![Page 1: ONT Powering ACE Meeting Fort Worth, Texas May 8, 2012](https://reader035.vdocuments.us/reader035/viewer/2022062501/56816754550346895ddc069f/html5/thumbnails/1.jpg)
ONT PoweringACE Meeting
Fort Worth, TexasMay 8, 2012
![Page 2: ONT Powering ACE Meeting Fort Worth, Texas May 8, 2012](https://reader035.vdocuments.us/reader035/viewer/2022062501/56816754550346895ddc069f/html5/thumbnails/2.jpg)
Person Educated in Other Nuances
Introduction
![Page 6: ONT Powering ACE Meeting Fort Worth, Texas May 8, 2012](https://reader035.vdocuments.us/reader035/viewer/2022062501/56816754550346895ddc069f/html5/thumbnails/6.jpg)
Power Meter Collars
Overview
![Page 7: ONT Powering ACE Meeting Fort Worth, Texas May 8, 2012](https://reader035.vdocuments.us/reader035/viewer/2022062501/56816754550346895ddc069f/html5/thumbnails/7.jpg)
Telco Provided Line Power
Overview
![Page 8: ONT Powering ACE Meeting Fort Worth, Texas May 8, 2012](https://reader035.vdocuments.us/reader035/viewer/2022062501/56816754550346895ddc069f/html5/thumbnails/8.jpg)
•Non-Traditional• Solar•Wind
Overview
![Page 9: ONT Powering ACE Meeting Fort Worth, Texas May 8, 2012](https://reader035.vdocuments.us/reader035/viewer/2022062501/56816754550346895ddc069f/html5/thumbnails/9.jpg)
Or if you’re in South Carolina!
![Page 10: ONT Powering ACE Meeting Fort Worth, Texas May 8, 2012](https://reader035.vdocuments.us/reader035/viewer/2022062501/56816754550346895ddc069f/html5/thumbnails/10.jpg)
Indoor UPSCustomer Premise UPS
![Page 11: ONT Powering ACE Meeting Fort Worth, Texas May 8, 2012](https://reader035.vdocuments.us/reader035/viewer/2022062501/56816754550346895ddc069f/html5/thumbnails/11.jpg)
Pros
• Low Cost Equipment• Easy Installation• Environmentally Protected•Most Widely accepted practice
Indoor UPS
![Page 12: ONT Powering ACE Meeting Fort Worth, Texas May 8, 2012](https://reader035.vdocuments.us/reader035/viewer/2022062501/56816754550346895ddc069f/html5/thumbnails/12.jpg)
Cons
• Vulnerable to Extended outages• Customer incurs power consumption
expense (12-30 watts @ 12 vdc)• Battery Replacement• Recurring Cost (3-5 years)• Replacement Schedule• Telco Staff or Homeowner
Indoor UPS
![Page 13: ONT Powering ACE Meeting Fort Worth, Texas May 8, 2012](https://reader035.vdocuments.us/reader035/viewer/2022062501/56816754550346895ddc069f/html5/thumbnails/13.jpg)
Outdoor UPSCustomer Premise UPS
![Page 14: ONT Powering ACE Meeting Fort Worth, Texas May 8, 2012](https://reader035.vdocuments.us/reader035/viewer/2022062501/56816754550346895ddc069f/html5/thumbnails/14.jpg)
Pros
• Easy Installation• Access to equipment without
Homeowner being present• No bulky equipment to burden the
Homeowner
Outdoor UPS
![Page 15: ONT Powering ACE Meeting Fort Worth, Texas May 8, 2012](https://reader035.vdocuments.us/reader035/viewer/2022062501/56816754550346895ddc069f/html5/thumbnails/15.jpg)
Cons
• Higher Cost of equipment (Must be Weather Hardened)
• Battery Replacements• Recurring Cost (every 3-5 years)• Telco or Homeowner to replace
• Customer Incurs Power Consumption (15-30 watts @ 12VDC)
• Vulnerable to Extended Outages
Outdoor UPS
![Page 16: ONT Powering ACE Meeting Fort Worth, Texas May 8, 2012](https://reader035.vdocuments.us/reader035/viewer/2022062501/56816754550346895ddc069f/html5/thumbnails/16.jpg)
Power Meter Collars
![Page 17: ONT Powering ACE Meeting Fort Worth, Texas May 8, 2012](https://reader035.vdocuments.us/reader035/viewer/2022062501/56816754550346895ddc069f/html5/thumbnails/17.jpg)
Pros
• Partnering Opportunities with Electric Company could provide no cost power consumption
• No indoor equipment to burden Customer
• No inside Maintenance Required
Power Meter Collars
![Page 18: ONT Powering ACE Meeting Fort Worth, Texas May 8, 2012](https://reader035.vdocuments.us/reader035/viewer/2022062501/56816754550346895ddc069f/html5/thumbnails/18.jpg)
Cons
• High Cost installation (would require electrician)• Many Electric Co-ops will not allow collar in front
of meter• Still Requires Weather Hardened Battery Backup
housing• Vulnerable to Long term Outages• Battery Replacements• Recurring Cost• Telco or Homeowner to replace??
Power Meter Collars
![Page 19: ONT Powering ACE Meeting Fort Worth, Texas May 8, 2012](https://reader035.vdocuments.us/reader035/viewer/2022062501/56816754550346895ddc069f/html5/thumbnails/19.jpg)
Telco Line Powering
![Page 20: ONT Powering ACE Meeting Fort Worth, Texas May 8, 2012](https://reader035.vdocuments.us/reader035/viewer/2022062501/56816754550346895ddc069f/html5/thumbnails/20.jpg)
Pros
• No recurring power cost for Customer Telco provides power and battery backup from CO
• Reliable un-interrupted power for POTS• No Battery Replacements Needed• Accounting may benefit from use of existing
copper plant in Cost Companies• Copper plant can continue to be
depreciated if used for line powering
Telco Line Powering
![Page 21: ONT Powering ACE Meeting Fort Worth, Texas May 8, 2012](https://reader035.vdocuments.us/reader035/viewer/2022062501/56816754550346895ddc069f/html5/thumbnails/21.jpg)
Cons
• Must maintain or build Hybrid copper plant
• Training of staff on crossover technology
• Safety• High Cost Equipment• Power Supply systems at CO• Power converters at the home• Modifications/Rehab to existing plant
Telco Line Powering
![Page 22: ONT Powering ACE Meeting Fort Worth, Texas May 8, 2012](https://reader035.vdocuments.us/reader035/viewer/2022062501/56816754550346895ddc069f/html5/thumbnails/22.jpg)
Non-Traditional Solar and Wind Power
![Page 23: ONT Powering ACE Meeting Fort Worth, Texas May 8, 2012](https://reader035.vdocuments.us/reader035/viewer/2022062501/56816754550346895ddc069f/html5/thumbnails/23.jpg)
Pros
• No commercial power consumption• Green power• No Battery Replacements
Non-Traditional Solar and Wind Power
![Page 24: ONT Powering ACE Meeting Fort Worth, Texas May 8, 2012](https://reader035.vdocuments.us/reader035/viewer/2022062501/56816754550346895ddc069f/html5/thumbnails/24.jpg)
Cons
• High Cost equipment• Geographically dependent (most
benefits in the Western Plains)• Dependent on Mother Nature
Non-Traditional Solar and Wind Power
![Page 25: ONT Powering ACE Meeting Fort Worth, Texas May 8, 2012](https://reader035.vdocuments.us/reader035/viewer/2022062501/56816754550346895ddc069f/html5/thumbnails/25.jpg)
Conclusions
![Page 26: ONT Powering ACE Meeting Fort Worth, Texas May 8, 2012](https://reader035.vdocuments.us/reader035/viewer/2022062501/56816754550346895ddc069f/html5/thumbnails/26.jpg)
• Options are widespread, and all are readily available
• Careful Considerations must be made early• Evaluate Capital Expenditures as well
as Operating Expenditures• Find the best fit that suits your work
force and your customers
![Page 27: ONT Powering ACE Meeting Fort Worth, Texas May 8, 2012](https://reader035.vdocuments.us/reader035/viewer/2022062501/56816754550346895ddc069f/html5/thumbnails/27.jpg)
Thank You!