PentagonWashington, D.C.
UMCS contract for modernization of the Pentagon
Scope includes:
Design, engineering and commissioning of the Building Operations Control Center
Metasys® building management system to measure and manage environmental comfort, energy usage and lighting control
Upgrading indoor air quality and providing efficient lighting
Monitoring and management of critical systems including fire protection and emergency lighting
York® chillers for the refrigeration plant
Oak Ridge National LaboratoryOak Ridge, Tennessee
ESPC project funded by $8.2 million in guaranteed annual savings
Scope includes: Upgrading existing natural gas
steam plant to a wood gasification biomass plant
Upgrading outdated infrastructure in existing plant
Upgrading existing steam distribution system
Advanced metering networked to Metasys® building management system
Reduces fossil fuel consumption by over 80%
Aberdeen Proving GroundAberdeen, Maryland
Three ESPC projects with total projected savings of more than $5 million annually
Scope includes:
Decreased steam waste, effectively increasing plant capacity
Energy efficient lighting retrofits and upgrades for more than 100 buildings
Full automation of steam generation and distribution process
Improved steam and electrical system efficiency and reliability
Common platform for energy delivery, operation and maintenance decisions
Reliable and more efficient steam supply for heating and hot water at soldier barracks
Whiteman Air Force BaseWhiteman AFB, Missouri
Two projects: UMCS contract includes metering and additional contract for HVAC upgrade
Scope included: Installation and integration of electric and
natural gas meters
Steam plant upgrade to enable remote control
Outside air sensing and monitoring of 100 buildings
Complete controls upgrade for 30 buildings
Boiler and chiller upgrades for 13 buildings
Fort BlissFort Bliss, Texas
ESPC project with total projected savings of more than $500K annually
Developed in concert with USACE EEAP report
Scope included:
Installation of solar thermal renewable technology
Energy efficient lighting retrofits and upgrades for more than 50 buildings
Utility Monitoring and Control System (UMCS) LON platform covering 1.52 million square feet
Provided lighting occupancy sensors in 25 buildings
Marine Air Ground Task Force Training CommandTwentynine Palms, California
Three-phase ESPC project with projected savings around $7 million annually
Over past five years, savings have exceeded projections
Scope includes: Building 7.5 megawatt cogeneration
facility
Building 1.2 megawatt photovoltaic dual tracking solar array
Adding three new central chiller plants with 3,600 tons of cooling capacity
Providing renewal power systems and connections to the central water plants
Denver Federal CenterDenver, Colorado
Two-phase ESPC project with guaranteed energy savings of $450,000 per year
Scope included: Lighting retrofits
Upgraded HVAC equipment
Installed new, high-efficiency chillers and pumps
Recommissioned existing solar hot water heating systems
Improved irrigation control system yielding water savings of nearly 11 million gallons per year
Installed system to automate electric and gas meter readings in all major facilities
Fort BraggFort Bragg, North Carolina
Retrofit project including mechanical, controls, mold and mildew mitigation and energy plant
Scope included: Replaced boilers and chillers, air-
handling units and VAV boxes
Installation of new LON DDC controls
Base-wide integration of controls
Removal of contaminated sheetrock, paint and asbestos
Fire alarm and pumps installation
Advanced metering
U.S. Navy BaseGuam
ESPC contract for energy conservation measures to reduce energy use by over 10%
Scope includes: Large-scale solar photovoltaic
power system
New induction lighting equipment
Base-wide Metasys® building management system
NASA Ames Research CenterMoffett Federal Airfield, California
ESPC contract with guaranteed energy savings of more than $500,000 annually
Scope included: Lighting retrofits in Center’s older
buildings
Reprogrammed and recommissioned systems
Installed a windmill-driven mechanical pump to drain north basin
Coordinating schedules with site personnel and subcontractors, along with maintaining timetables and providing communications to on-site operations team
Fort HoodFort Hood, Texas
Two-phase Super ESPC contract for energy conservation measures with guaranteed savings of $1.77 million annually
Scope includes: Lighting Lighting Sensors
Utility Monitoring and Control System (UMCS) LON platform covering 2.5 million square feet
VFDs
Service agreement to include on-site controls technicians and HVAC mechanics
Naval Aviation DepotCherry Point, North Carolina
UMCS contract to reduce energy costs and increase employee productivity
Scope includes: Metasys® building management
system to optimize energy consumption and maintain production schedules
Placed meters at 72 major utility substations and connected them to Metasys to enable better information and real-time adjustments
Established maintenance strategy through Metasys to free 3-4 full-time employees to perform higher-level tasks