-
bathroom design
www.bruynzeelhomeproducts.nl
Playtimeshower column integrated head
www.bathstore.comAny queries? Call: 08000 232323
-
4mm
2 pers.3
H -
10m
m
130 mm
40 m
m
1/2 B
B
858-888 mm
H
H = ............................................mm
1/2 B
858-888 mm
SOL651 (2x)
SOL501 (2x)
SOL661
SDK654 (2x) PLT216
PLT212
PLT206
PLT211
SDK660
1 2
SDK659This part is pre assembled on the water pipe for packaging. Please disassemble. 1/2” outher thread
Attention: The shower crossbeam is only 40 mm thick. Please keep this in mind when tiling around the water outlet.
Attention: Always start with the installation of your shower enclosure according to the manual. But keep in mind that the outside of the glass must be 858 mm till 888 mm from the wall.
InstallationPlease make sure that any debris is flushed out of the pipe work before installation as it can damage the shower.
1 of 3
SOL227 (6x)
SOL098 (4x)
SOL226 (4x)
-
A
B
C
A
B
A
BC
6
1/2
AB
B
3
5 6
7 8
3 4 Attention: Please use PTFE tape or similar to ensure a waterproof connection.
PLT216
SOL651
SOL501
SDK660
SDK659
PLT212
PLT206
SDK654 (2x)
Attention: loosely connect the pipe to the water outlet, this will be tightened in step 8
Attention: tighten the water connection and slide the cover over.
2 of 3
-
bathroom design
www.bruynzeelhomeproducts.nl
Playtimeshower column integrated head
www.bathstore.comAny queries? Call: 08000 232323
V03
_040
1201
2_P
LT79
7
Maximum operating pressure: 9 BarRecommended operating pressure: 2 - 9 Bar
Minimum operating pressure: 0.2 BarWhen flow rate is 14.1 L/min, the pressure is 3 Bar
Hot water temperature max : 75 °CHot water temperature recommended: 65 °C
Guidelines for cleaning the Playtime showerPlease remove all shampoo and soap. Then dry the showerhead. If the showerhead is calcified, you can remove calcification by gently rubbing the silicone nozzles of the showerhead.
For cleaning, we recommend to use a very soft, non-abrasive cloth combined with a non-aggressive cleaning agent. Only use cleaning agents suited for sanitary showers and taps. Please use according to the product’s instructions.
Don’t use cleaning agents that contain acids, chlorine or bleach. Neither use abrasive cleaning products.
After cleaning, please use water to remove all remaining cleaning agent. Then dry the showerhead.
Technical data
L/min
3 of 3
Bar
-
PlayTimewalk-in shower
shower enclosure
www.bathstore.comAny queries? Call: 08000 23 23 23
D
-
SET 01 SET 02 SET 03 SET 0451000030700/10/20 1x 1x 1x 1x51000030800 1x* 2x* - -51000030810 1x - 1x -51000030820 1x 2x - -51000030830 - - 1x 2x
51000030700/10/20 51000030800 51000030810 51000030820 51000030830
SOL101 (100cm)SOL102 (120cm)SOL103 (140cm)
SOL653(5x)
SOL501(5x)
SOL505(4x)
SOL661(4mm)
SOL501 (4x)
SOL651
SOL664(3mm)
SOL653 (3x)
PLT110
PLT092
PLT096
PLT099
PLT098 (3x)
SOL226 (3x)
PLT091
PLT064
PLT097
PLT098
SOL664(3mm)
SOL401 (4x)
SOL501 (4x)
SOL651 (4x)
PLT061
PLT062
SOL227 (6x)
-
SET 01 + side screen* (p. 4 - 7)
SET 03 (p. 12 - 15) SET 04 (p. 16 - 19)
SET 02 + side screen* (p. 8 - 11)
SET 01 SET 02 SET 03 SET 0451000030700/10/20 1x 1x 1x 1x51000030800 1x* 2x* - -51000030810 1x - 1x -51000030820 1x 2x - -51000030830 - - 1x 2x
51000030700/10/20 51000030800 51000030810 51000030820 51000030830
Select your shower configuration and proceed to the corresponding pages of this manual. Check the table on the left for the required packaging units.
* With SET 01 en SET 02 the side screen is optional.
SOL505(4x)
PLT098
SOL664(3mm)
Max
. 275
cm
Max
. 275
cm
-
32
1a
1b
90 / 100cm 100 / 12
0 / 140c
m
2cm
SET 01 + Side screen*
max. 100cm
4
PLT061
PLT061
SOL501 (4x)SOL651 (4x)
Ø6mm (4x)
The rubber pads SOL227 may be stacked to level the screen and overcome irregularities of the (tiled) floor.
-
8
4 5
100 / 12
0 / 140c
m
76
800mm (100cm)1000mm (120cm)1200mm (140cm)
2050mm
200mm
200mm
5
SOL501
Ø6mm
PLT096
SOL651
SOL227
PLT062
SOL101 (100cm)SOL102 (120cm)SOL103 (140cm)
SOL227
The rubber pads SOL227 may be stacked to level the screen and overcome irregularities of the (tiled) floor.
-
12
13
15
14
*17
*19
L
L - 5mm
6
10
11
Ø3,5mm (4x)
PLT092
PLT092
PLT099
SOL664(3mm)
SOL661(4mm)
SOL401(4x)
25mm (* 32mm)
9
-
1615
*17
*20*19
* + Side screen
250mm
*18
7
SOL227 PLT110
IMPORTANT: Silicone must be applied to both sides of the screen as it will be the sole means of fixation to the floor.
-
1c
SET 02 + Side screen*
8
1a
1b
90 / 100cm
100 / 12
0 / 140c
m
200mm
200mm
200mm
200mm
100 / 12
0 / 140c
m
max. 100cm
When installing directly on to the bathroom floor there are two possibilities:
1b. Placement on the rubber pads SOL227. Silicone has to be applied to the bottom edge with this option.
1c. Placement on blocks PLT098. The bottom edge of the screen will not be sealed off (steps 10 & 11 are cancelled). A gap will remain between the floor and the screen. NOTE: The blocks PLT098 are mounted to the floor with screws. In case of floor heating we strongly advise against this installation option.
100 / 12
0 / 140c
m
max. 100cm200
mm
200mm
SOL227
SOL227
SOL501 (2x)
SOL226
SOL653
PLT098
2x
Ø6mm (2x)
The rubber pads SOL227 may be stacked to level the screen and overcome irregularities of the (tiled) floor.
-
6
2
3
5
4
9
200mm
200mm
200mm
2050mm
200mm
200mm
L
L - 5mm
PLT098
SOL501 (2x)
Ø6mm (2x)
PLT092 (2x)
SOL651 (2x)
SOL227
The rubber pads SOL227 may be stacked to level the screen and overcome irregularities of the (tiled) floor.
-
8
9
11
10
10
*12a
*13
*15
PLT092 (2x)
PLT099 (2x)
SOL664(3mm)
SOL661(4mm)
7
SOL101 (100cm)SOL102 (120cm)SOL103 (140cm)
IMPORTANT: Silicone must be applied to both sides of the screen as it will be the sole means of fixation to the floor.
-
*12a
* + Side screen
250mm
*12b
250mm
*13 *14
*15
SOL227SOL501
(2x)
Ø6mm (2x)
SOL226
SOL653
PLT098
2x
PLT110(2x)
11
IMPORTANT: Silicone must be applied to both sides of the screen as it will be the sole means of fixation to the floor.
-
SET 03 1a
1b
90 / 100cm 100 / 12
0 / 140c
m
2cm
max. 100cm
32
12
PLT061
PLT061
SOL501 (4x)SOL651 (4x)
Ø6mm (4x)
Max
. 275
cm
-
100 / 12
0 / 140c
m
5
4
200mm
200mm
32mm
7
6
8
SOL227
PLT062
Ø3,5mm (4x)
SOL401(4x)
SOL101 (100cm)SOL102 (120cm)SOL103 (140cm)
13
SOL227
The rubber pads SOL227 may be stacked to level the screen and overcome irregularities of the (tiled) floor.
-
21
17
21
15
11 12
1413
14
h - 23mm
h - 2025m
m
10
PLT091
PLT064
PLT097
PLT091
SOL501 (4x)
Ø6mm (4x)
PLT091
PLT064
PLT097
4x
9
h
-
21
17
21
15
15
16
SOL653 (4x)
SOL505 (4x)
SOL664(3mm)
IMPORTANT: Silicone must be applied to both sides of the screen as it will be the sole means of fixation to the floor.
-
21
1a
1b
SET 04
16
100 / 12
0 / 140c
m
25mm
35mm
100 / 12
0 / 140c
m
25mm
35mmPLT098
PLT098
Max
. 275
cm
When installing the screen directly on to the bathroom floor there are two possibilities:
1b. The block PLT098 is mounted with double sided adhesive tape which is already applied to the block.
1c. The block PLT098 is screwed directly into the bathroom floor. In case of floor heating we strongly advise against this installation option. NOTE: In both cases the mounting of the floor block is merely an installation help to keep the profile PLT091 in place. The final fixation of the screen will be realized by the application of the silicone seal (step 17).
1c
SOL501 (2x)
SOL653
PLT098Ø6mm (2x)
35mm25mm
-
21
3
4
2
5
21
76
17
h
h - 23mm
h - 2025m
m
PLT091 (2x)
PLT064 (2x)
SOL501 (4x)
Ø6mm (4x)
PLT091
PLT064
PLT097
PLT097
PLT091
PLT098
4x
-
21
1510
21
11
13
12
18
SOL101 (100cm)SOL102 (120cm)SOL103 (140cm)
PLT097
PLT091
4x
98
21 SOL653 (4x)
SOL505 (4x)
SOL664(3mm)
SOL227
SOL227
The rubber pads SOL227 may be stacked to level the screen and overcome irregularities of the (tiled) floor.
-
21
15
2
1
1413
19
16
17
SOL501 (4x)
Ø6mm (4x)
PLT091
PLT064
PLT097
SOL653 (4x)
SOL505 (4x)
SOL664(3mm)
IMPORTANT: Silicone must be applied to both sides of the screen as it will be the sole means of fixation to the floor.
-
PlayTimewalk-in shower
shower enclosure
www.bathstore.comAny queries? Call: 0121 553 5777
v010610 D
ES2S-7 PLT797 Manual Playtime shower column integrated head +5mm v03_020120122012.01.04playtime instruction