Transcript
Page 1: Páginas de Curriculum inglés-12

RELIEF ROADS

Relief roads reduce traffic trough urban areas. It is a linear work, and are located at different points along various types of strcutures that provide solutions to the cross-roads, intersections, cross rivers, etc.

ESTRUCTURAS CORELLANAS serves running all these, each one in different typologies:

- Consolidation of land. Running “in situ” bearing-walls, walls of reinforced-earth, and other connected activities.

- Foundations of the various structures that are developed throughout the work.

- Underpasses, wild life crossings and fabric works.

- Overpasses. We make the total of such steps from the foundations and pile caps to the full implementation of the slab. througtheabutments and piles.

- Viaducts. Being able to construct as easy as very complex types of them.

- Cover tunnels and tunnels. Whe have specialist teams in lining-tunnels and associated-tasks.

- Drain an gutters.

- Urbanization works at cross-roads, roundabouts and finishes.

131

RELIEF ROADSRelief Roads

Page 2: Páginas de Curriculum inglés-12

11. RELIEF ROADS

Andoain Relief Road UTE BURUNTZA (Murias - Otaduy)

Sádaba-Uncastillo Relief Road MARIANO LÓPEZ NAVARRO

Urnieta Relief Road CONSTRUCCIONES AMENABAR

Igorre Relief Road UTE VARIANTE DE IGORRE (Sacyr - Construcciones Amenabar)

Casalarreina (La Rioja) Relief Road SACYR

Lardero Relief Road. Albelda Stretch ROVER ALCISA

Monzón Relief Road UTE VARIANTE DE MONZÓN (JOCA - FCC)

La Alegría Relief Road VIAS Y CONSTRUCCIONES

Barbastro Relief Road SACYR

Metropolitan Relief Road Phase I under structure construction. Ca-dagua junction Stretch UTE ENLACE CADAGUA (Sacyr - Exbasa)

132

Page 3: Páginas de Curriculum inglés-12

RELIEF ROADS

San Adrián-La Cava pedestrian overpass FERROVIAL AGROMAN

Espinal ditch in the PK-41+500 EMISA, S.A.

Alfajeria Access Road ESTRUCTURAS ARAGÓN

Miranda de Ebro underpass construction ROVER ALCISA

CP-3 Road Tauste-Luceni improvement MARIANO LÓPEZ NAVARRO

National Road I-Álava improvement UTE ARMIÑON (Acciona - Sols) (Para Ulma)

Completion of the third ring Road in Saragossa UTE IDECONSA-SACYR

A G44/2 P.G.O.U. development. Saragossa UTE IDECONSA-SACYR

Delicias station environment UTE IDECONSA-SACYR

Alcañiz N-232 Vinaroz-Santander Relief Road UTE CONSTRUCCIONES BEGAR-CEINSA (Para Ulma)

Valtierra-Arguedas Relief Road in the NA134 Road Eje del Ebro UTE HNV - IRUÑA CONSTRUCCIÓN

Irurita Elizondo (Navarre) Relief Road UTE HNV-OBENASA

133

Page 4: Páginas de Curriculum inglés-12

134

RELIEF ROADSRelief Roads

SAN ADRIAN-LA CAVA PEDESTRIAN OVERPASS-2006

Page 5: Páginas de Curriculum inglés-12

135

RELIEF ROADSRelief Roads

SAN ADRIAN-LA CAVA PEDESTRIAN OVERPASS-2006

Page 6: Páginas de Curriculum inglés-12

136

BARBASTRO RELIEF ROAD-2008

RELIEF ROADSRelief Roads

Page 7: Páginas de Curriculum inglés-12

137

RELIEF ROADSRelief Roads

ALCAÑIZ RELIEF ROAD-2008

Page 8: Páginas de Curriculum inglés-12

METROPOLITAN RELIEF ROAD. CADAGUA JUNCTION STRETCH138

RELIEF ROADSRelief Roads

ALCAÑIZ RELIEF ROAD-2008

Page 9: Páginas de Curriculum inglés-12

139

RELIEF ROADSRelief Roads

METROPOLITAN RELIEF ROAD. CADAGUA JUNCTION STRETCH

Page 10: Páginas de Curriculum inglés-12

140

RELIEF ROADSRelief Roads

METROPOLITAN RELIEF ROAD. CADAGUA JUNCTION STRETCH

Page 11: Páginas de Curriculum inglés-12

141

RELIEF ROADSRelief Roads

METROPOLITAN RELIEF ROAD. CADAGUA JUNCTION STRETCH

Page 12: Páginas de Curriculum inglés-12

142

RELIEF ROADSRelief Roads

METROPOLITAN RELIEF ROAD. CADAGUA JUNCTION STRETCH

Page 13: Páginas de Curriculum inglés-12

143

RELIEF ROADSRelief Roads

METROPOLITAN RELIEF ROAD. CADAGUA JUNCTION STRETCH

Page 14: Páginas de Curriculum inglés-12

144

IGORRE RELIEF ROAD-2008

RELIEF ROADSRelief Roads

Page 15: Páginas de Curriculum inglés-12

145

URNIETA RELIEF ROAD -2008

RELIEF ROADSRelief Roads

Page 16: Páginas de Curriculum inglés-12

146

RELIEF ROADSRelief Roads

URNIETA RELIEF ROAD -2008


Top Related