Project Human Resources ManagementBased on PMBOK 5th Edition
Abdelrahman Sheta, PMP,ITIL
1PMP - Human Resource Managementfacebook.com/Sheta.Page
![Page 2: PMP 06 Project HR Management](https://reader037.vdocuments.us/reader037/viewer/2022103115/557d59dbd8b42ae1438b497c/html5/thumbnails/2.jpg)
9.1 Plan HR Management
9.2 Acquire Project Team
9.3 Develop Project Team
Motivation Theories
9.4 Manage Project Team
Conflict Management
Agenda
2PMP - Human Resource Managementfacebook.com/Sheta.Page
![Page 3: PMP 06 Project HR Management](https://reader037.vdocuments.us/reader037/viewer/2022103115/557d59dbd8b42ae1438b497c/html5/thumbnails/3.jpg)
Human Resources Management
3
Project Human Resource
Management includes the processes
that organize, manage and lead the
project team. The project team is
comprised of the people with
assigned roles and responsibilities for
completing the project.
PMP - Human Resource Managementfacebook.com/Sheta.Page
![Page 4: PMP 06 Project HR Management](https://reader037.vdocuments.us/reader037/viewer/2022103115/557d59dbd8b42ae1438b497c/html5/thumbnails/4.jpg)
4PMP - Human Resource Managementfacebook.com/Sheta.Page
![Page 5: PMP 06 Project HR Management](https://reader037.vdocuments.us/reader037/viewer/2022103115/557d59dbd8b42ae1438b497c/html5/thumbnails/5.jpg)
Identifying and documenting project roles,
responsibilities, required skills, reporting
relationships, and creating a staff
management plan.
The key benefit of this process is that it
established project roles and
responsibilities, project organization charts,
and staffing management plan including the
timetable of resource acquisition and
release.
9.1 Plan HR Management
5PMP - Human Resource Managementfacebook.com/Sheta.Page
![Page 6: PMP 06 Project HR Management](https://reader037.vdocuments.us/reader037/viewer/2022103115/557d59dbd8b42ae1438b497c/html5/thumbnails/6.jpg)
1. Project Management Plan
2. Activity Resource Requirements
3. Enterprise Environmental Factors Organizational Structure and culture Existing human resources Geographical dispersion and team
members Personnel administration policies Marketplace Conditions
4. Organizational Process Assets
Plan HR Management: Input
6PMP - Human Resource Managementfacebook.com/Sheta.Page
![Page 7: PMP 06 Project HR Management](https://reader037.vdocuments.us/reader037/viewer/2022103115/557d59dbd8b42ae1438b497c/html5/thumbnails/7.jpg)
1. Organizational Charts and Position Descriptions
Hierarchical-type Charts
Matrix-based Charts
Text Oriented Formats
2. Networking
3. Organizational Theory
4. Expert Judgment
5. Meetings
Plan HR Management: T & T
7PMP - Human Resource Managementfacebook.com/Sheta.Page
![Page 8: PMP 06 Project HR Management](https://reader037.vdocuments.us/reader037/viewer/2022103115/557d59dbd8b42ae1438b497c/html5/thumbnails/8.jpg)
8PMP - Human Resource Managementfacebook.com/Sheta.Page
![Page 9: PMP 06 Project HR Management](https://reader037.vdocuments.us/reader037/viewer/2022103115/557d59dbd8b42ae1438b497c/html5/thumbnails/9.jpg)
1. Human Resource PlanA. Roles and Responsibilities: Project
Manager,
Team Members, Functional Manager, Business
Analyst, Sponsor, … etc. Role Authority Responsibility Competency
Plan HR Management: Outputs (1)
9PMP - Human Resource Managementfacebook.com/Sheta.Page
![Page 10: PMP 06 Project HR Management](https://reader037.vdocuments.us/reader037/viewer/2022103115/557d59dbd8b42ae1438b497c/html5/thumbnails/10.jpg)
B. Project Organization Charts
Plan HR Management: Outputs (2)
10PMP - Human Resource Managementfacebook.com/Sheta.Page
![Page 11: PMP 06 Project HR Management](https://reader037.vdocuments.us/reader037/viewer/2022103115/557d59dbd8b42ae1438b497c/html5/thumbnails/11.jpg)
C. Staffing Management Plan: Describes the entrance and release
criteria human resources into the project.
Includes: Staff Acquisition Resource Calendars Staff Release Plan Training Needs Recognition and rewarding system Compliance Safety
Plan HR Management: Outputs (3)
11PMP - Human Resource Managementfacebook.com/Sheta.Page
![Page 12: PMP 06 Project HR Management](https://reader037.vdocuments.us/reader037/viewer/2022103115/557d59dbd8b42ae1438b497c/html5/thumbnails/12.jpg)
12PMP - Human Resource Managementfacebook.com/Sheta.Page
![Page 13: PMP 06 Project HR Management](https://reader037.vdocuments.us/reader037/viewer/2022103115/557d59dbd8b42ae1438b497c/html5/thumbnails/13.jpg)
Understand the key environmental factors and the five constraints that can impact the Human Resource Planning process
Using templates and checklists is one way to ensure that you don’t miss any key responsibilities when planning the project and will help reduce the amount of time spent in planning
Exam Spotlights
13PMP - Human Resource Managementfacebook.com/Sheta.Page
![Page 14: PMP 06 Project HR Management](https://reader037.vdocuments.us/reader037/viewer/2022103115/557d59dbd8b42ae1438b497c/html5/thumbnails/14.jpg)
You have been assigned as a project manager for a software development project. The project team consists of 15 team members. You want to understand who is responsible for doing what in the project. Where can you find this information?
A. Responsibility Assignment MatrixB. Resource HistogramC. Bar ChartD. Project Organization Chart
Quiz
14PMP - Human Resource Managementfacebook.com/Sheta.Page
![Page 15: PMP 06 Project HR Management](https://reader037.vdocuments.us/reader037/viewer/2022103115/557d59dbd8b42ae1438b497c/html5/thumbnails/15.jpg)
What type of organization is BEST for managing complex projects involving cross disciplinary efforts?
A. ProjectizedB. FunctionalC. LineD. Matrix
Quiz
15PMP - Human Resource Managementfacebook.com/Sheta.Page
![Page 16: PMP 06 Project HR Management](https://reader037.vdocuments.us/reader037/viewer/2022103115/557d59dbd8b42ae1438b497c/html5/thumbnails/16.jpg)
Attain & assign human resources to the project.
Staff may come from inside or outside theorganization
Project Manager does not always have control over team members selection.
Beware of Halo Effect: “You are a great programmer, so when we hire you as a project manager we expect you to be great”.
9.2 Acquire Project Team
16PMP - Human Resource Managementfacebook.com/Sheta.Page
![Page 17: PMP 06 Project HR Management](https://reader037.vdocuments.us/reader037/viewer/2022103115/557d59dbd8b42ae1438b497c/html5/thumbnails/17.jpg)
1.Human Resource Management Plan Roles & Responsibilities Project Organization Chart Staffing Management Plan
2.Enterprise Environmental Factors Organizational Structure Availability, competency levels, prior
experience and interest Personnel administration policies and cost Location or multiple locations
3. Organizational Process Assets
Acquire Project Team: Inputs
17PMP - Human Resource Managementfacebook.com/Sheta.Page
![Page 18: PMP 06 Project HR Management](https://reader037.vdocuments.us/reader037/viewer/2022103115/557d59dbd8b42ae1438b497c/html5/thumbnails/18.jpg)
1. Pre-Assignment2. Negotiation3. Acquisition4. Virtual Teams5. Multi-criteria Decision Analysis
(Examples
of selection criteria: availability, cost,
experience, ability, knowledge, skills,
attitude and international factors).18
Acquire Project Team T&T
PMP - Human Resource Managementfacebook.com/Sheta.Page
![Page 19: PMP 06 Project HR Management](https://reader037.vdocuments.us/reader037/viewer/2022103115/557d59dbd8b42ae1438b497c/html5/thumbnails/19.jpg)
1. Project Staff Assignment
2. Resource Calendar: documents the time
periods each project team member can
work on the project.
3. Project Management Plan Updates.
Acquire Project Team Outputs
19PMP - Human Resource Managementfacebook.com/Sheta.Page
![Page 20: PMP 06 Project HR Management](https://reader037.vdocuments.us/reader037/viewer/2022103115/557d59dbd8b42ae1438b497c/html5/thumbnails/20.jpg)
20PMP - Human Resource Managementfacebook.com/Sheta.Page
![Page 21: PMP 06 Project HR Management](https://reader037.vdocuments.us/reader037/viewer/2022103115/557d59dbd8b42ae1438b497c/html5/thumbnails/21.jpg)
The MOST common causes of conflict areproject schedules, project priorities and:A. PersonalitiesB. ResourcesC. CostD. Management
Quiz
21PMP - Human Resource Managementfacebook.com/Sheta.Page
![Page 22: PMP 06 Project HR Management](https://reader037.vdocuments.us/reader037/viewer/2022103115/557d59dbd8b42ae1438b497c/html5/thumbnails/22.jpg)
During project planning in a matrix organization, the project manager determines that additional human resources are needed. From whom would he/she request these resources?A. Functional ManagerB. TeamC. Project SponsorD. Human Resources Department
Quiz
22PMP - Human Resource Managementfacebook.com/Sheta.Page
![Page 23: PMP 06 Project HR Management](https://reader037.vdocuments.us/reader037/viewer/2022103115/557d59dbd8b42ae1438b497c/html5/thumbnails/23.jpg)
A project manager must publish a project schedule. Activities, start/end times and resources are identified. What should the project manager do NEXT?
A. Distribute the schedule according to communication plan.
B. Confirm availability of resources
C. Refine the project plan to reflect more accurate costinformation.
D. Publish a bar chart illustrating the timeline.
Quiz
23PMP - Human Resource Managementfacebook.com/Sheta.Page
![Page 24: PMP 06 Project HR Management](https://reader037.vdocuments.us/reader037/viewer/2022103115/557d59dbd8b42ae1438b497c/html5/thumbnails/24.jpg)
Creating and open, encouraging environment
for your team
Developing & enhancing the team into an
effective, functioning, and coordinated group.
It’s complicated in matrix structures
where there are dual reporting
relationships.
9.3 Develop Project Team
24PMP - Human Resource Managementfacebook.com/Sheta.Page
![Page 25: PMP 06 Project HR Management](https://reader037.vdocuments.us/reader037/viewer/2022103115/557d59dbd8b42ae1438b497c/html5/thumbnails/25.jpg)
1. Human Resource Management Plan
2. Project Staff Assignments
3. Resource Calendar
Develop Project Team: Inputs
25PMP - Human Resource Managementfacebook.com/Sheta.Page
![Page 26: PMP 06 Project HR Management](https://reader037.vdocuments.us/reader037/viewer/2022103115/557d59dbd8b42ae1438b497c/html5/thumbnails/26.jpg)
1. Interpersonal Skills (Soft Skills):
Understand sentiments of TMs,
anticipate actions, acknowledge
concerns and follow up their issues.
2. Training:
Technical
Soft skills
Develop Project Team: T&T (1)
26PMP - Human Resource Managementfacebook.com/Sheta.Page
![Page 27: PMP 06 Project HR Management](https://reader037.vdocuments.us/reader037/viewer/2022103115/557d59dbd8b42ae1438b497c/html5/thumbnails/27.jpg)
Develop Project Team: T&T (2)3. Team Building Activities: to improve interpersonal
relationships and team cohesiveness, may be by involving team members in planning.
27PMP - Human Resource Managementfacebook.com/Sheta.Page
![Page 28: PMP 06 Project HR Management](https://reader037.vdocuments.us/reader037/viewer/2022103115/557d59dbd8b42ae1438b497c/html5/thumbnails/28.jpg)
28PMP - Human Resource Managementfacebook.com/Sheta.Page
![Page 29: PMP 06 Project HR Management](https://reader037.vdocuments.us/reader037/viewer/2022103115/557d59dbd8b42ae1438b497c/html5/thumbnails/29.jpg)
4. Ground Rules: decreases conflicts and increasesproductivity.
5. Colocation: Placing team members or most of them in the same location.
6. Recognition & Reward: Formal actions to promote high performance and involve effective systems to link between performance & reward.
7. Personnel Assessment Tools
Develop Project Team: T&T (3)
29PMP - Human Resource Managementfacebook.com/Sheta.Page
![Page 30: PMP 06 Project HR Management](https://reader037.vdocuments.us/reader037/viewer/2022103115/557d59dbd8b42ae1438b497c/html5/thumbnails/30.jpg)
1. McGregor’s Theory : X and Y Theory X : Workers need to be watched, hate
work and responsibility. Managers must use coercion, threats & various control schemes to get workers to meet objectives.
Theory Y : Workers can work without supervision, they want to achieve, and can make their own decisions. Workers enjoy the satisfaction of esteem and self- actualization needs.
30
Motivational Theory
Ouchi’s Theory Z: based on the participative management style of the Japanese. workers are motivated by a sense of commitment, opportunity & advancement.
PMP - Human Resource Managementfacebook.com/Sheta.Page
![Page 31: PMP 06 Project HR Management](https://reader037.vdocuments.us/reader037/viewer/2022103115/557d59dbd8b42ae1438b497c/html5/thumbnails/31.jpg)
31PMP - Human Resource Managementfacebook.com/Sheta.Page
![Page 32: PMP 06 Project HR Management](https://reader037.vdocuments.us/reader037/viewer/2022103115/557d59dbd8b42ae1438b497c/html5/thumbnails/32.jpg)
Motivational Theory2. Maslow’s Hierarchy of Needs
32PMP - Human Resource Managementfacebook.com/Sheta.Page
![Page 33: PMP 06 Project HR Management](https://reader037.vdocuments.us/reader037/viewer/2022103115/557d59dbd8b42ae1438b497c/html5/thumbnails/33.jpg)
Herzberg's Motivational Theory
33PMP - Human Resource Managementfacebook.com/Sheta.Page
![Page 34: PMP 06 Project HR Management](https://reader037.vdocuments.us/reader037/viewer/2022103115/557d59dbd8b42ae1438b497c/html5/thumbnails/34.jpg)
PMP - Human Resource Management 34facebook.com/Sheta.Page
![Page 35: PMP 06 Project HR Management](https://reader037.vdocuments.us/reader037/viewer/2022103115/557d59dbd8b42ae1438b497c/html5/thumbnails/35.jpg)
Motivational Theory
• Expectancy Theory
• The expectation of a positive outcome drives motivation.
People will behave in certain ways if they think there will
be good rewards for doing so
• This theory also says that people become what you
expect of them.
35PMP - Human Resource Managementfacebook.com/Sheta.Page
![Page 36: PMP 06 Project HR Management](https://reader037.vdocuments.us/reader037/viewer/2022103115/557d59dbd8b42ae1438b497c/html5/thumbnails/36.jpg)
36PMP - Human Resource Managementfacebook.com/Sheta.Page
![Page 37: PMP 06 Project HR Management](https://reader037.vdocuments.us/reader037/viewer/2022103115/557d59dbd8b42ae1438b497c/html5/thumbnails/37.jpg)
5. Achievement Theory• Achievement Theory says that people are motivated by theneed for three things: achievement, power, and affiliation.
The achievement motivation is obviously the need to
achieve or succeed. The power motivation involves a desire for
influencing the behavior of others. The need for affiliation is relationship oriented.
Workers want to have friendships with their coworkers and a sense of camaraderie with their fellow team members. The strength of your team members’ desire for each of these will drive their performance on various activities.
37
Motivational Theory
PMP - Human Resource Managementfacebook.com/Sheta.Page
![Page 38: PMP 06 Project HR Management](https://reader037.vdocuments.us/reader037/viewer/2022103115/557d59dbd8b42ae1438b497c/html5/thumbnails/38.jpg)
Power is the potential ability to influence behavior to get people to do things they would not otherwise do.Types of power include:
Coercive power (Penalty) Legitimate power (Formal) Expert power Reward power Referent power
Powers of the Project Manager
38PMP - Human Resource Managementfacebook.com/Sheta.Page
![Page 39: PMP 06 Project HR Management](https://reader037.vdocuments.us/reader037/viewer/2022103115/557d59dbd8b42ae1438b497c/html5/thumbnails/39.jpg)
1. Team Performance Assessment:
Improvement in skills to allow for higher
performance.
Improvement in competencies and moral.
Reduced turnover rates
2. Enterprise Environmental Factors Updates
39
Develop Project Team: Outputs
PMP - Human Resource Managementfacebook.com/Sheta.Page
![Page 40: PMP 06 Project HR Management](https://reader037.vdocuments.us/reader037/viewer/2022103115/557d59dbd8b42ae1438b497c/html5/thumbnails/40.jpg)
40PMP - Human Resource Managementfacebook.com/Sheta.Page
![Page 41: PMP 06 Project HR Management](https://reader037.vdocuments.us/reader037/viewer/2022103115/557d59dbd8b42ae1438b497c/html5/thumbnails/41.jpg)
Different teams progress through the stages of development at different rates. When new team members are brought onto the team, the development stages start all over again.
Remember that Herzberg was the inventor of the Hygiene Theory and that this theory claims that hygiene factors prevent dissatisfaction while motivators lead to satisfaction
Understand the theories of motivation. Understand the different types of
project manager powers
Exam Spotlights
41PMP - Human Resource Managementfacebook.com/Sheta.Page
![Page 42: PMP 06 Project HR Management](https://reader037.vdocuments.us/reader037/viewer/2022103115/557d59dbd8b42ae1438b497c/html5/thumbnails/42.jpg)
Project performance appraisals are different from team performance assessment in that project performance appraisals focus on:
A. How an individual team member is performing on the project
B. An evaluation of the project team’s effectiveness
C. A team building effortD. Reducing the staff turnover rate
Quiz
42PMP - Human Resource Managementfacebook.com/Sheta.Page
![Page 43: PMP 06 Project HR Management](https://reader037.vdocuments.us/reader037/viewer/2022103115/557d59dbd8b42ae1438b497c/html5/thumbnails/43.jpg)
9.4 Manage Project Team
• Tracking & reporting on the performance of
• individual team members. Performance
appraisals are prepared and conducted, issues
• are identified and resolved & feedback is given
to the team members
43PMP - Human Resource Managementfacebook.com/Sheta.Page
![Page 44: PMP 06 Project HR Management](https://reader037.vdocuments.us/reader037/viewer/2022103115/557d59dbd8b42ae1438b497c/html5/thumbnails/44.jpg)
1. Human Resource Management Plan
2. Project Staff Assignments.
3. Team Performance Assessment: formal and
informal.
4. Issue Log
5. Work Performance Reports: e.g. CPI & SPI.
6. Organizational Process Assets.
Manage Project Team: Inputs
44PMP - Human Resource Managementfacebook.com/Sheta.Page
![Page 45: PMP 06 Project HR Management](https://reader037.vdocuments.us/reader037/viewer/2022103115/557d59dbd8b42ae1438b497c/html5/thumbnails/45.jpg)
1. Observation and Conversation
2. Project Performance Appraisals: Evaluation of
employees from people who supervise them.
3. Conflict Management
4. Interpersonal Skills Leadership
Influencing
Effective Decision Making
Manage Project Team: T&T (1)
45PMP - Human Resource Managementfacebook.com/Sheta.Page
![Page 46: PMP 06 Project HR Management](https://reader037.vdocuments.us/reader037/viewer/2022103115/557d59dbd8b42ae1438b497c/html5/thumbnails/46.jpg)
Conflict Management
46PMP - Human Resource Managementfacebook.com/Sheta.Page
![Page 47: PMP 06 Project HR Management](https://reader037.vdocuments.us/reader037/viewer/2022103115/557d59dbd8b42ae1438b497c/html5/thumbnails/47.jpg)
Sources of Conflict
47PMP - Human Resource Managementfacebook.com/Sheta.Page
![Page 48: PMP 06 Project HR Management](https://reader037.vdocuments.us/reader037/viewer/2022103115/557d59dbd8b42ae1438b497c/html5/thumbnails/48.jpg)
1. Change Requests
2. Project Management Plan Updates
3. Project Document Updates
4. Enterprise Environmental Factors Updates
5. Organizational Process Assets Updates
Manage Project Team: Outputs
48PMP - Human Resource Managementfacebook.com/Sheta.Page
![Page 49: PMP 06 Project HR Management](https://reader037.vdocuments.us/reader037/viewer/2022103115/557d59dbd8b42ae1438b497c/html5/thumbnails/49.jpg)
Take note that the PMBOK states that one of the outcomes or results of the Manage Project Team process is an update to the staffing management plan. However, staffing management plan updates are not listed as an output of this process
Understand the different conflict resolutiontechniques
Exam Spotlights
49PMP - Human Resource Managementfacebook.com/Sheta.Page
![Page 50: PMP 06 Project HR Management](https://reader037.vdocuments.us/reader037/viewer/2022103115/557d59dbd8b42ae1438b497c/html5/thumbnails/50.jpg)
Create a project team directory Negotiate with resource managers for
the best available resources. Understand the team members’ needs
for trainingrelated to the project and make sure they
get it. Create a formal staffing plan. Prepare reports for team members’
performance. Make sure team members are motivated. Create a reward system.
PM HRM Responsibilities
50PMP - Human Resource Managementfacebook.com/Sheta.Page
![Page 51: PMP 06 Project HR Management](https://reader037.vdocuments.us/reader037/viewer/2022103115/557d59dbd8b42ae1438b497c/html5/thumbnails/51.jpg)
What conflict Resolution technique is a
project manager using when he says, “ I
cannot deal with this issue now!”
A. Problem Solving
B. Forcing
C. Withdrawal
D. Compromising
Quiz
51PMP - Human Resource Managementfacebook.com/Sheta.Page
![Page 52: PMP 06 Project HR Management](https://reader037.vdocuments.us/reader037/viewer/2022103115/557d59dbd8b42ae1438b497c/html5/thumbnails/52.jpg)
A PM is trying to settle a dispute between team members. One says the systems should be integrated before testing, and the other wants each system be tested before integration. The project involves 12 systems that need to be integrated and deadline of the project is of high priority. What is the BEST statement the PM can make to resolve the conflict?
A. Do it my way
B. Let’s calm down and get the job done
C. Let’s discuss this issue in our next meeting.
D. Let’s do some limited testing before integration and finish the testing after the integration.
Quiz
52PMP - Human Resource Managementfacebook.com/Sheta.Page
![Page 53: PMP 06 Project HR Management](https://reader037.vdocuments.us/reader037/viewer/2022103115/557d59dbd8b42ae1438b497c/html5/thumbnails/53.jpg)
All the following forms of powers are derived from the
project manager’s position except:
A. Formal
B. Reward
C. Penalty
D. Expert
Quiz