![Page 1: New Timing and Control Equipment At LSU Wildwood, NJ](https://reader035.vdocuments.us/reader035/viewer/2022062517/56649ecf5503460f94bdcfc4/html5/thumbnails/1.jpg)
![Page 2: New Timing and Control Equipment At LSU Wildwood, NJ](https://reader035.vdocuments.us/reader035/viewer/2022062517/56649ecf5503460f94bdcfc4/html5/thumbnails/2.jpg)
New Timing and Control Equipment At LSU Wildwood, NJ
![Page 3: New Timing and Control Equipment At LSU Wildwood, NJ](https://reader035.vdocuments.us/reader035/viewer/2022062517/56649ecf5503460f94bdcfc4/html5/thumbnails/3.jpg)
New Transmitter At LSU Wildwood, NJ
![Page 4: New Timing and Control Equipment At LSU Wildwood, NJ](https://reader035.vdocuments.us/reader035/viewer/2022062517/56649ecf5503460f94bdcfc4/html5/thumbnails/4.jpg)
Building Construction Begins At LORSTA George, WA
![Page 5: New Timing and Control Equipment At LSU Wildwood, NJ](https://reader035.vdocuments.us/reader035/viewer/2022062517/56649ecf5503460f94bdcfc4/html5/thumbnails/5.jpg)
New Transmitting Complex At LORSTA George, WA
(bottom – left)
![Page 6: New Timing and Control Equipment At LSU Wildwood, NJ](https://reader035.vdocuments.us/reader035/viewer/2022062517/56649ecf5503460f94bdcfc4/html5/thumbnails/6.jpg)
New Transmitting Complex At LORSTA George, WA
![Page 7: New Timing and Control Equipment At LSU Wildwood, NJ](https://reader035.vdocuments.us/reader035/viewer/2022062517/56649ecf5503460f94bdcfc4/html5/thumbnails/7.jpg)
New Transmitter Room At LORSTA George, WA
![Page 8: New Timing and Control Equipment At LSU Wildwood, NJ](https://reader035.vdocuments.us/reader035/viewer/2022062517/56649ecf5503460f94bdcfc4/html5/thumbnails/8.jpg)
New Operations Room At LORSTA George, WA
![Page 9: New Timing and Control Equipment At LSU Wildwood, NJ](https://reader035.vdocuments.us/reader035/viewer/2022062517/56649ecf5503460f94bdcfc4/html5/thumbnails/9.jpg)
Ready To Install New Equipment At LORSTA George, WA
![Page 10: New Timing and Control Equipment At LSU Wildwood, NJ](https://reader035.vdocuments.us/reader035/viewer/2022062517/56649ecf5503460f94bdcfc4/html5/thumbnails/10.jpg)
New Equipment At LORSTA George, WA
![Page 11: New Timing and Control Equipment At LSU Wildwood, NJ](https://reader035.vdocuments.us/reader035/viewer/2022062517/56649ecf5503460f94bdcfc4/html5/thumbnails/11.jpg)
New Timing and Control Equipment At LSU Wildwood, NJ
![Page 12: New Timing and Control Equipment At LSU Wildwood, NJ](https://reader035.vdocuments.us/reader035/viewer/2022062517/56649ecf5503460f94bdcfc4/html5/thumbnails/12.jpg)
New Transmitter At LORSTA George, WA
![Page 13: New Timing and Control Equipment At LSU Wildwood, NJ](https://reader035.vdocuments.us/reader035/viewer/2022062517/56649ecf5503460f94bdcfc4/html5/thumbnails/13.jpg)
New Transmitter At LSU Wildwood, NJ
![Page 14: New Timing and Control Equipment At LSU Wildwood, NJ](https://reader035.vdocuments.us/reader035/viewer/2022062517/56649ecf5503460f94bdcfc4/html5/thumbnails/14.jpg)
ET1 McKinney Changing Antenna Feed At George, WA
![Page 15: New Timing and Control Equipment At LSU Wildwood, NJ](https://reader035.vdocuments.us/reader035/viewer/2022062517/56649ecf5503460f94bdcfc4/html5/thumbnails/15.jpg)
Mr. Paulus Has The Honor At LORSTA George, WA
![Page 16: New Timing and Control Equipment At LSU Wildwood, NJ](https://reader035.vdocuments.us/reader035/viewer/2022062517/56649ecf5503460f94bdcfc4/html5/thumbnails/16.jpg)
Old Equipment Secured At LORSTA George, WA
![Page 17: New Timing and Control Equipment At LSU Wildwood, NJ](https://reader035.vdocuments.us/reader035/viewer/2022062517/56649ecf5503460f94bdcfc4/html5/thumbnails/17.jpg)
Old Tube Transmitter Silent At LORSTA George, WA
![Page 18: New Timing and Control Equipment At LSU Wildwood, NJ](https://reader035.vdocuments.us/reader035/viewer/2022062517/56649ecf5503460f94bdcfc4/html5/thumbnails/18.jpg)
Whidbey Island TD 5990Y
0
50
100
150
200
250
300
350
Time (hrs)
TD
(n
Sec
)
15-Oct 23-Oct
OCTOBER 15 OCTOBER 23
MEAN 28405.259 28405.264
MEDIAN 28405.261 28405.263
MAX 28405.286 28405.291
MIN 28405.218 28405.240
![Page 19: New Timing and Control Equipment At LSU Wildwood, NJ](https://reader035.vdocuments.us/reader035/viewer/2022062517/56649ecf5503460f94bdcfc4/html5/thumbnails/19.jpg)
Whidbey Island SNR 5990Y
0
5
10
15
20
25
30
35
40
17:06
18:06
19:06
20:06
21:06
22:06
23:06 1:
062:06
3:06
4:06
5:06
6:06
7:06
8:06
8:36
Time (hrs)
SN
R (
dB
)
15-Oct 23-Oct
Whidbey Island ECD 5990Y
0
0.5
1
1.5
2
2.5
3
17:06
18:06
19:06
20:06
21:06
22:06
23:06 1:
062:06
3:06
4:06
5:06
6:06
7:06
8:06
8:36
Time (Hrs)
EC
D (
uS
ec)
15-Oct 23-Oct
OCTOBER 15 OCTOBER 23
MEAN 35.00 31.77
MEDIAN 36.00 33.00
MAX 38.00 37.00
MIN 31.00 23.00
OCTOBER 15 OCTOBER 23
MEAN 2.37 1.65
MEDIAN 2.36 1.64
MAX 2.78 1.78
MIN 2.22 1.55
![Page 20: New Timing and Control Equipment At LSU Wildwood, NJ](https://reader035.vdocuments.us/reader035/viewer/2022062517/56649ecf5503460f94bdcfc4/html5/thumbnails/20.jpg)
Commissioning Crew At LORSTA George, WA
![Page 21: New Timing and Control Equipment At LSU Wildwood, NJ](https://reader035.vdocuments.us/reader035/viewer/2022062517/56649ecf5503460f94bdcfc4/html5/thumbnails/21.jpg)
Primary TOT(Secondary)
RF Gate
SecondaryPCI
PCI
SZC
SecondaryTransmits
SZC
LocusTINO
Alternate TOT(Secondary)
UTC(Secondary)
XMTRDelay
MasterPCI
MasterUTC
PCI
RF Gate
Master receivedat Secondary
RF Gate
Loran(Master)
RF Gate
Secondary received at Master
UTC
Baseline Length(in Usec)
UTC
MasterTransmitter
Delay
Alternate TOT(Master)
LocusTINO
(Master)SZC
SZC
Baseline Length(in uSEC)
(Secondary)(Secondary)
Loran(Secondary)
Primary TOT(Master 30 uSEC)
MasterTransmitsSZC
Timing Ladder Diagram