Download - NEA Different Projects
Nepal Electricity AuthorityList of Projects to be Developed by Independent Power Producers
Power Purchase Agreement (PPA) Concluded Projects
S.No. Name of Company Name of ProjectLocation Date of PPA(District) BS AD
Projects In Operation1 Himal Power Ltd. Khimti Khola Dolkha 60,000 Magh 1, 2052 15-Jan-96
2 Bhotekoshi Power Company Ltd. Bhotekoshi Khola Sindhupalchok 45,000 Shrawan 6, 2053 21-Jul-96
3 Chilime Rasuwa 22,000 Ashadh 11, 2054 25-Jun-97
4 Indrawati - III Sindhupalchowk 7,500 Mangsir 15, 2054 30-Nov-97
5 Butwal Power Company Ltd. Jhimruk Khola Pyuthan 12,000 Ashadh 29, 2058 13-Jul-01
6 Butwal Power Company Ltd. Andhi Khola Syangza 9,400 Ashadh 29, 2058 13-Jul-01
7 Syange Bidyut Company Limited Syange Khola Lamjung 183 Magh 3, 2058 16-Jan-02
8 Piluwa Khola Sankhuwasava 3,000 Magh 9, 2056 23-Jan-00
9 Rairang Khola Dhading 500 Mangsir 27, 2059 13-Dec-02
10 Sunkoshi Khola Sindhupalchok 2,500 Kartik 28, 2058 13-Nov-01
11 Alliance Power Nepal Pvt.Ltd. Chaku Khola Sindhupalchok 3,000 Falgun 3, 2056 15-Feb-00
12 Khudi Hydro Power Ltd. Khudi Khola Lamjung 3,450 Ashadh 4, 2058 18-Jun-01
13 Unique Hydel Co. Pvt.Ltd. Baramchi Khola Sindhupalchowk 4,200 27-Mar-02
14 Thoppal Khola Dhading 1,650 Falgun 23, 2059 7-Mar-03
15 Sisne Khola Palpa 750 Shrawan 29, 2061 13-Aug-04
Capacity (kW)
Chilime Hydro Power Company Ltd.
National Hydro Power Company Ltd.
Arun Valley Hydro Power Company Ltd.
Rairang Hydro Power Development Co. (P) Ltd.
Sanima Hydro Power Company Ltd.
Chaitra 14, 2058 Mangsir 3, 2066
Thoppal Khola Hydro Power Co. Pvt. Ltd.
Gautam Buddha Hydropower (Pvt) Ltd
Nepal Electricity AuthorityList of Projects to be Developed by Independent Power Producers
Power Purchase Agreement (PPA) Concluded Projects
S.No. Name of Company Name of ProjectLocation Date of PPA(District) BS AD
Capacity (kW)
16 Sali Nadi Kathmandu 232 Shrawan 24, 2062 8-Aug-05
17 Pheme Khola Panchtar 995 Chaitra 31, 2057 13-Apr-01
18 Unified Hydropower (P) Ltd. Pati Khola Parbat 996 Magh 28, 2062 10-Feb-06
19 Seti-II Kaski 979 Ashwin 08, 2063 24-Sep-06
20 Ridi Khola Gulmi 2,400 Bhadra 08, 2063 24-Aug-06
21 Upper Hadi Khola Sindhupalchowk 991 Shrawan 7, 2064 23-Jul-07
22 Gandaki Hydro Power Co. Pvt. Ltd. Mardi Khola Kaski 4,800 Kartik 7, 2060 24-Oct-03
23 Mai Khola Ilam 4,500 Chaitra 19, 2063 2-Apr-07
24 Baneshor Hydropower Pvt. Ltd. Lower Piluwa Sankhuwasabha 990 Kartik 21,2064
25 Hewa Khola Sankhuwasabha 4,455 Ashwin 2, 2064
26 Nyadi Group (P.) Ltd. Siuri Khola Lamjung 4,950 Shrawan 17, 2064 2-Aug-07
27 United Modi Hydropwer Pvt. Ltd. Lower Modi I Parbat 9,900 Magh 20, 2065 2-Feb-09
28 Bijayapur-1 Kaski 4,410 Ashadh 30, 2066 14-Jul-09
29 Sipring Khola Dolkha 9,658 Magh 20, 2065 2-Feb-09
30 Solar Kathmandu, Lalitpur 680 Aswin 12, 2069
Kathmandu Small Hydropower Systems Pvt. Ltd.
Khoranga Khola Hydro Power Co. Ltd.
Task Hydropower Company (P.) Ltd.
Ridi Hydropower Development Co. (P.) Ltd.Centre for Power Dev. And Services (P.) Ltd.
Himal Dolkha Hydropower Company Ltd.
Barun Hydropower Development Co. (P.) Ltd.
Bhagawati Hydropower Development Co. (P.) Ltd.
Synergy Power Development (P.) Ltd.
Kathmandu Upatyaka Khanepani Board
Nepal Electricity AuthorityList of Projects to be Developed by Independent Power Producers
Power Purchase Agreement (PPA) Concluded Projects
S.No. Name of Company Name of ProjectLocation Date of PPA(District) BS AD
Capacity (kW)
31 Tadi Khola (Thaprek) Nuwakot 5,000 28-Mar-05
32 Middle Chaku Sindhupalchowk 1,800 Falgun 03, 2066 15 Feb. 10
33 Nepal Hydro Developer Pvt..Ltd Charanawati Khola Dolakha 3,520
34 Lower Chaku Khola Sindhupalchowk 1,765 Kartik 02, 2063
35 Ankhu Khola - 1 Sindhupalchok 8,400 Jestha 22, 2066 5-Jun-09
Sub Total 240,554
Projects Under Construction
36 Lower Indrawati Khola Sindhupalchok 4,500 Mangsir 23, 2059 9-Nov-02
37 Bhairab Kunda Sindhupalchowk 3,000 17-Nov-08
38 Bojini Company Private Limited Jiri Khola Dolkha 2,200 Magh 23, 2065 5-Feb-09
39 Eastern Hydropower (P.) Ltd. Pikhuwa Khola Bhojpur 2,475 Kartik 24, 2066 10 Nov. 09
40 Sanima Hydro Power P.Ltd. Mai Khola Ilam 22,000 Baishakh 8, 2067 21-Apr-10
41 Upper Tamakoshi HPP Dolkha 456,000 Poush 14, 2067 29-Dec-10
42 Prime Hydropower Co. Pvt. Ltd. Belkhu Dhading 518 Shrawan 4, 2064 20-Jul-07
Aadishakti Power Dev. Company (P.) Ltd.
Chaitra 15, 2061, 2068/4/15 amd from 970
Laughing Buddha Power Nepal (P.) Ltd.
Laughing Buddha Power Nepal (P.) Ltd.
Ankhu Khola Jal Bidhyut Co. (P.) Ltd.
Sunkoshi Hydro Power Co. Pvt. Ltd.
Bhairabkunda Hydropower Pvt. Ltd.
Mangsir 2, 2065, 17 chait 2065
Upper Tamakoshi Hydropower Co. Ltd.
Nepal Electricity AuthorityList of Projects to be Developed by Independent Power Producers
Power Purchase Agreement (PPA) Concluded Projects
S.No. Name of Company Name of ProjectLocation Date of PPA(District) BS AD
Capacity (kW)
43 Mailung Khola Rasuwa 5,000 Shrawan 9, 2058 24-Jul-01
44 Jhyadi Khola Sindhupalchowk 2,000 13-May-10
45 Phawa Khola Taplejung 4,950 Falgun 1, 2063 13-Feb-07
46 Upper Mai Khola Ilam 9,980 1-Apr-05
47 Chake Khola Ramechhap 2,830 Falgun 6, 2065 17-Feb-09
48 Madi Power Pvt. Ltd. Upper Madi Kaski 19,008 Bhadra 21, 2066 6 Sep. 09
49 Radhi Bidyut Company Ltd. Radhi Khola Lamjung 4,400 Magh 18, 2066 01 Feb. 10
50 Greenlife Energy Pvt.Ltd Khani khola-1 Dolakha 25,000 Ashoj 24, 2067 10-Oct-10
51 Sanjen Hydropower Co.Limited Upper Sanjen Rasuwa 14,800 Aswin 23, 2068
52 Middle Bhotekoshi Sindhupalchowk 102,000 Kartik 28, 2068
53 RasuwaGadi Rasuwa 111,000 Kartik 28, 2068
54 Water and Energy Co.Pvt.Ltd Badi Gad Baglung 6,600 Mansir 13, 2068
55 Sanjen Hydropower Co.Limited Sanjen Rasuwa 42,500 Mansir 19, 2068
Mailung Khola Hydro Power Company (P.) Ltd.
Electro-com and Research Centre Pvt.Ltd
Baishakh 30, 2067, 2068/4/15 amd by 1MW
Shivani Hydropower Company (P.) Ltd.
East Nepal Development Endeavour (P) Ltd
Chaitra 19, 2061, 2068/4/13 amd from 3100
Garjang Upatyaka Hydropower (P.) Ltd.
Middle Bhotekoshi Jalbidhyut Company
Chilime Hydro Power Company Ltd.
Nepal Electricity AuthorityList of Projects to be Developed by Independent Power Producers
Power Purchase Agreement (PPA) Concluded Projects
S.No. Name of Company Name of ProjectLocation Date of PPA(District) BS AD
Capacity (kW)
56 Gelun Hydropower Co.Pvt.Ltd Gelun Sindhupalchowk 3,200 Poush 25, 2068
57 Hewa Khola A Pachathar 14,900
58 Upper Marsyangdi A Lamjung 50,000
59 Upper Puwa Khola-1 Ilam 3,000
60 Hira Ratna Hydropower P.ltd Tadi Khola Nuwakot 5,000 Baishakh 9, 2067 22-Apr-10
61 Robust Energy Pvt. Ltd. Mistri Khola Myagdi 42,000 Magh 20, 2067
62 Dronanchal Hydropower Co.Pvt.Ltd Dhunge-Jiri Dolakha 600 Poush 28, 2068
63 Chhandi Lamjung 1,700 Chaitra 23, 2068
64 Tungun-Thosne Lalitpur 4,360 Srawan 5, 2069
65 Khani Khola Lalitpur 2,000 Srawan 5, 2069
66 Manang Trade Link Pvt. Ltd. Lower Modi Parbat 20,000 Bhadra 20, 2068
67 Chhote Khola Gorkha 993 Phalgun 9, 2067
68 Ruru Hydropower Project (P) Ltd. Upper Hugdi Khola Gulmi 5,000 20 Sep. 09
Pachathar Power Company Pvt. Ltd.
Sinohydro-Sagarmatha Power Company (P.) Ltd
Joshi Hydropower Development Co. (P.) Ltd.
Chyangdi Hydropower Privated Limited
Pashupati Energy Development Co. Pvt. Ltd.
Pashupati Energy Development Co. Pvt. Ltd.
Pashupati Environmental Eng. Power Co. Pvt. Ltd.
Ashwin 4, 2066 (Capacity Upgraded on 2067/12/18 of 2400 KW)
Nepal Electricity AuthorityList of Projects to be Developed by Independent Power Producers
Power Purchase Agreement (PPA) Concluded Projects
S.No. Name of Company Name of ProjectLocation Date of PPA(District) BS AD
Capacity (kW)
69 Universal Power Company (P) Ltd. Lower Khare Dolakha 8,260 Magh 22, 2069
70 Jumdi Hydropower Pvt. Ltd. Jumdi Khola Gulmi 1,750 Magh 21, 2066 04 Feb. 10
71 Daram Khola A Baglung 2,500 Chaitra 19, 2068
72 Dariyal Small Hydropower Pvt.Ltd Upper Belkhu Dhading 750 Falgun 28, 2068
73 Mount Kailash Energy Pvt. Ltd. Thapa Khola Myagdi 11,200 Magh 11, 2067
Sub-Total = 1,023,774
PPA Concluded Projects (In Different Stage of Development)
74 Annapurna Group Pvt. Ltd. Madi-1 Khola Kaski 10,000 Mangsir 18, 2060 4-Dec-03
75 TMB Energietechnik Rupandehi 600 Magh 25, 2063 8-Feb-07
76 Nama Buddha Hydropower (P) Ltd Tinau Khola Palpa 990 Asadh 31, 2065 15-Jul-08
77 Gayatri Hydro Power (P.) Ltd. Charanawati Dolakha 980 Kartik 6, 2065 22-Oct-08
78 Mansarowar Powers (P.) Ltd. Golmagad Doti 580 Kartik 10, 2065 26-Oct-08
79 L. K. Power (P.) Ltd. Dapcha-Roshi Kavrepalanchowk 5,000 Chaitra 24, 2066 6-Apr-09
80 Universal Power Company (P) Ltd. Ladku Khola Kavrepalanchowk 700 Ashadh 9, 2066 23-Jun-09
Sayapatri Hydropower Privated Limited
Narayani Shankar Biomass
Nepal Electricity AuthorityList of Projects to be Developed by Independent Power Producers
Power Purchase Agreement (PPA) Concluded Projects
S.No. Name of Company Name of ProjectLocation Date of PPA(District) BS AD
Capacity (kW)
81 Himalayan Hydropower Pvt. Ltd. Namarjun Madi Kaski 11,880 Bhadra 30, 2066 15-Sep-09
82 Lower Balephi Sindhupalchowk 18,514 Ashwin 7, 2066 23 Sep. 09
83 Shreeup Hydropower Co. (P.) Ltd. Seti Khola Chitwan 465 Kartik 25, 2066 11 Nov. 09
84 Sikles Hydropower (P) Ltd. Madkyu Khola Kaski 9,968 Mangsir 3, 2066 18 Nov. 09
85 Lower Sunkoshi -III Sindhupalchowk 9,900 Mangsir 19, 2066 04 Dec. 09
86 Middle Gaddigad Doti 2,970 Magh 20, 2066 03 Feb. 10
87 Barahi Hydropower Pvt.ltd Theule Khola Baglung 1,500 Chaitra 16, 2066 29-Mar-10
88 Api Power Company Pvt.Ltd NauGad Gad Khola Baitadi 8,500 Baishakh 19, 2067 2-May-10
89 Eklekunda Hydropower Co.Pvt.Ltd Dorkhu Khola Nuwakot 990 Baishakh 26, 2067 9-May-10
90 Energy Engineering Pvt.ltd Upper Mailun A Rasuwa 5,000 Ashar 25, 2067 9-Jul-10
91 Teleye Samyak Company Pvt.Ltd Dhansi Khola Rolpa 955 Shrawan 12,2067 28-Jul-10
92 Shiva Shree Hydropower Pvt.Ltd Upper Chaku A Sindhupalchowk 22,200 Bhadra 22, 2067 7-Sep-10
93 Swoyembhu Hydropower Pvt. Ltd Upper charnawati Dolakha 2,020 Mangsir 15, 2067 1-Dec-10
Welcome Energy Development Company (P.) Ltd.
Baishno Devi Hydro Power (P.) Ltd.
Triyog Energy & Development Pvt. Ltd.
Nepal Electricity AuthorityList of Projects to be Developed by Independent Power Producers
Power Purchase Agreement (PPA) Concluded Projects
S.No. Name of Company Name of ProjectLocation Date of PPA(District) BS AD
Capacity (kW)
94 Balefi Jalbidhyut Com. Pvt. Ltd Balefi Sindhupalchowk 24,000 Poush 8, 2067 23-Dec-10
95 Himalayan Urja Bikas Co. Pvt. Ltd. Upper Khimti Dolkha 12,000 Magh 9, 2067
96 Green Venture Pvt.Ltd. Likhu-IV 52,400 Magh 19, 2067
97 Upper Ingua Khola Ilam 9,700 Ashar 10, 2068
98 Daraudi Kalika Hydro Pvt. Ltd. Daraudi Khola A Gorkha 6,000 Bhadra 19, 2068
99 Molnia Power Ltd. Upper Mailung Rasuwa 14,300 Bhadra 23, 2068
100 Tame Khola Dailekha 1,250 Ashwin 8, 2068
101 Sardi Khola Kaski 3,500 Falgun 11, 2068
102 Saba Khola Sankhubasha 3,300 Falgun 17, 2068
103 Suryakunda Hydroelectric Pvt. Ltd. Upper Tadi Nuwakot 11,000 Chaitra 3, 2068
104 Upper Mai C Ilam 5,100 Chaitra 23, 2068
105 Himalayan Power Partner Pvt. Ltd. Dordi Khola Lamjung 27,000 Asadh 1, 2069
106 Khani Khola(Dolakha) Dolakha 30,000 Ashadh 25, 2069
Okhaldhunga, Ramechhap
Ingua Hydropower Company Pvt.Ltd
Jywala Sajhedari Hydropower Company Pvt. Ltd.
Mandakani Hydropower Privated Limited
Dibeshwori Hydropower Company Limited
Mai Valley Hydropower Privated Limited
Sasa Engingeering Hydropower (P). Ltd
Nepal Electricity AuthorityList of Projects to be Developed by Independent Power Producers
Power Purchase Agreement (PPA) Concluded Projects
S.No. Name of Company Name of ProjectLocation Date of PPA(District) BS AD
Capacity (kW)
107 Arun Kabeli Power Ltd. Kabeli B-1 Taplejung, Panchthar 25,000 Ashadh 29, 2069
108 Rising Hydropower Compnay Ltd. Selang Khola Sindhupalchowk 990 Asadh 31, 2069
109 Upper Piluwa Khola Sankhuwa Sabha 9,622 Srawan 1, 2069
110 Suspa Bukhari Dolakha 350 Srawan 32, 2069
111 Middle Tadi Nuwakot 5,325 Bhadra 10, 2069
112 Rshikesh Hydropower Pvt. Ltd. Upper Jumdi Gulmi 995 Bhadra 26, 2069
113 Liberty Hydropower Pvt. Ltd. Upper Dordi A Lamjung 22,000 Ashwin 2, 2069
114 Hydro Innovation Pvt. Ltd. Tinekhu Khola Dolakha 990 Aswin 8, 2069
115 Salankhu Khola Nuwakot 2,500 Aswin 14, 2069
116 Moonlight Hydropower Pvt. Ltd. Balefi A Sindhupalchowk 10,600 Kartik 14, 2069
117 Sanvi Energy pvt. Ltd. Jogmai Ilam 7,600 Mangsir 7, 2069
118 Miya Khola Khotang 996 Mangsir 10, 2069
119 Middle Modi Hydropower Ltd. Madhya Modi Parbat 15,100 Magsir 21, 2069
Upper Piluwa Khola Hydropower Co. Pvt. Ltd.
Kutheli Bukhari Small Hydropower (P).Ltd
Dupcheshowr Mahadev Hydro Co. (P) Ltd.
Salankhu Khola Hydropower Pvt. Ltd.
Sapsu Kalika Hydropower Co. Pvt. Ltd.
Nepal Electricity AuthorityList of Projects to be Developed by Independent Power Producers
Power Purchase Agreement (PPA) Concluded Projects
S.No. Name of Company Name of ProjectLocation Date of PPA(District) BS AD
Capacity (kW)
120 Reliable Hydropower Co. Pvt. Ltd. Khorunga Khola Terhathum 4,800 Magsir 26, 2069
121 Rara Hydropower Co. Pvt. Ltd. Upper Parajuli Khola Dailekha 2,150 Magsir, 28, 2069
122 Lohore Hydropower Co. Pvt. Ltd. Lohore Khola Dailekha 4,200 Mangsir 8, 2069
123 Beni Hydropower Project Pvt. Ltd. Upper Solu Solukhumbu 18,000 Magsir 16, 2069
124 Rawa Khola Khotang 6,500 Paush 26, 2069
125 Bagmati Khola Makabanpur 20,000 Magh 7, 2069
126 Sanima Mai Hydropower Ltd. Mai Cascade Ilam 7,000 Magh 12, 2069
127 Middle Midim Lamjung 3,100 Magh 23, 2069
128 Volcano Hydropower Pvt. Ltd. Teliya Khola Dhankuta 996 Magh 25, 2069
129 Union Hydropower Pvt Ltd. Midim Karapu Lamjung 3,000 Magh 28 2069
130 Rudi A Lamjung, Kaski 6,800 Magh 28, 2069
131 Mai sana Cascade Ilam 8,000 Phalgun 14, 2069
132 Molung Hydropower Co. Pvt. Ltd. Molung Khola Okhaldhunga 7,000 Phalgun 21, 2069
Dudhkoshi Power Company Pvt. Ltd.
Mandu Hydropower Company Pvt.Ltd
Madhya Midim Jalbidhyut Company P. Ltd.
Bidhyabasini Hydropower Development Co. Pvt.Ltd.
Himal Dolkha Hydropower Company Ltd.
Nepal Electricity AuthorityList of Projects to be Developed by Independent Power Producers
Power Purchase Agreement (PPA) Concluded Projects
S.No. Name of Company Name of ProjectLocation Date of PPA(District) BS AD
Capacity (kW)
133 Phalankhu Khola Rasuwa 13,700 Chaitra 6, 2069
134 Upper Khimti II Ramechhap 7,000 Chaitra 9, 2069
135 Salmendevi Hydropower (P).Ltd Kapadigad Doti 3,300 Chaitra 11, 2069
136 Junbesi Khola Solukhumbu 5,200 Chaitra 29, 2069
137 Ghalendi Khola Myagdi 4,000 Chaitra 30, 2069
138 Dwari Khola Dailekha 3,750 Chaitra 30, 2069
139 Lower Midim Lamjung 996 Baishakh 19, 2070
140 Iwa Khola Taplejung 9,900 Baishakh 29, 2070
141 Apolo Hydropower Pvt. Ltd. Buku Khola Solukhumbu 6,000 Jestha 2, 2070
142 Midim Khola Lamjung 100 Jestha 20, 2070
143 Tangchhara Hydro Pvt. Ltd. Tangchhahara Mustang 2,200 Jestha 20, 2070
144 Abiral Hydropower Co. Pvt. Ltd. Upper Khadam Morang 990 Jestha 21, 2070
145 Midim Hydropower Pvt. Ltd. Midim Khola Lamjung 3,400 Asadh 30, 2070
Betrawoti Hydropower Company (P).Ltd
Himalaya Urja Bikash Company (P).Ltd
Dovan Hydropower Company (P).Ltd
Cemat Power Dev Company (P).Ltd
Bhugol Energy Dev Compay (P). Ltd
Tallo Midim Jalbidhut Company (P) Ltd.
Rairang Hydro Power Development Co. (P) Ltd.
Deurali Bahuudesiya Sahakari Sanstha Ltd.
Nepal Electricity AuthorityList of Projects to be Developed by Independent Power Producers
Power Purchase Agreement (PPA) Concluded Projects
S.No. Name of Company Name of ProjectLocation Date of PPA(District) BS AD
Capacity (kW)
146 Ghatte Khola Dolakha 5,000 Srawan 28, 2070
147 Lower Solu Solukhumbu 82,000 Kartik 15, 2070
148 Khare Khola Dolakha 24,100 Kartik 15, 2070
149 Solu Khola Solukhumbu 23,500 Kartik 24, 2070
150 Singati Hydro Energy (P) Ltd Singati Khola Dolakha 16,000 Kartik 27, 2070
151 Maya Khola HP Co. P. Ltd. Maya Khola Sankhuwa Sabha 14,900 Mangsir 30, 2070
152 Idi Hydropower Co. P.ltd. Idi Khola Kaski 975 Poush 1, 2070
153 Todi Khola Nuwakot 4,993 Chaitra 10, 2070
Sub Total = 733,887
Grand Total = 1,998,215
Manakamana Engineering Hydropower Co. Pvt. L.
Essel Clean Solu Hydropower (P).Ltd
Conrorium Power Developer (P) Ltd
Upper Solu Hydroelectric Company (P).Ltd
Buohabhumi Nepal Hydropower Co. P.ltd.
Nepal Electricity AuthorityList of Projects to be Developed by Independent Power Producers
RCOD (as per PPA) CODBS BS
Ashadh 27, 2057
Magh 11, 2057
Bhadra 8, 2060
Magh 10, 2058
Ashwin 1, 2060
Mangsir 1, 2061
Chaitra 11,2061
Ashadh 1,2062
Poush 15, 2063
Kartik 13, 2064
Ashwin 1, 2064
Ashwin 21, 2059
Poush 27, 2063 Kartik
28, 2067
Nepal Electricity AuthorityList of Projects to be Developed by Independent Power Producers
RCOD (as per PPA) CODBS BS
Mangsir 1, 2064
Mangsir 5, 2064
Magh 27, 2065
Falgun 14, 2065
Kartik 10, 2066
Kartik 22, 2066
Magh 08, 2066
Shrawan 1, 2068
Shrawan 17, 2068
Kartik 30, 2069
Mansir 10, 2069
Bhadra 4,2069
Magh 3, 2069
Kartik 15, 2069
Magh 14, 2067(upgrade
2400 Kw)
Nepal Electricity AuthorityList of Projects to be Developed by Independent Power Producers
RCOD (as per PPA) CODBS BS
Chaitra 14,2069
Falgun 15, 2069
Jestha 24, 2070
Falgun 1, 2068
Ashadh 15, 2063
Ashadh 31 , 2069
Falgun 30, 2069
Ashad 30, 2070
Chaitra 30, 2067
Jestha 1, 2068, 14 chaitra 2068
Poush 10, 2072 - 4 Units, Asadh 30, 2073 - 2 Units
Nepal Electricity AuthorityList of Projects to be Developed by Independent Power Producers
RCOD (as per PPA) CODBS BS
Chaitra 18, 2060
61776
Poush 16, 2067
Ashad 16, 2068
Shrawan 1, 2071
Chaitra 31, 2069
Ashad 1, 2072
Shrawan 15, 2072
Ashadh 1 , 2074
Ashadh 1 , 2074
Jestha 14, 2072
Poush 15, 2072
Falgun 20, 2065, 2071/3/31
Nepal Electricity AuthorityList of Projects to be Developed by Independent Power Producers
RCOD (as per PPA) CODBS BS
Falgun 7, 2070
Shrawan 1, 2070
Jestha 3, 2073
Baishakh 17, 2072
Bhadra 14, 2072
Chaitra 30, 2071
Chaitra 30, 2071
Asjoj 15, 2072
Chaita 25, 2069
Jestha 18, 2069
Nepal Electricity AuthorityList of Projects to be Developed by Independent Power Producers
RCOD (as per PPA) CODBS BS
Poush 17, 2073
Magh 11, 2069
Magh 1, 2071
Kartik 16, 2071
Jestha 5, 2071
Mangsir 30,2065
Chaitra 18, 2065
Falgun 1, 2066
Aswin 1, 2068
Poush 30, 2066
Falgun 1, 2068
Kartik 30, 2068
Nepal Electricity AuthorityList of Projects to be Developed by Independent Power Producers
RCOD (as per PPA) CODBS BS
Shrawan 1, 2071
Chaitra 17, 2070
Falgun 1, 2068
Shrawan 4, 2071
Mangsir 15, 2071
Baishakh 02, 2069
Shrawan 16, 2069
Poush 15, 2070
Falgun 1, 2069
Shrawan 1, 2071
Falgun 28, 2069
Baishakh 1, 2071
Jestha 7, 2070
Nepal Electricity AuthorityList of Projects to be Developed by Independent Power Producers
RCOD (as per PPA) CODBS BS
Poush 16, 2071
Kartik 30, 2072
Poush 16, 2071
Shrawan 1, 2073
Shrawan 15, 2072
Shawan 1, 2072
Phalgun 15, 2070
Kartik 11, 2072
Chaitra 1, 2071
Asoj 23, 2074
Chaitra 12, 2071
Asadh 1, 2074
Baishakh 31, 2073
Nepal Electricity AuthorityList of Projects to be Developed by Independent Power Producers
RCOD (as per PPA) CODBS BS
Aswin 1, 2073
Aswin 15, 2071
Aswin 1, 2076
Baishakh 10, 2070
Asadh 1, 2071
Ashwin 15. 2071
Ashwin 28, 2073
Paoush 31, 2071
Phalgun 30, 2071
Asadh 1, 2075
Kartik 7, 2073
Phalgun 16, 2071
Aswin 1, 2074
Nepal Electricity AuthorityList of Projects to be Developed by Independent Power Producers
RCOD (as per PPA) CODBS BS
Shrawan 1, 2074
Chaita 17, 2071
Magh 16, 2071
Magh 1, 2074
Mangsir 25, 2072
Ashadh 31,2075
Srawan 1, 2072
Bhadra 1, 2072
Kartik 24, 2071
Asadh 1, 2071
Srawan 1, 2073
Srawan 15, 2074
Baishakh 7, 2074
Nepal Electricity AuthorityList of Projects to be Developed by Independent Power Producers
RCOD (as per PPA) CODBS BS
Shrawan 16, 2073
Shrawan 1, 2074
Ashadh 31, 2073
Shrawan 1, 2074
Ashadh 17, 2074
Ashadh 16, 2074
Mangsir 1, 2071
Srawan 1, 2075
Srawn 1, 2074
Bhadra 1, 2070
Kartik 1, 2073
Magsir 1, 2071
Ashadh 17, 2074