Running Data Center is not an easy task!
2
Save energy,
go GREEN !!!
Optimize workload
Reduce service downtime
4
No Vendor Lock-In
Management
Complexity
00 05 151095
Server Management Complexity Drives Rising Costs
Server Spending
Management cost
Power & Cooling
$0
$50
$100
$150
$200
• You need to focus on cooling & management issues in the 1st place
• QCT provides solution to them via combining Open Rack & Intel® Rack Scale Architectures
• That’s what we call it “Open Rack Platform”
9
• OCP Timeline – 4~5 years
• QCT’s contribution to Open Community:– 1st windmill triplet
– 1st OCP decathelete
– 1st Open Rack solution
– 1st OCS
– 1st BBS in rack battery backup system
– ….
13
Storage
Compute
Offerings from Quanta
14
Switches Battery
15
Advocate for Open Standards
Rackgo 2.0(Scorpio)
Rackgo M(OCS)
Rackgo X(Open Rack)
• Save energy, go green• Reduce service downtime•No vendor lock-in
You can start with Open Rack with QCT NOW!
17
For Intel® Rack Scale Architecture,
centralized cooling Greener than ever !!
• Add unique features to enhance serviceability
19
20
CM
CM
CM
CM
Chassis Manager
• Resource locationidentifier
• Power / Coolingoptimization
21
RMM RMM RMM
CM
CM
CM
CM
Rack Management Manager
• Rack-level resourceWith one-click automation
232323
23
RMM RMM RMM
POD MANAGER
Pod Manager
• Resource PoolVisualization for DCworkload optimization
RMM
CM
CM
CM
CM
POD
POD MANAGER
Resource Pool
• Disaggregate ComputeStorage resource pool
• Incremental workloadOptimization
Intel® Rack Scale ArchitectureFinal Topology
30
1 Rack w/ 37 storage nodes, 3 controller nodes, 1.3PB capacity
Leading Products Co-developed with Intel
2U 42-NodeS1M uSVR
3U 12-NodeS1E uSVR
SDN IZ1 Switchon IA platform
You need complete build blocks
31
Xeon E5 blade Xeon D blade Aggregate Network & Storage Blade
RRC TOR inside the F20A
33
28x LFF & 4x U.2 SSD
35
Are you ready to take the next step ??
38
Portable SW development half rack
• Contact Kevin@US
• Contact Johnny@EU
• Contact Carlous@Japan