEDS ST
AXO1 Deck Construction
The construction of the decks leading out of the apartments allow for a transition from public to private, creating a privacy gradient along the edge of the apartments. The blind at the end of the decks allows for this area to either become an extension of the interior space or bring the outside atmosphere into the apartments. The detailing transition between the apartments was detailed to be as level as possible, enhancing the smooth transition. The flush surfaces were carried through to the detailing of the balustrade and blind covering.
Roof Construction
Floor ConstructionBalustrade Construction
Edge Wall Construction Primary supporting structure
D1
D2
D3
D3
| 12
LIVE|DISPLAY 2012
ARCI 311: DesignTutor: Mark Leong
This home and gallery space is designed for the owner of a vast array of domestic objects who wishes to display them for public viewing. Some of the object’s on display are lived or used objects as they are present in the home, the gallery affording glimpses into it. Others are ‘artificial’ or ‘staged’ on display in the main gallery space. Both programmes are visually accessible from each other but never physically accessible, intersecting along boundary walls with shared surfaces or items.
The design aims to explore the domestic interior and gallery spaces as platforms for display and performance that simultaneously contain and expose. Both of these places can be areas in which people wish to be seen in order to project a certain image of themselves.
Kitchen/Cafe Diagram
Living Space Diagram
Library Diagram
13 |
Kitchen/Cafe
Hinged Section
Floor Plans
Living Space Library
| 14
EARTHQUAKE MUSEUM 2011
ARCI 312: Integrated DesignTutor: Anne Kelly
The brief was to design a museum on the Wellington waterfront that provided a memorial for earthquakes that have occurred in New Zealand as well as exhibition and education spaces for the public.
An earthquake or any natural disaster strips away at a community until only its core is left, it is revealing about the character of the community and the stability of our built environment. The museum expresses this aspect of the earthquake by having walkways that strip down along the sides of the museum and spread across the site, acting as access ways to draw people in to the heart of the museum. The memorial is placed along these walkways so that people must remember what was lost before proceeding to the exhibition spaces. The exterior memorial spaces will be accessible to the public at any time of day, allowing the museum to fulfil this function at all times and integrate with the surroundings.
Section Aa
15 |
Site Plan
Exhibition Spaces
Floor Plans
Section Aa
A
a
| 16
MUSIC SCHOOL 2011ARCI 312: Integrated DesignTutor: Fabricio Chicca
Harmony in music is composed of consonant and dissonant sounds, a balance between the stable and unstable, temporary or transitional moments. There is a playoff and interchange between these pleasant and unpleasant moments reflecting the often difficult academic pursuit of the creative arts.
The Music School is an exploration of the interaction between the stable and unstable moments and the underlying tension between the two. The school is composed of two distinct wings that pull away from each other, not quite touching at a moment of tension down the centre
The architecture is at its most unstable around the atrium, the main transitional space in the building where the structure intrudes into the space. As the spaces radiate out from this transitional area into the teaching spaces the architecture becomes more regular and stable reflecting the interplay between in music between these two sounds.
Ghuznee St Perspective
Library Entry Space
17 |
Kitchen
Reception
Cafe
Small Audtorium
Large Auditorium
CrewRoom
Control Room
Rehearsal Room
Workshop
Storage
DressingRoom
DressingRoom
DressingRoom
VIP DressingRoom
Library
Comp. Lab 1
Comp. Lab 2
Large Auditorium
SO SO SO SO SO
SO SO SO SO SO SO SO SO SO SO SO
SO SO SO SO SO SO
SO SO SO SO SO Staff CommonArea
LibraryKeyboard Lab 1
Tutorial
Tutorial
Tutorial
Tutorial
Tutorial
Recording Venue
STR
STR
STR
STR
STR
STR
STR
STR
STR
STR
STR
STR
STR
STR
STR
Keyboard Lab 2
Post GradLTR
LTR
Open Plan Common Area
Aa
Kitchen
Reception
Cafe
Small Audtorium
Large Auditorium
CrewRoom
Control Room
Rehearsal Room
Workshop
Storage
DressingRoom
DressingRoom
DressingRoom
VIP DressingRoom
Library
Comp. Lab 1
Comp. Lab 2
Large Auditorium
SO SO SO SO SO
SO SO SO SO SO SO SO SO SO SO SO
SO SO SO SO SO SO
SO SO SO SO SO Staff CommonArea
LibraryKeyboard Lab 1
Tutorial
Tutorial
Tutorial
Tutorial
Tutorial
Recording Venue
STR
STR
STR
STR
STR
STR
STR
STR
STR
STR
STR
STR
STR
STR
STR
Keyboard Lab 2
Post GradLTR
LTR
Open Plan Common Area
Kitchen
Reception
Cafe
Small Audtorium
Large Auditorium
CrewRoom
Control Room
Rehearsal Room
Workshop
Storage
DressingRoom
DressingRoom
DressingRoom
VIP DressingRoom
Library
Comp. Lab 1
Comp. Lab 2
Large Auditorium
SO SO SO SO SO
SO SO SO SO SO SO SO SO SO SO SO
SO SO SO SO SO SO
SO SO SO SO SO Staff CommonArea
LibraryKeyboard Lab 1
Tutorial
Tutorial
Tutorial
Tutorial
Tutorial
Recording Venue
STR
STR
STR
STR
STR
STR
STR
STR
STR
STR
STR
STR
STR
STR
STR
Keyboard Lab 2
Post GradLTR
LTR
Open Plan Common Area
Kitchen
Reception
Cafe
Small Audtorium
Large Auditorium
CrewRoom
Control Room
Rehearsal Room
Workshop
Storage
DressingRoom
DressingRoom
DressingRoom
VIP DressingRoom
Library
Comp. Lab 1
Comp. Lab 2
Large Auditorium
SO SO SO SO SO
SO SO SO SO SO SO SO SO SO SO SO
SO SO SO SO SO SO
SO SO SO SO SO Staff CommonArea
LibraryKeyboard Lab 1
Tutorial
Tutorial
Tutorial
Tutorial
Tutorial
Recording Venue
STR
STR
STR
STR
STR
STR
STR
STR
STR
STR
STR
STR
STR
STR
STR
Keyboard Lab 2
Post GradLTR
LTR
Open Plan Common Area
Aa
Aa
Aa
Atrtium
Floor Plans 1:500
N