Guide for Hull Survey for New Construction
GUIDE FOR
HULL SURVEY FOR NEW CONSTRUCTION
AUGUST 2007 (Updated July 2011 see next page)
American Bureau of Shipping
Incorporated by Act of Legislature of
the State of New York 1862
Copyright 2007American Bureau of Shipping
ABS Plaza
16855 Northchase Drive
Houston, TX 77060 USA
-
8/3/2019 New Construction Survey Guide E-July11
2/61
Updates
July 2011 consolidation includes:
July 2010 version plus Notice No. 2 and Corrigenda/Editorials
July 2010 consolidation includes:
August 2007 version plus Notice No. 1
-
8/3/2019 New Construction Survey Guide E-July11
3/61
ABSGUIDE FOR HULL SURVEY FOR NEW CONSTRUCTION .2007 iii
Foreword
Foreword
This Guide contains requirements obtained from IACS Unified Requirement, UR Z23 Hull Survey forNew Construction. For the convenience of the users, the various cross-references to the relevant ABS
Rules and Guides are provided in addition to those for IACS documents. These IACS documents, UR, UI(Unified Interpretation) and Recommendation, are available from www.iacs.org.uk.
(1 July 2010) The July 2010 update to this Guide incorporates the latest requirements of IACS UI SC234,
UI LL76, and UI MPC96, regarding initial statutory surveys at new construction. Updates to IACS UR Z23are also incorporated.
The effective date of this Guide is 1 January 2008 and it is applicable for vessels contracted for construction
on or after 1 January 2008.
-
8/3/2019 New Construction Survey Guide E-July11
4/61
iv ABSGUIDE FOR HULL SURVEY FOR NEW CONSTRUCTION .2007
Table of Contents
GUIDE FOR
HULL SURVEY FOR NEW CONSTRUCTION
CONTENTS
1 Scope................................................................................................................... 1
2 Definitions ........................................................................................................... 1
2.1 Hull Structure ...................................................................................................1
2.2 Documents.......................................................................................................12.3 Survey Methods...............................................................................................1
3 Applications ........................................................................................................ 2
3.1 Vessel Types....................................................................................................2
3.2 Statutory Items.................................................................................................2
3.3 Equipment, Fittings and Appendages..............................................................2
3.4 Installation and Testing....................................................................................2
3.5 Locations of Construction ................................................................................2
4 Qualification and Monitoring of Personnel ...................................................... 2
5 Survey of the Hull Structure .............................................................................. 3
5.1 Items to be Surveyed.......................................................................................3
5.2 Evidence of Survey of Materials and Equipment .............................................3
6 Review of the Construction Facility .................................................................. 3
7 Newbuilding Survey Planning ........................................................................... 4
7.1 Kick-off Meeting ...............................................................................................4
7.2 Administration and Statutory Requirements ....................................................4
7.3 Update of Meeting Record...............................................................................4
7.4 Shipbuilding Quality Standards........................................................................4
7.5 Attendance by Other Parties............................................................................4
7.6 Series Ship Production ....................................................................................48 Examination and Test Plan for Newbuilding Activities ................................... 4
9 Proof of the Consistency of Surveys ................................................................ 5
9.1 Compliance with Newbuilding Survey Planning...............................................5
9.2 Audit .................................................................................................................5
10 Ship Construction File ....................................................................................... 5
10.1 Responsibility...................................................................................................5
10.2 Documents to be Included...............................................................................5
-
8/3/2019 New Construction Survey Guide E-July11
5/61
ABSGUIDE FOR HULL SURVEY FOR NEW CONSTRUCTION .2007 v
11 Initial Statutory Surveys at New Construction............................................... 23
11.1 Scope.............................................................................................................23
11.2 Definitions Used in the Survey Tables...........................................................23
11.3 Application......................................................................................................23
11.4 Interpretation of the Survey Requirements ....................................................2311.5 Qualification and Monitoring of Personnel.....................................................24
11.6 Inspection and test plan for new building activities........................................24
11.7 Product and Type Approval Certificates ........................................................24
11.8 Proof of the Consistency of Surveys..............................................................24
TABLE 1 ........................................................................................................................6
APPENDIX 1 Survey Tables for Initial Statutory Surveys at New Construction ... 25
1 Description........................................................................................25
TABLE 1 Safety Equipment....................................................................26
TABLE 2 Load Line ................................................................................39
TABLE 3 MARPOL Annex 1...................................................................42
APPENDIX 2 Shipyard Review Record ..................................................................... 48
1 Details of Any Management Systems...............................................48
2 Construction Facilities.......................................................................48
2.1 Building Berth (B) or Dock (D) .......................................................48
2.2 Outfitting Quays............................................................................. 482.3 Main Fabrication and Erection Facilities........................................ 49
3 Shipyard Control of Qualified Welders..............................................50
4 Feature of Construction Procedure...................................................50
5 Quality Control System .....................................................................51
6 Measures for Safety and Health .......................................................51
7 Control System of Nondestructive Examination (NDE) ....................52
8 Quality Control on Production Line...................................................53
8.1 Preventive Measures for Misuse of Materials................................ 53
8.2 Shot Blasting/Primer Coating ........................................................53
8.3 Marking and Cutting (Assembly Work) .......................................... 548.4 Bending and Strain Free................................................................54
8.5 Control of Welding Procedure ....................................................... 54
8.6 Treatment of Serious Non-conformities......................................... 55
8.7 Hydrostatic and Watertight Tests .................................................. 55
-
8/3/2019 New Construction Survey Guide E-July11
6/61
This Page Intentionally Left Blank
-
8/3/2019 New Construction Survey Guide E-July11
7/61
ABSGUIDE FOR HULL SURVEY FOR NEW CONSTRUCTION .2007 1
Guide for Hull Survey for New Construction
1 Scope
The scope of this Guide includes the following:
i) Examination of the parts of the vessel covered by the Rules and by applicable statutory regulations
for hull construction, to obtain appropriate evidence that they have been built in compliance withthe Rules and regulations, taking account of the relevant approved drawings.
ii) Appraisal of the manufacturing, construction, control and qualification procedures, including welding
consumables, weld procedures, weld connections and assemblies, with indication of relevant approvaltests.
iii) Witnessing inspections and tests as required in the Rules applicable for ship construction, including
materials, welding and assembling, specifying the items to be examined and/or tested and how(e.g., by hydrostatic, hose or leak testing, nondestructive examination, verification of geometry)
and by whom.
Appraisal of materials and equipment used for ship construction and their inspection at works is not included in
this Guide. Details of requirements for hull and machinery steel forgings and castings and for normal and higher
strength hull structural steel are given in Section 2-1-6, Section 2-1-5 and Sections 2-1-2 and 2-1-3, respectively,of the ABSRules for Materials and Welding (Part 2). Acceptance of these items is verified through the surveyprocess carried out at the manufacturers works and the issuing of the appropriate certificates.
2 Definitions
2.1 Hull Structure
The hull structure is defined as follows:
i) Hull envelope including all internal and external structures
ii) Superstructures, deckhouses and casings
iii) Welded foundations (e.g., main engine seatings)
iv) Hatch coamings, bulwarks
v) All penetrations fitted and welded into bulkheads, decks and shell
vi) The fittings of all connections to decks, bulkheads and shell, such as air pipes and ship side valves all
ILLC 1966, as amended, items
vii) Welded attachments to shell, decks and primary members (e.g., crane pedestals, bitts and bollards),but only as regards their interaction on the hull structure
2.2 Documents
Referenceto documents also includes electronic transmission or storage.
2.3 Survey Methods
Definition of survey methods which the Surveyor is directly involved in: Patrol, Review and Witness:
2.3.1 Patrol (1 July 2010)
Patrolis the act of checking on an independent and unscheduled basis that the applicable processes,
activities and associated documentation of the shipbuilding functions identified in Table 1 continue
to conform to classification and statutory requirements.
-
8/3/2019 New Construction Survey Guide E-July11
8/61
2 ABSGUIDE FOR HULL SURVEY FOR NEW CONSTRUCTION .2007
2.3.2 Review (1 July 2010)
Review is the act of examining documents in order to determine traceability and identification andto confirm that processes continue to conform to classification and statutory requirements.
2.3.3 Witness
Witness is attendance of scheduled survey items as defined within the shipbuilding functions.
3 Applications
3.1 Vessel Types
This Guide covers the survey of all new construction of steel vessels intended for classification and forinternational voyages except for:
i) Those defined in SOLAS I/3
ii) High speed craft as defined in Part 1, Section 1 of the ABS Guide for Building and Classing HighSpeed Craft
iii) Mobile Offshore Drilling Units as defined in Section 1-1-3 of the ABS Rules forConditions ofClassification Offshore Units and Structures
3.2 Statutory Items (1 July 2010)
This Guide covers all statutory items relevant to the hull structure and coating (i.e., Load Line and SOLASSafety Construction).
3.3 Equipment, Fittings and Appendages
This Guide does not cover the manufacture of equipment, fittings and appendages, regardless of whether
they are made inside or outside of the shipyard, examples being as follows. Evidence of acceptance shall beprovided by accompanying documentation from class Surveyor at manufacturer and verified at the shipyard :
i) Hatch covers
ii) Doors and ramps integral with the shell and bulkheads
iii) Rudders and rudder stock
iv) All forgings and castings integral to the hull
3.4 Installation and Testing
This Guide applies to the installation into the vessel, welding and testing of:
i) The items listed in 3.3 above
ii) Equipment forming part of the watertight and weathertight integrity of the vessel.
3.5 Locations of Construction (1 July 2010)
This Guide applies to the hull structures constructed and coatings applied at any of the following:
i) Shipbuilders facilities
ii) Subcontractors at the shipbuilders facilities
iii) Subcontractors at their own facilities or at other remote locations
4 Qualification and Monitoring of Personnel (1 July 2010)
The Surveyors are to confirm through patrol, review and witness as defined in 2.3, that the vessels are built
using approved plans in accordance with the relevant Rules and statutory requirements. The Surveyors are
to be qualified to be able to carry out the tasks and procedures are to be in place to ensure that their activitiesare monitored. (See Section 1-1-6 of the ABSRules forConditions of Classification.)
-
8/3/2019 New Construction Survey Guide E-July11
9/61
ABSGUIDE FOR HULL SURVEY FOR NEW CONSTRUCTION .2007 3
5 Survey of the Hull Structure
5.1 Items to be Surveyed (1 July 2010)
Table 1 provides a list of surveyable items for the hull structure and coating covered by this Guide, including:
i) Description of the shipbuilding functions.
ii) Classification and statutory survey requirements
iii) Survey method required by the Rules for classification
iv) Relevant IACS and statutory requirement references
v) Documentation to be available for the Surveyor during construction.
The shipbuilder is to provide the Surveyors access to documentation required for classification.This includes documentation retained by the shipbuilder or other third parties.
The list of documents approved or reviewed by ABS for the specific new construction are asfollows:
a) Plans and supporting documents
b) Examination and testing plans
c) NDE plans
d) Welding consumable details
e) Welding procedure specifications
f) Welding plan or details
g) Welders qualification records (See 2-4-3/7 of the ABSRules for Materials and Welding)
h) NDE operators qualification records (See Section 1, subsection 5 of ABS Guide forNondesructive Inspection of Hull Welds)
vi) Documents to be inserted into the ship construction file. Refer to Section 10 for details.
vii) A list of specific activities which are relevant to the shipbuilding functions. This list is not exhaustiveand can be modified to reflect the construction facilities or specific vessel type.
5.2 Evidence of Survey of Materials and Equipment
Evidence is also to be made available, as required, by the shipbuilder, to the Surveyor whilst the construction
process proceeds to prove that the material and equipment supplied to the vessel has been built ormanufactured under survey relevant to the Rules and statutory requirements.
6 Review of the Construction Facility*
(1 July 2010) ABS is to familiarize itself with the yards production facilities, management processes, and
safety procedures for consideration in complying with the requirements of Table 1 prior to any steelwork orconstruction taking place in the following circumstances:
i) Where ABS has no recent experience at the construction facilities (typically after a one year lapse)
or when significant new infrastructure has been added
ii) Where there has been a significant management or personnel restructuring having an impact onthe ship construction process
iii) Or where the shipbuilder contracts to construct a vessel of a different type or substantially different
in design
* Note: Reference is made to Appendix 2, Shipyard Review Record, as an example.
-
8/3/2019 New Construction Survey Guide E-July11
10/61
4 ABSGUIDE FOR HULL SURVEY FOR NEW CONSTRUCTION .2007
7 Newbuilding Survey Planning
7.1 Kick-off Meeting (1 July 2010)
Prior to commencement of surveys forany newbuilding project, ABS is to discuss with the shipbuilder at akick-off meeting the items listed in Table 1. The purpose of the meeting is to agree how the list of specific
activities shown in Table 1 is to be addressed.
The meeting is to take into account the shipbuilders construction facilities and vessel type including thelist of proposed subcontractors. A record of the meeting is to be made, based upon the contents of the
Table (the Table can be used as the record with comments made into the appropriate column).
If ABS has nominated a Surveyor for a specific newbuilding project, then the Surveyor is to attend thekick-off meeting. The builder is to be asked to agree to undertake ad hoc investigations during construction
where areas of concern arise and to keep ABS advised of the progress of any investigation.
Whenever an investigation is undertaken, the builder is to be requested, in principle, to agree to suspendrelevant construction activities if warranted by the severity of the problem.
7.2 Administration and Statutory RequirementsThe records are to take note of specific published Administration requirements and interpretations ofstatutory requirements.
7.3 Update of Meeting Record (1 July 2010)
The shipyard shall be requested to advise of any changes to the activities agreed to at the kick off meetingand these are to be documented. (e.g., if the shipbuilder chooses to use or change subcontractors, or toincorporate any modifications necessitated by changes in production or inspection methods, Rules and
regulations, structural modifications, or in the event where increased inspection requirements are deemednecessary as a result of a substantial non-conformance or otherwise).
7.4 Shipbuilding Quality Standards (1 July 2011)
Shipbuilding quality standards for the hull structure during new construction are to be reviewed and agreedduring the kick-off meeting. Structural fabrication is to be carried out in accordance with the latest versionof IACS Recommendation No. 47 Shipbuilding and Repair Quality Standard, or a recognized fabrication
standard which has been accepted by ABS prior to the commencement of fabrication/construction. The workis to be carried out in accordance with the Rules and under ABS survey.
7.5 Attendance by Other Parties
The kick-off meeting may be attended by other parties, Owner, Administrations, etc., subject to agreement
by the shipbuilder.
7.6 Series Ship Production (1 July 2010)
In the event of series ship production consideration may be given to waiving the requirement for a kickoffmeeting for the second and subsequent ships provided any changes are documented as required in 7.1.
8 Examination and Test Plan for Newbuilding Activities (1 July 2010)
The shipbuilder is to provide plans of the items which are intended to be examined and tested. These plansneed not be submitted for approval and examination at the time of the kick-off meeting. They are to include:
i) Proposals for the examination of completed steelwork (generally referred to as the block plan) and
are to include details of joining blocks together at the pre-erection and erection stages or at otherrelevant stages
ii) Proposals for fit up examinations where necessary
iii) Proposals for testing of the structure (leak and hydrostatic) as well as for all watertight and weathertightclosing appliances
-
8/3/2019 New Construction Survey Guide E-July11
11/61
ABSGUIDE FOR HULL SURVEY FOR NEW CONSTRUCTION .2007 5
iv) Proposals for nondestructive examination
v) Any other proposals specific to the vessel type or to the statutory requirements.
The plans and any modifications to them are to be submitted to the Surveyors in sufficient time to allowreviewbefore the relevant survey activity commences.
9 Proof of the Consistency of Surveys9.1 Compliance with Newbuilding Survey Planning
ABS is to be able to provide evidence (e.g., through records, check lists, inspection and test records, etc.)that its Surveyors have complied with the requirements of the newbuilding survey planning and duly
participated in the relevant activities shown in the shipbuilders examination and test plans.
9.2 Audit
For audit purposes, the information specified in 9.1 is to be made available.
10 Ship Construction File
10.1 Responsibility
The shipbuilder is to deliver documents for the Ship Construction File. In the event that items have beenprovided by another party such as the Owner, and where separate arrangements have been made for documentdelivery which excludes the shipbuilder, that party has the responsibility.
10.2 Documents to be Included
It is recognized that the purpose of documents held in the Ship Construction File onboard the vessel, is tofacilitate inspection (survey) and repair and maintenance, and, therefore, is to include in addition to documentslisted in Table 1, but not be limited to:
i) As-built structural drawings including scantling details, material details, and, as applicable, wastageallowances, location of butts and seams, cross section details and locations of all partial and fullpenetration welds, areas identified for close attention and rudders [Section 7-3-2 of the ABSRulesfor Survey After Construction (Part 7) for Hull Surveys]
ii) Manuals required for classification and statutory requirements (e.g., loading and stability, bowdoors and inner doors and side shell doors and stern doors operations and maintenance manuals)[3-2-16/27 of the ABSRules for Building and Classing Steel Vessels]
iii) Ship structure access manual, as applicable
iv) Copies of certificates of forgings and castings welded into the hull [Sections 2-1-6 and Section2-1-5 of the ABSRules for Materials and Welding (Part 2)]
v) Details of equipment forming part of the watertight and weathertight integrity of the vessel
vi) Tank testing plan including details of the test requirements [Section 3-7-1 of the ABS Rules forBuilding and Classing Steel Vessels]
vii) Corrosion protection specifications [3-2-18/5 of the ABS Rules for Building and Classing SteelVessels]
viii) Details for the in-water survey, if applicable, information for divers, clearances measurementsinstructions, etc., tank and compartment boundaries [Appendix 7-A-1 of the ABSRules for Survey
After Construction (Part 7)]
ix) Docking plan and details of all penetrations normally examined at drydocking [3-1-2/11 and 3-2-2/7of the ABSRules for Building and Classing Steel Vessels and Section 7-4-1 of the ABSRules forSurvey After Construction (Part 7)]
x) Coating Technical File, for vessels subject to compliance with the IMO Coating PerformanceStandard (PSPC) as a class requirement under the IACS Common Structural Rules. [Section 6 ofthe ABS Guide for The Class Notation Coating Performance Standard (CPS)]
-
8/3/2019 New Construction Survey Guide E-July11
12/61
TABLE
1(1
July2011)
Reference
Shipbuilding
Function
Survey
Requirements
for
Classification
SurveyMethod
Requiredfor
Classification
ABS
Rules/Guide(1)
[IACS
Reference
(2,3)]
Statutory
Requirements
andRelevant
Reference
Documentation
Availableto
Classification
Surveyorduring
Construction
Documentation
forShip
Construction
File
Specific
Activities
ABS
Proposalsfor
theProject
Shipbu
ildingQualityControlFunction
1
Welding
.1Identify
consumables
againstapproved
list
.2Verifytemporary
andpermanent
storagefacilities
e.g.,keptdry,
covered,
andwhere
applicable,
heated
1.1
Welding
Consumables
Approved
separatelyatthe
manufacturer
Reviewapproval
statusand
patrol,verify
storage,
handlingand
treatmentin
accordancewith
manufacturer's
requirements
Appendix2of
theRulesfor
Materialsand
Welding(Part2
)
[URW17]
Consumable
specification
andapproval
status
Notrequired
.3Verifytraceability
e.g.,random
batchnumber
checking
.1Verifywelder
qualification
standard,
e.g.,classor
recognized
standardapprova
l
.2Verifywelder
approvedfor
weldposition
1.2
Welder
Qualification
Qualified
welders
Reviewofwelder
certificationand
patrol
[Recommend-
ation47]
Shipyards
recordswith
individual's
identification
Notrequired
.3Verifyvalidity
ofqualification
certificate
6 ABSGUIDE FOR HULL SURVEY FOR NEW CONSTRUCTION .2007
-
8/3/2019 New Construction Survey Guide E-July11
13/61
TABLE1(con
tinue
d)(1
July2011)
Reference
Shipbuilding
Function
Survey
Requirements
for
Classification
SurveyMethod
Requiredfor
Classification
ABS
Rules/Guide(1)
[IACS
Reference
(2,3)]
Statutory
Requirements
andRelevant
Reference
Documentation
Availableto
Classification
Surveyorduring
Construction
Documentation
forShip
Construction
File
Specific
Activities
ABS
Proposalsfor
theProject
Allweldjoint
configurations
,
positionsand
materialstobe
coveredbywe
ld
procedures
approvedby
ABSorby
anotherIACS
member
available
.1Verifyweld
procedures
recordshave
beenapproved
andcoverall
weldprocesses
andpositionsin
accordancewith
classificationor
recognized
standards.
.2Verifyprocedure
s
areavailable
atrelevant
workstations
1.3
Welding
Mechanical
Properties
(Welding
Procedures)
ABSwitnesses
allnewweld
procedure
qualification
testscarriedout
intheshipyard
wheneverABS
issurveyingin
theshipyard
Reviewand
patrol
2-4-3/5ofthe
Rulesfor
Materialsand
Welding(Part2
)
[URW28]
Approvedweld
procedure
specification
andwelding
planrelevantto
thevessel
projector
process
Notrequired
.3Verifyweld
proceduresare
availableforthe
Surveyors
reference
.1Verifycondition
ofmachinery
andequipment.
.2Verifymachines
arecalibratedby
appropriatestaf
f
.3Verifycalibration
carriedoutin
accordancewith
manufacturer's
recommendation
s
1.3a
Welding
Equipment
Correctly
calibratedand
maintained
Patroland
review
Shipbuilders
maintenanceand
calibration
records
Notrequired
.4Verifycalibration
inaccordance
withmaintenance
schedule
ABS GUIDE FOR HULL SURVEY FOR NEW CONSTRUCTION .2007 7
-
8/3/2019 New Construction Survey Guide E-July11
14/61
TABLE1(con
tinue
d)(1
July2011)
Reference
Shipbuilding
Function
Survey
Requirements
for
Classification
SurveyMethod
Requiredfor
Classification
ABS
Rules/Guide(1)
[IACS
Reference
(2,3)]
Statutory
Requirements
andRelevant
Reference
Documentation
Availableto
Classification
Surveyorduring
Construction
Documentation
forShip
Construction
File
Specific
Activities
ABS
Proposalsfor
theProject
.1Verifywelding
areasclean,dry
,
welllit.
.2Confirmrelevan
t
measurestaken
foranypreor
postheat
treatment,drying
ofsurfacesprior
towelding
1.3b
Welding
Environment
Satisfactory
environment
Patrol
[Recommend-
ation47]
Notrequired
.3Confirmshieldin
g
gases,fluxes
protected
1.3c
Welding
Supervision
Sufficientnumber
ofskilled
supervisors
Patrol
Pub#14:
Guidefor
Nondestructive
Inspectionof
HullWelds
[Recommend-
ation20and47]
.1Verify
supervisionis
effective
.1Identify
workstations
whereNDEis
carriedout,e.g.,
panellinebutt
welds,castings
intohullstructure
1.4
Welding
Surface
Discontinuities
Substantially
freefrom
significant
indications,
satisfactory
profileandsiz
e
Visual
examination,
surfacedetection
techniques,
reviewof
documentsand
patrolofoperator
Pub#14:
Guidefor
Nondestructive
Inspectionof
HullWelds
[Recommend-
ation20and47]
Shipbuilders
andrecognized
standardsand
Rulesas
applicable,
weldingand
NDEplans,NDE
reports,operator
qualifications
Notrequired
.2VerifyNDE
carriedoutin
accordancewith
approvedplans
whereapplicable
8 ABSGUIDE FOR HULL SURVEY FOR NEW CONSTRUCTION .2007
-
8/3/2019 New Construction Survey Guide E-July11
15/61
TABLE1(con
tinue
d)(1
July2011)
Reference
Shipbuilding
Function
Survey
Requirements
for
Classification
SurveyMethod
Requiredfor
Classification
ABS
Rules/Guide(1)
[IACS
Reference
(2,3)]
Statutory
Requirements
andRelevant
Reference
Documentation
Availableto
Classification
Surveyorduring
Construction
Documentation
forShip
Construction
File
Specific
Activities
ABS
Proposalsfor
theProject
.3Verify
suitabilityof
NDEmethods
.4Verifyoperators
suitablyqualified
particularlywhere
sub-contractors
havebeen
employed
.5VerifyNDEis
carriedout
accordingtothe
acceptable
process
1.4
Welding
Surface
Discontinuities
(contd)
Substantially
freefrom
significant
indications,
satisfactory
profileandsiz
e
Visual
examination,
surfacedetection
techniques,
reviewof
documentsand
patrolofoperator
Pub#14:
Guidefor
Nondestructive
Inspectionof
HullWelds
[Recommend-
ation20and47]
Shipbuilders
andrecognized
standardsand
Rulesas
applicable,
weldingand
NDEplans,NDE
reports,operator
qualifications
Notrequired
.6ReviewNDE
records
.1Identify
workstations
whereNDEis
carriedout,e.g.
panellinebutt
welds,castings
intohullstructure
.2VerifyNDE
carriedoutin
accordancewith
approvedplans
whereapplicable
.3Verifysuitability
ofNDEmethod
s
1.5
Welding
Embedded
Discontinuities
NDEistobe
carriedoutby
qualified
operatorscapab
le
ofensuringthat
weldsare
substantiallyfree
fromsignificant
indications
Radiography
andultrasonic
testing,review
ofdocuments
andpatrolof
operator,
examinationof
films
Pub#14:
Guidefor
Nondestructive
Inspectionof
HullWelds
[Recommend-
ation20and47]
Shipbuilders
andrecognized
standardsand
Rulesas
applicable,
weldingand
NDEplans,
NDEreports,
operator
qualifications
Notrequired
.4Verifyoperators
suitablyqualified
particularlywhere
sub-contractors
havebeen
employed
ABS GUIDE FOR HULL SURVEY FOR NEW CONSTRUCTION .2007 9
-
8/3/2019 New Construction Survey Guide E-July11
16/61
TABLE1(con
tinue
d)(1
July2011)
Reference
Shipbuilding
Function
Survey
Requirements
for
Classification
SurveyMethod
Requiredfor
Classification
ABS
Rules/Guide(1)
[IACS
Reference
(2,3)]
Statutory
Requirements
andRelevant
Reference
Documentation
Availableto
Classification
Surveyorduring
Construction
Documentation
forShip
Construction
File
Specific
Activities
ABS
Proposalsfor
theProject
.5Verifythat
recordshave
beencompleted
andinaccordanc
e
withrecognized
standards,
e.g.IQIand
sensitivity
recorded
.6Verifythatreports
andradiographs
havebeen
evaluated
correctlybythe
shipbuilder.
Systematic
reviewof
radiographs
carriedoutby
theSurveyor
.7Verifyequipmen
t
calibration
satisfactoryandin
accordancewith
manufacturers
andrecognized
standards
requirements
1.5(cont
d.)
Welding
Embedded
Discontinuities
(contd.)
NDEistobe
carriedoutby
qualified
operatorscapab
le
ofensuringthat
weldsare
substantiallyfree
fromsignificant
indications
Radiography
andultrasonic
testing,review
ofdocuments
andpatrolof
operator,
examinationof
films
Pub#14:
Guidefor
Nondestructive
Inspectionof
HullWelds
[Recommend-
ation20and47]
Shipbuilders
andrecognized
standardsand
Rulesas
applicable,
weldingand
NDEplans,
NDEreports,
operator
qualifications
Notrequired
.8VerifyNDEis
carriedout
accordingto
theacceptable
process
10 ABSGUIDE FOR HULL SURVEY FOR NEW CONSTRUCTION .2007
-
8/3/2019 New Construction Survey Guide E-July11
17/61
TABLE1(con
tinue
d)(1
July2011)
Reference
Shipbuilding
Function
Survey
Requirements
for
Classification
SurveyMethod
Requiredfor
Classification
ABS
Rules/Guide(1)
[IACS
Reference
(2,3)]
Statutory
Requirements
andRelevant
Reference
Documentation
Availableto
Classification
Surveyorduring
Construction
Documentation
forShip
Construction
File
Specific
Activities
ABS
Proposalsfor
theProject
2
SteelPreparationandFitUp:
.1Verifystockyard
storage
satisfactory
.2Verifymaterial
traceability,e.g.
stamping
identification
againstmaterial
certification,
archivingof
records
.3Verifytransfer
markingafter
treatmentline
.4Verifystandard
ofshotblasting
andpriming
.5Verifysuitability
ofprimer
.6Verifythatsteel
gradescanbe
identified
.7Verifymachinery
adjustedto
maintainwithin
IACSor
manufacturers
recommendation
s
.8Verifyaccuracy
ofmarkingand
cutting
2.1
Surface
Preparation,
Markingand
Cutting
Traceabilityand
acceptabilityo
f
material,check
ofsteelplates
&
profilesmateria
ls
type,scantling
identification,
testingmarks
Patrol
[Recommend-
ation47]
Material
certificates,
shipbuilder's
marking/cutting
production
documentsatthe
workstage-
documents
retainedatthe
facility
Notrequired
.9Verifystorage
ofpieceparts.
ABS GUIDE FOR HULL SURVEY FOR NEW CONSTRUCTION .2007 11
-
8/3/2019 New Construction Survey Guide E-July11
18/61
TABLE1(con
tinue
d)(1
July2011)
Reference
Shipbuilding
Function
Survey
Requirements
for
Classification
SurveyMethod
Requiredfor
Classification
ABS
Rules/Guide(1)
[IACS
Reference
(2,3)]
Statutory
Requirements
andRelevant
Reference
Documentation
Availableto
Classification
Surveyorduring
Construction
Documentation
forShip
Construction
File
Specific
Activities
ABS
Proposalsfor
theProject
.1Verifythat
straightening
processesare
approvedforthe
gradeandtype
ofsteel,e.g.,
tmcp,z-plate.
2.2
Straightening
Approvalof
straightening
methods/
procedures
against
deformation
Patroland
review
[Recommend-
ation47]
Recognized
standards,
approved
procedures
Notrequired
2.Verifythatplates
andsectionsare
withinrecognized
tolerances
.1Verifythat
temperature
controlis
exercisedbythe
operator
.2Verifythat
suitablemethods
oftemperature
controlare
availablewhen
formingspecial
steelsand
materials
2.3
Forming
Maintainmaterial
properties.
Acceptanceof
formingmethod
againstunprop
er
deformations
Patrol
[Recommend-
ation47]
Shipbuilders
procedurefor
hotforming
Notrequired
.3Verifythat
formingprocesses
areacceptable
2.4
Conformitywith
Alignment/Fit
Up/GapCriteria
Checkalignme
nt/
fitup/gapagain
st
reference
standards
Patrol
[Recommend-
ation47]
Shipbuilders
andrecognized
standardsand
Rulesas
applicable
Notrequired
.1Verifythe
processesto
ensure
satisfactoryfitup
andalignmentat
allworkstations
12 ABSGUIDE FOR HULL SURVEY FOR NEW CONSTRUCTION .2007
-
8/3/2019 New Construction Survey Guide E-July11
19/61
TABLE1(con
tinue
d)(1
July2011)
Reference
Shipbuilding
Function
Survey
Requirements
for
Classification
SurveyMethod
Requiredfor
Classification
ABS
Rules/Guide(1)
[IACS
Reference
(2,3)]
Statutory
Requirements
andRelevant
Reference
Documentation
Availableto
Classification
Surveyorduring
Construction
Documentation
forShip
Construction
File
Specific
Activities
ABS
Proposalsfor
theProject
.2Verify
thatedge
preparationsare
re-instated
wherelost
duringfitting
operations
2.4(contd)
Conformitywith
Alignment/Fit
Up/GapCriteria
Checkalignme
nt/
fitup/gapagain
st
reference
standards
Patrol
[Recommend-
ation47]
Shipbuilders
andrecognized
standardsand
Rulesas
applicable
Notrequired
.3Verifyremedial
proceduresare
inplaceto
compensatefor
widegapsand
alignment
deviations
.1Verifythatthe
information
relevanttothe
latestapproved
drawingsis
availableatthe
workstations
.2Verifythe
processesto
ensure
satisfactoryfitup
andalignmentat
allworkstations
2.5
Conformityfor
CriticalAreas
withAlignment/
FitUporWeld
Configuration
Checkalignme
nt/
fitup/gapagainst
approved
drawings
Patroland
review
[Recommend-
ation47]
Shipbuilders
andrecognized
standardsand
Rulesas
applicable,
approvedplanor
standard,
builder'srecords
Approvedplans
ofcriticalareas
ifapplicable
.3Verifythatedge
preparationsare
re-instatedwhere
lostduringfitting
operations
ABS GUIDE FOR HULL SURVEY FOR NEW CONSTRUCTION .2007 13
-
8/3/2019 New Construction Survey Guide E-July11
20/61
TABLE1(con
tinue
d)(1
July2011)
Reference
Shipbuilding
Function
Survey
Requirements
for
Classification
SurveyMethod
Requiredfor
Classification
ABS
Rules/Guide(1)
[IACS
Reference
(2,3)]
Statutory
Requirements
andRelevant
Reference
Documentation
Availableto
Classification
Surveyorduring
Construction
Documentation
forShip
Construction
File
Specific
Activities
ABS
Proposalsfor
theProject
2.5(contd)
Conformityfor
CriticalAreas
withAlignment/
FitUporWeld
Configuration
Checkalignme
nt/
fitup/gapagainst
approved
drawings
Patroland
review
[Recommend-
ation47]
Shipbuilders
andrecognized
standardsand
Rulesas
applicable,
approvedplanor
standard,
builder'srecords
Approvedplans
ofcriticalareas
ifapplicable
.4Verifyremedial
procedures
areinplaceto
compensatefor
widegapsand
alignment
deviations
.1Verifythatthe
information
relevanttothe
latestapproved
drawingsis
availableatthe
workstations
.2Verifythatcorrect
weldsizeshave
beenadopted
.3Verifyoperation
ofthewelding
processesatthe
differentwork
stagesis
satisfactory
.4Verifythatpiec
e
partsare
identifiable
3
Steelwork
Process,(e.g.,sub
assembly,block,
grandandmega
blockassembly,
pre-erectionand
erection,closing
plates)
Compliance
withapproved
drawings,visu
al
examinationof
weldingand
material,check
alignmentand
deformations
Patrolofthe
processand
witnessofthe
completeditem
[Recommend-
ation47]
Approvedplans,
shipbuilders
inspection
records,
Shipbuilders
andrecognized
standardsand
Rulesas
applicable,
construction
plan(steelwork
subdivision)
.5Verifythatfit
upsarewithin
recognized
tolerances
14 ABSGUIDE FOR HULL SURVEY FOR NEW CONSTRUCTION .2007
-
8/3/2019 New Construction Survey Guide E-July11
21/61
TABLE1(con
tinue
d)(1
July2011)
Reference
Shipbuilding
Function
Survey
Requirements
for
Classification
SurveyMethod
Requiredfor
Classification
ABS
Rules/Guide(1)
[IACS
Reference
(2,3)]
Statutory
Requirements
andRelevant
Reference
Documentation
Availableto
Classification
Surveyorduring
Construction
Documentation
forShip
Construction
File
Specific
Activities
ABS
Proposalsfor
theProject
.6Verifythat
correctwelding
requirements
specifiedin
reference1of
thistablehave
beenadopted
.7Verifyprocesse
s
forclosing
plates,etc.,are
acceptable
3(contd)
Steelwork
Process,(e.g.,sub
assembly,block,
grandandmega
blockassembly,
pre-erectionand
erection,closing
plates)
(contd)
Compliance
withapproved
drawings,visu
al
examinationof
weldingand
material,check
alignmentand
deformations
Patrolofthe
processand
witnessofthe
completeditem
[Recommend-
ation47]
Approvedplans,
shipbuilders
inspection
records,
Shipbuilders
andrecognized
standardsand
Rulesas
applicable,
construction
plan(steelwork
subdivision)
.8Confirmthat
steelworkisin
accordancewith
theapprovedplan
.1Verifythat
recordshave
beenmaintained
ofsignificant
deviationsfrom
theapproved
plans,for
situationssuch
asmis-cut
openings,
re-routingoutfit
items
4
RemedialWork
andAlteration
Welding,chec
k
against
deformation,
alignment
Reviewrecords
andwitness
[Recommend-
ation47]
Permanentrecord
ofshipyard
surveyableitem
.2Verifythatall
deviations
broughttothe
attentionofABS
bytheshipbuilde
r
areacceptable
ABS GUIDE FOR HULL SURVEY FOR NEW CONSTRUCTION .2007 15
-
8/3/2019 New Construction Survey Guide E-July11
22/61
TABLE1(con
tinue
d)(1
July2011)
Reference
Shipbuilding
Function
Survey
Requirements
for
Classification
SurveyMethod
Requiredfor
Classification
ABS
Rules/Guide(1)
[IACS
Reference
(2,3)]
Statutory
Requirements
andRelevant
Reference
Documentation
Availableto
Classification
Surveyorduring
Construction
Documentation
forShip
Construction
File
Specific
Activities
ABS
Proposalsfor
theProject
.1Confirmthattank
testingiscarried
outinaccordanc
e
withtheapproved
plan
.2Confirmthe
methodsusedto
carryoutleak
testing
.3Confirmthat
correcttest
pressures
maintainedfor
leak,hoseand
hydroandhydro
-
pneumatictesting
issatisfactory
5
Tightness
Testing,
includingleak
andhosetesting,
hydropneumatic
testing
Absenceof
leaks
Patrolofthe
processand
witnessofthe
test
Section3-7-1of
theRulesfor
Buildingand
ClassingSteel
Vessels
[URS14]
Reg.II-1/14of
SOLASas
amended
Approvedtank
testingplan,
shipbuilders
inspection
records
Approvedtank
testingplan
.4Verifythat
adequaterecords
ofthetanktesting
havebeen
maintained
.1Confirmthattank
testingiscarried
outinaccordanc
e
withtheapproved
plan
6
Structural
Testing
Structural
adequacyofth
e
design
Witnesstesting
Section3-7-1of
theRulesfor
Buildingand
ClassingSteel
Vessels
[URS14]
Reg.II-1/14of
SOLASas
amended
Approvedtank
testingplan,
shipbuilders
inspection
records
Approvedtank
testingplan
.2Confirmthat
correcttest
pressures
maintainedfor
testingis
satisfactory
16 ABSGUIDE FOR HULL SURVEY FOR NEW CONSTRUCTION .2007
-
8/3/2019 New Construction Survey Guide E-July11
23/61
TABLE1(con
tinue
d)(1
July2011)
Reference
Shipbuilding
Function
Survey
Requirements
for
Classification
SurveyMethod
Requiredfor
Classification
ABS
Rules/Guide(1)
[IACS
Reference
(2,3)]
Statutory
Requirements
andRelevant
Reference
Documentation
Availableto
Classification
Surveyorduring
Construction
Documentation
forShip
Construction
File
Specific
Activities
ABS
Proposalsfor
theProject
6(contd)
Structural
Testing
(contd)
Structural
adequacyofth
e
design
Witnesstesting
Section3-7-1of
theRulesfor
Buildingand
ClassingSteel
Vessels
[URS14]
Reg.II-1/14of
SOLASas
amended
Approvedtank
testingplan,
shipbuilders
inspection
records
Approvedtank
testingplan
.3Verifythat
adequaterecords
ofthetanktesting
havebeen
maintained
.1Verifythat
appliedcoatings
areapproved
andreview
recordsof
application
(1July2010)
Corrosion
Protection
Systems(e.g.,
coatings,
cathodic
protection,
impressed
current)except
forcoating
systemsubject
toPSPC
Saltwaterballa
st
tankswith
boundaries
formedbythe
hullenvelope,
andalsobulk
carrierhold
internalsurfaces,
coamingsand
hatchcovers
shallhavean
efficient
protective
coating.Safety
aspectsof
cathodicsystem
s
tobedealtwith
separately.
Reviewand
reporton
builder'sand
manufacturer's
documentation
3-2-18/5ofthe
RulesforBuilding
andClassing
SteelVessels
[URZ8andZ9,
UISC122,
URF1]
Reg.II-1/3-2of
SOLASas
amended
Manufacturers
andbuilders
specification
Corrosion
protection
specifications
.2Verifythat
adequate
recordshave
beenmaintained
andcopiedto
theshipfile
7
(1July2010)
Applicationof
Antifouling
Systems
Review
AFSConvention
Painting
Specification
Paint
Specification
andMfg.
Declaration
.3Verifythat
adequaterecords
havebeen
maintainedand
copiedtotheship
constructionfile.
ABS GUIDE FOR HULL SURVEY FOR NEW CONSTRUCTION .2007 17
-
8/3/2019 New Construction Survey Guide E-July11
24/61
TABLE1(con
tinue
d)(1
July2011)
Reference
Shipbuilding
Function
Survey
Requirements
for
Classification
SurveyMethod
Requiredfor
Classification
ABS
Rules/Guide(1)
[IACS
Reference
(2,3)]
Statutory
Requirements
andRelevant
Reference
Documentation
Availableto
Classification
Surveyorduring
Construction
Documentation
forShip
Construction
File
Specific
Activities
ABS
Proposalsfor
theProject
7.1(1July
2010
)
Applicationof
Protective
Coatingsfor
Dedicated
SeawaterBallast
Tanksinall
TypesofShips
andDouble-Side
SkinSpacesof
BulkCarriers
subjecttoPSPC
Monitor
implementatio
n
ofthecoating
inspection
requirements.
Patrollingand
Review
UISC223,PR3
4
Reg.II-1/3-2of
SOLASas
amended;
Coating
Standard
Coating
TechnicalFile
.1Verifythat
appliedcoatings
areapproved
andreview
recordsof
applicationin
accordancewith
Chapter7of
Annexto
MSC.215(82).
8
Installation,WeldingandTestingoftheFollowing:
.1Confirmleaktes
t
ofhatchcovers
8.1
HatchCovers
Tightnessand
securing
Witness
Section3-7-1of
theRulesfor
Buildingand
ClassingSteel
Vessels
[URS14]
Reg.13-14-15
and16ofILLC
'66
Approvedtank
testingplan,
shipbuilders
inspection
records
Detailsrequired,
structural
drawings
.2Confirm
operationand
securingtest
.1Confirmleaktest
.2Confirm
operationand
securingtest
.3Confirmsafety
deviceoperation
8.2
Doorsand
RampsIntegral
withtheShell
andBulkheads
Tightnessand
securing
Witness
Section3-7-1of
theRulesfor
Buildingand
ClassingSteel
Vessels
[URS14]
Reg.II-1/18of
SOLASas
amended;Reg.
12and21of
ILLC'66
Approvedtank
testingplan,
shipbuilders
inspection
records
Detailsrequired
.4Ensurecorrect
maintenance
logs/manuals
suppliedwiththe
shipconstruction
file
18 ABSGUIDE FOR HULL SURVEY FOR NEW CONSTRUCTION .2007
-
8/3/2019 New Construction Survey Guide E-July11
25/61
TABLE1(con
tinue
d)(1
July2011)
Reference
Shipbuilding
Function
Survey
Requirements
for
Classification
SurveyMethod
Requiredfor
Classification
ABS
Rules/Guide(1)
[IACS
Reference
(2,3)]
Statutory
Requirements
andRelevant
Reference
Documentation
Availableto
Classification
Surveyorduring
Construction
Documentation
forShip
Construction
File
Specific
Activities
ABS
Proposalsfor
theProject
.1Confirm
alignmentand
mountingand
fittinguptothe
connectionto
thetiller
.2Confirmfunction
test
.3Verifyfittingof
pintlesandall
securingbolts
8.3
Rudders
Fitting
Witness
Section3-7-1of
theRulesfor
Buildingand
ClassingSteel
Vessels
[URS14]
Approvedplan,
shipbuilders
inspection
records
Detailsrequired,
structural
drawings
.4Verifyallfitup
recordsincluding
allclearances
maintainedand
placedintoship
constructionfile
.1Verifycasting
andforgings
againstmaterial
certificate
.2Verifythatcorrect
weldingandfit
uprequirements
specifiedin
reference1,2.4
and2.5ofthis
tablehavebeen
adopted
8.4
Forgingsand
Castings
Compliance
withapproved
drawings,visu
al
examinationof
weldingand
material,check
alignmentand
deformations
withapproved
drawings,visu
al
examinationof
weldingand
material,check
alignmentand
deformations
Patrolofthe
processand
witnessofthe
completeditem
Sections2-1-6
and2-1-5of
theRulesfor
Materialsand
Welding(Part2
)
[URW7and
W8]
Approvedplans,
shipbuilders
inspection
records,
Shipbuilders
andrecognized
standardsand
Rulesas
applicable,
construction
plan(steelwork
subdivision)
Copiesof
certificatesof
forgingsand
castings
.3Verifythat
material
certificatesare
includedinthe
shipconstruction
file
ABS GUIDE FOR HULL SURVEY FOR NEW CONSTRUCTION .2007 19
-
8/3/2019 New Construction Survey Guide E-July11
26/61
TABLE1(con
tinue
d)(1
July2011)
Reference
Shipbuilding
Function
Survey
Requirements
for
Classification
SurveyMethod
Requiredfor
Classification
ABS
Rules/Guide(1)
[IACS
Reference
(2,3)]
Statutory
Requirements
andRelevant
Reference
Documentation
Availableto
Classification
Surveyorduring
Construction
Documentation
forShip
Construction
File
Specific
Activities
ABS
Proposalsfor
theProject
8.4
Appendages
Compliance
withapproved
drawings,visu
al
examinationof
weldingand
material,check
alignmentand
deformations
withapproved
drawings,visu
al
examinationof
weldingand
material,check
alignmentand
deformations
Patrolofthe
processand
witnessofthe
completeditem
Sections2-1-6
and2-1-5of
theRulesfor
Materialsand
Welding(Part2
)
[URW7and
W8]
Approvedplans,
shipbuilders
inspection
records,
Shipbuilders
andrecognized
standardsand
Rulesas
applicable,
construction
plan(steelwork
subdivision)
Copiesof
certificatesof
forgingsand
castings
.4Verifythatcorrect
weldingandfit
uprequirements
specifiedin
reference1,2.4
and2.5ofthis
tablehavebeen
adopted
.1Verifythatcorrect
weldingandfit
uprequirements
specifiedin
reference1,2.4
and2.5ofthis
tablehavebeen
adopted
8.5
Equipment
Formingthe
Watertightand
Weathertight
Integrityofthe
Ship(e.g.,
overboard
discharges,air
pipes,ventilators)
Tightnessand
securing
Witness
Reg.II-1/19of
SOLASas
amended;Reg.
17-18-19-20-22-
23ofILLC'66
Approvedtank
testingplan,
shipbuilders
inspection
records
Detailsrequired
.2Verify
compliancewith
LoadLine
Convention1966
asamended(i.e
.,
allfittingsin
accordancewith
therecordof
freeboard
assignment)
20 ABSGUIDE FOR HULL SURVEY FOR NEW CONSTRUCTION .2007
-
8/3/2019 New Construction Survey Guide E-July11
27/61
TABLE1(con
tinue
d)(1
July2011)
Reference
Shipbuilding
Function
Survey
Requirements
for
Classification
SurveyMethod
Requiredfor
Classification
ABS
Rules/Guide(1)
[IACS
Reference
(2,3)]
Statutory
Requirements
andRelevant
Reference
Documentation
Availableto
Classification
Surveyorduring
Construction
Documentation
forShip
Construction
File
Specific
Activities
ABS
Proposalsfor
theProject
4-6-4/9.3.7ofthe
RulesforBuilding
andClassing
SteelVessels
[URP3]
.3Verifyairpipes
,
ventsetc.,closing
deviceare
approvedtype
.4Verifymaterial
certificatesfor
overboard
dischargeswhere
applicable
Equipment
Formingthe
Watertightand
Weathertight
Integrityofthe
Ship(e.g.,
overboard
discharges,air
pipes,ventilators)
Tightnessand
securing
Witness
Reg.II-1/19of
SOLASas
amended;Reg.
17-18-19-20-22-
23ofILLC'66
Approvedtank
testingplan,
shipbuilders
inspection
records
Detailsrequired
.5Verifyrecordof
freeboard
assignmentand
allmaterial
certificates
includedinthe
shipconstruction
file
.6Verifyfreeboard
marksin
accordancewith
loadline
assignment
8.5(contd)
FreeboardMarks
andDraftMarks
Within
allowable
tolerancesand
in
accordancewi
th
thefreeboard
assignment
Witness
Appendix1-1-A
1
oftheRulesfor
Conditionsof
Classification
(Part1)
[UI-LL4]
Reg.4-5-6-7
and8ofILLC
'66
Detailsrequired
.7Verifydraft
marksin
accordancewith
theagreed
tolerances
specifiedbythe
builderunless
moreonerous
flagstate
requirements
ABS GUIDE FOR HULL SURVEY FOR NEW CONSTRUCTION .2007 21
-
8/3/2019 New Construction Survey Guide E-July11
28/61
TABLE1(con
tinue
d)(1
July2011)
Reference
Shipbuilding
Function
Survey
Requirements
for
Classification
SurveyMethod
Requiredfor
Classification
ABS
Rules/Guide(1)
[IACS
Reference
(2,3)]
Statutory
Requirements
andRelevant
Reference
Documentation
Availableto
Classification
Surveyorduring
Construction
Documentation
forShip
Construction
File
Specific
Activities
ABS
Proposalsfor
theProject
.8Verifyprincipal
dimensionsin
accordancewith
recognized
standard
Principal
Dimensions
Within
allowable
tolerances
Reviewand
witness
[Recommend-
ation47]
Detailsrequired
.9Verify
dimensions
includedinship
constructionfile
8.5(contd)
Safety
Construction
Certification
Nooutstanding
imperfections
or
defects
Witness
Reg.10of
SOLASas
amended
.10Verifythat
Administration
requirements
havebeen
incorporated
intothehull
structure
Shipbu
ilder'sname
Kick-o
ffMeetingDate
Project
RepresentingBuilder
Project
Duration
RepresentingClassSociety
Notes:
1
ABSreferenceddocumentsareavailablefromtheRulesandGuidesDownloadspageofwww.eagle.org.
2
IACSreferenceddocumentsa
reavailablefromwww.iacs.org.uk.
3
IACSRecommendationsarenotmandatoryrequirements.
22 ABSGUIDE FOR HULL SURVEY FOR NEW CONSTRUCTION .2007
-
8/3/2019 New Construction Survey Guide E-July11
29/61
ABS RULES FOR BUILDING AND CLASSING STEEL VESSELS 2000 23
11 Initial Statutory Surveys at New Construction (1 July 2010)
11.1 Scope*
The scope of this section is to define the requirements for the initial statutory surveys at new construction
as detailed in IMO Resolution A.997(25), which are not addressed in UR Z23 for the following as applicable:
i) International Load Line Certificate (1966)
ii) Cargo Ship Safety Equipment Certificate
iii) International Oil Pollution Prevention Certificate
This section only covers the survey activities required and does not cover the technical interpretations of
the statutory requirements or approval of plans, designs and manuals required by the Regulations.
This section does not cover the requirements for type approval or certification at vendors works and for
which evidence of acceptance is to be provided as indicated in the survey tables.
11.2 Definitions Used in the Survey Tables
Survey Item: A description of the survey item considered
Origin of the Requirement: Applicable Statutory Regulation
Approved Drawings/Documentation: Indicates whether approved drawings/documentation is required
Conformity Verification: This verification may consist of an examination of the certificate, a check of the
marks or, for products which require type approval, to verify conformity of the product with the approvedprototype or certification with Flag Administration requirements
Survey During Construction or Installation: Indicates whether the witness by surveyor of construction andinstallation on board is required
Tightness Testing: Indicates whether tightness testing is required to be witnessed by the surveyor for
survey item
Survey After Construction or Installation: Indicates whether the survey item is examined by the Surveyorafter completion of its construction and installation on board
Function Test: Indicates whether a survey item or system is to be subjected to a functioning and/orperformance test or trial in the presence of a Surveyor after installation on board
Onboard Verification of Documentation: Indicates whether the required documentation is to be verified onboard by the surveyor
Series of Vessels: As defined in section 1-1-4/3.3 of the ABS Rules for Conditions of Classification
* Note: This section is to be uniformly implemented on ships contracted for construction from 1st July 2010.
11.3 ApplicationThis applies to all vessels for which the statutory certificates listed in 11.1 are to be issued at new constructionby ABS.
11.4 Interpretation of the Survey Requirements
Interpretation of the survey requirements is given in Appendix 1
Table 1 Safety Equipment
Table 2 Load Line
Table 3 MARPOL Annex 1
Specific flag administration requirements, if any, supersede the requirements contained in this section.
-
8/3/2019 New Construction Survey Guide E-July11
30/61
24 ABSGUIDE FOR HULL SURVEY FOR NEW CONSTRUCTION .2007
11.5 Qualification and Monitoring of Personnel
The surveys required by this section shall be carried out by exclusive ABS surveyors. The surveyors are tobe qualified to be able to carry out the tasks and procedures are to be in place to ensure that their activitiesare monitored.
11.6 Inspection and test plan for new building activitiesThe shipbuilder is to provide inspection and test plans for the items which are required to be surveyed
and/or tested prior to the commencement of the surveys and/or test.
11.7 Product and Type Approval Certificates
The shipbuilder is to provide product and type approval certificates for the applicable items listed in
Appendix 1 to be placed onboard.
11.8 Proof of the Consistency of Surveys
ABS is to be able to provide evidence, (e.g., through records, check lists, inspection and test records, etc.)that its surveyors have complied with the requirements of this section.
-
8/3/2019 New Construction Survey Guide E-July11
31/61
ABSGUIDE FOR HULL SURVEY FOR NEW CONSTRUCTION .2007 25
Appendix 1: Survey Tables for Initial Statutory Surveys at New Construction
A P P E N D I X 1 Survey Tables for Initial Statutory Surveys atNew Construction (1 July 2010)
1 Description
COLUMN 1 A.997(25) Requirements
COLUMN 2 Survey Item A description of the survey item considered
COLUMN 3 Origin of the Requirement Applicable Statutory Regulation
COLUMN 4Correspondence with Approved
Drawings/DocumentationIndicates whether approved drawings/documentation is required
COLUMN 5 Conformity Verification
This verification may consist of an examination of the certificate,a check of the marks or, for type approved products, to verifyconformity of the product with the approved prototype orcertification with National Requirements
COLUMN 6Survey during construction or
installationIndicates whether the witness by surveyor of fabrication and
installation on board is required
COLUMN 7 Tightness TestingIndicates whether tightness testing is required to be witnessed bythe surveyor for survey item
COLUMN 8Survey after construction or
installationIndicates whether the survey item is examined by the Surveyorafter completion of its installation on board and/or
COLUMN 9 Function Test
Indicates whether a system is to be subjected to a functioning
and/or performance test or trial in the presence of a Surveyorafter installation on board
COLUMN 10Onboard Verification of
documentation
Indicates whether the required documentation is to be verified onboard by the surveyor
-
8/3/2019 New Construction Survey Guide E-July11
32/61
T
ABLE1
SafetyEquip
ment(1
July2010)
A.9
97(25)Requirement
SurveyItem
Originofthe
Requirement
Correspondencewith
ApprovedDrawings/
Documentation
Conformity
Verification
InspectionsDuring
Installation
InspectionAfter
Installation
OnboardVerification
ofDocumentation
FunctionTest
FirePump
s
X
X
X
X
FireMains
X
X
Hydrants
X
X
Hosesand
Nozzles
X
X
X
(EI)
1.1.3.1
Examiningthefirepumpsandfirema
inandthedispositionofthe
hydrants,hosesandnozzlesandthein
ternationalshoreconnection
andcheckingthateachfirepump,includingtheemergencyfire
pump,canbeoperatedseparatelyso
thattwojetsofwaterare
producedsimultaneouslyfromdiffer
enthydrantsatanypartof
theshipwhilsttherequiredpressureismaintainedinthefiremain
InternationalShoreConnection
(SOLAS74/00reg.
II-2/10.2FSSCchs.2
and12)
(SOLAS74/88
regs.II-2/4and19)
X
X
(EI)
1.1.3.2
Examiningtheprovisionanddispositionofthefireextinguishers
FireExtin
guishers
(SOLAS74/00reg.
II-2/10.3FSSCch.4)
(SOLAS74/88reg.
II-2/6)
X
X
X
FireFighters'Outfits
X
X
X
(EI)
1.1.3.3
Examiningthefirefightersoutfitsandemergencyescape
breathingdevicesEEBDs
EEBDs
EmergencyEscape
Breathing
Devices
(SOLAS74/00regs.
II-2/10.10,13.3.4
and13.4.3FSSC
ch.3)
(SOLAS74/88reg.
II-2/17)
X
X
X
(EI)
1.1.3.4
Checkingtheoperationalreadinessand
maintenanceoffire-fighting
systems
OperationalReadinessand
MaintenanceofFire-fighting
System
(SOLAS74/00reg.
II2/14)
(SOLAS74/88
reg.II-2/21)
X
(EI)
1.1.3.5
Examiningthefixedfire-fightingsyste
mforthemachinery,cargo,
vehicle,specialcategoryandro-rospaces,asappropriate,and
confirmingthattheinstallationtestshavebeensatisfactorily
completedandthatitsmeansofoper
ationareclearlymarked
FixedFire
fightingsystems
(SOLAS74/00regs.
II-2/10.4,10.5,1
0.7
and20.6.1,FSSC
chs.5to7)
(SOLAS74/88
regs.II-2/7and5
3)
X
X
X
X
X
Appendix 1 Survey Tables for Initial Statutory Surveys at New Construction
26 ABSGUIDE FOR HULL SURVEY FOR NEW CONSTRUCTION.2007
-
8/3/2019 New Construction Survey Guide E-July11
33/61
-
8/3/2019 New Construction Survey Guide E-July11
34/61
TABLE
1(con
tinue
d)
Sa
fetyEquip
men
t(1
July2010)
A.9
97(25)Requirement
SurveyItem
Originofthe
Requirement
Correspondencewith
ApprovedDrawings/
Documentation
Conformity
Verification
InspectionsDuring
Installation
InspectionAfter
Installation
OnboardVerification
ofDocumentation
FunctionTest
FireDetectionandAlarmSystem
X
X
X
X
FixedFire
ExtinguishingSystem
X
X
Structural
FireProtection
X
X
X
(EI)1.1.3.1
0
Examiningthefireprotectionarrangementsincargo,vehicle
andro-rospacesandconfirming,asfaraspracticableandas
appropriate,theoperationofthemea
nsforclosingthevarious
openings
Precautionagainstignitionof
flammablevapoursinclosed
vehiclesp
aces,closedro-ro
spacesandspecialcategory
spaces
(SOLAS74/00regs.
II-2/10.7,20.2.1,
20.3and20.6.2)
(SOLAS74/88reg.
II-2/53)
X
X
X
WaterSup
ply
X
X
SourcesofIgnition
X
X
X
Detection
System
X
X
X
Ventilation
X
X
Bilgesystem
X
X
Personnel
Protection
X
X
X
FireExtin
guishers
X
X
X
Insulation
ofMachineryspace
boundaries
X
X
X
(EI)1.1.3.1
1
Examining,whenappropriate,thespec
ialarrangementsforcarrying
dangerousgoods,includingchecking
theelectricalequipment
andwiring,theventilation,theprovisionofprotectiveclothing
andportableappliancesandthetestingofthewatersupply,
bilgepumpingandanywatersprays
ystem
WaterSpr
aySystem
(SOLAS74/00reg.
II-2/19(except
19.3.8,19.3.10a
nd
19.4)FSSCchs.9
and10)
(SOLAS74/88reg.
II-2/54)
X
X
X
X
X
SurvivalC
raftProvisionand
Dispositio
n
X
X
X
RescueBoatProvisionand
Dispositio
n
X
X
X
(EI)1.1.3.1
2
Checkingtheprovisionanddispositionofthesurvivalcraft,
whereapplicable,marineevacuation
systemsandrescueboats
MarineEv
acuationSystems
Provision
andDisposition
(SOLAS74/88regs.
III/11to16and31;
LSACsection6.2)
X
X
X
(EI)1.1.3.1
3
Deploymentof50%oftheMESafte
rinstallation
Deployme
ntofMarine
EvacuationSystems
(LSACparagrap
h
6.2.2.2)
X
Appendix 1 Survey Tables for Initial Statutory Surveys at New Construction
28 ABSGUIDE FOR HULL SURVEY FOR NEW CONSTRUCTION .2007
-
8/3/2019 New Construction Survey Guide E-July11
35/61
-
8/3/2019 New Construction Survey Guide E-July11
36/61
TABLE
1(con
tinue
d)
Sa
fetyEquip
men
t(1
July2010)
A.9
97(25)Requirement
SurveyItem
Originofthe
Requirement
Correspondencewith
ApprovedDrawings/
Documentation
Conformity
Verification
InspectionsDuring
Installation
InspectionAfter
Installation
OnboardVerification
ofDocumentation
FunctionTest
Two-way
VHFradiotelephone
apparatus
X
X
X
(EI)1.1.3.2
1
Examiningtheprovisionandstowage
andcheckingtheoperation
ofportableonboardcommunications
equipment,ifprovided,and
two-wayVHFradiotelephoneappara
tusandradartransponders
RadarTra
nsponders
(SOLAS74/88regs.
II-2/12.2andIII/6)
X
X
X
DistressF
laresandLine-
Throwing
Appliances
X
X
OnboardCommunications
equipment
X
X
X
(EI)1.1.3.2
2
Examiningtheprovisionandstowageofthedistressflaresand
theline-throwingappliance,checkingtheprovisionandoperation
offixedonboardcommunicationsequipment,ifprovided,and
testingthemeansofoperationofthe
generalalarmsystem
GeneralA
larmSystem
(SOLAS74/00regs.
III/6and18;LSAC
sections3.1,7.1
and7.2)
X
X
X
Lifebuoys
X
X
X
Lifebuoysfittedwithself-igniting
lights
X
X
X
Lifebuoys
fittedwithself-
activating
smokesignals
X
X
X
Lifebuoys
fittedwithbuoyant
lines
X
X
X
Lifejackets
X
X
X
Immersionsuits
X
X
X
(EI)1.1.3.2
3
Examiningtheprovision,disposition
andstowageofthe
lifebuoys,includingthosefittedwith
self-ignitinglights,self-
activatingsmokesignalsandbuoyan
tlines,lifejackets,and
immersionsuits
Anti-expo
suresuits
(SOLAS74/00regs.
III/7and32to37;
LSACsections2.1,
2.5and3.3)
X
X
X
Appendix 1 Survey Tables for Initial Statutory Surveys at New Construction
30 ABSGUIDE FOR HULL SURVEY FOR NEW CONSTRUCTION .2007
-
8/3/2019 New Construction Survey Guide E-July11
37/61
TABLE
1(con
tinue
d)
Sa
fetyEquip
men
t(1
July2010)
A.9
97(25)Requirement
SurveyItem
Originofthe
Requirement
Correspondencewith
ApprovedDrawings/
Documentation
Conformity
Verification
InspectionsDuring
Installation
InspectionAfter
Installation
OnboardVerification
ofDocumentation
FunctionTest
MusterandEmbarkationStation
Lighting
X
X
AlleywaysandStairways
Lighting
X
X
ExitsgivingAccesstotheMuster
andEmba
rkationStations
Lighting
X
X
MusterandEmbarkationStation
Lightingf
romEmergency
Sourceof
Power
X
X
AlleywaysandStairways
Lightingf
romEmergency
Sourceof
Power
X
X
(EI)1.1.3.2
4
Checkingthelightingofthemusterandembarkationstationsand
thealleyways,stairwaysandexitsgivingaccesstothemuster
andembarkationstations,includingwhensuppliedfromthe
emergencysourceofpower
ExitsgivingAccesstotheMuster
andEmba
rkationStations
Lightingf
romEmergency
Sourceof
Power
(SOLAS74/88regs.
II-1/43andIII/11)
X
X
NavigationLights
X
X
X
X
(EI)1.1.3.2
5
Examiningtheprovisionandpositioningandcheckingthe
operationof,asappropriate,thenavigationlights,shapesand
soundsignallingequipment
Shapesan
dSoundssignalling
equipment
(International
Regulationsfor
Preventing
CollisionsatSea
(COLREG)inforce,
regs.20to24,27
to30and33)
X
X
X
(EI)1.1.3.2
6
Checkingthattheminimumsafedistancesfromthesteeringand
standardmagneticcompassesforall
electricalequipmentare
compliedwith
Bridge
(SOLAS74/00regs.
V/17and19)
X
(EI)1.1.3.2
7
Checkingtheelectromagneticcompa
tibilityofelectricaland
electronicequipmentonorinthevic
inityofthebridge
Bridge
(SOLAS74/00reg.
V/17)
X
X
Appendix 1 Survey Tables for Initial Statutory Surveys at New Construction
ABS GUIDE FOR HULL SURVEY FOR NEW CONSTRUCTION .2007 31
-
8/3/2019 New Construction Survey Guide E-July11
38/61
TABLE
1(con
tinue
d)
Sa
fetyEquip
men
t(1
July2010)
A.9
97(25)Requirement
SurveyItem
Originofthe
Requirement
Correspondencewith
ApprovedDrawings/
Documentation
Conformity
Verification
InspectionsDuring
Installation
InspectionAfter
Installation
OnboardVerification
ofDocumentation
FunctionTest
(EI)1.1.3.2
8
Checking,asappropriate,theprovisionandoperationofthe
followingshipbornenavigationalsystemsequipment
Navigation
Equipment:Magnetic
Compass
X
X
(EI)1.1.3.2
8
.1
Themagneticcompass,includingexaminingthesighting,movement,
illuminationandapylorusorcompassbearingdevice
NavigationEquipment:Pylorus
orCompassBearingDevice
(SOLAS74/00reg.
V/19)
X
X
NavigationEquipment:ECDIS
includingback-uparrangements
X
X
(EI)1.1.3.2
8
.2
Nauticalchartsandnauticalpublicationsnecessaryfortheintended
voyageareavailableandhavebeenupdated,and,whereelectronic
systemsareused,theelectronicchartshavebeenupdatedand
therequiredback-upsystemisprovidedandupdated
NauticalC
hartsandNautical
Publicatio
ns
(SOLAS74/00reg.
V/19)
X
(EI)1.1.3.2
8
.3
Globalnavigationsatellitesystemreceiverorterrestrialradio
navigationsystem
NavigationEquipment:GNSS
receiver
X
X
(EI)1.1.3.2
8
.4
Soundreceptionsystem,whenbridgeistotallyenclosed
NavigationEquipment:Sound
Reception
System
X
X
(EI)1.1.3.2
8
.5
Meansofcommunicationtoemergencysteeringposition,where
provided
NavigationEquipment:Means
ofcommu
nicationwith
Emergenc
ySteeringPosition
X
X
X
(EI)1.1.3.2
8
.6
Sparemagneticcompass
NavigationEquipment:Spare
Magnetic
Compass
X
X
(EI)1.1.3.2
8
.7
Daylightsignallinglamp
NavigationEquipment:
DaylightSignallingLamp
X
X
(EI)1.1.3.2
8
.8
Echosoundingdevice
NavigationEquipment:Echo-
soundingDevice
X
X
Appendix 1 Survey Tables for Initial Statutory Surveys at New Construction
32 ABSGUIDE FOR HULL SURVEY FOR NEW CONSTRUCTION .2007
-
8/3/2019 New Construction Survey Guide E-July11
39/61
TABLE
1(con
tinue
d)
Sa
fetyEquip
men
t(1
July2010)
A.9
97(25)Requirement
SurveyItem
Originofthe
Requirement
Correspondencewith
ApprovedDrawings/
Documentation
Conformity
Verification
InspectionsDuring
Installation
InspectionAfter
Installation
OnboardVerification
ofDocumentation
FunctionTest
(EI)1.1.3.2
8
.9
Radarreflector
NavigationEquipment:Radar
Reflector
X
X
(EI)1.1.3.2
8
.10
Radar(s),includingexaminingthewaveguideandcablerunsfor
routeingandprotectionandthedisplayunitconfirminglighting,
correctoperationofallcontrols,and
functions
NavigationEquipment:Radar
Installations
X
X
X
NavigationEquipment:
Electronic
PlottingAid
X
X
(EI)1.1.3.2
8
.11
Electronicplottingaid,automatictrackingaidorautomaticradar
plottingaidasappropriate,usingthe
appropriatetestfacilities
NavigationEquipment:
AutomaticTrackingaid(s)or
AutomaticRadarPlottingAid
X
X
(EI)1.1.3.2
8
.12
Speedanddistancemeasuringdevices"throughthewater"and
"overtheground"
NavigationEquipment:Speed
andDistancemeasuringDevice
X
X
(EI)1.1.3.2
8
.13
Transmittingheadingdeviceprovidingheadinginformationto
radar,plottingaidsandautomaticidentificationsystem
equipmentandvoyagedatarecorder
NavigationEquipment:
TransmittingHeadingDevice
X
X
(EI)1.1.3.2
8
.14
Automaticidentificationsystem
NavigationEquipment:AIS
Automatic
IdentificationSystem
X
X
NavigationEquipment:Gyro
Compass
X
X
(EI)1.1.3.2
8
.15
Gyrocompass,includingexaminingthealignmentofthemaster
andallrepeaters
NavigationEquipment:Gyro
CompassRepeaters
X
X
(EI)1.1.3.2
8
.16
Rudderangleindicator
NavigationEquipment:Rudder
AngleInd
icator
X
X
Appendix 1 Survey Tables for Initial Statutory Surveys at New Construction
ABS GUIDE FOR HULL SURVEY FOR NEW CONSTRUCTION .2007 33
-
8/3/2019 New Construction Survey Guide E-July11
40/61
TABLE
1(con
tinue
d)
Sa
fetyEquip
men
t(1
July2010)
A.9
97(25)Requirement
SurveyItem
Originofthe
Requirement
Correspondencewith
ApprovedDrawings/
Documentation
Conformity
Verification
InspectionsDuring
Installation
InspectionAfter
Installation
OnboardVerification
ofDocumentation
FunctionTest
(EI)1.1.3.2
8
.17
Propellerrateofrevolutionindicator
NavigationEquipment:
PropellerrateofRevolution
Indicator
X
X
(EI)1.1.3.2
8
.18
Propeller,operationalmode,thrust,a
ndpitchindicator
NavigationEquipment:
Variable-Pitchpropellerpitch
andoperationalmodeindicator
X
X
(EI)1.1.3.2
8
.19
Rate-of-turnindicator
NavigationEquipment:Rateof
TurnIndicator
X
X
(EI)1.1.3.2
8
.20
Headingortrackcontrolsystem
NavigationEquipment:
Headingo
rTrackControl
System
X
X
(EI)1.1.3.2
9
Checkingfortheprovisionandoperationofthevoyagedatarecorder
VDRVoyageDataRecorder
(SOLAS74/00reg.
V/20)
X
X
(EI)1.1.3.3
1
Checkingnavigationbridgevisibility
NavigationBridgeVisibility
(SOLAS74/00reg.
V/22)
X
(EI)1.1.3.3
2
Checkingtheprovisionand,asappro
priate,thedeploymentor
operationofthepilotladdersandhoists/pilottransferarrangements
Pilotladdersandhoists/pilot
transferar
rangements
(SOLAS74/00reg.
V/23)
X
X
X
X
DeckFoam
System:FoamTanks
X
X
DeckFoamSystem:Monitors
X
X
X
DeckFoam
System:Applicators
X
X
X
(EI)1.1.4.1
Checkingthedeckfoamsystem,includingthesuppliesoffoam
concentrate,andtestingthattheminim
umnumberofjetsofwater
attherequiredpressureinthefiremain
isobtained(see(EI)1.1.3.1)
whenthesystemisinoperation
DeckFoamSystem:Foam
Concentra
tes
(SOLAS74/00reg.
II-2/10.8;FSSC
ch.15)
(SOLAS74/88reg.
II-2/61)
X
(EI)1.1.4.2
Examiningtheinertgassystemandinparticular:
CargoTan
kProtection:Venting
(SOLAS74/00reg.
II-2/4.5.5;FSSC
ch.15)
(SOLAS74/88reg.
II-2/62)
X
X
Appendix 1 Survey Tables for Initial Statutory Surveys at New Construction
34 ABSGUIDE FOR HULL SURVEY FOR NEW CONSTRUCTION .2007
-
8/3/2019 New Construction Survey Guide E-July11
41/61
TABLE
1(con
tinue
d)
Sa
fetyEquip
men
t(1
July2010)
A.9
97(25)Requirement
SurveyItem
Originofthe
Requirement
Correspondencewith
ApprovedDrawings/
Documentation
Conformity
Verification
InspectionsDuring
Installation
InspectionAfter
Installation
OnboardVerification
ofDocumentation
FunctionTest
(EI)1.1.4.2
.
1
Examiningexternallyforanysignof
gasoreffluentleakage
SignsofG
asorEffluentLeakage
X
X
(EI)1.1.4.2
.
2
Confirmingtheproperoperationofb
othinertgasblowers
InertGasBlowers
X
(EI)1.1.4.2
.
3
Observingtheoperati