Download - Orchestr8 Planning & Operations Management
![Page 1: Orchestr8 Planning & Operations Management](https://reader031.vdocuments.us/reader031/viewer/2022012419/61743372128aca5c9a4ae3ef/html5/thumbnails/1.jpg)
Orchestr8 Planning & Operations Management
![Page 2: Orchestr8 Planning & Operations Management](https://reader031.vdocuments.us/reader031/viewer/2022012419/61743372128aca5c9a4ae3ef/html5/thumbnails/2.jpg)
O8 Software
THE PRODUCT
2
![Page 3: Orchestr8 Planning & Operations Management](https://reader031.vdocuments.us/reader031/viewer/2022012419/61743372128aca5c9a4ae3ef/html5/thumbnails/3.jpg)
O8 Software
• ‘Enterprise-level’ – demanding, diverse supply & market demand
• ‘Outside In’ – demand patterns determine replenishment rules
• Forecast – Planners shift focus to market intelligence re: variation
• 20 years of Demand Driven …
• Plus product intro and exit in PLC
• Full system orientation around Demand Driven flow in
• Supply, Production Replenishment, Distribution
• SaaS volume scalable fees
3
![Page 4: Orchestr8 Planning & Operations Management](https://reader031.vdocuments.us/reader031/viewer/2022012419/61743372128aca5c9a4ae3ef/html5/thumbnails/4.jpg)
O8 Software
• Proven Benefits at clients
4
![Page 5: Orchestr8 Planning & Operations Management](https://reader031.vdocuments.us/reader031/viewer/2022012419/61743372128aca5c9a4ae3ef/html5/thumbnails/5.jpg)
O8 Software
SUCCESS METRICS
5
![Page 6: Orchestr8 Planning & Operations Management](https://reader031.vdocuments.us/reader031/viewer/2022012419/61743372128aca5c9a4ae3ef/html5/thumbnails/6.jpg)
Benefit| Major soft drinks manufacturing
6
Production stability
Service level > 99%
Inventory reduction
80
85
90
95
100
14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45
Volume Fill %
2017
0
1
2
3
4
5
14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45
C3 line changes per week
C3
![Page 7: Orchestr8 Planning & Operations Management](https://reader031.vdocuments.us/reader031/viewer/2022012419/61743372128aca5c9a4ae3ef/html5/thumbnails/7.jpg)
Benefit | Europe’s Largest Personal Care Factory
• Inbound
• Doubled inventory turns
• Improved schedule stability from 60% to 95%
• In-house Bottle Blowing
• Reduced lead time from 6 weeks to 1 week
• 33% stock reduction
• Finished Goods
• 30% reduction in stock in 6 months
7
0
10
20
30
40
50
60
70
80
90
100
Inbound
StockFG
StockOrder
Stability
Obsole-
scenceService Headcount FG Lead
Time
Before With O8
Fareva
![Page 8: Orchestr8 Planning & Operations Management](https://reader031.vdocuments.us/reader031/viewer/2022012419/61743372128aca5c9a4ae3ef/html5/thumbnails/8.jpg)
Benefit | Gaining control
‘Working with O8 has put us
back in control
of the supply chain’
3M Supply Chain Manager, OH & ES, Europe
8
![Page 9: Orchestr8 Planning & Operations Management](https://reader031.vdocuments.us/reader031/viewer/2022012419/61743372128aca5c9a4ae3ef/html5/thumbnails/9.jpg)
O8 Software
9
DIFFERENT THINKING
![Page 10: Orchestr8 Planning & Operations Management](https://reader031.vdocuments.us/reader031/viewer/2022012419/61743372128aca5c9a4ae3ef/html5/thumbnails/10.jpg)
MRP | built in failure
• MRP is systemically flawed
• Bullwhip effect is built in
10
PINPOINT
FORECAST
Detail
review
MRP
scheduling
Reality ≠
Forecast
Expedite &
re-schedule
Weak
metrics
REPEAT
ONCE A
MONTH
• Poor metrics are a certain outcome
![Page 11: Orchestr8 Planning & Operations Management](https://reader031.vdocuments.us/reader031/viewer/2022012419/61743372128aca5c9a4ae3ef/html5/thumbnails/11.jpg)
O8 | Outside In driven [Long run]
• Flow-based
• Bullwhip eliminated
11
STATS –
RUN RATE
Buffered
inventory
Market
resilience
Pull - actual
demand
Stable
production
Strong
metrics
REPEAT
ONCE A
MONTH
• High performance metrics are the outcome
VARIATION
![Page 12: Orchestr8 Planning & Operations Management](https://reader031.vdocuments.us/reader031/viewer/2022012419/61743372128aca5c9a4ae3ef/html5/thumbnails/12.jpg)
O8 | Outside In driven [Period Run]
• Push to forecast
• Inventory policy by phase
12
Analogy
forecast
Sales<>
Forecast
variation
Δ supply volΔ channel
Δ priceREVIEW
WEEKLY
• Manage supply and sales to zero through product life cycle
Phase
inventory
policy
![Page 13: Orchestr8 Planning & Operations Management](https://reader031.vdocuments.us/reader031/viewer/2022012419/61743372128aca5c9a4ae3ef/html5/thumbnails/13.jpg)
Rules-based | Demand Profiles drive the system
• Process | Segment planning in line with SKU demand profile
• O8 | Seven inventory replenishment policies
• Process | Monthly ‘conditioning’, update to market intelligence
13
![Page 14: Orchestr8 Planning & Operations Management](https://reader031.vdocuments.us/reader031/viewer/2022012419/61743372128aca5c9a4ae3ef/html5/thumbnails/14.jpg)
O8 Software
14
THE SOFTWARE
![Page 15: Orchestr8 Planning & Operations Management](https://reader031.vdocuments.us/reader031/viewer/2022012419/61743372128aca5c9a4ae3ef/html5/thumbnails/15.jpg)
Simulated Supply Plan
Demand
Planning
Sales
Management
Marketing
Statistical
Forecast
Marketing
Plan
Sales Plan
Demand Plan
Supply Manager | Plan
Inventory
Plan
RCCP
Material Plans
& Sourcing
Targets
Rough Cut Capacity Plan
Supply Manager | Operations
Targets & Rules
Finished Goods
Replenishment
Works Order
Management
Materials
Replenishment
Product Master Data Supply ConstraintsInventory & Open
OrdersSales History
Agreed Forecast, NPI
Data & Promotions
DEMAND
PLANNER
Agreed Forecast, NPI
Data & Promotions
Demand Planner
O8 ERP
Comprehensive Planning & Operations Management toolkit
15
![Page 16: Orchestr8 Planning & Operations Management](https://reader031.vdocuments.us/reader031/viewer/2022012419/61743372128aca5c9a4ae3ef/html5/thumbnails/16.jpg)
Planner role | system monitor & authoriser
16
![Page 17: Orchestr8 Planning & Operations Management](https://reader031.vdocuments.us/reader031/viewer/2022012419/61743372128aca5c9a4ae3ef/html5/thumbnails/17.jpg)
Supply Manager
• Supply, Production Replenishment, Distribution
17
![Page 18: Orchestr8 Planning & Operations Management](https://reader031.vdocuments.us/reader031/viewer/2022012419/61743372128aca5c9a4ae3ef/html5/thumbnails/18.jpg)
Refresher | Demand Driven inventory buffers, to embed market resilience into the Supply Chain
• Decoupling• Supply chain is broken
into sections with inventory buffers
• Why? Eliminates Instability • Breaks systemic cause of
Bullwhip Effect
• Shorten Replenishment lead-times• Reduces volume in each
buffer
18
![Page 19: Orchestr8 Planning & Operations Management](https://reader031.vdocuments.us/reader031/viewer/2022012419/61743372128aca5c9a4ae3ef/html5/thumbnails/19.jpg)
Inventory buffers | System calculation, core to operations
• Yellow zone (volume) is the average consumption in the lead time
• Red zone is expected to be used, not dead inventory – it reflects the service level
• Green is the re-order volume – used to define the quantity ordered / produced
19
![Page 20: Orchestr8 Planning & Operations Management](https://reader031.vdocuments.us/reader031/viewer/2022012419/61743372128aca5c9a4ae3ef/html5/thumbnails/20.jpg)
Rules-based | Part Type Code
• SKU replenishment rules are assigned to sku groups, based on client coding
• Managed ‘en bloc’
20
• ‘Outside In’ –demand patterns determine replenishment rules
![Page 21: Orchestr8 Planning & Operations Management](https://reader031.vdocuments.us/reader031/viewer/2022012419/61743372128aca5c9a4ae3ef/html5/thumbnails/21.jpg)
Planning Board | planner daily authorisation
• The order recommendation list; colour coding indicates priority
• Planner approves the recommendations.
• Calculated daily
• Most items will have a weekly order cycle where orders are released on a set day.
21
![Page 22: Orchestr8 Planning & Operations Management](https://reader031.vdocuments.us/reader031/viewer/2022012419/61743372128aca5c9a4ae3ef/html5/thumbnails/22.jpg)
Forward simulation
• Uses forecast demand
• Does not generate orders – provides an outlook of planned & firm demand for a specific part, for S&OP analysis
22
![Page 23: Orchestr8 Planning & Operations Management](https://reader031.vdocuments.us/reader031/viewer/2022012419/61743372128aca5c9a4ae3ef/html5/thumbnails/23.jpg)
Shipment Builder
23
• Rules-based Process Automation• Optimises Shipment Planning to Demand Driven rules
• Links production & warehousing to shipment lanes and end point requirements• Utilises requirement priority, pack type, packing rules
Rules- based
Multi-mode,
multi-pack
![Page 24: Orchestr8 Planning & Operations Management](https://reader031.vdocuments.us/reader031/viewer/2022012419/61743372128aca5c9a4ae3ef/html5/thumbnails/24.jpg)
O8 | reporting & analytics
24
• Extensive suite of
S&OP reports and
LogiAnalytics
reporting
![Page 25: Orchestr8 Planning & Operations Management](https://reader031.vdocuments.us/reader031/viewer/2022012419/61743372128aca5c9a4ae3ef/html5/thumbnails/25.jpg)
Demand Manager
• The volume planning front-end to Supply Manager
• Extensive – covers both Long Run (ongoing sales) and Period Run (start and end date sales)
• Works with Supply Manager component
25
![Page 26: Orchestr8 Planning & Operations Management](https://reader031.vdocuments.us/reader031/viewer/2022012419/61743372128aca5c9a4ae3ef/html5/thumbnails/26.jpg)
The Edit Board | Base forecast plus planner variation
26
Base projection [LR or PR]
Runrate modifier
Material events
Totals to…
Viewing selection
Weeks, Months columns
![Page 27: Orchestr8 Planning & Operations Management](https://reader031.vdocuments.us/reader031/viewer/2022012419/61743372128aca5c9a4ae3ef/html5/thumbnails/27.jpg)
‘I need to filter my view by market’
27
![Page 28: Orchestr8 Planning & Operations Management](https://reader031.vdocuments.us/reader031/viewer/2022012419/61743372128aca5c9a4ae3ef/html5/thumbnails/28.jpg)
‘I wish to add in the volume impact of a marketing event’
28
![Page 29: Orchestr8 Planning & Operations Management](https://reader031.vdocuments.us/reader031/viewer/2022012419/61743372128aca5c9a4ae3ef/html5/thumbnails/29.jpg)
Period Run | Top down working - Add forecast demand curve x-time, break down to sku sales
• Working in a top down mode.
• Build the profile and then assign the sku breakdown.
• > Library of organization templates – mid-2019
29
![Page 30: Orchestr8 Planning & Operations Management](https://reader031.vdocuments.us/reader031/viewer/2022012419/61743372128aca5c9a4ae3ef/html5/thumbnails/30.jpg)
‘I need to add a Period Run, working top down’
30
• 1.4. Top-down | channel
![Page 31: Orchestr8 Planning & Operations Management](https://reader031.vdocuments.us/reader031/viewer/2022012419/61743372128aca5c9a4ae3ef/html5/thumbnails/31.jpg)
‘I need to narrow the product range in mid-life’
31
![Page 32: Orchestr8 Planning & Operations Management](https://reader031.vdocuments.us/reader031/viewer/2022012419/61743372128aca5c9a4ae3ef/html5/thumbnails/32.jpg)
Rules-based | Planning Manager’s Signoff Board
32
Viewing selection
Tick box signoff
WIP, Firm, Final
Review prioritisation
Recent & projection
ADU
Configuration info
![Page 33: Orchestr8 Planning & Operations Management](https://reader031.vdocuments.us/reader031/viewer/2022012419/61743372128aca5c9a4ae3ef/html5/thumbnails/33.jpg)
Rules-based | management attention priority
• Signoff board indicates where most attention is needed
• … Ranked priority #
33
% SALE /
FORECAST
DEVIATION
END OF
LIFE
IMMINENT
LAUNCH
IMMINENT
% RATE OF
FORECAST
CHANGE
‘HIGH MARGIN’
LOCAL
SETTINGS
‘ONE
CUSTOMER
DEPENDENCY’
‘HIGH BRAND
VALUE’
![Page 34: Orchestr8 Planning & Operations Management](https://reader031.vdocuments.us/reader031/viewer/2022012419/61743372128aca5c9a4ae3ef/html5/thumbnails/34.jpg)
The Shell Experience | Nick Lynch
34
• Ease-of-Use | Very intuitive, high user confidence
• Prioritised Action | Highly visual, big improvement over previous *** ERP system
• Full network view | E2E network view, really helps our IBV/S&OP discussions
• Clarity | Consistency & simplicity of replenishment orders on the O8 Planning Board
• Prime data source | for IBV / S&OP e.g. warehouse capacity projections in $, Ltrs, Pallets driven from O8 not sea of Excel
• Ops design change | much faster in tackling design challenges than legacy system
• O8 frontline experience | Clear that O8 as a system and a team are mature. Demand Driven systems are not new to O8, a significant help during deployment, config, training etc
![Page 35: Orchestr8 Planning & Operations Management](https://reader031.vdocuments.us/reader031/viewer/2022012419/61743372128aca5c9a4ae3ef/html5/thumbnails/35.jpg)
O8 | Founded in 2002, experienced on the frontline
35
Mark
Robinson
Phil
Ribbins
Ashley
Wilcock
Raymond
Brown
Justin
Forrest