VY Decommissioning UpdateThe focus of Entergy Vermont Yankee (VY) and its Employees continues to be our ongoing commitment to Safety.
Decommissioning Preparation Activities◦ System Draining/Lay-Up (50 Systems/24 Complete/11 In Progress and
will be complete by the end of this year). The remaining Systems are scheduled in the future.
◦ Building Power and Services Removal – Ongoing Emergency Plan Update
◦ Conducted an E-Plan Drill on October 21, 2015 as part of ongoing training and Emergency Response Organization (ERO) qualifications.
◦ Successfully completed a test of the sirens on November 7, 2015. NRC Inspection Activities
◦ On-Site Inspection completed the week of 10/26-10/29◦ Inspection scope informed by the NRC Decommissioning Program◦ 3Q15 NRC Decommissioning Power Reactor Inspection Report was
issued on October 22, 2015 with no findings.
4
NRC Licensing Action/Exemption Status◦ Nuclear Decommissioning Trust (NDT) License Amendment Request
(LAR) Entergy filed this LAR to change the current requirement in the ENVY Operating
License for providing NRC a 30-day notification prior to withdrawals to the NDT. State filed petitions to intervene before the ASLB
After a review of options, EVY withdrew the LAR on September 22, 2015. On October 15, 2015, the ASLB issued an order granting Entergy’s motion to
withdraw the LAR and imposed two (2) conditions: ENVY must provide written notice to Vermont of any new license amendment application
relating to the NDT at the time such application is submitted to the NRC. ENVY must specify in our withdrawal notifications whether the disbursement includes one
of the six line items or legal expenses. ENVY will continue to comply with its existing license conditions as well as the
new conditions and will continue to provide notifications to the NRC at least 30 days in advance of any withdrawals from the trust fund.
VY Decommissioning Update (Cont’d)The focus of Entergy Vermont Yankee (VY) and its Employees continues to be our ongoing commitment to Safety.
5
NRC Licensing Action/Exemption Status◦ Commingled Funds Exemption
Approved and issued by the NRC - June 17, 2015 State, GMP and VYNPC petitioned the D.C. Circuit for review of NRC’s issuance
of the commingled funds exemption – August 13, 2015 Entergy filed a motion to intervene – September 2, 2015 State of Vermont notified Entergy that in accordance with 30 VSA Sections 20
and 21 the costs of litigating this petition, the costs will be “billed-back” to Entergy.
VY Decommissioning Update (Cont’d)The focus of Entergy Vermont Yankee (VY) and its Employees continues to be our ongoing commitment to Safety.
6
Vermont State Agency Interactions◦ Public Service Board (PSB) – Second ISFSI Pad CPG
Filed supplemental pre-filed testimony in May 2015 to explain results of additional soil analyses, update pad construction schedule, revise plans for security diesel generator, and revise dry storage funding plan.
Completed first two rounds of discovery in July 2015. Pre-filed testimony received from DPS, ANR, WRC, and NEC in August Entergy discovery requests issued to ANR and WRC on September 2, 2015 Entergy filed an Objection to Admission of Pre-filed Testimony of Mr. Ray Shadis
on Behalf of NEC – September 18, 2015. Responses to Entergy’s discovery requests received September 30, 2015. Entergy’s Pre-file Rebuttal Testimony issued October 21, 2015. Discovery on Entergy’s Rebuttal Testimony received on November 4, 2015. Responses to Discovery on Rebuttal Testimony due November 25, 2015. Approval expected in May 2016.
VY Decommissioning Update (Cont’d)The focus of Entergy Vermont Yankee (VY) and its Employees continues to be our ongoing commitment to Safety.
Nuclear Decommissioning Citizens Advisory Panel (NDCAP)
Stakeholder Outreach: Speaking Engagements, Community Involvement, and Facility Tours
SAFSTOR Matters – Monthly Cable TV Show Vermont Yankee Decommissioning website:
www.vydecommissioning.com
7
Communication and Outreach
8
BCTV 2015 Series of the Year SAFSTOR MATTERS
Decommissioning Overview Emergency Planning Spent Fuel Management
Economic Impact Decommissioning Update Decommissioning Maine Yankee