Our ‘BIM’ journey in AMP 6
May 11th 2017 – Pump Centre Conference
Kevin Bezant – BIM Manager
Who we are –
2
Our mantra & purpose
3
‘Deliver Sustainable and Innovative
Solutions for Thames Water’s 15
million customers that leave a lasting
legacy, deliver outstanding value and
meet the required outcomes.’
Be safe
Love our Customers
Create Value
4
5
6
Information Management
7
Standards refreshed & enhanced
Part 01 - Drawing title block
Part 02a - Drawing numbering - early start projects
Part 02b – Drawing/Reference/Model File naming and
revision/version/status.
Part 03a – Asset Classification for Drawing numbering,
reference and model file naming.
Part 03b – Asset Classification for BIM Models
Part 04 - General Drawing Standards
Part 05 - Model Authoring and Model Segregation
Part 06 - Layer/level standards
Part 07 - Data exchange formats & Standards
Part 08 - Level of definition
Asset hierarchy defined -
The Common Data Environment
Business Collaborator
Navigator – End to End Process
13
BC Assure - Governance tool
Bentley ProjectWise
CDE – graphical informationProjectWise – Managed Service
Fold
er
Str
uctu
re
17
CD
E O
rigin
ate
d W
ork
flow
CD
EIm
port
ed
work
flow
Digital Solutions
Digital Sweetshop
21
22
Laser scanning - Process plant
Laser scanning - Sewer network
23
Drones & photogrammetry
24
Digital Rehearsals (Synchro) -
Digital Construction
Level 3
Concurrent design
Concurrent engineering
One live model environment
Neutral file formats
Neutral processes
Web hosted data and model
Level 1
Managed 2D CAD
Managed 3D CAD
BS1192: 2007
Common data environment
Level 0
Un-managed 2D CAD
0 1 2 3
Level 2
BIM Execution plan
Common data environment
PAS 1192 (2 and 3)
Interoperable systems
Intelligent 3D libraries
Intelligent 3D models
3D Based collaboration
Asset performance
optimisation
3D Digital survey (inc. Laser)
COBie UK 2012
How are we doing?
AMP 5
AMP 6 target
Today
Digital Solutions for Customer Engagement
Mobile visualisation studio – Thames Water ‘BIM’ Bus
• Public consultation
• Support for early ops
engagement sessions
• Design reviews with ops
& contractor teams
Virtual & augmented reality ……
3D printing
Work in progress – connecting with the wider business
32
Focus on Infrastructure …
• Improving the quality of GIS information….
Connecting Operations to the model…..
Bentley Map
Bentley ProjectWise
Bentley Worksite
35
Join
ing m
ultip
le d
ata
sou
rce
s
36
Reach
out acro
ss T
ham
es
Operations
Infrastructure AllianceDeveloper Services
37
Questions
38