This week the cab finished on the cab line and has
been merged with the chassis along with the pump
house. The body finished in paint and began on the line
where harnessing and trim are added. Next week the
chassis is scheduled to begin on the main assembly
line where the body and water tank should be merged
with the chassis.
© 2015 Fire & Safety Consulting, LLC WWW.FASCG.COM
DSC07502 DSC07503
DSC07504 DSC07505
© 2015 Fire & Safety Consulting, LLC WWW.FASCG.COM
DSC07506 DSC07507
DSC07508 DSC07509
© 2015 Fire & Safety Consulting, LLC WWW.FASCG.COM
DSC07510 DSC07511
DSC07512 DSC07513
© 2015 Fire & Safety Consulting, LLC WWW.FASCG.COM
DSC07514 DSC07515
DSC07516 DSC07517
© 2015 Fire & Safety Consulting, LLC WWW.FASCG.COM
DSC07518 DSC07519
DSC07520 DSC07521
© 2015 Fire & Safety Consulting, LLC WWW.FASCG.COM
DSC07522 DSC07523
DSC07524 DSC07525
© 2015 Fire & Safety Consulting, LLC WWW.FASCG.COM
DSC07526 DSC07527
DSC07528 DSC07529
© 2015 Fire & Safety Consulting, LLC WWW.FASCG.COM
DSC07530 DSC07531
DSC07532 DSC07533
© 2015 Fire & Safety Consulting, LLC WWW.FASCG.COM
DSC07534 DSC00388
DSC00389 DSC00390
© 2015 Fire & Safety Consulting, LLC WWW.FASCG.COM
DSC00391 DSC00392