Role of EMP Checklist
Minor rehabilitation or small-scale works in building construction, in health, education and public services sectors (Env. Category “B”)
Alternative to current EMP format (OP/BP 4.01)
Practical, streamlined approach to prepare an EMP that is compatible with the WB OP 4.01 requirements; integrated in bidding documents
Simplified format to meet WB requirements
![Page 3: Overview of Environmental and Social Safeguards](https://reader036.vdocuments.us/reader036/viewer/2022062517/56813c2c550346895da5a7e4/html5/thumbnails/3.jpg)
Content of EMP Checklist
1. General Project and Site information2. Environmental and Social Safeguards
Information related to project investments
3. Mitigation Measures (Plan) of possible effects
4. Monitoring Actions (Plan)
(2), (3) + (4) – included in bidding documents and properly supervised during project implementation
![Page 4: Overview of Environmental and Social Safeguards](https://reader036.vdocuments.us/reader036/viewer/2022062517/56813c2c550346895da5a7e4/html5/thumbnails/4.jpg)
General Project and Site Info Project location, physical characteristics
Administrative framework and current legislation applicable to project investments
Technical project content
Institutional Capacity building program
Public consultation
![Page 5: Overview of Environmental and Social Safeguards](https://reader036.vdocuments.us/reader036/viewer/2022062517/56813c2c550346895da5a7e4/html5/thumbnails/5.jpg)
![Page 6: Overview of Environmental and Social Safeguards](https://reader036.vdocuments.us/reader036/viewer/2022062517/56813c2c550346895da5a7e4/html5/thumbnails/6.jpg)
Environmental and Social Safeguards Information
Simple environmental and social screening in an “Yes/No” format for possible environmental impacts related to proposed project investments
![Page 7: Overview of Environmental and Social Safeguards](https://reader036.vdocuments.us/reader036/viewer/2022062517/56813c2c550346895da5a7e4/html5/thumbnails/7.jpg)
![Page 8: Overview of Environmental and Social Safeguards](https://reader036.vdocuments.us/reader036/viewer/2022062517/56813c2c550346895da5a7e4/html5/thumbnails/8.jpg)
Mitigation Measures
Activities performed by Contractors during the construction phase to prevent and minimize possible negative impacts on the environment and people
Waste management; soil water and air pollution; cultural resources; traffic safety; natural habitats; worker’s safety
![Page 9: Overview of Environmental and Social Safeguards](https://reader036.vdocuments.us/reader036/viewer/2022062517/56813c2c550346895da5a7e4/html5/thumbnails/9.jpg)
![Page 10: Overview of Environmental and Social Safeguards](https://reader036.vdocuments.us/reader036/viewer/2022062517/56813c2c550346895da5a7e4/html5/thumbnails/10.jpg)
![Page 11: Overview of Environmental and Social Safeguards](https://reader036.vdocuments.us/reader036/viewer/2022062517/56813c2c550346895da5a7e4/html5/thumbnails/11.jpg)
Monitoring Plan Measurements of specific parameters taken
based on agreed schedule (including frequency, location, responsibility)
Related to the proposed mitigation measures Applicable during the preparation, construction
and operation phases
Approximate costs for monitoring activities
Clear description of institutional responsibility
![Page 12: Overview of Environmental and Social Safeguards](https://reader036.vdocuments.us/reader036/viewer/2022062517/56813c2c550346895da5a7e4/html5/thumbnails/12.jpg)
![Page 13: Overview of Environmental and Social Safeguards](https://reader036.vdocuments.us/reader036/viewer/2022062517/56813c2c550346895da5a7e4/html5/thumbnails/13.jpg)
EMP Checklist Supervision
Focus on: Actions needed in case of project
changes – review of mitigation measures; institutional assignments; baseline studies to address mitigation changes
Adoption of mitigation measures Implementation of monitoring plan
and clauses provided in contracts and bidding documents
Coordination among institutions responsible for EMP