Download - OMS Team Role

Transcript
  • HASNUR GROUPConfidential

    ROLE DESIGN [PT HJE - Mining]

    Jakarta13 Desember 2013

    This document is confidential and is intended solely for the use and information of the client to whom it is addressed.

    HASNUR GROUP

    1

    ORGANIZING COMMITTEE

  • HASNUR GROUPConfidential

    Role Design

    Menyusun mikro proses elemen OMS

    Mengembangkan sistem & prosedur elemen OMS

    Monitoring penyusunan dokumen elemen elemen OMS

    Memfasilitasi sosialisasi & implementasi elemen OMS

    Pre & final assesment implementasi elemen OMS

  • HASNUR GROUPConfidential

    Responsibility

    No Elemen Ruang Lingkup PIC

    1 Forecasting &Planning

    Mengatur pelaksanaan proses perencanaan jangka panjang, pengembangantambang, perencanaan jangka pendek dan meeting harian operasi sebelumdi eksekusi dilapangan

    Syaiful Anam (SFA)Yan Mudesa (YMP)Nur Cholik (NRC)

    2 Operation Pengaturan jadwal kerja, pergantian shift sampai pelaksanaan kegiatanoperasional (dari pembebasan lahan hingga reklamasi)

    Nugraha Hakim (NGH)Arfan Sani (AFS)

    3 MineCompliance

    Mengatur pedoman monitoring status perijinan dan pemenuhan kewajibanentitas sebagai pemilik IUP serta IPPKH

    Nugraha Hakim (NGH)

    4 Report &Evaluation

    Mengatur cara kelola proses produksi, sistem komunikasi, supervisi, evaluasikinerja kontraktor dan pelaporan aktifitas entitas ke HJE

    Widi Aribowo (WAG)Agung Basuki (AGB)

    5 ProcessManagement

    Mengatur pedoman untuk pengembangan organisasi, rekrutment danseleksi, pengembangan dan program penilaian karyawan di operation

    M Fahrur rozi (MFR)

    6 Audit danDokumenKontrol

    Mengatur pedoman pembuatan dokumen, pengendalian dokumen danimplementasi

    Widi Aribowo (WAG)

    : Standarisasi Tahap 1

  • HASNUR GROUPConfidential

    Draft mikro proses Elemen OMS (Pemilik IUP)Forecasting & Planning

    Land Bank*

    Report & Evaluation ProcessManagement*

    Dewatering Drainage Jalan Komoditas Jalan Tambang Lighting

    1

    2

    Audit & Dok. Kontrol

    Pengendalian Produk Stockpile Management Pencemaran dan kerusakan lingkungan Com Dev dan pengaduan masyarakat

    PembebasanLahan

    Regular Meeting Survey Activity Standard Pelaporan Entitas

    Operation

    4 5 6

    Revegetasi Pemantauan Revegetasi Riset dan Pengembangan

    Appraisal Kontraktor

    Perhitungan Cadangan Standar Drawing Daily Meeting

    Perencanaan Jangka Panjang Perencanaan Global Pengembangan Tambang

    Mine Infrastructure*

    LandClearing

    Loading & Hauling

    (Waste & Coal)

    Commodity Processing*

    Commodity Transport* Rehabilitasi*

    Land clearing Soil Management Pengelolaan Overburden Disposal Management Pengiriman Produk

    Mine Compliance

    Kewajiban Pemilik IUP Kewajiban Pemilik IPPKH

    3

    Human Resource ManagementSystem

    Change shift

    : Standarisasi Tahap 1

  • HASNUR GROUPConfidential

    Forecasting, Planning & MeetingYearly Monthly Weekly Daily

    Land Clearing

    Ripping/Drilling &

    Blasting

    Loading & hauling

    ( Coal & Waste)

    Pit Service

    CommodityTransport

    Report & Evaluation ProcessManagement

    Ripping/Drilling Blasting Activity Blast Material Inspection Perizinan & pengadaan Pengeluaran & Pengangkutan

    Drainage system Dewatering Disposal Mngmt

    1

    2

    Audit & Dok. Kontrol

    ROM Stock pile mngmt Weight bridge system Road maintenance

    Coal Pit Activity Waste Removal Changeshift

    Land clearing

    Monitor & Control Activity Survey Activity Standard Report Appraisal Subkontraktor

    3 Monthly

    Production

    3 4 5

    Draft mikro proses Elemen OMS (Kontraktor Penambangan)

    : Standarisasi Tahap 1

  • HASNUR GROUPConfidential

    Calender of Event

    No Nama Pertemuan Frekuensi Pimpinan Peserta Agenda Jadwal

    1 OMS Level 2 Mingguan KoordinatorOC/Wakil

    Anggota OC Reviewkemajuanpenyusunansetiap elemenOMS

    Rencanapengembanganberikutnya.

    Jumat,pukul14-15

    2 OMS Level 1 Bulanan SteeringCommittee

    SteeringCommittee

    OrganizingCommittee

    Reviewkemajuanpenyusunansetiap elemenOMS

    SupportRequirement

    Senin,pukul10 - 12

  • 2010 Hasnur Group. All rights reservedConfidential

    This document contains certain results of operation, and may also contain certain projections, plans, strategies, policies and objectives of the Company, which could be treated as forward looking statements within the meaning of applicable law. Forwards looking statements, by their nature, involve risks and uncertainties that could cause actual results and development to differ materially from those expressed or implied in these statements. HASNUR GROUPdoes not guarantee that any action, which should have been taken in reliance on this document will bring specific results as expected.

    Disclaimer

    7


Top Related