Presentation Topics
Parson Avenue Water Plant (PAWP) Background
Process Improvements and Design Considerations
Electrical Upgrades
![Page 3: PARSONS AVENUE WATER PLANT - cdn.ymaws.com€¦ · Plant Design – Late 1970s Plant Construction/Start-Up – Early 1980’s Operations Upgrades Project – Late 1990’s Groundwater](https://reader033.vdocuments.us/reader033/viewer/2022042114/5e90a1a3c04b50369e7d025d/html5/thumbnails/3.jpg)
PAWP BACKGROUND
Plant Design – Late 1970s Plant Construction/Start-Up – Early 1980’s Operations Upgrades Project – Late 1990’s Groundwater Plant – 6 Radial Collector Wells
Hydraulic Capacity – 50 MGD
![Page 4: PARSONS AVENUE WATER PLANT - cdn.ymaws.com€¦ · Plant Design – Late 1970s Plant Construction/Start-Up – Early 1980’s Operations Upgrades Project – Late 1990’s Groundwater](https://reader033.vdocuments.us/reader033/viewer/2022042114/5e90a1a3c04b50369e7d025d/html5/thumbnails/4.jpg)
Proposed Treatment Plant Process
![Page 5: PARSONS AVENUE WATER PLANT - cdn.ymaws.com€¦ · Plant Design – Late 1970s Plant Construction/Start-Up – Early 1980’s Operations Upgrades Project – Late 1990’s Groundwater](https://reader033.vdocuments.us/reader033/viewer/2022042114/5e90a1a3c04b50369e7d025d/html5/thumbnails/5.jpg)
PAWP Existing Construction Site
![Page 6: PARSONS AVENUE WATER PLANT - cdn.ymaws.com€¦ · Plant Design – Late 1970s Plant Construction/Start-Up – Early 1980’s Operations Upgrades Project – Late 1990’s Groundwater](https://reader033.vdocuments.us/reader033/viewer/2022042114/5e90a1a3c04b50369e7d025d/html5/thumbnails/6.jpg)
Primary/Secondary Clarifiers
Split Treatment Softening 80% Raw Water Treated in Primary Clarifiers 20% By-Pass Blended in Secondary Clarifiers
![Page 7: PARSONS AVENUE WATER PLANT - cdn.ymaws.com€¦ · Plant Design – Late 1970s Plant Construction/Start-Up – Early 1980’s Operations Upgrades Project – Late 1990’s Groundwater](https://reader033.vdocuments.us/reader033/viewer/2022042114/5e90a1a3c04b50369e7d025d/html5/thumbnails/7.jpg)
Primary Clarifier Upgrades
7
New Contact Clarifier Equipment.
Increased Treatment Capacity from 25 MGD to 30 MGD.
Turbine Mixer
Stainless Steel Construction
![Page 8: PARSONS AVENUE WATER PLANT - cdn.ymaws.com€¦ · Plant Design – Late 1970s Plant Construction/Start-Up – Early 1980’s Operations Upgrades Project – Late 1990’s Groundwater](https://reader033.vdocuments.us/reader033/viewer/2022042114/5e90a1a3c04b50369e7d025d/html5/thumbnails/8.jpg)
Secondary Clarifier Upgrades
8
Rehabilitation of Existing Contact Clarifier Equipment.
Replaced Radial, Collector and Circular Launder with Stainless Steel Launders.
Steel Rehab and Paint
Rake Arms
Center Cage
Skirt
Bridge
![Page 9: PARSONS AVENUE WATER PLANT - cdn.ymaws.com€¦ · Plant Design – Late 1970s Plant Construction/Start-Up – Early 1980’s Operations Upgrades Project – Late 1990’s Groundwater](https://reader033.vdocuments.us/reader033/viewer/2022042114/5e90a1a3c04b50369e7d025d/html5/thumbnails/9.jpg)
Recarbonation Basin
9
Existing pH Adjust Flume
Only Minutes of Detention Time.
New Basin provides 20 Minutes of Detention Time.
New Recarbonation Building and gas feed equipment.
New CO2 Storage Tanks: 3 – 50 Ton Tanks
![Page 10: PARSONS AVENUE WATER PLANT - cdn.ymaws.com€¦ · Plant Design – Late 1970s Plant Construction/Start-Up – Early 1980’s Operations Upgrades Project – Late 1990’s Groundwater](https://reader033.vdocuments.us/reader033/viewer/2022042114/5e90a1a3c04b50369e7d025d/html5/thumbnails/10.jpg)
Temporary CO2 Storage
10
New Electrical Building within existing Storage Tank Footprint.
Contractor provided Temporary CO2 Storage Tanks
Used Existing Feed Equipment
![Page 11: PARSONS AVENUE WATER PLANT - cdn.ymaws.com€¦ · Plant Design – Late 1970s Plant Construction/Start-Up – Early 1980’s Operations Upgrades Project – Late 1990’s Groundwater](https://reader033.vdocuments.us/reader033/viewer/2022042114/5e90a1a3c04b50369e7d025d/html5/thumbnails/11.jpg)
Filter Upgrades
11
Maintain Existing Filter Drain Clay Tiles
Replaced Media In-Kind
Replaced Subsurface Wash Sweeps with New Surface Wash Sweeps
Revised Backwash Sequence
![Page 12: PARSONS AVENUE WATER PLANT - cdn.ymaws.com€¦ · Plant Design – Late 1970s Plant Construction/Start-Up – Early 1980’s Operations Upgrades Project – Late 1990’s Groundwater](https://reader033.vdocuments.us/reader033/viewer/2022042114/5e90a1a3c04b50369e7d025d/html5/thumbnails/12.jpg)
New Clearwell
12
New 11 MG Clearwell (Existing 11 MG Clearwell)
Provides Operation Flexibility & Additional Storage
Valves provided for 4 Operational Scenarios
![Page 13: PARSONS AVENUE WATER PLANT - cdn.ymaws.com€¦ · Plant Design – Late 1970s Plant Construction/Start-Up – Early 1980’s Operations Upgrades Project – Late 1990’s Groundwater](https://reader033.vdocuments.us/reader033/viewer/2022042114/5e90a1a3c04b50369e7d025d/html5/thumbnails/13.jpg)
New Bulk Chemical & Transport SystemLime and Soda Ash
13
Existing Dense Phase System
High Pressure Compressors – Shared System
Two large Receivers
Continuous Problems – Plant modified to operate similar to Dilute Phase System
New Dilute Phase System
Blowers/Low Pressure – Dedicated System
Rotary Feeders
Dedicated Transfer Line for each Chemical
![Page 14: PARSONS AVENUE WATER PLANT - cdn.ymaws.com€¦ · Plant Design – Late 1970s Plant Construction/Start-Up – Early 1980’s Operations Upgrades Project – Late 1990’s Groundwater](https://reader033.vdocuments.us/reader033/viewer/2022042114/5e90a1a3c04b50369e7d025d/html5/thumbnails/14.jpg)
EXISTING ELECTRICAL SYSTEM
![Page 15: PARSONS AVENUE WATER PLANT - cdn.ymaws.com€¦ · Plant Design – Late 1970s Plant Construction/Start-Up – Early 1980’s Operations Upgrades Project – Late 1990’s Groundwater](https://reader033.vdocuments.us/reader033/viewer/2022042114/5e90a1a3c04b50369e7d025d/html5/thumbnails/15.jpg)
Power & Distribution System
Dual Power Feeds to PAWP
Automatic Transfer Switch
MCC’s Original Equipment
![Page 16: PARSONS AVENUE WATER PLANT - cdn.ymaws.com€¦ · Plant Design – Late 1970s Plant Construction/Start-Up – Early 1980’s Operations Upgrades Project – Late 1990’s Groundwater](https://reader033.vdocuments.us/reader033/viewer/2022042114/5e90a1a3c04b50369e7d025d/html5/thumbnails/16.jpg)
New Plant Equipment
Reconfigure Power Feeds, more reliable Circuit for Primary Use
New Automatic Transfer Switch equipped with Radio Telemetry
New 15KV Switchgear
Option for automatic breaker operation
Arc-Resistant construction
Remote breaker operation
New Arc-Resistant 5KV Substation to Power Finished Water Pumps
New Arc-Resistant Low Voltage Substation for distribute 480V Power
New Low Voltage MCCs to Feed New and Existing Loads at PAWP
![Page 17: PARSONS AVENUE WATER PLANT - cdn.ymaws.com€¦ · Plant Design – Late 1970s Plant Construction/Start-Up – Early 1980’s Operations Upgrades Project – Late 1990’s Groundwater](https://reader033.vdocuments.us/reader033/viewer/2022042114/5e90a1a3c04b50369e7d025d/html5/thumbnails/17.jpg)
New Electrical Building
![Page 18: PARSONS AVENUE WATER PLANT - cdn.ymaws.com€¦ · Plant Design – Late 1970s Plant Construction/Start-Up – Early 1980’s Operations Upgrades Project – Late 1990’s Groundwater](https://reader033.vdocuments.us/reader033/viewer/2022042114/5e90a1a3c04b50369e7d025d/html5/thumbnails/18.jpg)
Thank You