![Page 1: PB JH On-line Analysis A Water Company PersSpecord S100 spectrophotometer (4cm cell) Asulam standard in Lobwood river (RO water baseline) 0.30 0.50 0.70 0.90 1.10 1.30 1.50 1.70 1.90](https://reader034.vdocuments.us/reader034/viewer/2022042108/5e883d7eeff4bc2e2609087f/html5/thumbnails/1.jpg)
On-line Analysis – A Water CompanyPerspective
Peter Boruszenko – R&D Engineer
John Haley – Water Quality Compliance Manager
K. Clive Thompson
ALcontrol Laboratories
![Page 2: PB JH On-line Analysis A Water Company PersSpecord S100 spectrophotometer (4cm cell) Asulam standard in Lobwood river (RO water baseline) 0.30 0.50 0.70 0.90 1.10 1.30 1.50 1.70 1.90](https://reader034.vdocuments.us/reader034/viewer/2022042108/5e883d7eeff4bc2e2609087f/html5/thumbnails/2.jpg)
Introduction
• Why is on-line monitoring important to YW?
• 3 Case studies - Online Monitoring for:-
– Raw Water
– Water Treatment
– Distribution
![Page 3: PB JH On-line Analysis A Water Company PersSpecord S100 spectrophotometer (4cm cell) Asulam standard in Lobwood river (RO water baseline) 0.30 0.50 0.70 0.90 1.10 1.30 1.50 1.70 1.90](https://reader034.vdocuments.us/reader034/viewer/2022042108/5e883d7eeff4bc2e2609087f/html5/thumbnails/3.jpg)
RiverDerwent
Sheffield
ElvingtonArthington
Reservoirs 45% Groundwater 22%
RiverSwale Wiske
RiverWharfe
RiverUre
RiverNidd
RiverOuse
Hull
DoncasterBarnsley
LeedsHull
Scarborough
Bridlington
Richmond
York
Aire
Eccup
Moor Monkton
Elvington
Wakefield
Halifax
Huddersfield
Lobwood
BradfordLoftsome
Rivers 33%
![Page 4: PB JH On-line Analysis A Water Company PersSpecord S100 spectrophotometer (4cm cell) Asulam standard in Lobwood river (RO water baseline) 0.30 0.50 0.70 0.90 1.10 1.30 1.50 1.70 1.90](https://reader034.vdocuments.us/reader034/viewer/2022042108/5e883d7eeff4bc2e2609087f/html5/thumbnails/4.jpg)
Why on-line analysis?
• Raw waters are variable
• Water treatment is rarely steady-state
• Best possible knowledge of risks to water quality
• Optimise treatment
• Manage risky situations
• Improved customer service
![Page 5: PB JH On-line Analysis A Water Company PersSpecord S100 spectrophotometer (4cm cell) Asulam standard in Lobwood river (RO water baseline) 0.30 0.50 0.70 0.90 1.10 1.30 1.50 1.70 1.90](https://reader034.vdocuments.us/reader034/viewer/2022042108/5e883d7eeff4bc2e2609087f/html5/thumbnails/5.jpg)
![Page 6: PB JH On-line Analysis A Water Company PersSpecord S100 spectrophotometer (4cm cell) Asulam standard in Lobwood river (RO water baseline) 0.30 0.50 0.70 0.90 1.10 1.30 1.50 1.70 1.90](https://reader034.vdocuments.us/reader034/viewer/2022042108/5e883d7eeff4bc2e2609087f/html5/thumbnails/6.jpg)
• There are over 15 million known organicsubstances.
•Robust technique to detect all ofthese? Impossible !
• Compromise, pragmatism robustness,costs are key
• Not much TLC available – OPEX limited!
CASE STUDY 1: RAW WATER MONITORING
![Page 7: PB JH On-line Analysis A Water Company PersSpecord S100 spectrophotometer (4cm cell) Asulam standard in Lobwood river (RO water baseline) 0.30 0.50 0.70 0.90 1.10 1.30 1.50 1.70 1.90](https://reader034.vdocuments.us/reader034/viewer/2022042108/5e883d7eeff4bc2e2609087f/html5/thumbnails/7.jpg)
On-line systems for river intake protection(11 sites) in YWS – position in 1986
• The Worcester & Dee Incidents made intake protection high profile
• Avoid supplying Water unfit for human consumption- Due diligence defence
• Some companies have opted for highly intensive on-line analysis oftenspecifically directed on the more potentially polluted rivers
• YW has relatively unpolluted rivers – more widespread use of ‘broad- band’monitors because we do not have known fixed contaminant risk!
• UV absorption detects a wide range of chemicals but not very sensitive in1986 essentially detecting gross contamination.
• YW therefore developed the UV based system from firstprinciples
![Page 8: PB JH On-line Analysis A Water Company PersSpecord S100 spectrophotometer (4cm cell) Asulam standard in Lobwood river (RO water baseline) 0.30 0.50 0.70 0.90 1.10 1.30 1.50 1.70 1.90](https://reader034.vdocuments.us/reader034/viewer/2022042108/5e883d7eeff4bc2e2609087f/html5/thumbnails/8.jpg)
Old YWS Uvikon with “Sand Pre-filter”
![Page 9: PB JH On-line Analysis A Water Company PersSpecord S100 spectrophotometer (4cm cell) Asulam standard in Lobwood river (RO water baseline) 0.30 0.50 0.70 0.90 1.10 1.30 1.50 1.70 1.90](https://reader034.vdocuments.us/reader034/viewer/2022042108/5e883d7eeff4bc2e2609087f/html5/thumbnails/9.jpg)
On-line systems for river intake protection(11 sites) in YWS – position in 2002
• Decision made to re-examine systems for on-line monitoring from first
principles
• Options considered and conclusion that broad screen monitoring most
appropriate for YW rivers due to no specific risks.
• Some very expensive options on the market but no UV systems
• Decided that UV detection was the best process and to persuade a
commercial supplier to develop a UV system with modern hardware and
software
![Page 10: PB JH On-line Analysis A Water Company PersSpecord S100 spectrophotometer (4cm cell) Asulam standard in Lobwood river (RO water baseline) 0.30 0.50 0.70 0.90 1.10 1.30 1.50 1.70 1.90](https://reader034.vdocuments.us/reader034/viewer/2022042108/5e883d7eeff4bc2e2609087f/html5/thumbnails/10.jpg)
The PMS system
![Page 11: PB JH On-line Analysis A Water Company PersSpecord S100 spectrophotometer (4cm cell) Asulam standard in Lobwood river (RO water baseline) 0.30 0.50 0.70 0.90 1.10 1.30 1.50 1.70 1.90](https://reader034.vdocuments.us/reader034/viewer/2022042108/5e883d7eeff4bc2e2609087f/html5/thumbnails/11.jpg)
Specord S100 spectrophotometer (4cm cell)Asulam standard in Lobwood river
(RO water baseline)
0.30
0.50
0.70
0.90
1.10
1.30
1.50
1.70
1.90
230 240 250 260 270 280 290 300 310 320
nm
Abs
.
100ppb 250ppb 500ppb 1ppm 2ppm 5ppm lobw ood
![Page 12: PB JH On-line Analysis A Water Company PersSpecord S100 spectrophotometer (4cm cell) Asulam standard in Lobwood river (RO water baseline) 0.30 0.50 0.70 0.90 1.10 1.30 1.50 1.70 1.90](https://reader034.vdocuments.us/reader034/viewer/2022042108/5e883d7eeff4bc2e2609087f/html5/thumbnails/12.jpg)
On-line Monitors
Key criteria
• Robust
• Low false positives
• Very low false negatives
• Sample pre-treatment for raw waters is key (This is the ‘Achilles
heel’ of many commercial systems)
• Minimum preventative maintenance frequency: 1 visit / Month
KEY ISSUE
• If there’s no aromatic ring then it will not work.
![Page 13: PB JH On-line Analysis A Water Company PersSpecord S100 spectrophotometer (4cm cell) Asulam standard in Lobwood river (RO water baseline) 0.30 0.50 0.70 0.90 1.10 1.30 1.50 1.70 1.90](https://reader034.vdocuments.us/reader034/viewer/2022042108/5e883d7eeff4bc2e2609087f/html5/thumbnails/13.jpg)
CASE STUDY2: WATER TREATMENTCoagulation optimisation using on-lineinstrumentation
![Page 14: PB JH On-line Analysis A Water Company PersSpecord S100 spectrophotometer (4cm cell) Asulam standard in Lobwood river (RO water baseline) 0.30 0.50 0.70 0.90 1.10 1.30 1.50 1.70 1.90](https://reader034.vdocuments.us/reader034/viewer/2022042108/5e883d7eeff4bc2e2609087f/html5/thumbnails/14.jpg)
![Page 15: PB JH On-line Analysis A Water Company PersSpecord S100 spectrophotometer (4cm cell) Asulam standard in Lobwood river (RO water baseline) 0.30 0.50 0.70 0.90 1.10 1.30 1.50 1.70 1.90](https://reader034.vdocuments.us/reader034/viewer/2022042108/5e883d7eeff4bc2e2609087f/html5/thumbnails/15.jpg)
![Page 16: PB JH On-line Analysis A Water Company PersSpecord S100 spectrophotometer (4cm cell) Asulam standard in Lobwood river (RO water baseline) 0.30 0.50 0.70 0.90 1.10 1.30 1.50 1.70 1.90](https://reader034.vdocuments.us/reader034/viewer/2022042108/5e883d7eeff4bc2e2609087f/html5/thumbnails/16.jpg)
![Page 17: PB JH On-line Analysis A Water Company PersSpecord S100 spectrophotometer (4cm cell) Asulam standard in Lobwood river (RO water baseline) 0.30 0.50 0.70 0.90 1.10 1.30 1.50 1.70 1.90](https://reader034.vdocuments.us/reader034/viewer/2022042108/5e883d7eeff4bc2e2609087f/html5/thumbnails/17.jpg)
![Page 18: PB JH On-line Analysis A Water Company PersSpecord S100 spectrophotometer (4cm cell) Asulam standard in Lobwood river (RO water baseline) 0.30 0.50 0.70 0.90 1.10 1.30 1.50 1.70 1.90](https://reader034.vdocuments.us/reader034/viewer/2022042108/5e883d7eeff4bc2e2609087f/html5/thumbnails/18.jpg)
![Page 19: PB JH On-line Analysis A Water Company PersSpecord S100 spectrophotometer (4cm cell) Asulam standard in Lobwood river (RO water baseline) 0.30 0.50 0.70 0.90 1.10 1.30 1.50 1.70 1.90](https://reader034.vdocuments.us/reader034/viewer/2022042108/5e883d7eeff4bc2e2609087f/html5/thumbnails/19.jpg)
![Page 20: PB JH On-line Analysis A Water Company PersSpecord S100 spectrophotometer (4cm cell) Asulam standard in Lobwood river (RO water baseline) 0.30 0.50 0.70 0.90 1.10 1.30 1.50 1.70 1.90](https://reader034.vdocuments.us/reader034/viewer/2022042108/5e883d7eeff4bc2e2609087f/html5/thumbnails/20.jpg)
Coagulation in Brief
• Coagulant metal hydroxide precipitates to give floc.• Coagulant only does this efficiently in a narrow pH band• Colour particles stick to the precipitating coagulant hydrolysis
products in the flash mixer (takes seconds)• If there is not enough coagulant the colour particles give the
precipitate a negative charge– Compromises optimum flocculation (small particles)– Compromises optimum filtration because charged particles
won’t stick to filter media at any time during the filter run.• Overdosing of coagulant wastes money
– Increases coagulant costs– Increases sludge production
![Page 21: PB JH On-line Analysis A Water Company PersSpecord S100 spectrophotometer (4cm cell) Asulam standard in Lobwood river (RO water baseline) 0.30 0.50 0.70 0.90 1.10 1.30 1.50 1.70 1.90](https://reader034.vdocuments.us/reader034/viewer/2022042108/5e883d7eeff4bc2e2609087f/html5/thumbnails/21.jpg)
Simplified Treatment Process
Mixers ClarifiersRapid Gravity
Filters
Up to 95% flocremoval
Remaining FlocRemoved
Add
• Aluminium or Ferric Sulphate(coagulant)
• Lime or Acid to control the pH of themixture
Floc production
Products
Potable Water (after disinfection)
Sludge
![Page 22: PB JH On-line Analysis A Water Company PersSpecord S100 spectrophotometer (4cm cell) Asulam standard in Lobwood river (RO water baseline) 0.30 0.50 0.70 0.90 1.10 1.30 1.50 1.70 1.90](https://reader034.vdocuments.us/reader034/viewer/2022042108/5e883d7eeff4bc2e2609087f/html5/thumbnails/22.jpg)
Time
Baseline
This distance is an indicator ofcoagulation optimisation.
Changing the coagulant dose (for agiven raw water quality) changesthis value.
Changing from optimumcoagulation pH range to a differentcoagulation pH increases thisvalue.
Backwash Spike
Wider and higher spike indicateslesser degree of coagulationoptimisation.
Breakthrough
Onset of break-through caused byoverloading filter with small weak floc.Usually occurs in winter/spring at flotationsites.
Made worse by increasing filtered water flow,increasing pre-filt turbidity and by flow surgesthrough the filter.
Observed relationships between filter outlet turbiditytrend and degree of coagulation optimisation
BASELINE
BREAKTHROUGH
BACKWASHSPIKET
urbi
dity
![Page 23: PB JH On-line Analysis A Water Company PersSpecord S100 spectrophotometer (4cm cell) Asulam standard in Lobwood river (RO water baseline) 0.30 0.50 0.70 0.90 1.10 1.30 1.50 1.70 1.90](https://reader034.vdocuments.us/reader034/viewer/2022042108/5e883d7eeff4bc2e2609087f/html5/thumbnails/23.jpg)
Raw water colour coagulant dose and filteredturbidity
Works D
0
10
20
30
40
50
60
23-Jun 23-Jun 24-Jun 24-Jun 25-Jun 25-Jun 26-Jun 26-Jun 27-Jun 27-Jun
UV
abso
rban
ce(a
bs/m
)
0
0.1
0.2
0.3
0.4
0.5
0.6
Tu
rbid
ityan
dm
g/l
Al/
10
Raw Water UV Coagulant Dose (mg/l)/10 Filter 5 Turbidity Filter 8Turbidity Filter 14 Turbidity
Increase in coagulant dose causesfiltered water turbidity to decrease
Raw water UV increase causesfiltered water turbidity increase
![Page 24: PB JH On-line Analysis A Water Company PersSpecord S100 spectrophotometer (4cm cell) Asulam standard in Lobwood river (RO water baseline) 0.30 0.50 0.70 0.90 1.10 1.30 1.50 1.70 1.90](https://reader034.vdocuments.us/reader034/viewer/2022042108/5e883d7eeff4bc2e2609087f/html5/thumbnails/24.jpg)
Example ACC Algorithm
0
1
2
3
4
5
6
7
8
9
0 10 20 30 40 50 60 70 80 90
Raw Water UV (abs/m)
mg
/lA
l
0 5 10 15 20
Temp
![Page 25: PB JH On-line Analysis A Water Company PersSpecord S100 spectrophotometer (4cm cell) Asulam standard in Lobwood river (RO water baseline) 0.30 0.50 0.70 0.90 1.10 1.30 1.50 1.70 1.90](https://reader034.vdocuments.us/reader034/viewer/2022042108/5e883d7eeff4bc2e2609087f/html5/thumbnails/25.jpg)
Automatic Coagulation Control Schematic (ACC).
Raw UV 254Monitor.
Sam
ple
Works first stageRaw water inlet
DosedRawFlashMixer
Inletflowmeter
CoagulantPump
Flowmeter
pHCorrection
PLC
User Interface
Calculates predictedcoagulant dose (mg/l).Converts to coagulant flowsetpoint.
SCADA
Feedback control ofcoagulant flow.
![Page 26: PB JH On-line Analysis A Water Company PersSpecord S100 spectrophotometer (4cm cell) Asulam standard in Lobwood river (RO water baseline) 0.30 0.50 0.70 0.90 1.10 1.30 1.50 1.70 1.90](https://reader034.vdocuments.us/reader034/viewer/2022042108/5e883d7eeff4bc2e2609087f/html5/thumbnails/26.jpg)
![Page 27: PB JH On-line Analysis A Water Company PersSpecord S100 spectrophotometer (4cm cell) Asulam standard in Lobwood river (RO water baseline) 0.30 0.50 0.70 0.90 1.10 1.30 1.50 1.70 1.90](https://reader034.vdocuments.us/reader034/viewer/2022042108/5e883d7eeff4bc2e2609087f/html5/thumbnails/27.jpg)
![Page 28: PB JH On-line Analysis A Water Company PersSpecord S100 spectrophotometer (4cm cell) Asulam standard in Lobwood river (RO water baseline) 0.30 0.50 0.70 0.90 1.10 1.30 1.50 1.70 1.90](https://reader034.vdocuments.us/reader034/viewer/2022042108/5e883d7eeff4bc2e2609087f/html5/thumbnails/28.jpg)
![Page 29: PB JH On-line Analysis A Water Company PersSpecord S100 spectrophotometer (4cm cell) Asulam standard in Lobwood river (RO water baseline) 0.30 0.50 0.70 0.90 1.10 1.30 1.50 1.70 1.90](https://reader034.vdocuments.us/reader034/viewer/2022042108/5e883d7eeff4bc2e2609087f/html5/thumbnails/29.jpg)
0.0
0.1
0.2
0.3
0.4
0.5
0.6
0.7
0.8
0.9
1.0
17/02/200500:00
22/02/200500:00
27/02/200500:00
04/03/200500:00
09/03/200500:00
14/03/200500:00
19/03/200500:00
24/03/200500:00
29/03/200500:00
03/04/200500:00
08/04/200500:00
Raw
UV
(mg/
lC)/
100
and
filte
red
turb
idity
(FTU
).
0.0
1.0
2.0
3.0
4.0
5.0
6.0
7.0
8.0
9.0
10.0
Co
agu
alan
tD
ose
s(m
g/l
Al),
Raw
Tu
rbid
ity/
10(F
TU
)an
dT
emp
Filter 3 Outlet Turbidity Filter 1 Outlet Turbidity Raw UV/100 Actual Coagulant Dose
Predicted Coagulant Dose Temperature Dosed raw pH Spsheet Predicted Dose
ACC Example – River Works (Site F)
![Page 30: PB JH On-line Analysis A Water Company PersSpecord S100 spectrophotometer (4cm cell) Asulam standard in Lobwood river (RO water baseline) 0.30 0.50 0.70 0.90 1.10 1.30 1.50 1.70 1.90](https://reader034.vdocuments.us/reader034/viewer/2022042108/5e883d7eeff4bc2e2609087f/html5/thumbnails/30.jpg)
Conclusions
• Reduces the need for manual intervention
• Reduces overdosing of Coagulant
• (1500 Tonnes in 11 months)
• Reduces out-of-hours call-outs
• Maintains optimum treated water turbidity
• Minimises risk of Cryptosporidium breakthrough
The ACC System:-
![Page 31: PB JH On-line Analysis A Water Company PersSpecord S100 spectrophotometer (4cm cell) Asulam standard in Lobwood river (RO water baseline) 0.30 0.50 0.70 0.90 1.10 1.30 1.50 1.70 1.90](https://reader034.vdocuments.us/reader034/viewer/2022042108/5e883d7eeff4bc2e2609087f/html5/thumbnails/31.jpg)
Real Time MonitoringCASE STUDY 3 - DISTRIBUTION
![Page 32: PB JH On-line Analysis A Water Company PersSpecord S100 spectrophotometer (4cm cell) Asulam standard in Lobwood river (RO water baseline) 0.30 0.50 0.70 0.90 1.10 1.30 1.50 1.70 1.90](https://reader034.vdocuments.us/reader034/viewer/2022042108/5e883d7eeff4bc2e2609087f/html5/thumbnails/32.jpg)
ImpoundingReservoir
Borehole Raw WaterPumping
RiverAbstraction
WaterTreatment
TreatedWaterStorage
Grid TreatedWaterPumping
DistributionManagement
Areas
Monitoring, Controlling & Optimising
Internal Work Mngt and Scheduling
Real Time Asset Monitoring, Control & Optimisation
Remote Asset Management & Technical Support
Variable Approach to Asset Maintenance
Reactive Customer Service
MONITOR CONTROL OPTIMISE
SourceSource TapTap
![Page 33: PB JH On-line Analysis A Water Company PersSpecord S100 spectrophotometer (4cm cell) Asulam standard in Lobwood river (RO water baseline) 0.30 0.50 0.70 0.90 1.10 1.30 1.50 1.70 1.90](https://reader034.vdocuments.us/reader034/viewer/2022042108/5e883d7eeff4bc2e2609087f/html5/thumbnails/33.jpg)
RTnet Drivers
1. Reduce/Remove manual data collection
2. Leakage data on a daily basis
3. Receive customer service data every half hour
‘Respond to failure before the customer is impacted’
![Page 34: PB JH On-line Analysis A Water Company PersSpecord S100 spectrophotometer (4cm cell) Asulam standard in Lobwood river (RO water baseline) 0.30 0.50 0.70 0.90 1.10 1.30 1.50 1.70 1.90](https://reader034.vdocuments.us/reader034/viewer/2022042108/5e883d7eeff4bc2e2609087f/html5/thumbnails/34.jpg)
Key Issues
• Communications• Battery life
– Currently only 2.5 years
– Power harvesting?
• Managing the data• COST !!!
![Page 35: PB JH On-line Analysis A Water Company PersSpecord S100 spectrophotometer (4cm cell) Asulam standard in Lobwood river (RO water baseline) 0.30 0.50 0.70 0.90 1.10 1.30 1.50 1.70 1.90](https://reader034.vdocuments.us/reader034/viewer/2022042108/5e883d7eeff4bc2e2609087f/html5/thumbnails/35.jpg)
Future Issues
• Rtnet only measure at zone inlets…– How do we measure rest of the network
• Measure real time water quality:– In distribution– At service reservoirs
• Multi-functioning device– Water quality, pressure, flow– CENSAR
![Page 36: PB JH On-line Analysis A Water Company PersSpecord S100 spectrophotometer (4cm cell) Asulam standard in Lobwood river (RO water baseline) 0.30 0.50 0.70 0.90 1.10 1.30 1.50 1.70 1.90](https://reader034.vdocuments.us/reader034/viewer/2022042108/5e883d7eeff4bc2e2609087f/html5/thumbnails/36.jpg)
This is very heavy –a two man operation– also attenuatessignals
![Page 37: PB JH On-line Analysis A Water Company PersSpecord S100 spectrophotometer (4cm cell) Asulam standard in Lobwood river (RO water baseline) 0.30 0.50 0.70 0.90 1.10 1.30 1.50 1.70 1.90](https://reader034.vdocuments.us/reader034/viewer/2022042108/5e883d7eeff4bc2e2609087f/html5/thumbnails/37.jpg)
Valving Operations at Daisy Hill - Detail of Initial turns
0
0.5
1
1.5
2
2.5
3
9:47:31 9:50:24 9:53:17 9:56:10 9:59:02 10:01:55 10:04:48 10:07:41 10:10:34 10:13:26 10:16:190
5
10
15
20
25
30
35
40
45
Turbidity Valve turns
Initial Closure Turbidity Effects
![Page 38: PB JH On-line Analysis A Water Company PersSpecord S100 spectrophotometer (4cm cell) Asulam standard in Lobwood river (RO water baseline) 0.30 0.50 0.70 0.90 1.10 1.30 1.50 1.70 1.90](https://reader034.vdocuments.us/reader034/viewer/2022042108/5e883d7eeff4bc2e2609087f/html5/thumbnails/38.jpg)
CONCLUSIONS
• There is a widespread move away from manualintervention in water treatment process control
• 20 new sites require robust reliable pollution monitors –various new systems are being considered.
• At least one month unattended operation is essential
• Enhanced customer service
• Attain top position in the OFWAT league table !
![Page 39: PB JH On-line Analysis A Water Company PersSpecord S100 spectrophotometer (4cm cell) Asulam standard in Lobwood river (RO water baseline) 0.30 0.50 0.70 0.90 1.10 1.30 1.50 1.70 1.90](https://reader034.vdocuments.us/reader034/viewer/2022042108/5e883d7eeff4bc2e2609087f/html5/thumbnails/39.jpg)
Discussion / Questions