Transcript
  • 1

    New NAD83(2011) Adjustment

    MSPS Annual ConferenceFebruary 15-17, 2012

    David ZenkNGS Advisor

    A Brief History of Time in MN

    • Reveal the development of the physical Geodetic Control Placement in MN from 1860 through 2007.

    • Outline the historical Datums and Adjustments used over time.

  • 2

    The Big Picture

    The Great Depression

    The War Years

    The Interstate Years

    The Modern Era

    The HARN

    The Big Picture• Total = 59408• Good = 39641, Destroyed = 12944, Other Cond = 6823

  • 3

    Sample Legend

    Marks Set in the 2000 DecadeContributors of Geodetic Control Data and number of marks

    ! National Agencies

    " Inter-State or Inter Province Agencies

    # State, Province, Commonwealth, and Territorial Agencies

    X County Agencies

    [ Other Agencies

    1860-1869

    • 3 marks• Old set dates are uncertain

  • 4

    1870-1879

    • 11 marks• US Lake Survey• Army Corps

    1880-1889

    • 55 marks• Army Corps• Miss River Comm• and unknowns

  • 5

    1890-1899

    • The MRC has been busy• Army Corps too

    1900-1909

    • Closely spaced dots are level lines

    • Scattered dots represent triangulation arcs

  • 6

    1910-1919

    • International Boundary Commission

    1920-1929

    • Connecting the 1890-1909 triangulation to extensive Triangulation across southern MN

  • 7

    1930-1939

    • Great Depression• WPA and CCC make a

    contribution to geodetic leveling

    1940-1949

    • Pre-War– Continuation of

    WPA/CCC leveling• Post-War

    – US Geological Survey begins benchmark leveling campaign to support Quadrangle Mapping

    • Built on existing leveling lines from the 1930’s

  • 8

    1950-1959

    • US Geological Survey expands benchmark leveling campaign to support Quadrangle Mapping

    1960-1969

    • US Geological Survey expands benchmark leveling campaign to support Quadrangle Mapping

    • MHD begins Interstate surveys

    • MHD Geodetic Unit started

  • 9

    1970-1979

    • State Highway corridors benefit from geodetic horizontal and vertical surveys

    1980-1989

    • State Highway corridors benefit from geodetic horizontal and vertical surveys

    • Metro Area County GPS Surveys

  • 10

    1990-1999

    • State Highway corridors benefit from geodetic horizontal and vertical surveys

    • County GPS Surveys expand

    2000-2007

    • County GPS Surveys expand

    • Lots of leveling still occurring

  • 11

    1860-2007

    • Cumulative Effort Pays Off!

    Historical Datums in MN

    • Horizontal– United States Standard Datum of 1913,

    • North American Datum, just NAD, not NAD13!

    – North American Datum of 1927• NAD27 – almost same datum, new adjustment

    – North American Datum of 1983• NAD83 – new datum, several adjustments

    – 1986, 1996, 2007

  • 12

    Sample Datum/Adjustment Shifts

    TUCKY MNDT Nicollet County Coordinates (meters)

    Datum Tag Easting E Shift Northing N ShiftNAD27 n/a n/a

    n/a n/aNAD83(1986) 176327.286 82099.219

    -0.026 -0.109NAD83(1996) 176327.312 82099.328

    0.012 -0.015NAD83(2007) 176327.300 82099.343

    Sample Datum/Adjustment Shifts

    ANTRIM MNDT

    Datum Tag Longitude Lon Shift (m) Latitude Lat Shift (m)NAD27 94 26 33.36931 43 52 36.98645

    26.357 -3.232NAD83(1986) 94 26 34.22535 43 52 36.83501

    0.137 0.057NAD83(1996) 94 26 34.22980 43 52 36.83769

    0.010 0.014NAD83(2007) 94 26 34.23013 43 52 36.83833

  • 13

    Sample Datum/Adjustment Shifts

    APGAR MNDT

    Datum Tag Longitude Lon Shift (m) Latitude Lat Shift (m)NAD27 93 31 49.11572 44 47 03.08770

    25.631 -2.836NAD83(1986) 93 31 49.94811 44 47 02.95481

    0.031 0.111NAD83(1996) 93 31 49.94913 44 47 02.96001

    n/a n/aNAD83(2007) not GPS not GPS

    Historical Datums in MN • Shifts from NAD27 to NAD83

  • 14

    Historical Datums in MN

    • Vertical– Great Lakes Datums

    • USLS1903, USLS1935, IGLD1955, IGLD1985– Mississippi River Datums

    • Cairo, Memphis, Mean Gulf Level, others– St Paul City Datum (-694.28 ft)– Minneapolis City Datum (-710.48 ft)– National Geodetic Vertical Datum of 1929 (NGVD29)– North American Vertical Datum of 1988 (NAVD88)

    Historical Datums in MN

  • 15

    General Relationships Among Vertical Datums

    Historical Datums in MN

    • National Height Modernization– GPS + GEOID = ORTHOMETRIC HEIGHT

    • 3D Datum of 2022– Is this the Future?– If everything is moving, what does a datum mean?– Is there anything that’s not moving?

    • WANT MORE DETAIL?– http://www.olmweb.dot.state.mn.us– Technology and Tools – then download:

    • 2007 Adjustment of the National Spatial Reference System in Minnesota

    • Geodetic History in MN

  • 16

    Datum Conversion Tools

    • HORIZONTAL Conversion Tools– NADCON - NGS converter from NAD27 to NAD83– MNCON – MNDOT written conversion tool– CONAD – DOS program from MNDOT, use MNCON now

    • VERTICAL Conversion Tools– VERTCON - NGS converter from NAD27 to NAD83

    • Combined Conversion Tools– CORPSCON – US Army Corps of Engineers

    • Combines NADCON and VERTCON

    MNCON

    http://www.olmweb.dot.state.mn.us/tech/OlmSoftware.html#MCN

  • 17

    MN Map Projections and Parameters

    http://www.olmweb.dot.state.mn.us/tech/Projections.htm

    New NAD83(2011) Adjustment

    • NAD83(1986) Original realization – Consisted (almost) entirely of classical (optical)

    observations• NAD83(1996)

    – “High Precision Geodetic Network” (HPGN) and High Accuracy Reference Network” (HARN) realizations

    – Most done in 1990s, essentially state-by-state– Based on GNSS but classical stations included in

    adjustments

  • 18

    New NAD83(2011) Adjustment

    • NAD83(2007) National Re-Adjustment of 2007– Used NAD 83(CORS96) epoch 2002.0 as

    constraint– Simultaneous nationwide adjustment (GNSS

    only)• Needed badly to resolve the state-by-state biases

    of the “HARN” era adjustments.• Underlying CORS coordinates were known to be

    less-than-perfect, but the Multi-Year CORS Solution (MYCS) was not even close to completed.

    New NAD83(2011) Adjustment

    • Completion of MYCS in 2011 made a set of constraints available that could truly be described as: “state-of-the art”– Reprocessed all CORS GPS data 1994-2011– 2264 CORS & other global GPS tracking stations– New orbits were computed for all satellites for

    all years.– The X,Y,Z and Vx,Vy,Vz for every CORS was

    solved for as unknowns in a set of millions of equations

    – Accurate computed velocities and consistent coordinates for all CORS

  • 19

    New NAD83(2011) Adjustment

    • Using the MYCS coordinates and velocities as constraints – the new adjustment could include:– 4196 projects – 80,077 stations – 430,766 vectors total – approx 387,000 enabled

    • New realization: NAD 83(2011) epoch 2010.00

    New NAD83(2011) Adjustment

    • Build up of network over time

  • 20

    NA2011 CONUS 1983-1988 (6 yrs) 7712 vectors (1.8%)

    NA2011 CONUS 1983-1992 (10 yrs) 61,574 vectors (14.4%)

  • 21

    NA2011 CONUS 1983-1996 (14 yrs) 135,261 vectors (31.7%)

    NA2011 CONUS 1983-2001 (19 yrs) 227,940 vectors (53.4%)

  • 22

    NA2011 CONUS 1983-2006 (24 yrs) 351,855 vectors (82.4%)

    NA2011 CONUS 1983-2011 (29 yrs) 426,977 vectors (100.0%)

  • 23

    New NAD83(2011) Adjustment

    New NAD83(2011) Adjustment

  • 24

    New NAD83(2011) Adjustment

    New NAD83(2011) Adjustment

    • NAD 83(CORS96) epoch 2002.00 NAD 83(2011) epoch 2010.00

    • Expect overall coordinate change about same as MYCS– Horizontal: Mean ~2 cm (±8 cm), median ~0 cm– Vertical: Mean ~ -1 cm (±2 cm), median ~ -1 cm– This is for change in realization and reference epoch

    • In MINNESOTA, the changes are about – Horizontal: about 2 cm– Vertical: about 2-3 cm

  • 25

    New NAD83(2011) Adjustment

    • Changes in Ellipsoid Heights mean that a new GEOID Model will be needed.

    • New hybrid geoid model (GEOID12)– Use NAD 83(2011) epoch 2010.00 ellipsoid

    heights on NAVD 88 benchmarks– Might also use OPUS-Database results on NAVD

    88 BMs– Plan release same time as NA2011

    New NAD83(2011) Adjustment

    • Multi-Year CORS Solution– Officially released coordinates September 2011

    • National Adjustment of 2011– Goal: Complete by mid-April 2012– Deadline for submitted projects was Aug 31, 2011

    • OPUS (Online Positioning User Service)– Provides solutions referenced both to previous

    (CORS96) and new (MYCS) coordinates– Dual solutions will be available until NA2011

    complete

  • 26

    Future Datum

    • NGS is planning to release an all-new 3D datum• Timeline not definite.• Consider 10 years away.

    New geometric datum minus NAD 83 (horizontal)

  • 27

    New geometric datum minus NAD 83

    (ellipsoid height)


Top Related