Nantasket Seawall Stabilization Project
DCR/USACE Public Meeting
December 15, 2016 – 7:00pm to 8:30pm
Nantasket Beach Resort
![Page 2: Nantasket Seawall Stabilization Project](https://reader030.vdocuments.us/reader030/viewer/2022012721/61b368fcc72eb334976e956f/html5/thumbnails/2.jpg)
Commonwealth of Massachusetts
Governor
Charles D. Baker
Lieutenant Governor
Karyn E. Polito
Energy and Environmental Secretary
Matthew A. Beaton
Department of Conservation and Recreation Commissioner
Leo P. Roy
![Page 3: Nantasket Seawall Stabilization Project](https://reader030.vdocuments.us/reader030/viewer/2022012721/61b368fcc72eb334976e956f/html5/thumbnails/3.jpg)
DCR Mission Statement
To protect, promote and enhance our
common wealth of natural, cultural
and recreational resources
for the well-being of all.
![Page 4: Nantasket Seawall Stabilization Project](https://reader030.vdocuments.us/reader030/viewer/2022012721/61b368fcc72eb334976e956f/html5/thumbnails/4.jpg)
Purpose of Meeting
• Project Goals
• Project Partnership – DCR and US Army Corps
of Engineers (USACE)
• USACE Findings Regarding Risk of Wall Failure
• USACE Recommended Plan and Design
• Project Schedule and Next Steps
![Page 5: Nantasket Seawall Stabilization Project](https://reader030.vdocuments.us/reader030/viewer/2022012721/61b368fcc72eb334976e956f/html5/thumbnails/5.jpg)
Project Goals
Seawall Stabilization
• Enhance Safety
• Protect Public and Private Infrastructure and Future Investment in
DCR Master Plan work
• Set the stage for potential beach nourishment
![Page 6: Nantasket Seawall Stabilization Project](https://reader030.vdocuments.us/reader030/viewer/2022012721/61b368fcc72eb334976e956f/html5/thumbnails/6.jpg)
Source: 2010 Coastal Engineering and Shore Protection Alternatives
Assessment (Woods Hole Group, Inc. and Louis Berger)
Enhance Safety: Protection Provided by Seawall
These lines represent where the shore line would be. Any wave action from
storms would impact areas landward of these lines.
![Page 7: Nantasket Seawall Stabilization Project](https://reader030.vdocuments.us/reader030/viewer/2022012721/61b368fcc72eb334976e956f/html5/thumbnails/7.jpg)
Enhance Safety:
Damage Caused by the Lowering Beach
![Page 8: Nantasket Seawall Stabilization Project](https://reader030.vdocuments.us/reader030/viewer/2022012721/61b368fcc72eb334976e956f/html5/thumbnails/8.jpg)
Protect Future Investment:
DCR Master Plan for Water Street to Bay Street
![Page 9: Nantasket Seawall Stabilization Project](https://reader030.vdocuments.us/reader030/viewer/2022012721/61b368fcc72eb334976e956f/html5/thumbnails/9.jpg)
Cross Section of DCR Master Plan at
USACE Project Area
Existing 10’ promenade shown with red line
![Page 10: Nantasket Seawall Stabilization Project](https://reader030.vdocuments.us/reader030/viewer/2022012721/61b368fcc72eb334976e956f/html5/thumbnails/10.jpg)
Set the Stage for Potential Nourishment
Not all Beach Nourishment
Material is the same:
Need to find the right balance
between shore protection…
…and recreation. Having a
stable seawall allows greater
emphasis on recreation.
![Page 11: Nantasket Seawall Stabilization Project](https://reader030.vdocuments.us/reader030/viewer/2022012721/61b368fcc72eb334976e956f/html5/thumbnails/11.jpg)
Project Partnership-
DCR and the US Army Corps Engineers 1. The USACE has a history of designing coastal
solutions. USACE has been working with DCR at
Nantasket Beach for decades
a) Designed southern seawall stabilization
b) Designed northern seawall replacement and
revetment
2. The Army Corps will pay for two-thirds of this project
![Page 12: Nantasket Seawall Stabilization Project](https://reader030.vdocuments.us/reader030/viewer/2022012721/61b368fcc72eb334976e956f/html5/thumbnails/12.jpg)
217
217
217
200
200
200
255
255
255
0
0
0
163
163
163
131
132
122
239
65
53
110
135
120
112
92
56
62
102
130
102
56
48
130
120
111
237
237
237
80
119
27
252
174
.59
Prepared By Michael Riccio
December 15, 2016
NANTASKET BEACH
COASTAL STORM DAMAGE REDUCTION PROJECT
HULL, MASSACHUSETTS
12
![Page 13: Nantasket Seawall Stabilization Project](https://reader030.vdocuments.us/reader030/viewer/2022012721/61b368fcc72eb334976e956f/html5/thumbnails/13.jpg)
13 PROJECT PURPOSE
Prevent failure of seawall and subsequent damages to public infrastructure
• Failure experienced in 1992
• Mode of future failure evident within unprotected section of the beach
Currently Exposed Seawall Footing
![Page 14: Nantasket Seawall Stabilization Project](https://reader030.vdocuments.us/reader030/viewer/2022012721/61b368fcc72eb334976e956f/html5/thumbnails/14.jpg)
File Name
14
Northern Revetment (2006)
TSF
(2004)
Exposed Seawall
(Study Area)
2,200 Linear Feet
![Page 15: Nantasket Seawall Stabilization Project](https://reader030.vdocuments.us/reader030/viewer/2022012721/61b368fcc72eb334976e956f/html5/thumbnails/15.jpg)
15
IDENTIFYING THE PROBLEM – RISK OF WALL FAILURE
Conceptual Instability (Coastal Processes)
Seawalls increase scour/erosion
Calculated Instability
Stability Analysis (USACE)
Coastal Modeling (USACE)
Survey Data (DCR, current)
Demonstrated Instability
Currently Exposed Footings
Previous Undermining of Wall
Previous Failure of North Section
![Page 16: Nantasket Seawall Stabilization Project](https://reader030.vdocuments.us/reader030/viewer/2022012721/61b368fcc72eb334976e956f/html5/thumbnails/16.jpg)
16
CONCEPTUAL INSTABILITY (COASTAL PROCESSES)
In a natural system wave energy dissipates upward
and gradually along the beach berm
![Page 17: Nantasket Seawall Stabilization Project](https://reader030.vdocuments.us/reader030/viewer/2022012721/61b368fcc72eb334976e956f/html5/thumbnails/17.jpg)
17
CONCEPTUAL INSTABILITY (COASTAL PROCESSES)
When a seawall is in place, such as at Nantasket Beach,
wave energy meets an impasse and can no longer
dissipate gradually…
![Page 18: Nantasket Seawall Stabilization Project](https://reader030.vdocuments.us/reader030/viewer/2022012721/61b368fcc72eb334976e956f/html5/thumbnails/18.jpg)
18
CONCEPTUAL INSTABILITY (COASTAL PROCESSES)
…instead, that wave energy is reflected violently both
upward and downward
![Page 19: Nantasket Seawall Stabilization Project](https://reader030.vdocuments.us/reader030/viewer/2022012721/61b368fcc72eb334976e956f/html5/thumbnails/19.jpg)
19
CONCEPTUAL INSTABILITY (COASTAL PROCESSES)
Energy reflected downward, creates a scouring effect
eroding beach material along the face of the seawall.
![Page 20: Nantasket Seawall Stabilization Project](https://reader030.vdocuments.us/reader030/viewer/2022012721/61b368fcc72eb334976e956f/html5/thumbnails/20.jpg)
20
CONCEPTUAL INSTABILITY (COASTAL PROCESSES)
Erosion continues downward and outward and begins
undermining the toe of the seawall
![Page 21: Nantasket Seawall Stabilization Project](https://reader030.vdocuments.us/reader030/viewer/2022012721/61b368fcc72eb334976e956f/html5/thumbnails/21.jpg)
File Name
21
CONCEPTUAL INSTABILITY (COASTAL PROCESSES)
Eventually scouring undermines the toe of the seawall
and the seawall collapses.
![Page 22: Nantasket Seawall Stabilization Project](https://reader030.vdocuments.us/reader030/viewer/2022012721/61b368fcc72eb334976e956f/html5/thumbnails/22.jpg)
22
CONCEPTUAL INSTABILITY (COASTAL PROCESSES)
Conceptual wave energy depicted in real
time at Nantasket Beach.
February
2008
![Page 23: Nantasket Seawall Stabilization Project](https://reader030.vdocuments.us/reader030/viewer/2022012721/61b368fcc72eb334976e956f/html5/thumbnails/23.jpg)
23
CALCULATED INSTABILITY
Stability Analysis (USACE)
- Concluded that “instability of the seawall is caused by the lack of
passive resistance resulting from the continued loss of sand.”
- Confirmed that the condition of the middle section was “serious and
should be addressed as soon as possible.”
- Concluded that the “sand elevation should be at or above the footing of
the seawall to maintain its stability.”
Coastal Modeling (USACE)
- Modeled performance of the existing beach for 84 different storm events
(using existing data from previous storm events).
- Identified that even 2 year storm events could expose the footing of the
seawall
Surveys Conducted Between 2006 - 2016 (DCR)
- Surveyed sand elevations along the seawall quarterly for the past 10 years.
- Demonstrated steady erosion of the material in front of the seawall.
- Does not show signs of improving conditions.
![Page 24: Nantasket Seawall Stabilization Project](https://reader030.vdocuments.us/reader030/viewer/2022012721/61b368fcc72eb334976e956f/html5/thumbnails/24.jpg)
24
Top of Seawall Footing
CALCULATED INSTABILITY – (CURRENT SURVEY DATA)
![Page 25: Nantasket Seawall Stabilization Project](https://reader030.vdocuments.us/reader030/viewer/2022012721/61b368fcc72eb334976e956f/html5/thumbnails/25.jpg)
25
September 2016
Seasonal Variability of Beach Profile
DEMONSTRATED INSTABILITY
![Page 26: Nantasket Seawall Stabilization Project](https://reader030.vdocuments.us/reader030/viewer/2022012721/61b368fcc72eb334976e956f/html5/thumbnails/26.jpg)
File Name
26
June 2016
Seasonal Variability of Beach Profile
DEMONSTRATED INSTABILITY
![Page 27: Nantasket Seawall Stabilization Project](https://reader030.vdocuments.us/reader030/viewer/2022012721/61b368fcc72eb334976e956f/html5/thumbnails/27.jpg)
27
2004 CONDITIONS
DEMONSTRATED INSTABILITY
![Page 28: Nantasket Seawall Stabilization Project](https://reader030.vdocuments.us/reader030/viewer/2022012721/61b368fcc72eb334976e956f/html5/thumbnails/28.jpg)
28
2004 CONDITIONS
DEMONSTRATED INSTABILITY
![Page 29: Nantasket Seawall Stabilization Project](https://reader030.vdocuments.us/reader030/viewer/2022012721/61b368fcc72eb334976e956f/html5/thumbnails/29.jpg)
29
2004 CONDITIONS
DEMONSTRATED INSTABILITY
![Page 30: Nantasket Seawall Stabilization Project](https://reader030.vdocuments.us/reader030/viewer/2022012721/61b368fcc72eb334976e956f/html5/thumbnails/30.jpg)
30
Seawall collapse at Nantasket Beach caused
by undermining during 1992 coastal storm
DEMONSTRATED INSTABILITY
![Page 31: Nantasket Seawall Stabilization Project](https://reader030.vdocuments.us/reader030/viewer/2022012721/61b368fcc72eb334976e956f/html5/thumbnails/31.jpg)
31
POTENTIAL SOLUTIONS
USACE Feasibility Study
Authorized to study, design, and construct small coastal storm
damage reduction projects Section 103 - Continuing Authorities
Program
Must demonstrate a public benefit and positive Cost Benefit Ratio
Cannot be used for the purpose of providing a recreational beach
Requires a 65/35 percent cost share with non-federal sponsor for
implementation
The Federal cost for planning, design, and construction of any one
project CANNOT EXCEED $5,000,000
![Page 32: Nantasket Seawall Stabilization Project](https://reader030.vdocuments.us/reader030/viewer/2022012721/61b368fcc72eb334976e956f/html5/thumbnails/32.jpg)
File Name
32
POTENTIAL SOLUTIONS - BEACH NOURISHMENT
Beach Nourishment
Process
- Beach Profile is rebuilt and
new material acts as
sacrificial material
protecting the toe of the wall
- Sacrificial material erodes
over time
- Beach continues to function
if re-nourished as needed.
![Page 33: Nantasket Seawall Stabilization Project](https://reader030.vdocuments.us/reader030/viewer/2022012721/61b368fcc72eb334976e956f/html5/thumbnails/33.jpg)
33
BEACH NOURISHMENT ALTERNATIVES
10 year level of Protection - 50’ wide beach berm at elevation 9.25’
- 246,000 cubic yards of material
- Positive Benefit Cost Ratio
- Total Project Cost w/ maintenance
$55 million
25 year level of Protection - 75’ wide beach berm at elevation 9.25’
- 378,000 cubic yards of material
- Positive Benefit Cost Ratio
- Total Project w/ maintenance
- $50 million
![Page 34: Nantasket Seawall Stabilization Project](https://reader030.vdocuments.us/reader030/viewer/2022012721/61b368fcc72eb334976e956f/html5/thumbnails/34.jpg)
34
Revetment Process
- Sloped Revetment creates more natural slope allowing
waves to break and run up the revetment, reducing the
downward wave energy that causes scour and erosion.
- Reduced scour reduces risk of the wall undermining and
collapsing.
POTENTIAL SOLUTIONS - STONE REVETMENT
![Page 35: Nantasket Seawall Stabilization Project](https://reader030.vdocuments.us/reader030/viewer/2022012721/61b368fcc72eb334976e956f/html5/thumbnails/35.jpg)
35
POTENTIAL SOLUTIONS - REVETMENT
Project Area Without Revetment Project Area With Revetment
![Page 36: Nantasket Seawall Stabilization Project](https://reader030.vdocuments.us/reader030/viewer/2022012721/61b368fcc72eb334976e956f/html5/thumbnails/36.jpg)
36
REVETMENT ALTERNATIVES
10 year level of Protection
25 year level of Protection
![Page 37: Nantasket Seawall Stabilization Project](https://reader030.vdocuments.us/reader030/viewer/2022012721/61b368fcc72eb334976e956f/html5/thumbnails/37.jpg)
37
Stone Revetment – 10 Year Storm Event Protection Level - 8.25’ Crest
- 20’ Wide Slope
- Built to elevation 10’
- 14’ wide exposed revetment (i.e. 27,000 square feet of ‘lost beach’)
- Initial Construction Cost $5.8 million
RECOMMENDED PLAN
![Page 38: Nantasket Seawall Stabilization Project](https://reader030.vdocuments.us/reader030/viewer/2022012721/61b368fcc72eb334976e956f/html5/thumbnails/38.jpg)
File Name
38
RECOMMENDED PLAN
![Page 39: Nantasket Seawall Stabilization Project](https://reader030.vdocuments.us/reader030/viewer/2022012721/61b368fcc72eb334976e956f/html5/thumbnails/39.jpg)
USACE recognizes the
recreational usage of
beach and the concern
with impacting the limited
amount of high tide beach
DESIGN MEASURES
![Page 40: Nantasket Seawall Stabilization Project](https://reader030.vdocuments.us/reader030/viewer/2022012721/61b368fcc72eb334976e956f/html5/thumbnails/40.jpg)
File Name
40
ORIGINAL DESIGN 40’ wide revetment
≈30’ of revetment exposed
![Page 41: Nantasket Seawall Stabilization Project](https://reader030.vdocuments.us/reader030/viewer/2022012721/61b368fcc72eb334976e956f/html5/thumbnails/41.jpg)
41
REVISED DESIGN (REDUCED FOOTPRINT)
COULD reduce the slope
(Slope reduced from 3:1 to 2:1)
COULD NOT reduce the profile
(Design criteria requires 10’ thickness)
COULD NOT lower the revetment
(excavating below the footing would
risk failure during construction)
![Page 42: Nantasket Seawall Stabilization Project](https://reader030.vdocuments.us/reader030/viewer/2022012721/61b368fcc72eb334976e956f/html5/thumbnails/42.jpg)
42
REVISED DESIGN (REDUCED FOOTPRINT)
COULD reduce the slope
(Slope reduced from 3:1 to 2:1)
COULD NOT reduce the profile
(Design criteria requires 10’ thickness)
COULD NOT lower the revetment
(excavating below the footing would
risk failure during construction)
Revetment width of 40’ reduced to 33’
![Page 43: Nantasket Seawall Stabilization Project](https://reader030.vdocuments.us/reader030/viewer/2022012721/61b368fcc72eb334976e956f/html5/thumbnails/43.jpg)
43
REVISED DESIGN (REDUCED FOOTPRINT)
60’ wide project footprint = 130,000 sf
![Page 44: Nantasket Seawall Stabilization Project](https://reader030.vdocuments.us/reader030/viewer/2022012721/61b368fcc72eb334976e956f/html5/thumbnails/44.jpg)
44
REVISED DESIGN (REDUCED FOOTPRINT)
≈14’ of revetment exposed
![Page 45: Nantasket Seawall Stabilization Project](https://reader030.vdocuments.us/reader030/viewer/2022012721/61b368fcc72eb334976e956f/html5/thumbnails/45.jpg)
45
REVISED DESIGN (REDUCED FOOTPRINT)
Remainder backfilled and covered
≈14’ of revetment exposed ≈14’ of revetment exposed
(27,000 sf of beach “lost”)
![Page 46: Nantasket Seawall Stabilization Project](https://reader030.vdocuments.us/reader030/viewer/2022012721/61b368fcc72eb334976e956f/html5/thumbnails/46.jpg)
46
PROJECT SCHEDULE
95% Design Complete Nov. 2016
Submit Permit Application Dec. 2016
Obtain Permits Mar. 2017
Issue Solicitation (30 Days) Apr. 2017
Open Bids May 2017
Award Contract Jun. 2017
Preconstruction Meeting Aug. 2017
Issue Notice to Proceed Aug. 2017
Mobilize Equipment Begin Work Sept. 2017
Complete Project Mar. 2018
• Begin Construction no sooner than Labor Day 2017
• Finish Construction no later than Memorial Day 2018
![Page 47: Nantasket Seawall Stabilization Project](https://reader030.vdocuments.us/reader030/viewer/2022012721/61b368fcc72eb334976e956f/html5/thumbnails/47.jpg)
Next Steps: Nantasket Beach Reservation
• USACE Seawall Stabilization
• Scope for design contract: master plan components
• Review options for nourishment
![Page 48: Nantasket Seawall Stabilization Project](https://reader030.vdocuments.us/reader030/viewer/2022012721/61b368fcc72eb334976e956f/html5/thumbnails/48.jpg)
Q & A
![Page 49: Nantasket Seawall Stabilization Project](https://reader030.vdocuments.us/reader030/viewer/2022012721/61b368fcc72eb334976e956f/html5/thumbnails/49.jpg)
Q & A
![Page 50: Nantasket Seawall Stabilization Project](https://reader030.vdocuments.us/reader030/viewer/2022012721/61b368fcc72eb334976e956f/html5/thumbnails/50.jpg)
For more information: http://www.mass.gov/eea/agencies/dcr/public-outreach/public-meetings/
If you have comments or suggestions on this project:
Submit online:
http://www.mass.gov/eea/agencies/dcr/public-outreach/submit-public-comments/
Write: Department of Conservation and Recreation
Office of Public Outreach
251 Causeway Street, Suite 600
Boston, MA 02114
Deadline – Comments accepted by DCR through Thursday, December 29, 2016
Note: Public comments submitted to DCR may be posted on the DCR website in their entirety.