Company Profile
© OVER-SEA 2010
Table of Contents
Executive Summary Our Team
– Samyoung Machinery Industrial Company Limited– Mighty Engineering Company Limited
Our Work References
22
© OVER-SEA 2010
Executive Summary
OVER-SEA Services and Solutions Co., Ltd. is a maintenance and construction service provider for various industries with expertise in plant maintenance solutions, maintenance planning, large machine installation, construction design, construction management, and project management.
OVER-SEA Services and Solutions Co., Ltd is a Joint Venture (JV) formed between SamyoungMachinery Industrial Co,. Ltd. from Kwongwon-do, South Korea, who has played an essential role in the construction of the national mainstream industries since 1963, and Mighty Engineering Co., Ltd. in Ratchaburi, Thailand, a local construction contractor who provides construction and engineering services range from General Construction to Special Industry Machinery. OVER-SEA combines high-value industry expertise from overseas and experiences from a number of local projects to deliver services and solutions for complex projects.
3
Professional experiences and know-how in industrial maintenance and construction services for 40 years provide the best quality and service with competitive advantages from our capability of local construction management.
© OVER-SEA 2010
Our Team
In 1963, Samyoung Machinery Industrial Co., Ltd. was established to serve business activities in the process of rapid growth and industrialization according to the national policy of upbringing Heavy-Chemistry industry. The Korean-owned company under the name of Samyoung Machinery Industrial Co., Ltd. aims to provide engineering consulting services of professional industry standards with honesty and unity collaborated by the local JV party. In addition, Samyounghas committed to expanding engineering service and technologicalfrontiers which can contribute enormously to the customer's sustainable development.
4
Samyoung Machinery Industrial Co., Ltd.200 Samhwa-dong, Donghae City, Kwangwon-do, South Korea
© OVER-SEA 2010
Our Team
Jechon Factory
5
Samyoung Machinery Industrial Co., Ltd.200 Samhwa-dong, Donghae City, Kwangwon-do, South Korea
Donghae Factory Youngweol Factory
© OVER-SEA 2010
Our Team
Mighty Engineering Co., Ltd. Is a full service general contractor specializing in industrial construction, machinery design, industrial equipment installation and maintenance service.
Mighty offers traditional general contracting services as well as preconstruction, construction management, project management anddesign/build services. Mighty will perform work on both a negotiated or a competitive bid basis aiming to provide one-stop service to customers.
For years of operating, the company is equipped with skilled labor forces and experienced engineers to provide a full range of maintenance and construction services to customers.
6
Mighty Engineering Co., Ltd.149 Moo 14 Koh-Plab-Pla, Ampur Muang, Ratchaburi 70000, Thailand
© OVER-SEA 2010
Our Team
7
Mighty Engineering Co., Ltd.149 Moo 14 Koh-Plab-Pla, Ampur Muang, Ratchaburi 70000, Thailand
Ratchaburi Facility Ratchaburi Facility
© OVER-SEA 2010
Our Work
OVER-SEA provides a complete range of services including:
• Plant Maintenance Consulting
• Preventive Maintenance Planning
• Large Machine Installation
• Machinery Design (Made-to-Order, Hydraulic Machine Design and Fabrication)
• Steel Structure Construction
• Preconstruction Services (Conceptual Budgeting, Scheduling, Phase Analysis, Estimating)
• Design/Build
• Construction Management
• General Construction
88
© OVER-SEA 2010
References – Cement Plant
99
Ssang Yong Cement Industrial Co., Ltd.
1963-1964 Youngweol plant No. 1,2 Klin construction (400,000 ton)
1966-1967 Youngweol plant No. 3 Klin construction (400,000 ton)
1967-1968 Donghae plant No. 1,2 Klin construction (2,000,000 ton)
1971-1972 Youngweol plant No. 4,5 Klin construction (1,200,000 ton)
1973-1974 Donghae plant No.3 Klin construction (1,200,000 ton)
1976-1980 Donghae plant No.4,5,6,7Klin construction (5,600,000 ton)
1981-1982 Youngweol plant No. 3,4,5Klin coal firing construction
1981-1982 Donghae plant No. 4,5,6,7Klin coal firing construction
1987-1988 Youngweol plant No. 3 Klin NSP renovation (500,000 ton upgraded)
1989-1990 Youngweol plant No. 4,5Klin NSP renovation (1,560,000 ton upgraded)
1991-1993 Donghae plant No. 1 Klin NSP renovation (1,500,000 ton upgraded)
1995-1997 Donghae plant New mine crusher and belt-conveyor construction (1,400W)
Tong Yang Cement Co., Ltd.
1967 Samchok plant Kiln expansion
1974-1975 Samchok plant Kiln expansion
Hanil Cement Co., Ltd.
1968-1969 Dodam plant expansion
Sungshin Cement Mfg. Corp.
1984-1985 Raw mill & Kiln plant construction
© OVER-SEA 2010
References – Cement Plant
1010
Roller Mill Preheater & Klin/ Cooler
© OVER-SEA 2010
References – Cement Plant
1111
Ball Mill Klin Tire Replacement
Klin Shell Section Replacement
© OVER-SEA 2010
References – Grinding Mill & Bulk Terminal
1212
Grinding Mill Plant
1995-1996 Ssangyong Maepo plant cement mill construction (Roller mill 100 T/H)
1991-1992 Ssangyong Kwangyang plant slag mill construction (Roller mill 80 T/H)
1995 Philippines Limay plant cement mill construction (Tube mill 50 T/H)
2000-2001 Bangladesh Holcim plant cement mill construction (Tube mill 30 T/H)
Bulk Terminal
Ssangyong Cement Industrial Co., Ltd.
Halla Cement Eumsung Plant
Singapore HCBC Plant
Bulk Unloader(Vertical screw type 450 T/H)
Bulk Terminal (300 Ton Steel Silo x 5)
Dome Silo (10,000 Ton x 2)
© OVER-SEA 2010
References – Grinding Mill & Bulk Terminal
1313
Bulk Terminal(5,000 Ton Steel Silo)
Bulk Terminal (10,000 Ton Steel Silo x 2)
Bulk Terminal (15,000 Ton Steel Silo)
© OVER-SEA 2010
References – Concrete Batch Plant
1414
Tunnel Type (180 m3/H)
Tower Type (210 m3/H)
Tunnel Type (180 m3/H)
Tower Type (180 m3/H)
© OVER-SEA 2010
References – Concrete Batch Plant
1515
Tower Type (210 m3/H)Tower Type (210 m3/H)
© OVER-SEA 2010
References – Plant Construction & Machine Installation
1616
Davco Construction
Sand Silo/ Belt Conveyor/ Cement Screw Conveyor/ Bucket Elevator
Siam Michelins
Hydraulic Pressing Machine modification
Trackwork Co., Ltd.
Track Maintenance for BMCL
Track Installation for Airport Rail Links
Thai Industrial Gas Public Co., Ltd.
Made-to-Order Machines
Patkol Public Co., Ltd.
Tank Installation
Machinery Design
Prepack (Thailand)
Steel Structure Construction
Machine Installation & Maintenance
© OVER-SEA 2010
References – Plant Construction & Machine Installation
1717
Bergsoe Metal
Battery Recycle Plant
Material Transfer Conveyor Units
Dole Thailand
Harvesting Machine (Pineapple)
Fruit Bin (Container)
Dipping Station
Machine Installation & Plant Preparation
Crown Grating Station
Fresh Fruit Harvesting & Packing Machine.
Dole Philippine
Harvesting Machine (Pineapple)
On-Field Packing Unit
© OVER-SEA 2010
References – Maintenance & Construction Service
1818
Ratchaburi Power plant
Shut Down Maintenance Service
Thai ASAHI
Hydraulic Machine Maintenance Service
Trackwork Co., Ltd.
Track Maintenance for BMCL
Track Installation for Airport Rail Links
Thai Industrial Gas Public Co., Ltd.
Made-to-Order Machines
Prepack (Thailand)
Steel Structure Construction
Machine Maintenance
Machine Installation
Company Profile