Nova Scotia, CANADA
DUFFERIN GOLD MINE
Targeting First Gold Dore Q1 2014
OU3 (FWB) / APP (TSX.V)
Presented by:
Alain Hupé – President & CEO Douglas keating – Mine Manager
Forward-Looking Statements
This presentation may contain certain forward-looking statements regarding (i) estimated resources and reserves, (ii) planned production and operating costs profiles, (iii) planned capital requirements and (iv) plans, strategies and corporate objectives.
Such forward-looking statements are not guarantees of future performance and involve known and unknown risks, uncertainties and other factors, many of which are beyond the control of Ressources Appalaches and Dufferin Resources. The forward-looking statements are inherently uncertain and may therefore differ materially from results ultimately achieved.
External and other factors may impact the Company and affect the forward-looking statements in this release since its preparation. Subject to applicable law and stock exchange listing rules, the Company does not intend to publicly update any of the forward-looking statements or any assumptions on which any such forward-looking statement is made.
2OU3 (FWB) / APP (TSX.V)
Corporate Objectives
Become the next Nova Scotian gold producer
Extend resources
Increase production capacity
Three phase plan :
Phase #1 – Restart gold production at 300 TPD by Q1-2014.
Phase #2 – Production of 20,000 to 25,000 oz of gold per year.
Phase #3 – Explore the anticline structure towards the East and at depth
to double production capacity in 2015
3OU3 (FWB) / APP (TSX.V)
Corporate Profile
Direction & Gestion Experience
Alain Hupé, Eng.President, CEO & Cofounder
20 years in explorationEngineer-geologist, specialising in mining exploration geology, President of Gestion LesTrois Inc.
Jean-Claude Morel, M.A.DEMExecutive Vice-President & COO
25 years of management experienceDevelopment and managing of multi-disciplinary teams ranging from engineeringto logistics, including administrative, legal, environmental and financial components.
John A. Thomas, Eng Ph.D. Director
39 years in mining industryExperienced mining engineer from process development, engineering,Management, construction and operation of mines.
Jose Oro, Ph.D. Director
35 years in mining industryPh.D. in geology, held various Senior Vice-President and Chief Operating Officer position in the mining industry, as well as Director of the Ministry of Basic Industries
André Proulx, M.A. Director & Cofounder
30 years in company managementExperienced manager of mining and oil exploration companies, President andCEO of Pétrolia Inc.
Dominique Doucet, Eng.Director
28 years in explorationEngineer-geologist and has held senior management positions with Dios Exploration Inc., Sirios Inc. and Kalkhos Inc.
4
Company Description
Listed FWB: 2013Listed TSX.V: 1997
Shares Outstanding: 182,661,748 Market Cap 20 000 000 $Year Hi/Low: 0,12 / 0,05
OU3 (FWB) / APP (TSX.V)
Canada
Halifax
Sheet Harbour
0 20
kilometres
Miller Lake
Dufferin Mine
Dufferin Mine & Surrounding Appalaches Properties
Chocolate Lake
Ecum Secum
5
25 kilometers (km) radius
Dufferin EastDufferin North
OU3 (FWB) / APP (TSX.V)
Dufferin Mine
Dufferin Mine Existing Infrastructures
Existing mining infrastructure on site:
• Mining lease in good standing• 300 tonnes per day plant• Very short distance from mine to plant (150 m) • Gravity and flotation process• Tailings pound• Acces by decline
PORTAL AND DECLINE MILL
6
MILLING
OU3 (FWB) / APP (TSX.V)
Dufferin Mine Past and Existing Facilities
Ball Mill Shaking Table
Flotation System Infrasructure On-site
OU3 (FWB) / APP (TSX.V) 10
Dufferin Mine Past Operations
8
Quartz Vein – Saddle Quartz Vein – Saddle
OU3 (FWB) / APP (TSX.V)
Dufferin Mine Past Operations – Type of Veins
9OU3 (FWB) / APP (TSX.V)
Saddle Reef Vein Deposit
AnticlineFold Nose
D
Dufferin Mine Gold Quartz Vein
20-100 meters
1.4 - 8.4 km
10OU3 (FWB) / APP (TSX.V)
Potential continuity in depth and toward east open structure
Production and Exploration
Gold Surface Sample Wide Quartz Veins Milling
Dufferin Gold MineMining Lease no. 94-2
Area Drilled1,400 meters
Portal
Mined Zone450 metersMined Zone450 meters
11
Deposit OpenTowards East and at Depth
Ressources Appalaches owns claims covering anticline structure over
8.4 km long
OU3 (FWB) / APP (TSX.V)
Drilling Campaigns
12
1999-2001 2008-2009 2010-2011
OU3 (FWB) / APP (TSX.V)
Dufferin Mine Plan
Mine General Layout
13APP-TSX-V
700 m
Dufferin Mine Plan
14APP-TSX-V
Potential Resources
Mine Plan
Milestones Achieved
Latest Goals Achieved Past 6 months
Mid-2013: The following works have been completed since the announcement of the loan financing of US $10M (May 2013):
1. Mine underground dewatering & rehabilitation works
2. Refurbished the primary and secondary underground ventilation3. Completed plant rehabilitation and testing of all crushing circuit
components4. Finalised and filed mine plan with provincial authorities & filed
production permit (Industrial Approval) application
5. Acquisition and delivery of heavy equipment6. Started the vetting of 688 applications for the remaining
approximately 70 staffing positions required to resume mining operations
15OU3 (FWB) / APP (TSX.V)
Portal Flooded – Water Level May 17, 2013
16APP-TSX-V
Portal Rehabilitation
17OU3 (FWB) / APP (TSX.V)
Infrastructures
18OU3 (FWB) / APP (TSX.V)
Mill Refurbishment
19OU3 (FWB) / APP (TSX.V)
Galleries Rehabilitation
20OU3 (FWB) / APP (TSX.V)
Milestones to Achieve
Path to Production
Targeting First Gold Dore Q1 2014
2013: Complete development works required to restart production at 300 t/d
2014: Start of mining & milling ramp-up operations resume gold production Q1 2014
post-2014: Reinvest profits to increase resources and upgrade plant capacity
21OU3 (FWB) / APP (TSX.V)
DUFFERIN GOLD MINE
October, 2013
Questions
OU3 (FWB) / APP (TSX.V)
Presented by:
Alain Hupé – President & CEO Douglas Keating – Mine Manager