![Page 1: OTIS ACD2 MRL - job1001.comimg105.job1001.com/upload/adminnew/2014-12-27/1419643693-OA… · OTIS ACD2 MRL Field Installation Manual 3.2 Check of Run -Direction ERO UP](https://reader030.vdocuments.us/reader030/viewer/2022033121/5eb6d0c4caa3bd150744d71f/html5/thumbnails/1.jpg)
OTIS ACD2 MRL
Field Installation Manual
3.2 Check of Run -Direction
ERO
UP
![Page 2: OTIS ACD2 MRL - job1001.comimg105.job1001.com/upload/adminnew/2014-12-27/1419643693-OA… · OTIS ACD2 MRL Field Installation Manual 3.2 Check of Run -Direction ERO UP](https://reader030.vdocuments.us/reader030/viewer/2022033121/5eb6d0c4caa3bd150744d71f/html5/thumbnails/2.jpg)
OTIS ACD2 MRL
Field Installation Manual
3.3 Manual Brake Release check See Reference about SPBC and details of MRO.
BRB2 Press BRB1
BRB2 Key-
switched
Press BRB1
BRB2 BRB1 not pressed
/
/
![Page 3: OTIS ACD2 MRL - job1001.comimg105.job1001.com/upload/adminnew/2014-12-27/1419643693-OA… · OTIS ACD2 MRL Field Installation Manual 3.2 Check of Run -Direction ERO UP](https://reader030.vdocuments.us/reader030/viewer/2022033121/5eb6d0c4caa3bd150744d71f/html5/thumbnails/3.jpg)
OTIS ACD2 MRL
Field Installation Manual
4 PREPARE FIRST NORMAL RUN Attention: The elevator must be fully completed (wiring and mechanical assembly) before going beyond this point.
4.1 Position DSBD (connect 4T with 5T)
![Page 4: OTIS ACD2 MRL - job1001.comimg105.job1001.com/upload/adminnew/2014-12-27/1419643693-OA… · OTIS ACD2 MRL Field Installation Manual 3.2 Check of Run -Direction ERO UP](https://reader030.vdocuments.us/reader030/viewer/2022033121/5eb6d0c4caa3bd150744d71f/html5/thumbnails/4.jpg)
OTIS ACD2 MRL
Field Installation Manual
Unpublished Work Copyright © OTIS Elevator Company
4.2 Check of Hoistway Signals (PRS with RLEV/ADO)
Start
ERO
![Page 5: OTIS ACD2 MRL - job1001.comimg105.job1001.com/upload/adminnew/2014-12-27/1419643693-OA… · OTIS ACD2 MRL Field Installation Manual 3.2 Check of Run -Direction ERO UP](https://reader030.vdocuments.us/reader030/viewer/2022033121/5eb6d0c4caa3bd150744d71f/html5/thumbnails/5.jpg)
ACD2 MRL
Field Installation Manual
4.3 Check of Hoistway Signals (PRS without RLEV/ADO)
ERO
Start
![Page 6: OTIS ACD2 MRL - job1001.comimg105.job1001.com/upload/adminnew/2014-12-27/1419643693-OA… · OTIS ACD2 MRL Field Installation Manual 3.2 Check of Run -Direction ERO UP](https://reader030.vdocuments.us/reader030/viewer/2022033121/5eb6d0c4caa3bd150744d71f/html5/thumbnails/6.jpg)
OTIS ACD2 MRL
Field Installation Manual
4.4 Start up of the door system
4.4.1 NGSOK startup:
Reference: KAA31328AAA_SUR NGSOK Start up routine
![Page 7: OTIS ACD2 MRL - job1001.comimg105.job1001.com/upload/adminnew/2014-12-27/1419643693-OA… · OTIS ACD2 MRL Field Installation Manual 3.2 Check of Run -Direction ERO UP](https://reader030.vdocuments.us/reader030/viewer/2022033121/5eb6d0c4caa3bd150744d71f/html5/thumbnails/7.jpg)
OTIS ACD2 MRL
Field Installation Manual
4.4.2 Start up of DCSS5E
To startup the DCSS5 Operator please refer to the corresponding Field Installation Manual in Appendix.
4.5 Learn run
![Page 8: OTIS ACD2 MRL - job1001.comimg105.job1001.com/upload/adminnew/2014-12-27/1419643693-OA… · OTIS ACD2 MRL Field Installation Manual 3.2 Check of Run -Direction ERO UP](https://reader030.vdocuments.us/reader030/viewer/2022033121/5eb6d0c4caa3bd150744d71f/html5/thumbnails/8.jpg)
OTIS ACD2 MRL
Field Installation Manual
Press CHCS
Press DDO
NORM
ERO
NORM
Press “1” for calibration Press “0” for maintain
![Page 9: OTIS ACD2 MRL - job1001.comimg105.job1001.com/upload/adminnew/2014-12-27/1419643693-OA… · OTIS ACD2 MRL Field Installation Manual 3.2 Check of Run -Direction ERO UP](https://reader030.vdocuments.us/reader030/viewer/2022033121/5eb6d0c4caa3bd150744d71f/html5/thumbnails/9.jpg)
OTIS ACD2 MRL
Field Installation Manual