Download - NFPA 1710
![Page 1: NFPA 1710](https://reader034.vdocuments.us/reader034/viewer/2022051700/56815f4d550346895dce2ac1/html5/thumbnails/1.jpg)
NFPA 1710Standard for the Organization and Deployment of Fire Suppression Operations, Emergency Medical Operations, and Special Operations to the Public by Career Fire Departments
![Page 2: NFPA 1710](https://reader034.vdocuments.us/reader034/viewer/2022051700/56815f4d550346895dce2ac1/html5/thumbnails/2.jpg)
The Technical Committee30 members
◦10 Enforcers◦7 Labor ◦6 Users◦5 Special Experts◦2 Consumers
![Page 3: NFPA 1710](https://reader034.vdocuments.us/reader034/viewer/2022051700/56815f4d550346895dce2ac1/html5/thumbnails/3.jpg)
Revision ScheduleCurrent Standard is the 2010
EditionCycle 2015 (requested to change
cycle)First Draft completed
◦Public Input, and First BallotSecond Ballot
◦Public Input closed 5/16/14
![Page 4: NFPA 1710](https://reader034.vdocuments.us/reader034/viewer/2022051700/56815f4d550346895dce2ac1/html5/thumbnails/4.jpg)
Significant Proposals
Note: Added clarifying language to the Equivalency section.
![Page 5: NFPA 1710](https://reader034.vdocuments.us/reader034/viewer/2022051700/56815f4d550346895dce2ac1/html5/thumbnails/5.jpg)
Significant Proposals
Note: NFPA requires a specific number. The Technical Committee made it a minimum of five (5) and struck “or six” in 5.2.3.2.2 and made it a minimum of six (6) in new 5.2.3.2.2.1
![Page 6: NFPA 1710](https://reader034.vdocuments.us/reader034/viewer/2022051700/56815f4d550346895dce2ac1/html5/thumbnails/6.jpg)
Significant Proposals
Note: Adds a descriptive title and an EMS component to this section.
![Page 7: NFPA 1710](https://reader034.vdocuments.us/reader034/viewer/2022051700/56815f4d550346895dce2ac1/html5/thumbnails/7.jpg)
Significant Proposals
Note: New Section and occupancy - Approximately 26 personnel on the Initial Full Alarm this occupancy.
![Page 8: NFPA 1710](https://reader034.vdocuments.us/reader034/viewer/2022051700/56815f4d550346895dce2ac1/html5/thumbnails/8.jpg)
Significant Proposals
Note: New Section – Apartments. Initial Full Alarm will be approximately 26 members.
![Page 9: NFPA 1710](https://reader034.vdocuments.us/reader034/viewer/2022051700/56815f4d550346895dce2ac1/html5/thumbnails/9.jpg)
Significant Proposals
Note – New Section (based on the NIST High-Rise Fireground Field Experiments). The Initial Full Alarm Assignments will be approximately 37/38 members
![Page 10: NFPA 1710](https://reader034.vdocuments.us/reader034/viewer/2022051700/56815f4d550346895dce2ac1/html5/thumbnails/10.jpg)
Significant Proposals
Note: New language addressing the level of Training, adoption of Standards required and inclusion of such in the Annual Report.
![Page 11: NFPA 1710](https://reader034.vdocuments.us/reader034/viewer/2022051700/56815f4d550346895dce2ac1/html5/thumbnails/11.jpg)
Other InformationSecond Draft meeting will be held
August 6-7, 2014.Notice of Intent to make a Motion
Closing Date will be 3/6/15.Posting of Second Draft will be
1/16/15Issuance Date (at latest) will be
8/20/15
![Page 12: NFPA 1710](https://reader034.vdocuments.us/reader034/viewer/2022051700/56815f4d550346895dce2ac1/html5/thumbnails/12.jpg)
nfpa.org To review specific language and
updates.