Central Share HousesSanctionedReleasedAdjusted
SanctionedCompletedIn-progress
1
A&N IslandPort Blair24-Mar-2008--
35013837I1158 Construction of 40 Dwelling Units at Port Blair,Andman & Nicobar Isands
Project Cancelled on
dated 20-May-14
--2.37
-- - 2.37
------
- - -
2
A&N IslandPort Blair26-Feb-2009--
35013837I1911 IHSDP project at Port Blair, Andman &Nicobar Isands (infra only). 9.88
8.93.16
-- - -
InfraNANA
- - -
9.88 8.95.53
-- - 2.37
------
- - -
3
Andhra PradeshAdoni27-Dec-2007--
28210030I4753Revised project for Infrastructure facilities and
basic amenities in Indiramma colonies atAdoni, Kurnool district, Andhra Pradesh
4.75 3.83.8--
- 0.00 Infra
NANA
- - -
4
Andhra PradeshAnakapalle27-Feb-2007--
28130179I4862Revised project for construction of 384 DUs at
Anakapalli Municipality, Dist, Visakhapatnam,Andhra Pradesh
1.65 1.231.23
-- - -
384384--
- 384 -
5
Andhra PradeshAnakapalle07-Nov-2007--
28130179I4757Revised project of Infrastructure facilities in 24
slums at Anakapalle, Visakhapatnam Distt.Andhra Pradesh
3.50 2.82.8--
- - Infra
NANA
- - -
5.15 4.034.03
-- - -
384384--
- 384 -
6
Andhra PradeshBapatla27-Dec-2007--
28170495I4758Revised project for infrastructure facilities to
the 43 slums (39 notified & 4 non-notified) atBaptala, Guntur district, Andhra Pradesh
8.32 6.16.1--
- - Infra
NANA
- - -
7
Andhra PradeshBheemunipatnam27-Dec-2007--
28130698I744Provision of Infrastructure facilities in 39
Slums Beemunipatnam, Andhra Pradesh (Infra Only)
3.39 2.722.72
-- - -
InfraNANA
- - -
8
Andhra PradeshChilakaluripet27-Dec-2007--
28171042I4761Revised project for provision of infrastructure
facilities at Chilakaluripet, Guntur, Dist. AndhraPradesh
15.38 1212--
- - Infra
NANA
- - -
9
Andhra PradeshChirala27-Dec-2007--
28181063JI6761Revised project for provisions of infrastructure
facilities in 12 slums at Chirala Prakasam Dist.Andhra Pradesh.
3.47 2.782.82
-- - 0.04
InfraNANA
- - -
10
Andhra PradeshChittoor27-Dec-2007--
28231079I5448Revised - Infrastructure facilities (Stand Alone
Project) in relocation site at Thimmasanipallevillage of Anupalle Revenue Village, Chittoor.
3.73 2.993.38
-- - 0.39
InfraNANA
- - -
11
Andhra PradeshKadapa29-Oct-2007--
28201112I4763 Revised project for provision of infrastructurefacilities in Kadappa, Dist, Andhra Pradesh. 9.38
7.517.51
-- - -
InfraNANA
- - -
12
Andhra PradeshKadapa28-Sep-2006--
28201112I4851Revised- Construction of 534 DUs and
infrastructure facilities Mamillpalli layoutMrityunjayakunta colony, Kadapa, AndhraPradesh
8.18 6.546.54
-- 0.00 -
534534--
- 534 -
13
Andhra PradeshKadapa28-Sep-2006--
28201112I4836Revised- Construction of 600 DUs with
infrastructure in rehabilitation of BuggavankaSettlers at Kadappa Distt, Andhra Pradesh
6.94 5.555.55
-- - -
600600--
- 600 -
14
Andhra PradeshKadapa22-Oct-2008--
28201112I5049Revised project for infrastructure facilities
Azad Nagar Housing colony Kadapa Dist,Andhra Pradesh.
2.23 1.781.78
-- - -
InfraNANA
- - -
15
Andhra PradeshKadapa22-Oct-2008--
28201112I4870Revised project for infrastructure facilities at
Mamillapalli, Housing colony KadapaMunicipal corporation, Y.S.R. Dist, AndhraPradesh.
5.84 4.674.67
-- - -
InfraNANA
- - -
32.56 26.0526.05
-- 0.00 -
11341134
-- - 1,134 -
16
Andhra PradeshRajampet11-Oct-2006--
28201112I4848Revised- 510 DUs with independent pattern in
new layouts neat periphery of RajampetMunicipality, Kadappa Dist, Andhra Pradesh
5.63 4.54.5--
- - 510510--
- 510 -
17
Andhra PradeshPulivendla27-Dec-2007--
28201112I4789Revised project for provision of infrastructure
facilities Pulivendula Kadapa Dist, AndhraPradesh.
14.69 11.7511.75
-- - -
InfraNANA
- - -
18
Andhra PradeshGudur27-Feb-2007--
28191654I4808Revised - construction of 1536 DUs at
GUDURU Municipality of SPSR NelloreDistrict, Andhra Pradesh
17.84 9.539.53
-- - -
15361376142
18 938 438
19
Andhra PradeshGuntur29-Oct-2007--
28171672I751Revised project for Infrastructure to 36 slums
(Stand Alone Infrastructure) at Guntur, GunturDistt., Andhra Pradesh
18.23 14.5814.582.68
- - Infra
NANA
- - -
Monitoring Report dated 1st Jan 2019
IHSDP : State wise Report for latest Progress at Project & Town LevelProject Completed
Sr. No.
StateCityInitial SanctionedResent Sanctioned
Project Title Project Code NonStarter Occupied Un-
Occupied
Total of A&N Island for 1 project(s)
Sub-total of Anakapalle for 2 project(s)
Sub-total of Kadapa for 5 project(s)
Financial Progress (Rs in Crores) Physical Progress (Nos)
ProjectCost
UC Pending
Excess Central Share
* Project Cost and ACA Committed are recalculated after deducting cost of DUs alongwith proportionate cost of infrastructure dropped by CSMC.
Central Share HousesSanctionedReleasedAdjusted
SanctionedCompletedIn-progress
Monitoring Report dated 1st Jan 2019
IHSDP : State wise Report for latest Progress at Project & Town LevelProject Completed
Sr. No.
StateCityInitial SanctionedResent Sanctioned
Project Title Project Code NonStarter Occupied Un-
Occupied
Financial Progress (Rs in Crores) Physical Progress (Nos)
ProjectCost
UC Pending
Excess Central Share
20
Andhra PradeshGuntur21-Jan-2009--
28171672I4869Revised- 2432 DUs in G+3 pattern relocated
at Adavitakkellapadu (1152) andChowdavaram (1280) nos layouts near GunturMC , Andhra Pradesh
47.45 24.4724.47
-- - -
24322432
-- - 2,432 -
65.67 39.0539.052.68
- - 24322432--
- 2,432 -
21
Andhra PradeshKakinada11-Oct-2006--
28142092I4852Revised- construction of 662 Houses at
Kakinada Municipal Corporation, EastGodavari Dist., Andhra Pradesh
10.70 6.326.32
-- - -
662662--
- 662 -
22
Andhra PradeshKakinada27-Dec-2007--
28142092I4764Revised project for provision of infrastructure
facilities at Yetimoga Kakinada East Godavari,Andhra Pradesh
11.79 8.518.51
-- - 0.00
InfraNANA
- - -
23
Andhra PradeshKakinada21-Jan-2009--
28142092I4854Revised- 3120 DUs Ph-II at Yetimoga,
Parlovaepta and Ssambhamurthy nagarlayouts of Kakinada Municipal Corporation,East Godavari Dist, AP.
67.56 28.5914.29
-- - -
31201308
-- 1,812 1,308 -
90.04 43.4129.12
-- - 0.00
37821970
-- 1,812 1,970 -
24
Andhra PradeshKavali27-Dec-2007--
28192321I792 IHSDP Scheme for the town of Kavali (Phase-I), Nellore Distt, Andhra Pradesh 1.53
1.221.22
-- - -
InfraNANA
- - -
25
Andhra PradeshKavali27-Dec-2007--
28192321JI6668Revised project for Infrastructure facilities at
Satellite town ship, Budamagunta layout ofKavali Municipality, Nellore District, AP.
3.47 2.783.46
-- - 0.68
InfraNANA
- - -
5.00 4
4.68--
- 0.68 ------
- - -
26
Andhra PradeshKurnool11-Oct-2006--
28212671I4810Revised- 2112 DUs along with infrastructure
facilities in DalMil Joharapuram with in KurnoolMunicipal Corporation, Andhra Pradesh
21.24 16.9916.99
-- - 0.00
21122112
-- - 1,513 599
27
Andhra PradeshKurnool30-Jan-2009--
28212671I4769Revised project for infrastructure facilities and
basic amenities in slums of Kurnool MunicipalCorporation at Kurnool Distt. Andhra Pradesh
18.55 14.8414.84
-- - -
InfraNANA
- - -
39.80 31.8331.83
-- - 0.00
21122112
-- - 1,513 599
28
Andhra PradeshMacherla27-Dec-2007--
28172784I4770Revised project for infrastructure facilities for
13 slums in Macheria Municipality, Gunturdistrict, Andhra Pradesh
16.81 11.9911.99
-- - 0.00
InfraNANA
- - -
29
Andhra PradeshMachilipatnam28-Feb-2009--
28162787I4771Revised project for provision of infrastructure
facilities Machillipatnam town, Krishna Dist,Andhra Pradesh
9.17 7.347.34
-- 0.00 -
InfraNANA
- - -
30
Andhra PradeshMadanapalle27-Dec-2007--
28232789I4772 Revised in sanctioned IHSDP project atMadanapalle, Andhra Pradesh 4.29
3.433.43
-- - 0.00
InfraNANA
- - -
31
Andhra PradeshNarasaraopet29-Oct-2007--
28173320I4783Revised project for infrastructure facilities in
41 slums at Narasapet, Guntur Dist. AndhraPradesh.
19.67 15.6815.68
-- - -
InfraNANA
- - -
32
Andhra PradeshOngole27-Dec-2007--
28183493JI6762Revised project for infrastructure facilities in 9
slums at Ongole, Prakasam Dist. AndhraPradesh.
2.33 1.872.27
-- - 0.40
InfraNANA
- - -
33
Andhra PradeshPeddapuram21-Jan-2009--
28143719I4811 Revised project at Peddapuram (1416 DUs),East Godavari, Andhra Pradesh 28.18
15.4115.41
-- - -
14161416
-- - 1,416 -
34
Andhra PradeshPonnur28-Feb-2009--
28173827I4788Revised project for provision of infrastructure
facilities in 25 slums at Ponnur, Guntur DistAndhra Pradesh.
13.27 10.6210.62
-- - -
InfraNANA
- - -
35
Andhra PradeshProddatur11-Oct-2006--
28203851I4857Revised- 1500 houses and in Amruthanagar
of Prodatur Municipality, Kadapa Dist., AndhraPradesh.
18.12 12.8412.84
-- - -
15001500
-- - 1,475 25
36
Andhra PradeshRajahmundry11-Oct-2006--
28143947I4850Revised- project for 3023 DUs (G+2, G+3 )
with infrastructure in Rajahmundry Ph-I,EastGodavari Dist., Andhra Pradesh.
40.17 24.5224.52
-- - -
30232807
-- 216 2,807 -
37
Andhra PradeshRajahmundry21-Jan-2009--
28143947I4849Revised- project for 2832 DUs (G+2, G+3)
with infrastructure in Rajahmundry Ph-II inEast Godavari Dist., Andhra Pradesh.
58.74 29.429.4
-- 0.00 -
28322832
-- - 2,832 -
Sub-total of Guntur for 2 project(s)
Sub-total of Kakinada for 3 project(s)
Sub-total of Kavali for 2 project(s)
Sub-total of Kurnool for 2 project(s)
* Project Cost and ACA Committed are recalculated after deducting cost of DUs alongwith proportionate cost of infrastructure dropped by CSMC.
Central Share HousesSanctionedReleasedAdjusted
SanctionedCompletedIn-progress
Monitoring Report dated 1st Jan 2019
IHSDP : State wise Report for latest Progress at Project & Town LevelProject Completed
Sr. No.
StateCityInitial SanctionedResent Sanctioned
Project Title Project Code NonStarter Occupied Un-
Occupied
Financial Progress (Rs in Crores) Physical Progress (Nos)
ProjectCost
UC Pending
Excess Central Share
98.91 53.9253.92
-- 0.00 -
58555639
-- 216 5,639 -
38
Andhra PradeshRamachandrapuram11-Oct-2006--
28143982I4832Revised- 720 houses with infrastructure at
Muchchumill & Utrumilli layouts ofRamchandrapuram Municipality of EastGodavari Distt, Andhra Pradesh
9.62 5.845.84
-- - -
720720--
- 720 -
39
Andhra PradeshRayachoti11-Oct-2006--
28204067I4858Revised- Construction of 1013 relocation DUs
in 4 layouts in Rayachoty Municipality KadapaDist., Andhra Pradesh.
11.96 9.579.57
-- - -
10131013
-- - 1,013 -
40
Andhra PradeshRepalle22-Oct-2008--
28174087I4790Revised project for provision of infrastructure
facilities in 25 slums at Repalle, Guntur Dist,Andhra Pradesh.
5.82 4.654.65
-- - -
InfraNANA
- - -
41
Andhra PradeshSamalkota11-Oct-2006--
28144196I4812
Revised- 912 Houses with infrastructure indevelopment of Jaggammagari Peta ofSamalkota Municipality, East Godavari Distirct,Andhra Pradesh
13.02 8.38.3--
- - 912912--
- 912 -
42
Andhra PradeshSamalkota21-Jan-2009--
28144196I4871Revised- 888 houses with infrastructure of
Jaggammagari Peta Ph-II of SamalkotaMunicipality, East Godavari District AndhraPradesh.
19.79 9.589.3--
9.30 - 888
----
888 - -
32.80 17.8817.6
-- 9.30 -
1800912--
888 912 -
43
Andhra PradeshSattenapalli27-Dec-2007--
28174292I4791Revised project for provision of infrastructure
facilities in 22 slums at Sattenapalle, GunturDist, Andhra Pradesh.
14.10 11.1411.14
-- - -
InfraNANA
- - -
44
Andhra PradeshTenali22-Oct-2008--
28174687I4792Revised project for provision of infrastructure
facilities in 23 slums at Tenali, Guntur Dist,Andhra Pradesh.
5.16 4.134.13
-- - 0.00
InfraNANA
- - -
45
Andhra PradeshTirupati21-Feb-2009--
28234817I1820 1560 DUs at relocation sites at Damineedu-IIat Tirupati, Andhra Pradesh
Project Cancelled on
dated 28-Mar-12
------
- - ------
- - -
46
Andhra PradeshTirupati21-Feb-2009--
28234817I1821 2136 DUs at relocation site at Damineedu-I,Tirupati, Andhra Pradesh
Project Cancelled on
dated 28-Mar-12
------
- - ------
- - -
47
Andhra PradeshTirupati18-May-2007--
28234817I5409Revised- 4056 DUs with Infrastructure for
Tirupati MC at Avilala & Damineedu Layouts,Chitoor districts, Andhra Pradesh
70.81 37.1837.75
-- - 0.58
40564056
-- - 3,482 574
48
Andhra PradeshVinukonda27-Dec-2007--
28175084I4793Revised project for provision of infrastructure
facilities in 34 slums at Virukonda, Guntur Dist,Andhra Pradesh.
14.71 11.7511.75
-- - -
InfraNANA
- - -
49
Andhra PradeshDhone22-Oct-2008--
28215172I5052Revised project for provision of infrastructure
facilities in 6 slums at Dhone, Kurnool Dist,Andhra Pradesh.
1.12 0.890.89
-- - -
InfraNANA
- - -
692.29 440.66428.18
2.68 9.30 2.09
2825025174
142 2,934 23,538 1,636
50
Arunachal PradeshRoing26-Nov-2008--
12104108I1429 IHSDP Scheme for the Roing Town at Distt Dibang Valley (Arunachal Pradesh) 9.95
8.968.96
-- - -
176176--
- - 176
9.95 8.968.96
-- - -
176176--
- - 176
51
AssamBadarpur27-Feb-2007--
18220346I796 56 DUs IHSDP Scheme for the town ofBadarpur, Assam 1.23
1.111.11
-- 0.55 -
56141
41 14 -
52
AssamBokajan26-Feb-2009--
18190827I18941010 DUs (244- New & 766- Upgrade) IHSDP
Scheme for Bokajan, Karbi Anglong Distt,Assam
10.49 8.618.61
-- 4.30 -
1010353443
214 632 -
53
AssamDhing26-Sep-2007--
18101295I797790 DUs (72-new & 718- upgrade) IHSDP
Scheme for the town of Dhing, Nagaon Distt,Assam
1.86 1.551.28
-- - -
7272--
- 72 -
54
AssamDhubri27-Feb-2007--
18021301I798 Rehabilitate 99 families at two locations atDhubri, Assam 5.46
4.684.16
-- 1.82 -
9939--
60 39 -
55
AssamGolaghat06-Oct-2007--
18181609I799839 DUs (104-new & 735-upgrade)
Implementation of IHSDP Scheme (839 DUs)at Golaghat, Assam
2.60 2.192.77
-- 0.65 0.58
210210--
- 210 -
Sub-total of Rajahmundry for 2 project(s)
Sub-total of Samalkota for 2 project(s)
Total of Andhra Pradesh for 45 project(s)including 36 project(s) which are completed
Total of Arunachal Pradesh for 1 project(s)
* Project Cost and ACA Committed are recalculated after deducting cost of DUs alongwith proportionate cost of infrastructure dropped by CSMC.
Central Share HousesSanctionedReleasedAdjusted
SanctionedCompletedIn-progress
Monitoring Report dated 1st Jan 2019
IHSDP : State wise Report for latest Progress at Project & Town LevelProject Completed
Sr. No.
StateCityInitial SanctionedResent Sanctioned
Project Title Project Code NonStarter Occupied Un-
Occupied
Financial Progress (Rs in Crores) Physical Progress (Nos)
ProjectCost
UC Pending
Excess Central Share
56
AssamKampur26-Sep-2007--
18102155I1159 384 DUs (62-new & 322- upgrade) IHSDPScheme for the town of Kampur, Assam 0.51
0.460.78
-- 0.46 0.32
322322--
- 322 -
57
AssamKarimganj27-Feb-2007--
18222258I800 458 DUs Implementation of IHSDP Schemefor the town of Karimganj, Assam 3.51
3.164.49
-- 0.68 1.33
290290--
- 290 -
58
AssamKokrajhar18-Dec-2009--
18012516I2231 1301 DUs (674- New & 627- Upgrade) IHSDPScheme for Kokrajhar, Assam 10.56
8.046.87
-- 6.87 -
51345910
44 351 108
59
AssamLanka06-Oct-2007--
18102732I801 409 DUs (127- new & 282- upgrade) IHSDPScheme for the town of Lanka, Assam 0.32
0.291.14
-- 0.29 0.85
204204--
- 204 -
60
AssamMangaldoi06-Oct-2007--
18082946I802 949 DUs (104-new & 845-upgrade) IHSDPScheme for the town of Mangaldoi, Assam 1.21
1.011.65
-- 1.01 0.64
50428
- 42 -
61
AssamNagaon11-Feb-2009--
18103234I1783 802 DUs (528- New & 274- Upgrade) IHSDPScheme for the town of Nagaon Slums, Assam 13.31
10.575.74
-- 5.74 -
52828553
190 285 -
62
AssamNalbari27-Apr-2007--
18073274I803 201 DUs IHSDP Programme at Nalbari town,Assam 2.19
1.882.27
-- 0.95 0.39
150150--
- 150 -
63
AssamPalasbari27-Apr-2007--
18063549I804 108 DUs IHSDP Programme for Palasbaritown, Assam 1.06
0.891.58
-- 0.27 0.69
5555--
- 55 -
64
AssamSarthebari26-Sep-2007--
18054271I805 260 DUs (80-new & 180- upgrade) for thetown of Sarthebari town, Assam 0.28
0.260.7--
0.26 0.44 180173
2 5 175 -
65
AssamTihu11-Feb-2009--
18074788I1782Integrated Housing & Slum Development
Programme (162 DUs) at Tihu town, Nabari,Assam
3.89 3.293.29
-- 1.65 -
1629733
32 97 -
66
AssamTinsukia06-Oct-2007--
18144800I806840 DUs (197-new & 643- upgrade)
Implementation of IHSDP Scheme at Tinsukia,Assam
2.48 2.121.94
-- 0.00 -
422422--
- 422 -
60.98 50.1148.37
-- 25.49 5.24
43233187550
586 3,360 108
67
BiharAraria30-Mar-2010--
10070235I2548 Construction of 728 Dwelling Units at ArariaCity, Bihar. 21.26
11.1311.13
-- 1.06 -
728491237
- 728 -
68
BiharArrah28-Feb-2009--
10290254I1921 Construction of 754 Dwelling Units at AraMunicipal corporation, Distt. Bhojpur, Bihar 22.03
10.6315.06
-- 1.59 4.43
532388144
- 532 -
69
BiharAurangabad21-Mar-2007--
10340299I807 Construction of 247 Dwelling Units atAurangabad Nagar Parishad, Bihar 1.93
1.522.43
-- - 0.90
155155--
- 155 -
70
BiharBahadurganj21-Aug-2007--
10080383I808 Construction of 294 Dwelling Units atBahadurganj, Distt. Kishanganj, Bihar 2.91
2.113.63
-- - 1.52
171171--
- 171 -
71
BiharBarh28-Mar-2011--
10280524I3553 Construction of 1154 Dwelling Units at Barh,Bihar 34.66
15.4215.42
-- 1.32 -
1154866288
- 1,154 -
72
BiharBarh28-Mar-2012--
10280524I4775 Construction of 500 DUs at Barh NagarParishad, District- Patna, Bihar 20.30
10.6910.69
-- - -
50043466
- 500 -
54.96 26.126.1
-- 1.32 -
16541300354
- 1,654 -
73
BiharBegusarai21-Feb-2009--
10200594I1832 Construction of 853 Dwelling Units for thetown of Begusarai, District Begusarai, Bihar 11.98
7.7515.86
-- - 8.11
417417--
- 417 -
74
BiharBelsand28-Mar-2012--
10040612I4776Construction of 1487 Dwelling Units at
Belsand Nagar Panchayat, District- Sitamarhi,Bihar
50.55 20.8720.87
-- 1.89 -
14871331106
50 1,437 -
Total of Assam for 16 project(s)
Sub-total of Barh for 2 project(s)
* Project Cost and ACA Committed are recalculated after deducting cost of DUs alongwith proportionate cost of infrastructure dropped by CSMC.
Central Share HousesSanctionedReleasedAdjusted
SanctionedCompletedIn-progress
Monitoring Report dated 1st Jan 2019
IHSDP : State wise Report for latest Progress at Project & Town LevelProject Completed
Sr. No.
StateCityInitial SanctionedResent Sanctioned
Project Title Project Code NonStarter Occupied Un-
Occupied
Financial Progress (Rs in Crores) Physical Progress (Nos)
ProjectCost
UC Pending
Excess Central Share
75
BiharBhagalpur21-Mar-2007--
10220647I809 Construction of 1188 Dwelling Units atBhagalpur, Bihar 14.31
10.1311.72
-- - 1.59
10271027
-- - 1,027 -
76
BiharBiharsharif21-Feb-2009--
10270753I1831 Construction of 810 Dwelling Units for thetown of Biharsarif, Bihar 9.91
6.4916.08
-- - 9.59
327327--
- 327 -
77
BiharFarbishganj28-Mar-2011--
10071462I3554 Construction of 870 Dwelling Units for theTown of Forbesganj, Bihar 21.53
9.029.022.13
0.01 - 870419442
9 861 -
78
BiharGaya28-Mar-2011--
10351539I3555 Construction of 1747 Dwelling Units for thetown of Gaya, Bihar 44.59
19.1819.189.59
2.94 - 17471285462
- 1,747 -
79
BiharJamui28-Mar-2011--
10371942I3556 Construction of 960 Dwelling Units for thetown of Jamui, Bihar 25.30
11.176.98
-- 1.40 -
960854106
- 960 -
80
BiharJogabani28-Feb-2009--
10072030I1922 Construction of 321 Dwelling Units atJogabani, Distt. Araria, Bihar 12.71
6.646.64
-- 2.66 -
321320
1 - 321 -
81
BiharKanti27-Feb-2007--
10142222I810 Construction of 143 Dwelling Units at Kanti,Bihar 3.06
2.452.56
-- - 0.11
137137--
- 137 -
82
BiharKishanganj27-Apr-2007--
10082488I811 Construction of 522 Dwelling Units underIHSDP, Kishanganj, Bihar 11.37
8.278.74
-- - 0.48
522522--
- 522 -
83
BiharKishanganj28-Mar-2011--
10082488I3557 Construction of 1255 New Dwelling Units atKishanganj, Bihar 30.55
12.6212.626.31
1.26 - 1255784471
- 1,255 -
41.92 20.8921.366.31
1.26 0.48 17771306471
- 1,777 -
84
BiharMadhepura28-Feb-2009--
10112797I1923 Construction of 319 Dwelling Units atMadhepura, Bihar 11.69
6.066.44
-- 2.19 0.38
300300--
- 300 -
85
BiharMadhepura30-Mar-2010--
10112797I2549 Construction of 776 Dwelling Units for NagarParisad Madhepura Phase-II, Bihar 20.32
9.999.994.99
1.00 - 776533158
85 691 -
32.01 16.0516.434.99
3.19 0.38 1076833158
85 991 -
86
BiharMokama28-Mar-2012--
10283108I4778 Construction of 1950 DUs at Mokama NagarParishad, District- Patna, Bihar 69.54
34.2517.13
-- - -
19501078872
- 1,950 -
87
BiharMotipur21-Mar-2007--
10143132I812 Construction of 520 Dwelling Units for thetown of Motipur, Bihar 4.71
3.714.29
-- - 0.58
450450--
- 450 -
88
BiharMunger30-Mar-2010--
10243182I2550 Construction of 868 Dwelling Units for NagarNigam, Munger, Bihar 20.19
8.558.554.28
0.86 - 86888
726 54 814 -
89
BiharNavinagar28-Mar-2012--
10343223I4780 Construction of 1277 DUs at NabiNagarNagar Parishad, District- Aurangabad, Bihar 43.67
21.721.7
10.85 2.89 -
1277998264
15 1,262 -
90
BiharNarkatiaganj21-Mar-2007--
10013336I813 Construction of 300 Dwelling Units for thetown of Narkatiaganj, Bihar
Project Cancelled on
dated 27-May-16
--1.46
-- - 1.46
------
- - -
91
BiharNaubatPur28-Mar-2012--
10285193I4784 Construction of 1500 DUs at NaubatPurNagar Parishad, District- Patna, Bihar 49.07
22.2122.2111.11
2.00 - 1500857643
- 1,500 -
92
BiharPurnia28-Mar-2012--
10093887I4781 Construction of 1615 DUs at Purnia NagarNigam, District- Purnia, Bihar 50.87
22.6522.6511.33
2.27 - 16151140475
- 1,615 -
93
BiharPurnia21-Aug-2007--
10093887I814 Construction of 1487 Dwelling Units atPurnea, Distt. Purnea, Bihar 3.43
2.4910.83
-- - 8.34
342342--
- 342 -
54.29 25.1433.4811.33
2.27 8.34 19571482475
- 1,957 - Sub-total of Purnia for 2 project(s)
Sub-total of Kishanganj for 2 project(s)
Sub-total of Madhepura for 2 project(s)
* Project Cost and ACA Committed are recalculated after deducting cost of DUs alongwith proportionate cost of infrastructure dropped by CSMC.
Central Share HousesSanctionedReleasedAdjusted
SanctionedCompletedIn-progress
Monitoring Report dated 1st Jan 2019
IHSDP : State wise Report for latest Progress at Project & Town LevelProject Completed
Sr. No.
StateCityInitial SanctionedResent Sanctioned
Project Title Project Code NonStarter Occupied Un-
Occupied
Financial Progress (Rs in Crores) Physical Progress (Nos)
ProjectCost
UC Pending
Excess Central Share
94
BiharRosera21-Mar-2007--
10194113I815 Construction of 1562 Dwelling Units for thetown of Rosera, Bihar
Project Cancelled on
dated 27-May-16
--5.38
-- - 5.38
------
- - -
95
BiharSaharsa30-Mar-2010--
10124156I2551 Construction of 820 Dwelling Units for NagarParishad Saharsa, Bihar 19.33
8.848.844.42
0.30 - 820697123
- 820 -
96
BiharSheikhpura21-Mar-2007--
10264379I816 Construction of 207 Dwellling Units atSheikhpura, Bihar 2.04
1.611.87
-- - 0.26
178178--
- 178 -
97
BiharSupaul28-Feb-2009--
10064604I1924 Construction of 207 Dwelling Units at Supual,Bihar 7.99
4.124.12
-- 1.65 -
207207--
- 207 -
98
BiharThakurganj28-Mar-2012--
10084702I4785 Construction of 1352 DUs at ThakurganjNagar Panchayat, Dist. Kishanganj, Bihar 42.04
18.5418.549.27
1.57 - 13521031321
- 1,352 -
683.83 330.81352.6374.27
28.84 43.13 23945178275905
213 23,732 -
99
ChhattisgarhAbhanpur28-Sep-2006--
22110666I1194 210 DUs IHSDP Scheme for Abhanpur,Chhattisgarh 2.38
1.751.92
-- - 0.16
192192--
- 15 177
100
ChhattisgarhBalod28-Sep-2006--
22100439I876 200 DUs IHSDP Scheme for Balod,Chhattisgarh 2.25
1.661.91
-- - 0.25
174174--
- - 174
101
ChhattisgarhBemetra11-Oct-2006--
22100618I877 200 DUs IHSDP Scheme for Bametara,Chhattisgarh 2.58
1.911.91
-- 0.00 -
200200--
- 192 8
102
ChhattisgarhBhatapara28-Sep-2006--
22110679I878 450 DUs IHSDP Scheme for Bhatapara,Chhattisgarh 4.32
3.143.62
-- - 0.48
390232158
- 88 144
103
ChhattisgarhBhilai Nagar28-Sep-2006--
22100702I879 1168 DUs IHSDP Scheme for Bhilai,Chhattisgarh 12.16
8.798.79
-- - -
11681168
-- - 1,168 -
104
ChhattisgarhBilaspur28-Sep-2006--
22070775I880 IHSDP Scheme for the Town of (1344 DUs)Bilaspur (Phase-I), Chhattisgarh 17.85
12.1312.15
-- - 0.02
13441248
96 - 385 863
105
ChhattisgarhBilaspur28-Sep-2006--
22070775I881 IHSDP Scheme for the Town of (6492 DUs)Bilaspur (Phase-II), Chhattisgarh 64.37
43.0753.08
-- - 10.01
52684836432
- 2,702 2,134
82.22 55.265.23
-- - 10.03
66126084528
- 3,087 2,997
106
ChhattisgarhDongargaon28-Feb-2009--
22091352I1925 480 DUs IHSDP Scheme for the town ofDongargaon, Chhattisgarh 5.46
4.16.01
-- - 1.90
32826068
- 254 6
107
ChhattisgarhDongargarh28-Sep-2006--
22091353I882 IHSDP Scheme for the townn of Dongargarh,Chhattisgarh 1.89
1.391.91
-- 0.00 0.51
146146--
- 146 -
108
ChhattisgarhDurg28-Sep-2006--
22101377I883 IHSDP Scheme for the townn of Durg (1638DUs), Chhattisgarh 18.14
13.213.2
-- - -
16381638
-- - 1,611 27
109
ChhattisgarhJagdalpur28-Sep-2006--
22151878I884 IHSDP Scheme for the townn of Jabalpur(800 DUs), Chhattisgarh 9.02
6.516.51
-- - -
88086218
- 792 70
110
ChhattisgarhJamul11-Oct-2006--
22101943I885 IHSDP Scheme for the townn of Jamul (228DUs), Chhattisgarh 2.95
2.182.18
-- 0.00 -
228228--
- 206 22
111
ChhattisgarhKawardha28-Feb-2009--
22082326I1926 1032 DUs IHSDP Scheme for the town ofKawardha, Chhattisgarh 8.00
5.9811.68
-- - 5.70
528528--
- 423 105
112
ChhattisgarhKhairagarh28-Feb-2009--
22092372I1927 492 DUs IHSDP Scheme for the town ofKhairagarh, Chhattisgarh 7.52
5.625.62
-- - -
49240092
- 20 380
Total of Bihar for 30 project(s)
Sub-total of Bilaspur for 2 project(s)
* Project Cost and ACA Committed are recalculated after deducting cost of DUs alongwith proportionate cost of infrastructure dropped by CSMC.
Central Share HousesSanctionedReleasedAdjusted
SanctionedCompletedIn-progress
Monitoring Report dated 1st Jan 2019
IHSDP : State wise Report for latest Progress at Project & Town LevelProject Completed
Sr. No.
StateCityInitial SanctionedResent Sanctioned
Project Title Project Code NonStarter Occupied Un-
Occupied
Financial Progress (Rs in Crores) Physical Progress (Nos)
ProjectCost
UC Pending
Excess Central Share
113
ChhattisgarhKumhari28-Sep-2006--
22102644I886 320 DUs IHSDP Scheme for the town ofKumhari, Chhattisgarh 3.40
2.462.46
-- - -
320320--
- 318 2
114
ChhattisgarhKurud28-Sep-2006--
22132677I887 204 DUs IHSDP Scheme for the town ofKurud, Chhattisgarh 1.19
0.871.74
-- - 0.87
102102--
- 102 -
115
ChhattisgarhRaigarh11-Oct-2006--
22043937I888 Integrated Housing and Slum DevelopmentProgramme at Raigarh, Chhattisgarh 15.93
10.6510.65
-- - 0.00
13121000312
- 709 291
116
ChhattisgarhRajnandgaon28-Feb-2009--
22093970I1928 1072 DUs IHSDP Scheme for the town ofRajnandgaon, Chhattisgarh 17.97
13.5213.52
-- - -
10721072
-- - 330 742
197.37 138.93158.85
-- 0.00 19.92
15782146061176
- 9,461 5,145
117
D&N HaveliSilvassa24-Mar-2008--
26014457I1160 IHSDP Scheme for Silvassa MunicipalCouncil, UT of Dadra & Nagar Haveli. 0.50
0.450.45
-- - -
InfraNANA
- - -
118
D&N HaveliSilvassa16-Feb-2010--
26014457I2456 144 DUs Implementation of IHSDP atSilvassa, UT of Dadra & Nagar Haveli 5.24
2.892.89
-- 0.00 -
1449648
- 96 -
5.74 3.343.34
-- 0.00 -
1449648
- 96 -
119
Daman & DiuDaman24-Mar-2008--
25021142I1161 16 DUs IHSDP Scheme for the town ofDaman Municipal Council UT, Daman & Diu 0.60
0.510.29
-- - -
1414--
- 14 -
0.60 0.510.29
-- - -
1414--
- 14 -
120
GoaConcolim09-Nov-2011--
30021113I4288 Construction of 70 Dwelling Units atCouncolim, Goa.
Project Cancelled on
dated 20-May-14
--0.7--
- 0.70 ------
- - -
- --0.7--
- 0.70 ------
- - -
121
GujaratAmreli27-Feb-2007--
24130171I5028Revised- Construction of 281 houses and
provision of infrastructure facilities at Amreli,Gujarat
3.39 2.43.65
-- - 1.25
281281--
- 105 176
122
GujaratAnand24-Nov-2011--
24150181I4310 Construction of 464 Dwelling Units in AnandMunicipality, Gujarat. 11.64
6.166.16
-- 1.69 -
464308--
156 - 308
123
GujaratAnklav26-Feb-2009--
24150202I5033Revised Project for 416 DUs with
infrastructure facilities at Anklav, Dist- Anand,Gujarat
4.53 3.484.310.45
- 0.83 336168168
- - 168
124
GujaratBagasara27-Feb-2007--
24130369I5029 Revised project for 376 DUs IHSDP project atBagasara, Amreli District, Gujarat 5.28
3.623.69
-- - 0.07
376376--
- 376 -
125
GujaratBoriavi21-Aug-2007--
24150843I819 611 Dwelling Units, IHSDP programme forBoriavi, Gujarat. 5.67
34.4--
- 1.41 416416--
- 416 -
126
GujaratChorvad21-Oct-2011--
24121088I4588 1088 DUs, IHSDP project in ChorwadMunicipality, Junagadh Distt, Gujarat
Project Cancelled on
dated 11-Nov-14
--7.89
-- - 7.89
------
- - -
127
GujaratChotila21-Oct-2011--
24085190I4628 Construction of 240 dwelling units in ChotialMunicipality, Gujarat 5.61
3.173.17
-- - -
240240--
- 240 -
128
GujaratDehgam24-Nov-2011--
24061125I4308 Construction of 256 dwelling units in DehgamMunicipality, Gandhi Nagar Distt, Gujarat". 7.45
4.454.45
-- - -
256256--
- 256 -
129
GujaratDhandhuka26-Sep-2007--
24071256I5030Revisied project - 96 DUs with infrastructure
at Dhandhuka nagarpalika, Dist – Ahmedabad,Gujarat
1.33 0.723.16
-- - 2.44
9696--
- 96 -
130
GujaratDhrangadhra27-Feb-2007--
24081299I852 564 Dwelling Units, IHSDP Scheme for thetown of Dhrangadhra, Gujarat 3.77
2.994.85
-- - 1.86
348348--
- - 348
Total of Chhattisgarh for 18 project(s)
Total of D&N Haveli for 2 project(s)including 1 project(s) which are completed
Total of Daman & Diu for 1 project(s)
Total of Goa for 0 project(s)
* Project Cost and ACA Committed are recalculated after deducting cost of DUs alongwith proportionate cost of infrastructure dropped by CSMC.
Central Share HousesSanctionedReleasedAdjusted
SanctionedCompletedIn-progress
Monitoring Report dated 1st Jan 2019
IHSDP : State wise Report for latest Progress at Project & Town LevelProject Completed
Sr. No.
StateCityInitial SanctionedResent Sanctioned
Project Title Project Code NonStarter Occupied Un-
Occupied
Financial Progress (Rs in Crores) Physical Progress (Nos)
ProjectCost
UC Pending
Excess Central Share
131
GujaratDahod26-Feb-2009--
24181343I1903 480 DUs Implementation of IHSDP at Dahod,Gujarat 12.32
8.018.01
-- - -
480480--
- 46 434
132
GujaratGondal26-Sep-2007--
24091613I822 1775 Dwelling Units, IHSDP Scheme for thetown of Gondal Municipality, Gujarat 18.68
14.4614.46
-- 0.00 -
17751775
-- - 1,775 -
133
GujaratHalol21-Mar-2007--
24171707I823 446 Dwelling Units, IHSDP Scheme for thetown of Halol Municipality, Gujarat 4.56
3.654.87
-- - 1.22
334334--
- 334 -
134
GujaratHalvad26-Feb-2009--
24081709I1904 828 Dwelling Units, Implementation of IHSDPat Halvad, Gujarat 14.86
9.829.824.91
- - 828600228
- - 600
135
GujaratHimatnagar13-Feb-2008--
24051772I830 IHSDP scheme for (1296 DUs) HimatnagarNagarpalika, Dist. Sabarkantha, Gujarat 10.56
6.829.82
-- - 3.00
900900--
- 900 -
136
GujaratIdar29-Dec-2011--
24051827I4414 Construction of 1056 DUs in Idar Municipality,Sabarkantha Distt, Gujarat.
Project Cancelled on
dated 20-May-14
--6.99
-- - 6.99
------
- - -
137
GujaratJamnagar27-Feb-2007--
24101938I824 864 Dwelling Units IHSDP scheme forJamnagar Town, Gujarat 10.06
7.337.33
-- - -
864864--
- 864 -
138
GujaratJamnagar21-May-2009--
24101938I2091GOI Subsidy Recommended from JNNURM
for Jamnagar MC Scheme No 18631 forComplete construction of 254 DU underVAMBAY Scheme.
3.31 0.510.51
-- - -
254254--
- 254 -
13.37 7.847.84
-- - -
11181118
-- - 1,118 -
139
GujaratJetpur Navagadh18-May-2007--
24091984I5031 Revised - 963 Dwelling Units IHSDP Projectat Jetpur, Rajkot District, Gujarat 14.10
9.419.41
-- - -
963963--
- 963 -
140
GujaratKadi26-Feb-2009--
24042069I1906 Construction of 664 Dwelling Units at Kadi,Gujarat 14.06
8.628.62
-- - -
664664--
- 664 -
141
GujaratKalol26-Feb-2009--
24172131I1905 400 Dwelling Units Implementation of IHSDPproject at Kaalol, Gujarat
Project Cancelled on
dated 20-May-14
--2.02
-- - 2.02
------
- - -
142
GujaratKarjan09-Nov-2011--
24192262I4292 Construction of 512 dwelling units in KarjanMunicipality, Vadodara Distt, Gujarat". 12.28
6.526.52
-- - -
512512--
- 512 -
143
GujaratKodinar24-Nov-2011--
24122507I4309 Construction of 512 dwelling units in KodinarMunicipality, Junagadh Distt, Gujarat". 13.76
7.927.923.96
0.00 - 512512--
- - 512
144
GujaratKutiyana09-Nov-2011--
24112691I4291 Construction of 608 dwelling units in KutianaMunicipality, Porbandar Distt, Gujarat". 10.02
5.676.73
-- - 1.06
512256256
- - 256
145
GujaratLimbdi24-Jan-2008--
24082755I854 384 Dwelling Units, IHSDP Scheme for thetown of Limdi, Gujarat 2.61
1.491.48
-- - -
192192--
- 192 -
146
GujaratMahuva24-Jan-2008--
24142850I857 500 DUs, IHSDP Scheme for the town ofMahuva Municipality, Gujarat 4.96
2.722.28
-- 0.00 -
372--
372 - - -
147
GujaratModasa26-Feb-2009--
24053090I5037Revised 240 DUs with provision of
infrastructure facilities for Modasa layout forSabarkantha Dist, Gujarat
Project Cancelled on
dated 20-May-14
--4.88
-- - 4.88
------
- - -
148
GujaratMorbi09-Nov-2011--
24093128I4289 Construction of 1008 Dwelling Units in MorbiMunicipality, Rajkot Distt, Gujarat". 27.52
15.5315.53
-- 0.00 -
1008416592
- 150 266
149
GujaratNavsari26-Feb-2009--
24243374I5036Revisied project for 368 DUs with
infrastructure facilities Navsari Nagarpalika,Navsari District, Gujarat
3.81 2.584.96
-- - 2.38
256256--
- 256 -
150
GujaratNavsari21-May-2009--
24243374I2094GOI Subsidy Recommended from JNNURM
lfor Navsari MC Scheme No 18794 forComplete construction of 387 DU underVAMBAY Scheme.
2.27 0.770.77
-- 0.22 -
387387--
- 387 -
Sub-total of Jamnagar for 2 project(s)
* Project Cost and ACA Committed are recalculated after deducting cost of DUs alongwith proportionate cost of infrastructure dropped by CSMC.
Central Share HousesSanctionedReleasedAdjusted
SanctionedCompletedIn-progress
Monitoring Report dated 1st Jan 2019
IHSDP : State wise Report for latest Progress at Project & Town LevelProject Completed
Sr. No.
StateCityInitial SanctionedResent Sanctioned
Project Title Project Code NonStarter Occupied Un-
Occupied
Financial Progress (Rs in Crores) Physical Progress (Nos)
ProjectCost
UC Pending
Excess Central Share
6.08 3.365.73
-- 0.22 2.38
643643--
- 643 -
151
GujaratPadra24-Nov-2011--
24193526I4311 Construction of 168 Dwelling Units in PadraMunicipality, Vadodara Distt, Gujarat". 4.14
2.252.251.12
0.00 - 168168--
- 160 8
152
GujaratPatan21-Mar-2007--
24033675I5034 Revised in sanctioned DPR - IHSDP Projectfor dropped out unit for Patan, Gujarat. 3.20
2.314.57
-- - 2.25
240240--
- - 240
153
GujaratPetlad26-Feb-2009--
24153759I5035 Revised in sanctioned DPR - IHSDP Projectat Petlad, Anand District, Gujarat 5.21
3.284.1--
- 0.82 224224--
- 224 -
154
GujaratPrantij26-Sep-2007--
24053843I828 449 Dwelling Units, IHSDP Scheme for thetown of Prantij, Gujarat 5.09
3.453.45
-- 0.00 -
449449--
- 399 50
155
GujaratRajkot21-May-2009--
24093967I2095GOI Subsidy Recommended from JNNURM
for Rajkot MC Scheme No 18881 for Completeconstruction of 1160 DU under VAMBAYScheme.
11.60 2.92.9--
- - 11601160
-- - 1,160 -
156
GujaratSantrampur09-Nov-2011--
24174244I4290Detailed Project report of "IHSDP Scheme for
construction of 272 dwelling units inSantrampur, Gujarat".
5.38 3.053.05
-- - -
272--
272 - - -
157
GujaratSongadh26-Feb-2009--
24224542I1909 784 DUs Implementation of IHSDP atSongadh, Gujarat 8.24
5.117.16
-- - 2.04
560--
560 - - -
158
GujaratUna21-Mar-2007--
24124909I5032Revised project for 1008 DUs with
infrastructure facilities for Una layout forJunagadh Dist, Gujarat
10.76 7.757.75
-- - -
10081008
-- - 1,008 -
159
GujaratUnjha18-May-2007--
24044916I858 IHSDP programme for 624 DUs at Unchatown, Mehsana Distt. Gujarat. 9.40
5.555.55
-- - -
624624--
- 624 -
160
GujaratUpleta24-Jan-2008--
24094919I856 Construction of 396 Dwelling Units for thetown of Upleta, Gujarat
Project Cancelled on
dated 20-May-14
--1.74
-- - 1.74
------
- - -
161
GujaratVadodara21-May-2009--
24194971I2092GOI Subsidy Recommended from JNNURM
for Vadodara MC Scheme No 18021 forComplete construction of 86 DU underVAMBAY Scheme.
0.88 0.220.22
-- 0.22 -
8686--
- 86 -
162
GujaratVadodara21-May-2009--
24194971I2093GOI Subsidy Recommended from JNNURM
for Vadodara MC Scheme No 18021 forComplete construction of 768 DU underVAMBAY Scheme.
5.76 1.921.92
-- 1.92 -
768768--
- 768 -
6.64 2.142.14
-- 2.14 -
854854--
- 854 -
163
GujaratValsad24-Jan-2008--
24254988I859 926 Dwelling Units, IHSDP Scheme forValsad Municipality, Gujarat 2.68
1.653.73
-- - 2.08
205205--
- 205 -
164
GujaratVeraval21-Oct-2011--
24125054I4608 960 Dwelling Units, IHSDP Scheme inVeraval - Patan Municipality, Gujarat. 24.01
13.2813.284.65
- - 960960--
- 689 271
165
GujaratBhavnagar19-Nov-2009--
24140689I2189 Construction of 1000 DUs Relocation atBhavnagar, Gujarat
Project Cancelled on
dated 28-Mar-12
--5.41
-- - 5.41
------
- - -
166
GujaratDharampur26-Sep-2007--
24251264I821 Construction of 132 DUs for Dharampur,Valasad Distt, Gujarat
Project Cancelled on
dated 28-Mar-12
--0.58
-- - 0.58
------
- - -
167
GujaratKhambhat21-Mar-2007--
24152384I825 Construction of 606 DUs for Khambat, AnandDistt, Gujarat
Project Cancelled on
dated 28-Mar-12
--2.35
-- - 2.35
------
- - -
168
GujaratMandvi21-Aug-2007--
24222937I826 Construction of 1548 DUs for Mandvi,Kachchh district, Gujarat
Project Cancelled on
dated 28-Mar-12
--6.58
-- - 6.58
------
- - -
169
GujaratUmreth24-Jan-2008--
24154902I855 Construction of 760 DUs for Umreth, Ananddistrict Gujarat
Project Cancelled on
dated 28-Mar-12
--3.75
-- - 3.75
------
- - -
Sub-total of Navsari for 2 project(s)
Sub-total of Vadodara for 2 project(s)
* Project Cost and ACA Committed are recalculated after deducting cost of DUs alongwith proportionate cost of infrastructure dropped by CSMC.
Central Share HousesSanctionedReleasedAdjusted
SanctionedCompletedIn-progress
Monitoring Report dated 1st Jan 2019
IHSDP : State wise Report for latest Progress at Project & Town LevelProject Completed
Sr. No.
StateCityInitial SanctionedResent Sanctioned
Project Title Project Code NonStarter Occupied Un-
Occupied
Financial Progress (Rs in Crores) Physical Progress (Nos)
ProjectCost
UC Pending
Excess Central Share
170
GujaratVapi18-May-2007--
24255001I860 Construction of 1008 DUs for Vapi, Valasaddistrict Gujarat
Project Cancelled on
dated 28-Mar-12
--3.59
-- - 3.59
------
- - -
324.76 194.53262.56
15.1 4.05 68.48
20350177462448
156 14,109 3,637
171
HaryanaAmbala28-Sep-2006--
06020134I906 495 DUs IHSDP Program Scheme for thetown of Ambala City, Haryana 15.40
12.3212.32
-- 6.16 0.00
49548312
- 483 -
172
HaryanaAmbala20-Mar-2012--
06020134I4797 Providing infrastructure facilities in identifiedslums of Ambala City Phase-II, Haryana. 5.94
4.74.7
2.35 3.00 -
InfraNANA
- - -
21.34 17.0217.022.35
9.16 0.00 49548312
- 483 -
173
HaryanaAmbala Sadar28-Aug-2006--
06020136I1162 Relocation of 192 slum dwellers in Bandhunagar, Ambala Sadar, Haryana
Project Cancelled on
dated 17-Feb-12
--1.27
-- - 1.27
------
- - -
174
HaryanaAmbala Sadar28-Aug-2006--
06020136I907 Insitu construction of 423 Dwelling units in 28slums pockets in Ambala Sadar, Haryana 11.41
9.139.13
-- 4.56 0.00
42339231
- 392 -
175
HaryanaAmbala Sadar20-Mar-2012--
06020136I4798 Providing infrastructure facilities in identifiedslums of Ambala Sadar Phase-II, Haryana. 6.15
4.874.872.44
3.01 - Infra
NANA
- - -
17.57 14
15.272.44
7.57 1.27 42339231
- 392 -
176
HaryanaBhiwani28-Aug-2006--
06130717I908 Insitu construction of 1679 Dwelling Units in21 slums pockets in Bhiwani, Haryana 28.92
23.1423.14
-- 11.57 0.00
16791679
-- - 1,679 -
177
HaryanaCharkhi Dadri28-Sep-2006--
06130964I1193 605 DUs IHSDP Scheme for the town ofDadri, Distt. Bhiwani, Haryana 12.11
9.699.69
-- 4.84 -
605605--
- 605 -
178
HaryanaHisar28-Nov-2006--
06121787I5468 Revision in Sanctioned DPR - IHSDP project,Hisar Ph-I, District Hisar, Haryana 12.36
5.919.48
-- - 3.57
424424--
- 424 -
179
HaryanaHisar28-Mar-2012--
06121787I4802 195 DUs IHSDP Scheme for the town of HisarPhase-II, Haryana 17.93
12.8812.88
-- 7.97 -
195195--
- 195 -
30.29 18.7822.35
-- 7.97 3.57
619619--
- 619 -
180
HaryanaJagadhri28-Nov-2006--
06031873I910968 DUs (885- New & 83- Upgrade) for the
town of Jagadhri, Distt. Yamuna Nagar,Haryana
26.52 18.818.8
-- - -
96895216
- 952 -
181
HaryanaJagadhri20-Mar-2012--
06031873I4795 Detailed Project Report for IHSDP SchemeJagadhri Phase-II, Yamunangar Distt, Haryana 5.94
4.764.762.38
- - Infra
NANA
- - -
32.46 23.5623.562.38
- - 96895216
- 952 -
182
HaryanaJhajjar28-Nov-2006--
06151992I911 431 DUs IHSDP Scheme for the town ofJhajjar, Haryana 8.07
5.735.73
-- 0.42 -
43142110
- 421 -
183
HaryanaJind28-Feb-2009--
06092017I1920 933 DUs IHSDP Scheme for the town of Jind,Haryana 18.67
14.9314.93
-- 1.09 -
93392112
- 921 -
184
HaryanaKalka28-Sep-2006--
06012122JI7112 Revised IHSDP project at Kalka, DistPanchkula (83 DUs), Haryana 1.19
0.951.04
-- 0.95 0.08
834835
- 42 6
185
HaryanaKalka28-Mar-2012--
06012122I4801IHSDP Scheme for construction of
Infrastructure works in slum area of KalkaTown, Haryana
0.98 0.710.36
-- 0.36 -
InfraNANA
- - -
2.17 1.661.39
-- 1.31 0.08
834835
- 42 6
Sub-total of Ambala Sadar for 2 project(s)
Sub-total of Hisar for 2 project(s)
Sub-total of Jagadhri for 2 project(s)
Sub-total of Kalka for 2 project(s)
Total of Gujarat for 39 project(s)including 17 project(s) which are completed
Sub-total of Ambala for 2 project(s)
* Project Cost and ACA Committed are recalculated after deducting cost of DUs alongwith proportionate cost of infrastructure dropped by CSMC.
Central Share HousesSanctionedReleasedAdjusted
SanctionedCompletedIn-progress
Monitoring Report dated 1st Jan 2019
IHSDP : State wise Report for latest Progress at Project & Town LevelProject Completed
Sr. No.
StateCityInitial SanctionedResent Sanctioned
Project Title Project Code NonStarter Occupied Un-
Occupied
Financial Progress (Rs in Crores) Physical Progress (Nos)
ProjectCost
UC Pending
Excess Central Share
186
HaryanaLadwa20-Feb-2009--
06042701I1803 200 DUs IHSDP Scheme for the town ofLadwa, Haryana 3.56
2.852.85
-- 0.88 -
200200--
- 200 -
187
HaryanaNaraingarh28-Sep-2006--
06023316I913 611 DUs, IHSDP scheme for the town ofNaraingarh, Distt. Ambala, Haryana 7.19
5.765.76
-- 2.88 -
611500111
- 500 -
188
HaryanaNaraingarh20-Mar-2012--
06023316I4799 Providing infrastructure facilities in identifiedslums of Naraingarh, Phase-II, Haryana 5.18
4.114.112.05
2.56 - Infra
NANA
- - -
12.38 9.869.862.05
5.43 - 611500111
- 500 -
189
HaryanaPanchkula28-Sep-2006--
06013598I914 Relocation of 8 No. slums IHSDP Scheme atPanchkula (Phase-I) (2388 DUs), Haryana 18.68
14.948.61
-- 8.61 -
20722072
-- - 2,072 -
190
HaryanaPanchkula28-Sep-2006--
06013598I916 Relocation of 3 No. slums 2457 DUs atPanchkula (Phase-II), Haryana
Project Cancelled on
dated 20-May-14
--2.42
-- - 2.42
------
- - -
191
HaryanaPanchkula28-Sep-2006--
06013598I915 Relocation of 2 No. slums 2449 DUs atPanchkula (Phase-III), Haryana
Project Cancelled on
dated 20-May-14
--8.84
-- - 8.84
------
- - -
18.68 14.9419.87
-- 8.61 11.26
20722072
-- - 2,072 -
192
HaryanaPinjore28-Sep-2006--
06013793JI7111 Revised in Sanctioned DPR - IHSDP projectat Pinjore, Dist Panchkula (71 DUs), Haryana 0.88
0.711.51
-- 0.71 0.81
714724
- 43 4
193
HaryanaPinjore28-Mar-2012--
06013793I4800 Providing Infrastructure works in slum Area ofPinjore Town (Phase-II), Haryana 0.83
0.60.3--
0.30 - Infra
NANA
- - -
1.71 1.311.82
-- 1.01 0.81
714724
- 43 4
194
HaryanaRewari14-Dec-2006--
06174091I918 485 DUs IHSDP Scheme for the town ofRewari, Haryana 27.09
19.219.2
-- 11.41 -
48544738
- 447 -
195
HaryanaYamunanagar20-Feb-2009--
06035136I1802 652 DUs IHSDP Scheme for The Town ofYamunanagar, Haryana 11.20
8.968.96
-- - -
65263319
- 633 -
196
HaryanaYamunanagar20-Mar-2012--
06035136I4796 Providing Infrastructure works in slum area ofYamunanagar Phase-II, Haryana 6.37
5.15.1
2.55 0.01 -
InfraNANA
- - -
17.57 14.0614.062.55
0.01 - 65263319
- 633 -
252.58 190.73200.7311.77
71.30 16.99 1032710019
308 - 10,009 10
197
Himachal PradeshBaddi21-Feb-2009--
02090350I1816 480 Dwelling Units for the town of Baddi,Himachal Pradesh 14.75
8.914.45
-- 4.45 -
480--
480 - - -
198
Himachal PradeshDharmsala27-Feb-2008--
02021281I832 328 Dwelling Units for the town of Dharmsala,Himachal Pradesh 9.42
6.623.31
-- - -
328--
153 175 - -
199
Himachal PradeshHamirpur27-Feb-2008--
02061710I831 152 Dwelling Units for the town of Hamirpur,Himachal Pradesh 4.43
3.413.41
-- 1.70 -
1527280
- - 72
200
Himachal PradeshNalagarh21-Feb-2009--
02093273I1817 128 Dwelling Units for the town of Nalagarh,Solan, Himachal Pradesh 5.47
3.753.75
-- 1.88 -
128128--
- - 128
201
Himachal PradeshParwanoo21-Feb-2009--
02093667I1818 192 Dwelling Units for the town of Parwanoodistt Solan, Himachal Pradesh 11.68
8.228.22
-- 4.42 -
192192--
- 76 116
202
Himachal PradeshSarkaghat25-Feb-2011--
02054266I3469 130 Dwelling Units for the town of Sarkaghat,District Mandi, Himachal Pradesh. 7.39
5.085.08
-- 3.28 -
130130--
- 130 -
Sub-total of Naraingarh for 2 project(s)
Sub-total of Panchkula for 1 project(s)
Sub-total of Pinjore for 2 project(s)
Sub-total of Yamunanagar for 2 project(s)
Total of Haryana for 23 project(s)including 1 project(s) which are completed
* Project Cost and ACA Committed are recalculated after deducting cost of DUs alongwith proportionate cost of infrastructure dropped by CSMC.
Central Share HousesSanctionedReleasedAdjusted
SanctionedCompletedIn-progress
Monitoring Report dated 1st Jan 2019
IHSDP : State wise Report for latest Progress at Project & Town LevelProject Completed
Sr. No.
StateCityInitial SanctionedResent Sanctioned
Project Title Project Code NonStarter Occupied Un-
Occupied
Financial Progress (Rs in Crores) Physical Progress (Nos)
ProjectCost
UC Pending
Excess Central Share
203
Himachal PradeshSolan27-Feb-2008--
02094529I833 336 Dwelling Units for the town of Solan,Himachal Pradesh 9.58
6.163.08
-- 0.23 -
336--
336 - - -
204
Himachal PradeshSundarnagar25-Feb-2011--
02054602I3470208 Dwelling Units for the town of
Sundernagar, District Mandi, HimachalPradesh.
9.99 6.636.63
-- 4.20 -
208208--
- 150 58
205
Himachal PradeshSarkaghat28-Mar-2012--
02054266I480389 Dwelling Units with infrastructure facilities
in 7 slums in Sarkarghat (Ph-II), HimachalPradesh
Project Cancelled on
dated 20-Jan-14
------
- - ------
- - -
72.71 48.7937.94
-- 20.17 -
1954730
1049 175 356 374
206
J&KAnantnag27-Apr-2007--
01060188I834 53 Dwelling Units IHSDP Scheme for the townof Anantanag, J&K 3.47
3.083.08
-- 0.40 -
5353--
- 53 -
207
J&KArnia10-Mar-2011--
01130249I3490 IHSDP Scheme for Arnia Town, Distt. Jammu,J&k. 2.81
2.082.080.79
1.04 - 1249529
- 95 -
208
J&KBadgam30-Jan-2009--
01040353I1596 IHSDP Scheme for Budgam Town, Distt.Budgam, Jammu & Kashmir 1.06
0.860.86
-- 0.09 -
8585--
- 85 -
209
J&KBadgam05-Aug-2010--
01040353I2688 IHSDP Scheme for Budgam Town, Distt.Budgam, J&K (Infra Only) 0.75
0.670.670.34
0.39 - Infra
NANA
- - -
1.81 1.541.540.34
0.47 - 8585--
- 85 -
210
J&KBandipore30-Jan-2009--
01020464I1602 IHSDP Scheme for Bandipora Town, Jammu& Kashmir 5.16
4.184.18
-- 0.42 -
413413--
- 413 -
211
J&KBanihal27-Apr-2007--
01090474I835 57 New Houses IHSDP programme forBanihal town, J&K 4.13
3.113.11
-- 0.78 -
574215
- 42 -
212
J&KBaramula30-Jan-2009--
01020504I1603 IHSDP Project for Baramulla Dist. BaramullaJammu & Kashmir 8.40
6.86.8--
1.24 - 672406211
55 406 -
213
J&KBaramula11-Nov-2009--
01020504I2128 IHSDP Scheme for Baramulla Town, J&K(Infra only) 3.47
3.123.121.56
1.78 - Infra
NANA
- - -
11.87 9.929.921.56
3.02 - 672406211
55 406 -
214
J&KBashohli27-Apr-2007--
01140562I836 592 DUs (281-new & 311- upgrade) IHSDPProgramme for Basohli Town, J&K 4.64
3.343.34
-- 0.36 -
592302290
- 588 -
215
J&KBatote27-Apr-2007--
01090577I837 114 New Houses IHSDP project for Batotetown, J&K 3.57
3.023.02
-- 0.76 -
1149618
- 96 -
216
J&KBhaderwah10-Mar-2011--
01090639I3491 IHSDP Scheme for Bhaeerwah Town, Distt.Doda, J&k. 2.45
1.831.83
-- 0.60 -
1035449
- 54 -
217
J&KBillawar10-Mar-2011--
01140784I3508 IHSDP Scheme for Billawar Town, Distt.Kathua, J&K 3.53
2.542.54
-- 0.58 -
17510570
- 105 -
218
J&KChenani10-Mar-2011--
01100982I3488 IHSDP Scheme for Chenani Town, Distt.Udhampur, J&k. 2.38
1.771.77
-- 0.43 -
1037017
16 70 -
219
J&KDuru-Verinag10-Mar-2011--
01061382I3510 IHSDP Scheme for Dooru Verinag Town,Distt. Anantnag, J&K 2.49
1.941.94
-- 0.57 -
825824
- 58 -
220
J&KGanderbal30-Jan-2009--
01031492I1605 IHSDP Scheme for Ganderbal Town, Distt.Ganderbal, Jammu & Kashmir 1.38
1.111.11
-- 0.11 -
11093--
17 93 -
221
J&KGanderbal05-Aug-2010--
01031492I2708 IHSDP Scheme for Ganderbal Town, Distt.Srinagar, J&K (Infra only). 1.34
1.21.20.6
0.71 - Infra
NANA
- - -
Total of Himachal Pradesh for 8 project(s)
Sub-total of Badgam for 2 project(s)
Sub-total of Baramula for 2 project(s)
* Project Cost and ACA Committed are recalculated after deducting cost of DUs alongwith proportionate cost of infrastructure dropped by CSMC.
Central Share HousesSanctionedReleasedAdjusted
SanctionedCompletedIn-progress
Monitoring Report dated 1st Jan 2019
IHSDP : State wise Report for latest Progress at Project & Town LevelProject Completed
Sr. No.
StateCityInitial SanctionedResent Sanctioned
Project Title Project Code NonStarter Occupied Un-
Occupied
Financial Progress (Rs in Crores) Physical Progress (Nos)
ProjectCost
UC Pending
Excess Central Share
2.71 2.322.320.6
0.82 - 11093--
17 93 -
222
J&KHajan30-Jan-2009--
01021697I1606 IHSDP Scheme for the town of Hajin Town,Distt Bandipora, Jammu & Kashmir 0.89
0.720.72
-- 0.07 -
7171--
- 71 -
223
J&KHajan11-Nov-2009--
01021697I2133 IHSDP Scheme for Hajin Town, J&K (Infraonly) 0.75
0.680.68
-- 0.34 -
InfraNANA
- - -
1.64 1.41.4--
0.41 - 7171--
- 71 -
224
J&KHandwara30-Jan-2009--
01011715I1607 IHSDP Scheme for Handwara Town, Distt.Handwara, Jammu & Kashmir. 2.45
1.981.98
-- 0.20 -
196196--
- 196 -
225
J&KHandwara11-Nov-2009--
01011715I2111 IHSDP Scheme for Handwara town, Distt.Handwara, J&K (Infra only) 1.77
1.591.59
-- 0.47 -
InfraNANA
- - -
4.22 3.583.58
-- 0.67 -
196196--
- 196 -
226 J&KDLB, Kashmir VAMBAY21-May-2009
01131937I2089GOI Subsidy Recommended from JnNURM
for DLB, Kashmir Scheme No-18064 toComplete Construction of 292 DU underVAMBAY Scheme.
1.58 0.660.66
-- 0.66 -
292292--
- 292 -
227
J&KKhour27-Apr-2007--
01132459I838 313 New Houses IHSDP programme forKhour town, J&K. 4.53
3.433.43
-- 0.86 -
31328033
- 280 -
228
J&KChak Malal10-Mar-2011--
01132459I3509 Construction of 92 DUs for Chak Malal Town,Distt. Jammu, J&K
Project Cancelled on
dated 20-May-14
--0.78
-- - 0.78
------
- - -
229
J&KKalakote10-Mar-2011--
01123957I3512 140 DUs IHSDP Scheme for Kalakote Town,Distt. Rajouri, J&K 3.34
2.492.49
-- 1.25 -
14010040
- 100 -
230
J&KKukernag10-Mar-2011--
01062627I3511 IHSDP Scheme for Kokernag Town, Distt.Anantnag, J&K 2.63
2.072.07
-- 0.39 -
836716
- 67 -
231
J&KKulgam30-Jan-2009--
01062631I1608 IHSDP Scheme for Kulgam Town, Jammu &Kashmir 3.20
2.592.59
-- 0.26 -
256256--
- 256 -
232
J&KKulgam11-Nov-2009--
01062631I2132 IHSDP Scheme for Kulgam Town, Distt.Kulgam, J&K (Infra only) 2.24
2.012.01
-- 0.75 -
InfraNANA
- - -
5.44 4.64.6--
1.01 - 256256--
- 256 -
233
J&KKupwara30-Jan-2009--
01012662I1598 IHSDP Scheme for Kupwara Town, Distt.Kupwara, Jammu & Kashmir 2.83
2.292.29
-- 0.23 -
22618728
11 187 -
234
J&KLeh Ladakh28-Mar-2011--
01072746I3558Slum improvement Programme for Leh to be
implemented in Ladakh Autonomus HillDevelopment Council (LAHDC)/PWD Circle,Leh.
9.85 8.868.86
-- 4.67 -
InfraNANA
- - -
235
J&KMagam30-Jan-2009--
01042813I1604 IHSDP Scheme for Magam Town, Distt.Budgam, Jammu & Kashmir 1.75
1.421.42
-- 0.14 -
140140--
- 140 -
236
J&KMagam11-Nov-2009--
01042813I2131 IHSDP Scheme for Magam Town, DisttBudgam, J&K (Infra only) 0.84
0.760.76
-- 0.33 -
InfraNANA
- - -
2.59 2.182.18
-- 0.47 -
140140--
- 140 -
237
J&KMattan30-Jan-2009--
01063013I1601 IHSDP Scheme for Mattan Town, Distt.Aanantnag, Jammu & Kashmir 0.55
0.450.45
-- 0.04 -
4441--
3 41 -
238
J&KMattan11-Nov-2009--
01063013I2130 IHSDP Scheme for Mattan Town, Distt.Aanantnag, Jammu & Kashmir. (Infra only) 0.63
0.570.57
-- 0.27 -
InfraNANA
- - -
Sub-total of Ganderbal for 2 project(s)
Sub-total of Hajan for 2 project(s)
Sub-total of Handwara for 2 project(s)
Sub-total of Kulgam for 2 project(s)
Sub-total of Magam for 2 project(s)
* Project Cost and ACA Committed are recalculated after deducting cost of DUs alongwith proportionate cost of infrastructure dropped by CSMC.
Central Share HousesSanctionedReleasedAdjusted
SanctionedCompletedIn-progress
Monitoring Report dated 1st Jan 2019
IHSDP : State wise Report for latest Progress at Project & Town LevelProject Completed
Sr. No.
StateCityInitial SanctionedResent Sanctioned
Project Title Project Code NonStarter Occupied Un-
Occupied
Financial Progress (Rs in Crores) Physical Progress (Nos)
ProjectCost
UC Pending
Excess Central Share
1.18 1.011.01
-- 0.31 -
4441--
3 41 -
239
J&KNowshehra27-Apr-2007--
01123463I839 110 New Houses IHSDP programme forNowshera town, J&K 3.24
2.242.24
-- 0.56 -
11010010
- 100 -
240
J&KParole27-Apr-2007--
01143661I840 1001 DUs (428-new & 573- upgrade) IHSDPScheme for the town of Parole, J&K 6.70
4.844.84
-- 1.42 -
1001410591
- 983 -
241
J&KPunch27-Apr-2007--
01113873I841 270 DUs IHSDP Programme for PoonchTown, J&K 7.06
5.065.06
-- 0.58 -
27023040
- 230 -
242
J&KRam Garh27-Apr-2007--
01133980I842 50 New Houses IHSDP project at Ramgarhtown in Jammu. 1.29
1.051.05
-- 0.26 -
504010
- 40 -
243
J&KRamnagar30-Jan-2009--
01104007I1599 187 DUs IHSDP Scheme for RamnagarTown, Distt. Udhampur Jammu & Kasmir 2.34
1.891.89
-- 0.28 -
18717017
- 170 -
244
J&KRamnagar11-Nov-2009--
01104007I2108 IHSDP Scheme for Ramnagar Town, Distt.Udhampur, J&K (Infra only) 2.24
2.022.02
-- 0.50 -
InfraNANA
- - -
4.58 3.913.91
-- 0.79 -
18717017
- 170 -
245
J&KReasi30-Jan-2009--
01104073I1597 223 DUs IHSDP Scheme for Reasi Town,Distt. Reasi, Jammu & Kashmir 2.79
2.262.26
-- 0.00 -
22319132
- 191 -
246
J&KReasi11-Nov-2009--
01104073I2109 IHSDP Scheme for Reasi town, Distt. Reasi,J&K, (Infra only) 2.72
1.391.39
-- 0.30 -
InfraNANA
- - -
5.50 3.653.65
-- 0.30 -
22319132
- 191 -
247
J&KShupiyan30-Jan-2009--
01054425I1609 132 DUs IHSDP Scheme for Shopian Town,Jammu & Kashmir 1.65
1.341.34
-- 0.13 -
132128
3 1 128 -
248
J&KShupiyan11-Nov-2009--
01054425I2110 IHSDP Scheme for Shopian Town, Distt.Shopian, Jammu & Kashmir., J&K (Infra only) 1.43
1.291.29
-- 0.49 -
InfraNANA
- - -
3.08 2.622.62
-- 0.63 -
132128
3 1 128 -
249
J&KSopore30-Jan-2009--
01024546I1600 446 DUs IHSDP Scheme for Sopore Town,Distt. Baramulla, Jammu & Kashmir 5.58
4.524.52
-- 0.45 -
44640046
- 400 -
250
J&KSopore11-Nov-2009--
01024546I2129 IHSDP Scheme for Sopore Town, DisttBaramulla, J&K (Infra only) 3.41
3.073.07
-- 0.77 -
InfraNANA
- - -
8.98 7.587.58
-- 1.22 -
44640046
- 400 -
251
J&KSumbal30-Jan-2009--
01024594I1610 207 DUs IHSDP Scheme for Sumbal Town,Jammu & Kashmir 2.59
2.12.1--
0.21 - 207207--
- 207 -
252
J&KSumbal05-Aug-2010--
01024594I2728 IHSDP at Sumbal in District Bandipora, J&K(Infra Only). 1.66
1.491.490.75
0.75 - Infra
NANA
- - -
4.25 3.593.590.75
0.96 - 207207--
- 207 -
253
J&KThanamandi27-Apr-2007--
01124710I843 94 DUs IHSDP Project at Thana Mandi Distt.Rajouri, J&K 3.76
3.073.07
-- 0.81 -
9494--
- 94 -
254
J&KUri10-Mar-2011--
01024929I3489 51 DUs IHSDP Scheme for Uri Town, Distt.Baramulla, J&K. 1.55
1.211.21
-- 0.24 -
513615
- 36 -
Sub-total of Mattan for 2 project(s)
Sub-total of Ramnagar for 2 project(s)
Sub-total of Reasi for 2 project(s)
Sub-total of Shupiyan for 2 project(s)
Sub-total of Sopore for 2 project(s)
Sub-total of Sumbal for 2 project(s)
* Project Cost and ACA Committed are recalculated after deducting cost of DUs alongwith proportionate cost of infrastructure dropped by CSMC.
Central Share HousesSanctionedReleasedAdjusted
SanctionedCompletedIn-progress
Monitoring Report dated 1st Jan 2019
IHSDP : State wise Report for latest Progress at Project & Town LevelProject Completed
Sr. No.
StateCityInitial SanctionedResent Sanctioned
Project Title Project Code NonStarter Occupied Un-
Occupied
Financial Progress (Rs in Crores) Physical Progress (Nos)
ProjectCost
UC Pending
Excess Central Share
255 J&KSrinagar21-May-2009
01035178I2090GOI subsidy Recommended from JNNURM
for Srinagar DA Scheme No 18632 forComplete construction of 316 DUs underVAMBAY Scheme.
4.64 0.710.71
-- 0.71 -
316316--
- 316 -
145.49 112.75113.53
4.03 29.61 0.78
753158241604
103 6,683 -
256
JharkhandChaibasa05-Jan-2009--
20170886I1514 IHSDP Scheme for Chaibasa, Distt. WSingbhum, Jharkhand 6.71
3.883.76
-- - -
380376--
4 376 -
257
JharkhandChatra05-Aug-2010--
20030969I2748 932 insitu Dwelling Units at Chatra (Phase-I),Jharkhand 19.08
11.2811.72
-- - 0.44
897897--
- 897 -
258
JharkhandDaltonganj26-Feb-2009--
20021140I1939 969 Dwelling Units for Medininagar(Daltonganj), Distt. Palamu, Jharkhand 8.63
5.376.19
-- 0.00 0.82
420417--
3 417 -
259
JharkhandGiridih26-Feb-2009--
20061580I1900 1132 Dwelling Units at Giridih, Jaharkhand 19.96 12.2412.246.12
0.00 - 11321126
-- 6 1,126 -
260
JharkhandGumla24-Jan-2008--
20161666I844 1292 Dwelling Units at Gumla, Jharkhand 13.14 10.4110.412.62
0.64 - 863851--
12 851 -
261
JharkhandHazaribag21-Jan-2009--
20041761I1565 1230 Dwelling Units for Hazaribagh, Distt.Hazaribagh, Jharkhand 15.27
8.7611.38
-- - 2.62
947947--
- 947 -
262
JharkhandLohardaga21-Jan-2009--
20152765I1566 1623 Dwelling Units for Lohardagga, Distt.Lohardagga, Jharkhand 35.05
19.5419.54
-- - -
16231623
-- - 1,623 -
263
JharkhandMihijam17-Jan-2011--
20113072I3368 1391 Dwelling Units at Mihijam, Jamtara,Jharkhand 15.88
9.089.081.34
- - 816810--
6 810 -
264
JharkhandPhusro26-Feb-2009--
20133779I1899 886 Dwelling Units at Phushro, Bokaro,Jharkhand 3.67
2.154.67
-- - 2.52
204204--
- 204 -
265
JharkhandSeraikela05-Aug-2010--
20174332I2768 1353 New Dwelling Units at Saraikela, DisttSarikela-Kharsawan, Jharkhand 6.77
3.958.07
-- - 4.12
331245--
86 245 -
144.15 86.6697.0610.08
0.64 10.53 76137496
-- 117 7,496 -
266
KarnatakaBagalkot10-Feb-2009--
29020368I3128Revised project for 240 Dwelling Units at
Bagalkot town in Bagalkot district ofKarnataka.
8.43 4.784.78
-- - -
240240--
- 240 -
267
KarnatakaBasavakalyan18-May-2007--
29050560I919 170 Dwelling Units, IHSDP Scheme atBasavakalya, Bidar Distt., Karnataka 2.37
1.681.68
-- - -
170170--
- 170 -
268
KarnatakaBelgaum25-Jul-2007--
29010604I3229 138 DUs IHSDP scheme at Belgaum,Belgaum Dist., Karnataka 3.03
1.671.67
-- 0.00 -
138138--
- 138 -
269
KarnatakaBallari27-Feb-2007--
29120609I921 520 Dwelling Units IHSDP Scheme at Bellary,Karnataka 8.66
5.375.37
-- - -
520520--
- 520 -
270
KarnatakaBhalki25-Jul-2007--
29050654I3228 Construction of 150 Dwelling Units at Bhalkitown, Bidar Distt., Karnataka 3.56
2.032.03
-- - 0.00
150150--
- 150 -
271
KarnatakaChincholi25-Jul-2007--
29041049I4149 Revised Project for construction of 200Dwelling Units at Chincholi, Karnataka. 4.24
2.332.33
-- - -
200200--
- 200 -
272
KarnatakaChintamani24-Jan-2008--
29191060I4129 Revised Detailed Project Report of "IHSDPScheme at Chinathamani, Karnataka". 19.49
10.5810.58
-- - -
798798--
- 798 -
273
KarnatakaDod Ballapur18-May-2007--
29211339I4148 Revised Detailed Project Report of "IHSDPScheme at Doddaballapura, Karnataka". 12.56
6.376.37
-- - -
648648--
- 648 -
Total of Jharkhand for 10 project(s)including 8 project(s) which are completed
Total of J&K for 49 project(s)
* Project Cost and ACA Committed are recalculated after deducting cost of DUs alongwith proportionate cost of infrastructure dropped by CSMC.
Central Share HousesSanctionedReleasedAdjusted
SanctionedCompletedIn-progress
Monitoring Report dated 1st Jan 2019
IHSDP : State wise Report for latest Progress at Project & Town LevelProject Completed
Sr. No.
StateCityInitial SanctionedResent Sanctioned
Project Title Project Code NonStarter Occupied Un-
Occupied
Financial Progress (Rs in Crores) Physical Progress (Nos)
ProjectCost
UC Pending
Excess Central Share
274
KarnatakaGadag-Betigeri09-Jan-2008--
29081469I3209 738 Dwelling Units for the town of Gadag-Betagiri, Distt. Gadag, Karnataka 22.77
13.1313.13
-- - -
738738--
- 738 -
275
KarnatakaGajendragarh18-May-2007--
29081482I3208 Construction of 500 Dwelling Units atGajendragada, Gadag Distt, Karnataka 9.17
4.544.54
-- - -
500500--
- 500 -
276
KarnatakaGauribidanur25-Jul-2007--
29191535I4150 Revised Detailed Project Report of "IHSDPScheme at Gowribidanur, Karnataka". 1.94
1.441.44
-- - -
InfraNANA
- - -
277
KarnatakaKalaburagi25-Jul-2007--
29041661I3191 Construction of 786 Dwelling Units atGulbarga, Gulbarga distt, Karnataka 16.63
9.129.12
-- - -
786786--
- 786 -
278
KarnatakaHassan18-May-2007--
29231744I3190 Construction of 1000 Dwelling Units forHassan town, Hassan Dist, Karnataka. 18.40
9.179.17
-- - -
10001000
-- - 1,000 -
279
KarnatakaHiriyur24-Jan-2008--
29131786I942123 Dwelling Units, IHSDP programme at
Hiriyur town of Chitradurga district ofKarnataka State.
3.93 2.162.16
-- - -
123123--
- 123 -
280
KarnatakaHole Narsipur18-May-2007--
29231793I3189 1000 DUs IHSDP Scheme for Holenarasipura, Karnataka 18.40
9.179.17
-- - -
10001000
-- - 1,000 -
281
KarnatakaHubli-Dharwad09-Jan-2008--
29091809I941 600 DUs IHSDP Scheme for the town of HubliPhase-I in Dharwad District of Karnataka. 16.00
7.417.41
-- - -
600600--
- 600 -
282
KarnatakaHubli-Dharwad10-Feb-2009--
29091809I1763 109 DUs IHSDP Scheme for the town of HubliPhase-II in Dharwad District of Karnataka. 3.50
1.841.84
-- - -
109109--
- 109 -
283
KarnatakaHubli-Dharwad10-Feb-2009--
29091809I1767 430 DUs IHSDP Programme for Hubli (Phase-III) town in Dharwad district of Karnataka 14.86
7.817.81
-- 0.00 -
430430--
- 430 -
34.35 17.0717.07
-- 0.00 -
11391139
-- - 1,139 -
284
KarnatakaKadur09-Jan-2008--
29172075I3188 500 Dwelling Units IHSDP Scheme at KadurTown, Distt. Chikmagalur, Karnataka 12.28
6.656.65
-- - -
500500--
- 500 -
285
KarnatakaKanakapura10-Feb-2009--
29212160I1765 727 DUs IHSDP Project at Kanakapura townin Ramanagara district, Karnataka 22.33
11.2311.23
-- - -
727727--
- 727 -
286
KarnatakaKoppal25-Jul-2007--
29072556I931 265 DUs IHSDP Scheme at Koppal, KoppalDistt, Karnataka 4.07
2.682.68
-- - -
265265--
- 265 -
287
KarnatakaMandya10-Feb-2009--
29222938I1770 558 DUs IHSDP Project at Mandya City inMandya district of Karnataka State. 13.95
7.927.13
-- - -
558558--
- 558 -
288
KarnatakaMulbagal27-Feb-2007--
29193164I4128 Revised project for 600 Dwelling Units atMULUBAGILU, Karnataka". 12.52
6.366.36
-- 0.00 -
600600--
- 600 -
289
KarnatakaNagamangala18-May-2007--
29223233I3168 420 Dwelling Units IHSDP Scheme forNagamangala, Karnataka (Revised). 7.91
3.923.92
-- - -
420420--
- 409 11
290
KarnatakaNanjangud18-May-2007--
29263311I3148 540 Dwelling Units at Nanjangad town inMysore Distt. Karnataka (Revised). 9.88
4.94.9--
- - 540540--
- 540 -
291
KarnatakaPavagada28-Feb-2009--
29183712I1929 508 Dwelling Units IHSDP at Pavagada townin Tumkur District of Karnatka state. 19.97
11.6211.62
-- - -
508508--
- 508 -
292
KarnatakaRamanagara27-Feb-2007--
29213986I5038Revised project at Ramanagara Town (1800
Dwelling Units) in Ramanagara District,Karnataka
33.46 16.5416.54
-- - -
18001800
-- - 1,800 -
293
KarnatakaSaundatti-Yellamma21-Mar-2007--
29014296I936 145 DUs IHSDP Scheme at Saundatti,Karnataka 2.56
1.591.59
-- - -
145145--
- 145 -
Sub-total of Hubli-Dharwad for 3 project(s)
* Project Cost and ACA Committed are recalculated after deducting cost of DUs alongwith proportionate cost of infrastructure dropped by CSMC.
Central Share HousesSanctionedReleasedAdjusted
SanctionedCompletedIn-progress
Monitoring Report dated 1st Jan 2019
IHSDP : State wise Report for latest Progress at Project & Town LevelProject Completed
Sr. No.
StateCityInitial SanctionedResent Sanctioned
Project Title Project Code NonStarter Occupied Un-
Occupied
Financial Progress (Rs in Crores) Physical Progress (Nos)
ProjectCost
UC Pending
Excess Central Share
294
KarnatakaShahpur25-Jul-2007--
29044359I937Construction of 207 Dwelling Units IHSDP
project at Shahapur, Gulbarga Distt.,Karnataka
3.71 2.442.44
-- 0.00 -
207207--
- 207 -
295
KarnatakaShikarpur10-Feb-2009--
29154393I1769 330 DU IHSDP Project for Shikarpur town inShimoga district of Karnataka State. 12.65
7.227.22
-- - -
330330--
- 330 -
296
KarnatakaShivamogga10-Feb-2009--
29154398I1768 600 DUs IHSDP for Shimoga town inShimoga district of Karnataka State. 23.05
13.1713.17
-- - -
600600--
- 600 -
297
KarnatakaSidlaghatta25-Jul-2007--
29194435I4191 Revised Detailed Project Report of "IHSDPScheme at Shidlagatta, Karnataka". 4.30
2.372.37
-- 0.00 -
200200--
- 200 -
298
KarnatakaSindhnur21-Mar-2007--
29064462I939 1005 Dwelling Units, IHSDP Scheme for thetown of Sindhnaur, Karnataka 19.66
12.0412.04
-- - -
10051005
-- - 1,005 -
299
KarnatakaSira10-Feb-2009--
29184483I1766 682 DUs IHSDP in Tumkur district at SiraTown, Karnataka 20.07
11.3211.32
-- - -
682682--
- 682 -
410.30 222.56221.77
-- 0.00 0.00
1723717237
-- - 17,226 11
300
KeralaAlappuzha27-Apr-2007--
32110091I845950 DUs (new 657 & upgrade 293 nos)
IHSDP Programme for Alappuzha town,Kerala
8.33 5.436.02
-- - 0.59
697693
4 - 697 -
301
KeralaAluva16-Feb-2010--
32080114I2452 IHSDP Scheme for the construction of 90 DUs(21 new & 69 Upgrade) at Aluva, Kerala 0.49
0.360.43
-- - 0.06
84831
- 83 -
302
KeralaAngamaly10-Feb-2009--
32080196I1756380 DUs (149 new houses & 231 upgrade)
IHSDP Scheme at Angamaly, Distt.Ernakulam, Kerala
2.17 1.732.24
-- - 0.51
340340--
- 340 -
303
KeralaAttingal27-Feb-2007--
32140290I846201 DUs (140 new houses & Renovation 18
nos & Toilet 43 nos) IHSDP Schme for thetown of Attingal, Kerala
1.55 1.241.25
-- 0.25 0.01
18716720
- 167 -
304
KeralaChalakudy16-Feb-2010--
32070907I2449IHSDP Scheme for the construction of 166
DUs & Upgradation of 368 DUs at Chalakudy,Kerala
3.17 2.191.99
-- - -
416416--
- 416 -
305
KeralaChanganassery27-Feb-2007--
32100947I2028388 DUs (150 new houses & Renovation 214
nos & Toilet 24 nos) IHSDP Programme forChanganassery town, Kerala
2.23 1.622.69
-- 0.18 1.06
30428717
- 287 -
306
KeralaChanganassery05-Mar-2010--
32100947I2508Construction of 269 new houses &
Upgradation of 581 DUs at Changanassery,Kottayam, Kerala
2.28 1.653.22
-- - 1.57
502502--
- 502 -
4.51 3.275.91
-- 0.18 2.64
80678917
- 789 -
307
KeralaChavakkad18-May-2007--
32070973I851 135 DUs (97 new houses & 38 upgrade)IHSDP Programme for Chavakkad, Kerala 1.31
1.041.27
-- - 0.23
112112--
- 112 -
308
KeralaCherthala16-Feb-2010--
32110994I2451IHSDP Scheme for the construction of 454
DUs (255 new & 199 Upgrade) at Cherthala,Kerala
3.37 2.422.58
-- 0.01 0.16
36530758
- 324 -
309
KeralaChittur- Thathamangalam27-Feb-2007--
32061080I8481313 DUs (424 new houses & Improvement
637 nos & Latrine 252 nos) IHSDP programmefor Chitur-Tattamangalam town, Kerala
12.20 9.349.77
-- 2.38 0.43
104697274
- 972 -
310
KeralaGuruvayoor10-Feb-2009--
32071683I1757123 DUs (50 new & 73 Upgrade) IHSDP
Scheme for the Construction of at Guruvayoor,Thrissur, Kerala
0.86 0.641.22
-- - 0.58
76751
- 73 2
311
KeralaIrinjalkuda24-Jan-2008--
32071852I898151 DUs (45 new houses & 106 nos upgrade)
IHSDP Scheme for the town of IrinjalakudaMunicipality, Kerala
0.87 0.70.87
-- 0.06 0.18
139136
3 - 136 -
312
KeralaIrinjalkuda05-Mar-2010--
32071852I2512IHSDP Scheme for the construction of 135
DUs & Upgradation of 259 DUs at Irinjalakuda,Thrissur, Kerala
1.01 0.732.27
-- - 1.54
22020911
- 220 -
Total of Karnataka for 34 project(s)
Sub-total of Changanassery for 2 project(s)
* Project Cost and ACA Committed are recalculated after deducting cost of DUs alongwith proportionate cost of infrastructure dropped by CSMC.
Central Share HousesSanctionedReleasedAdjusted
SanctionedCompletedIn-progress
Monitoring Report dated 1st Jan 2019
IHSDP : State wise Report for latest Progress at Project & Town LevelProject Completed
Sr. No.
StateCityInitial SanctionedResent Sanctioned
Project Title Project Code NonStarter Occupied Un-
Occupied
Financial Progress (Rs in Crores) Physical Progress (Nos)
ProjectCost
UC Pending
Excess Central Share
1.88 1.423.14
-- 0.06 1.71
35934514
- 356 -
313
KeralaKalpetta05-Mar-2010--
32032134I2515 78 DUs (new 31 & upgrade 47 nos) IHSDPProposal for Kalpetta, Wayanad, Kerala 1.57
1.081.18
-- 0.32 0.10
74731
- 74 -
314
KeralaKanhangad27-Feb-2007--
32012186I849221 DUs (152 new houses & 69 upgrade)
IHSDP Scheme for the Kanhangad town,Kerala
2.04 1.631.65
-- 0.11 0.01
21016631
13 161 5
315
KeralaKanhangad05-Mar-2010--
32012186I2518 IHSDP Scheme for the construction of 855DUs at Kanhangad Phase-II, Kerala 5.52
4.133.1--
- - 85376843
42 662 106
7.56 5.764.74
-- 0.11 0.01
106393474
55 823 111
316
KeralaKannur18-May-2007--
32022209I850301 DUs (179 new houses & upgrade 122
nos) IHSDP Scheme for Kannur Town, KannurDistt. Kerala
0.91 0.731.17
-- 0.01 0.44
189187
2 - 187 -
317
KeralaKasaragod27-Feb-2007--
32012283I889174 DUs (88 new houses & 86 upgrade)
IHSDP Scheme for the town of Kasargode,Kerala
1.04 0.81.02
-- 0.09 0.22
15413312
9 139 -
318
KeralaKodungallur05-Mar-2010--
32072511I2511285 DUs (insitu 232 & upgrade 53 nos)
IHSDP Proposal for kodungalloor, Thrissur,Kerala
4.47 2.753.49
-- 0.93 0.74
23421614
4 216 -
319
KeralaKoothuparamba27-Feb-2007--
32022551I893IHSDP Scheme for the construction of 43 DUs(30 new houses & 13 nos upgrade) atKuthuparamba town, Kerala
0.82 0.660.66
-- 0.42 -
4343--
- 43 -
320
KeralaKothamangalam10-Feb-2009--
32082579I1758 192 DUs (95 New and 97 Upgrade) forKothamangalam, Earnakulam Kerala 1.76
1.410.73
-- - -
18717215
- 172 -
321
KeralaKottayam05-Mar-2010--
32102592I2509831 DUs (364 in-situ & 467 upgrade) IHSDP
Proposal for Kottayam Municipality, Phase-1,Kottayam, Kerala
2.77 2
2.67--
- 0.67 450450--
- 450 -
322
KeralaKozhikode27-Feb-2007--
32042603I891IHSDP Scheme for the construction of 511
DUs (new houses) at Kozhikodde Town,Kerala
1.05 0.82.74
-- 0.80 1.93
7575--
- 75 -
323
KeralaKunnamkulam27-Feb-2007--
32072656I892206 DUs (new houses 127 nos, upgrade 71
nos & Latrine 8 nos) IHSDP programme forKunnamkulam town (206 DUs), Kerala
1.63 1.241.43
-- 0.42 0.18
18516310
12 163 -
324
KeralaMalappuram02-Feb-2007--
32052879I8941229 DUs (new houses 822 & upgrade 407
nos) IHSDP Proposal at Malappuram Town,Kerala
10.46 8.368.36
-- 0.11 -
12291215
14 - 1,220 -
325
KeralaMalappuram10-Feb-2009--
32052879I1759726 DUs (new 272 & upgrade 454 nos)
IHSDP Proposal at Malappuram Phase-II,Kerala
6.12 4.385.37
-- 0.82 0.99
65759166
- 625 -
16.58 12.7413.74
-- 0.93 0.99
18861806
80 - 1,845 -
326
KeralaMattannur27-Feb-2007--
32023014I895128 DUs (97 new & 31 upgrade) IHSDP
programme for Mattannur Town, Kannur,Kerala
1.08 0.871.05
-- - 0.18
110110--
- 110 -
327
KeralaMattannur05-Mar-2010--
32023014I2516 620 DUs (insitu 280 & upgrade 340) IHSDPProposal for Mattannur Ph-II, Kannur, Kerala 5.63
3.974.26
-- 0.41 0.30
553536
4 13 536 -
6.72 4.835.31
-- 0.41 0.48
663646
4 13 646 -
328
KeralaMuvattupuzha28-Jan-2009--
32083209I1573874 DUs (344 new houses, upgrade 384 &
Toilets 146) IHSDP Scheme atMoovattupuzha Muncipality, districtErnakulam, Kerala
3.79 3.034.78
-- - 1.75
738738--
- 738 -
329
KeralaNedumangad30-Sep-2008--
32143390I1357532 DUs (346 new houses, repair 65 nos &
Toilets 121 nos) for Nedumangad MuncipalityPhase-I, Kerala
3.71 2.972.16
-- - -
414414--
- 414 -
330
KeralaNeyyattinkara30-Sep-2008--
32143421I1358744 DUs (new houses 549 & repair 195 nos)
IHSDP Phase-1 for Neyyattinkara Muncipality,Keerala
7.77 5.795.95
-- 3.00 0.16
71043837
235 440 -
Sub-total of Irinjalkuda for 2 project(s)
Sub-total of Kanhangad for 2 project(s)
Sub-total of Malappuram for 2 project(s)
Sub-total of Mattannur for 2 project(s)
* Project Cost and ACA Committed are recalculated after deducting cost of DUs alongwith proportionate cost of infrastructure dropped by CSMC.
Central Share HousesSanctionedReleasedAdjusted
SanctionedCompletedIn-progress
Monitoring Report dated 1st Jan 2019
IHSDP : State wise Report for latest Progress at Project & Town LevelProject Completed
Sr. No.
StateCityInitial SanctionedResent Sanctioned
Project Title Project Code NonStarter Occupied Un-
Occupied
Financial Progress (Rs in Crores) Physical Progress (Nos)
ProjectCost
UC Pending
Excess Central Share
331
KeralaOttapalam27-Apr-2007--
32063505I896607 DUs (new 283, upgrade 270 & latrine 54
nos) for the construction of 607 DUs atOttapalam, Kerala
8.40 6.447.17
-- 2.95 0.74
576576--
- 576 -
332
KeralaOttapalam05-Mar-2010--
32063505I2514624 DUs (279 DUs & 5 flats & 340 upgrade)
for Ottapalam Municipality, Phase-2, Palakkad,Kerala
5.45 3.814.18
-- 2.19 0.36
55850751
- 507 -
13.85 10.2511.35
-- 5.14 1.10
11341083
51 - 1,083 -
333
KeralaPalakkad27-Feb-2008--
32063540I900IHSDP Scheme for the construction of 2001
DUs (1626 new houses & 375 upgrade) forPalakkad, Kerala
7.04 5.388.05
-- 2.26 2.67
864593108
163 613 -
334
KeralaParavoor-South02-Feb-2007--
32133648I904373 DUs ( new 192, renovation 83 nos &
Latrine 98 nos) IHSDP Proposal for the townof South paravoor, Kerala
2.13 1.72.11
-- 0.65 0.41
32725718
52 260 -
335
KeralaParavur- North24-Jan-2008--
32133648I899389 DUs (213 new houses, 118 nos upgrade
& 58 nos Toilets) IHSDP Proposal for the townof North Paravur Municipality, Kerala
2.64 2.12.29
-- 0.44 0.19
37032628
16 326 -
336
KeralaParavur- North05-Mar-2010--
32083649I2510743 DUs (insitu 285 & upgrade 458) IHSDP
Proposal for the town of North Paravur,Earnakulam, Kerala
5.60 3.94.06
-- 0.55 0.17
72766032
35 660 -
8.24 5.996.35
-- 0.98 0.36
109798660
51 986 -
337
KeralaPathanamthitta10-Feb-2009--
32123683I1762 749 DUs ( 369 New and 380 DUs upgrade)IHSDP proposal at for Pathanamthitta, Kerala 4.25
3.382.62
-- - -
60454021
43 561 -
338
KeralaPayyannur05-Mar-2010--
32023716I2517314 DUs (220 new & 94 upgrade) IHSDP
Proposal for Payyannur Municipality, Kannur,Kerala
1.92 1.271.15
-- 0.26 -
192133
3 56 133 -
339
KeralaPerinthalmanna27-Apr-2007--
32053737I901500 DUs (363 new houses & 137 upgrade)
IHSDP scheme for the construction ofPerintalamanna, Kerala
4.85 3.734.46
-- 0.03 0.73
43642610
- 426 -
340
KeralaPerinthalmanna10-Feb-2009--
32053737I1760879 DUs ( 271 New and upgrade 608 nos)
IHSDP Project for Perinthalmanna Phase-II,Malapuram Kerala
8.74 6.346.36
-- 1.64 0.02
87884131
6 855 -
13.59 10.0710.82
-- 1.66 0.75
13141267
41 6 1,281 -
341
KeralaPerumbavoor10-Feb-2009--
32083749I1761IHSDP proposal at Perumbavoor Municipality,
Earnakulam. 344 DUs (160 New and 141Upgrade & 43 Toilets), Kerala
2.47 1.981.84
-- 0.31 -
228193--
35 176 17
342
KeralaPonnani24-Jan-2008--
32053825I897 229 new houses IHSDP Project for PonnaniMunicipality, Kerala 2.30
1.843.52
-- - 1.67
120120--
- 120 -
343
KeralaPunalur27-Apr-2007--
32133872I902922 DUs (596 new houses, 236 upgrade &
Latrine 90 nos) IHSDP Programme for Punalurtown, Kerala
7.17 5.747.14
-- - 1.41
79678016
- 780 -
344
KeralaQuilandy27-Feb-2007--
32043911I890435 DUs (284 new houses & Improvement
151 nos) IIHSDP Programme for KoyilandiTown, Kerala
2.86 2.292.46
-- 0.08 0.17
41034960
1 349 -
345
KeralaShoranur27-Feb-2007--
32064417I903596 DUs (251 new houses, Improvement 275
nos & Latrine 70 nos) IHSDP Programme forShoranur Town, Kerala
7.65 5.367.09
-- - 1.74
530530--
- 530 -
346
KeralaTaliparamba02-Feb-2007--
32024643I1163 242 DUs (166 New & 76 Upgrade) IHSDPProgramme for Taliparamba, Kerala 1.38
1.11.95
-- - 0.84
166163
3 - 163 -
347
KeralaThalassery27-Apr-2007--
32024705I3268110 DUs (insitu 82 & upgrade 28 nos)
Revised in IHSDP Project for Thalassery,Kannur, Kerala
1.01 0.671.21
-- 0.07 0.54
6054--
6 54 -
348
KeralaThodupuzha27-Feb-2007--
32094768I905420 DUs (261 new houses & 159 upgrade)
IHSDP Programme for Thodupuzha town,Kerala
2.60 2.082.81
-- - 0.73
27520118
56 207 -
349
KeralaThrissur05-Mar-2010--
32074781I2513 Relocation 246 Dwelling Units, IHSDP Projectfor Thrissur, Kerala 2.37
1.531.57
-- - 0.04
120120--
- 120 -
Sub-total of Ottapalam for 2 project(s)
Sub-total of Paravur- North for 2 project(s)
Sub-total of Perinthalmanna for 2 project(s)
* Project Cost and ACA Committed are recalculated after deducting cost of DUs alongwith proportionate cost of infrastructure dropped by CSMC.
Central Share HousesSanctionedReleasedAdjusted
SanctionedCompletedIn-progress
Monitoring Report dated 1st Jan 2019
IHSDP : State wise Report for latest Progress at Project & Town LevelProject Completed
Sr. No.
StateCityInitial SanctionedResent Sanctioned
Project Title Project Code NonStarter Occupied Un-
Occupied
Financial Progress (Rs in Crores) Physical Progress (Nos)
ProjectCost
UC Pending
Excess Central Share
350
KeralaTirur21-Jan-2009--
32054820I1559 257 DUs (133 new houses & 124 nos repair of DUs) IHSDP of Tirur municipality, districtMalappuram, Kerala
1.38 0.991.99
-- - 1.00
160148
3 9 148 -
351
KeralaVadakara16-Feb-2010--
32044959I2453 IHSDP Scheme for the construction of 62 DUs(35 new and 27 Upgrade) at Vatakara, Kerala 0.76
0.540.46
-- 0.06 -
56521
3 52 -
352
KeralaVarkala16-Feb-2010--
32145009I2450 Construction of 328 DUs & Upgradation of333 DUs at Varkala, Kerala 3.42
2.523.09
-- 0.12 0.58
37835511
12 362 -
188.40 140.38165.17
-- 21.92 28.61
2038418711
852 821 18,732 130
353
Madhya PradeshAmarwara30-Mar-2011--
23430128I3648 274 Dwelling Units for the town of Amarwada,District Chhindwara, Madhya Pradesh 4.46
2.591.91
-- - -
186150--
36 150 -
354
Madhya PradeshBalaghat14-Dec-2006--
23450414I944 Construction of 966 Dwelling Units forBalaghat, Madhya Pradesh
Project Cancelled on
dated 20-May-14
--4.15
-- - 4.15
------
- - -
355
Madhya PradeshBarela02-Feb-2007--
23390519I945Development & Upgradation of Basic
Infrastructure for Slum Dwellers at Barela (120DUs), Madhya Pradesh
1.50 1.21.8--
- 0.60 8080--
- 80 -
356
Madhya PradeshBasoda28-Sep-2006--
23310568I952110 DUs (60- New & 50- Upgradation) IHSDP
Scheme for the town of Ganjbasoda, VidishaDistt., Madhya Pradesh
1.71 1.311.31
-- - 0.00
110110--
- 110 -
357
Madhya PradeshBerasia29-Dec-2006--
23320622I946160 DUs with infrastructure development for
Mahuakheda Deen Dyal Colony (JP NarayanWard) Berasia, Distt. Bhopal, Madhya Pradesh
0.09 0.070.68
-- - 0.61
88--
- 8 -
358
Madhya PradeshBetma18-May-2007--
23260628I94796 DUs Integrated Housing & Slum
Development Programme, Betma, Indore,Madhya Pradesh
3.14 2.442.19
-- - -
9696--
- 96 -
359
Madhya PradeshBurhanpur27-Dec-2007--
23290868I974 833 DUs IHSDP Scheme for the town ofBurhanpur, Madhya Pradesh 3.57
2.534.82
-- - 2.30
218218--
- 218 -
360
Madhya PradeshChandameta-butaria08-Feb-2010--
23430923I2370 Construction of 212 DUs for the town ofChandameta, District- Chhindwara (M.P.)
Project Cancelled on
dated 20-May-14
--2.15
-- - 2.15
------
- - -
361
Madhya PradeshChourai27-Apr-2011--
23430972I3728 266 Dwelling Units for the town of Chaurai,District- Chhindwara, Madhya Pradesh 0.34
0.241.99
-- - 1.75
1616--
- 16 -
362
Madhya PradeshChhindwara28-Feb-2009--
23431019I1917 500 DUs IHSDP proposal for the town ofChhindwara, Distt. Chindwara (MP) 4.75
3.765.29
-- - 1.53
320320--
- 320 -
363
Madhya PradeshDamoh29-Dec-2006--
23121145I948 IHSDP scheme for Damoh (104 DUs),Madhya Pradesh 0.82
0.61.27
-- - 0.67
3732--
5 32 -
364
Madhya PradeshDepalpur02-Feb-2007--
23261210I949 Rehabilitation/ Resettlement of Slums inDepalpur (96 DUs), Madhya Pradesh 4.00
3.113.11
-- - -
9696--
- 96 -
365
Madhya PradeshDewas29-Dec-2006--
23231235I9501216 DUs Development & Upgradation of
basic infrastructure for Slum Dwellers atDewas (Project-I), Madhya Pradesh
8.58 5.545.54
-- 0.00 -
608608--
- 608 -
366
Madhya PradeshDewas29-Dec-2006--
23231235I9511384 DUs Development & Upgradation of
basic infrastructure for Slum Dwellers atDewas (Project-II), Madhya Pradesh
2.63 1.696.22
-- - 4.53
188188--
- 188 -
11.20 7.2311.76
-- 0.00 4.53
796796--
- 796 -
367
Madhya PradeshDiken28-Mar-2011--
23181323I3561 124 DUs IHSDP Proposal for the Town ofDiken, Distt.-Neemuch, Madhya Pradesh 3.82
2.362.12
-- - -
124124--
- 124 -
368
Madhya PradeshGwalior14-Dec-2006--
23041686I954Development & Upgradation of Basic
Infrastructure for Slum Dwellers at Gwalior,Madhya Pradesh
39.00 26.66
33--
- 6.33 33283328
-- - 3,328 -
Sub-total of Dewas for 2 project(s)
Total of Kerala for 53 project(s)including 1 project(s) which are completed
* Project Cost and ACA Committed are recalculated after deducting cost of DUs alongwith proportionate cost of infrastructure dropped by CSMC.
Central Share HousesSanctionedReleasedAdjusted
SanctionedCompletedIn-progress
Monitoring Report dated 1st Jan 2019
IHSDP : State wise Report for latest Progress at Project & Town LevelProject Completed
Sr. No.
StateCityInitial SanctionedResent Sanctioned
Project Title Project Code NonStarter Occupied Un-
Occupied
Financial Progress (Rs in Crores) Physical Progress (Nos)
ProjectCost
UC Pending
Excess Central Share
369
Madhya PradeshHarrai08-Feb-2010--
23431737I2369 139 Dwelling Units for the town of Harrai,Distt. Chindwara, Madhya Pradesh 1.17
0.680.99
-- - 0.31
4848--
- 48 -
370
Madhya PradeshHoshangabad19-Oct-2007--
23371801I957 297 DUs Implementation of IHSDP Scheme atHoshangabad, Madhya Pradesh 5.16
3.733.74
-- - 0.01
296296--
- 296 -
371
Madhya PradeshItarsi21-Aug-2007--
23371862I958Development & Upgradation of Basic
Infrastructure for Slum Dwellers at Itarsi,Madhya Pradesh
3.64 2.772.49
-- - -
153153--
- 153 -
372
Madhya PradeshJaora27-Dec-2007--
23201952I973 167 DUs IHSDP Scheme for Jaora, MadhyaPradesh 1.48
1.041.3--
- 0.26 100100--
- 100 -
373
Madhya PradeshJeeran10-Jun-2011--
23182019I3833 IHSDP Proposal for the town of Jeeran, DisttNeemuch, Madhya Pradesh 3.77
2.312.08
-- - -
126126--
- 126 -
374
Madhya PradeshJirapur30-Mar-2011--
23302020I3649 145 Dwelling Units for the town of Jeerapur,District Rajgarh, Madhya Pradesh 4.00
2.392.150.96
- - 145145--
- 145 -
375
Madhya PradeshKatangi18-May-2007--
23392297I955 160 DUs IHSDP Scheme for Katangi, MadhyaPradesh 1.66
1.321--
- - 1062278
6 22 -
376
Madhya PradeshMurwara (Katni)02-Feb-2007--
23383199I9562182 DUs Development & Upgradation of
Basic Infrastructure for Slum Dwellers atKatani, Madhya Pradesh
19.04 14.9520.62
-- - 5.67
14241000424
- 766 234
377
Madhya PradeshKhandwa (East Nimar)29-Dec-2006--
23292395I11761296 DUs Development & Upgradation of
Basic Infrastructure for Slum Dwellers atKhandwa (Proposal-I), Madhya Pradesh
14.81 9.439.97
-- - 0.53
1104833271
- 768 65
378
Madhya PradeshKhandwa (East Nimar)29-Dec-2006--
23292395I1177812 DUs Development & Upgradation of
Basic Infrastructure for Slum Dwellers atKhandwa (Proposal-II), Madhya Pradesh
Project Cancelled on
dated 20-May-14
--3.41
-- - 3.41
------
- - -
14.81 9.4313.38
-- - 3.94
1104833271
- 768 65
379
Madhya PradeshKhargone (West Nimar)22-Feb-2010--
23272410I2495 200 Dwelling Units for the town of Khargone,District- Khargone (M.P.) 4.91
2.852.57
-- - -
200200--
- 200 -
380
Madhya PradeshKhujner02-Feb-2007--
23302463I959 Rehabilitation/ Resettlement of Slums 100DUs for the town of Khujner, Madhya Pradesh 2.41
1.881.88
-- - -
100100--
- 100 -
381
Madhya PradeshKurwai29-Dec-2006--
23312682I960 48 DUs (EWS) Development & Upgradation of Basic Infra & rehabilitation for slum dwellers atKurwai, Distt. Vidisha, Madhya Pradesh
0.24 0.180.37
-- - 0.18
1212--
- 12 -
382
Madhya PradeshLateri28-Sep-2006--
23312738I961Development & Upgradation of Basic
infrastructure for slum Dwellers at Lateri,Madhya Pradesh
0.45 0.350.35
-- - -
InfraNANA
- - -
383
Madhya PradeshMahidpur28-Mar-2011--
23212833I3560 Construction of 441 New DUs for the Town ofMahidpur, Distt. Ujjain, Madhya Pradesh.
Project Cancelled on
dated 20-May-14
--2.97
-- - 2.97
------
- - -
384
Madhya PradeshMajholi02-Feb-2007--
23392865I962140 DUs Development & Upgradation of
Basic Infrastructure for Slum Dwellers atMajholi, Madhya Pradesh
1.38 1.11.29
-- - 0.18
9090--
- 90 -
385
Madhya PradeshMalhargarh13-Mar-2012--
23192883I4804144 Dwelling Units IHSDP project at
Malhargarh, Distt Mandasaur, MadhyaPradesh
4.40 2.552.291.02
- - 144104--
40 104 -
386
Madhya PradeshMandideep26-Sep-2007--
23342933I963 Construction of 202 Dwelling Units forMandideep, Madhya Pradesh
Project Cancelled on
dated 20-May-14
--1.19
-- - 1.19
------
- - -
387
Madhya PradeshMandsaur22-Feb-2010--
23192936I2494IHSDP Proposal 500 houses at Tigariya road
of ward no.5, at Mandsaur, District- Mandsaur(M.P.)
12.50 7.286.55
-- - -
500500--
- 500 -
388
Madhya PradeshMohgaon28-Feb-2009--
23433102I1918Construction of 267 Dwelling Units for the
town of Mohgaon, Distt. Chhindwada, MadhyaPradesh
3.16 2.312.25
-- - -
137137--
- 137 -
Sub-total of Khandwa (East Nimar) for 1 project(s)
* Project Cost and ACA Committed are recalculated after deducting cost of DUs alongwith proportionate cost of infrastructure dropped by CSMC.
Central Share HousesSanctionedReleasedAdjusted
SanctionedCompletedIn-progress
Monitoring Report dated 1st Jan 2019
IHSDP : State wise Report for latest Progress at Project & Town LevelProject Completed
Sr. No.
StateCityInitial SanctionedResent Sanctioned
Project Title Project Code NonStarter Occupied Un-
Occupied
Financial Progress (Rs in Crores) Physical Progress (Nos)
ProjectCost
UC Pending
Excess Central Share
389
Madhya PradeshNarsinghpur02-Feb-2007--
23403341I964Development & Upgradation of Basic
Infrastructure for Slum Dwellers atNarsinghpur (651 DUs), Madhya Pradesh
6.77 5.416.03
-- - 0.63
525490--
35 490 -
390
Madhya PradeshOrachha19-Oct-2007--
23083494I965 Construction of 274 DUs at Orchha, Distt.,Tikamgarh, Madhya Pradesh
Project Cancelled on
dated 20-May-14
--1.28
-- - 1.28
------
- - -
391
Madhya PradeshPandhurna27-Apr-2011--
23433608I3729 IHSDP Scheme for the town of Pandhurna,District- Chhindwara, Madhya Pradesh 2.21
1.531.87
-- - 0.34
103103--
- 103 -
392
Madhya PradeshPansemal02-Feb-2007--
23283625I966128 Dwelling Units Rehabilitation/
Resettlement of Slums in Pansemal, MadhyaPradesh
2.94 2.282.05
-- - -
128128--
- 128 -
393
Madhya PradeshPatan02-Feb-2007--
23393678I967Development & Upgradation of Basic
Infrastructure for Slum Dwellers at Patan (120DUs), Madhya Pradesh
0.44 0.350.91
-- - 0.56
2323--
- 23 -
394
Madhya PradeshPetlawad18-May-2007--
23243760I968 IHSDP Scheme for Petlawad (240 DUs),Madhya Pradesh 2.77
2.212.74
-- - 0.52
194194--
- 194 -
395
Madhya PradeshPiplya Mandi28-Mar-2012--
23193801I480588 Dwelling Units (Relocation) for
Pipliyamandi Distt- Mandsaur, MadhyaPradesh
2.73 1.641.640.82
0.00 - 8888--
- 88 -
396
Madhya PradeshRatangarh10-Jun-2011--
23184049I3834 135 Dwelling Units for the town of Ratangarh,Distt Neemuch, Madhya Pradesh 4.18
2.592.33
-- 0.00 -
135135--
- 135 -
397
Madhya PradeshRewa22-Feb-2010--
23144090I2497 248 DUs IHSDP Proposal for the town ofRewa, District- Rewa, Madhya Pradesh 6.67
3.733.36
-- 0.00 -
248248--
- 248 -
398
Madhya PradeshRunji-gautampura18-May-2007--
23264122I95396 DUs Integrated Housing & Slum
Development Programme, Gautampura,Indore Dist., Madhya Pradesh.
3.96 3.072.77
-- 0.00 -
9696--
- 96 -
399
Madhya PradeshSagar28-Feb-2009--
23114148I1916 Construction of 480 Dwelling Units for thetown of Sagar, Distt. Sagar, Madhya Pradesh. 6.48
5.095.5--
- 0.41 400360--
40 360 -
400
Madhya PradeshSatna22-Feb-2010--
23134290I2493Construction of 270 Dwelling Units for the
town of Satna, District- Satna, MadhyaPradesh
7.33 4.44
4--
- - 270270--
- 270 -
401
Madhya PradeshSausar28-Feb-2009--
23434299I1919Construction of 461 Dwelling Units for the
town of Sausar, Distt. Chhindwada, MadhyaPradesh
4.06 3.084.85
-- - 1.78
263263--
- 263 -
402
Madhya PradeshShahpura02-Feb-2007--
23394366I969 Construction of 104 Dwelling Units forShahpura, Distt. Jabalpur, Madhya Pradesh 0.81
0.630.6--
- - 5555--
- 55 -
403
Madhya PradeshSingoli28-Mar-2011--
23184475I3559 120 New Dwelling Units for the town ofSingoli, Distt.-Neemuch, Madhya Pradesh 3.69
2.282.05
-- - -
120120--
- 120 -
404
Madhya PradeshSingrauli22-Feb-2010--
23174476I2496 300 Dwelling Units for the town of Singrauli,District- Singrauli, Madhya Pradesh 7.33
4.293.86
-- - -
300300--
- 300 -
405
Madhya PradeshSironj28-Sep-2006--
23314495I970114 DUs (48- New & 66- Improvement)
Development & Upgradation of Basicinfrastructure for slum Dwellers at Sironji,Madhya Pradesh
1.61 1.231.23
-- 0.00 -
114114--
- 114 -
406
Madhya PradeshSironj27-Feb-2007--
23314495I971 IHSDP Scheme for Sironji, Madhya Pradesh(RCC Nallah additional component approved) 0.19
0.150.15
-- - -
InfraNANA
- - -
1.80 1.381.38
-- 0.00 -
114114--
- 114 -
407
Madhya PradeshTendukheda28-Feb-2012--
23405191I4709256 Dwelling Units for the town of
Tendukheda, District Narsinghpur, MadhyaPradesh
6.75 3.681.84
-- 1.84 -
256----
256 - -
408
Madhya PradeshVidisha28-Sep-2006--
23315060I972217 DUs (New-70 & Improvement- 147)
Develpoment & Upgradation of Basic infra atVidisha at Ward No. 18, 19 & 1, M.P.
1.85 1.411.27
-- - -
217217--
- 217 -
Sub-total of Sironj for 2 project(s)
* Project Cost and ACA Committed are recalculated after deducting cost of DUs alongwith proportionate cost of infrastructure dropped by CSMC.
Central Share HousesSanctionedReleasedAdjusted
SanctionedCompletedIn-progress
Monitoring Report dated 1st Jan 2019
IHSDP : State wise Report for latest Progress at Project & Town LevelProject Completed
Sr. No.
StateCityInitial SanctionedResent Sanctioned
Project Title Project Code NonStarter Occupied Un-
Occupied
Financial Progress (Rs in Crores) Physical Progress (Nos)
ProjectCost
UC Pending
Excess Central Share
235.34 160.31197.31
2.79 1.84 44.84
1363512444
773 418 12,145 299
409
MaharashtraAchalpur10-Dec-2008--
27070015I1452 Implementation of IHSDP at Achalpur, Dist.Amravati , Maharashtra 20.81
13.4615.74
-- 3.42 2.28
825730--
95 730 -
410
MaharashtraAchalpur28-Mar-2012--
27070015I49101165 DUs Detailed Project Report of
"Implementation of IHSDP at Achalpur, Ph-II,Distt Amravati".
25.19 14.3718.96
-- 1.10 4.59
883705--
178 705 -
46.01 27.8334.7
-- 4.52 6.87
17081435
-- 273 1,435 -
411
MaharashtraAhmadnagar29-Dec-2011--
27260045I4413Revised project of Ahmednagar (Phase-I)
Municipal Council at Ahmednagar,Maharashtra
7.40 4.268.12
-- - 3.86
252252--
- 162 90
412
MaharashtraAhmadnagar13-Mar-2012--
27260045I4918 372 DUs Implementation of IHSDP at AhmedNagar, Phase-II, Maharashtra 12.36
6.936.933.47
0.01 - 372372--
- 188 184
19.76 11.215.063.47
0.01 3.86 624624--
- 350 274
413
MaharashtraAhmadpur06-Mar-2012--
27280048I4925 81 Dwelling Units Implementation of IHSDP atAhmadpur, Maharashtra. 3.38
2.042.04
-- 0.20 -
81801
- 81 -
414
MaharashtraAkola14-Dec-2006--
27050075I1003 Implementation of IHSDP project for AkolaCity Phase-1, Maharashtra 0.60
0.482.79
-- 0.00 2.31
6969--
- 69 -
415
MaharashtraAkola03-Feb-2009--
27050075I1661 1118 DUs IHSDP Project for Akola City Phase-2, Maharashtra 4.14
2.8110.05
-- - 7.25
156156--
- 156 -
416
MaharashtraAkola28-Feb-2009--
27050075I1933 1413 DUs Implementation of IHSDP at AkolaCity Phase-3, maharashtra 2.46
1.6411.12
-- 0.00 9.49
104104--
- 104 -
7.20 4.9223.97
-- 0.00 19.05
329329--
- 329 -
417
MaharashtraAlandi21-Mar-2007--
27250081I1004 Construction of 164 Dwelling Units at Alandi,Tal Khed, Dist. Pune, Maharashtra
Project Cancelled on
dated 30-May-11
------
- - ------
- - -
418
MaharashtraAmalner28-Feb-2009--
27030121I1937 462 DUs IHSDP Scheme in Amalner,maharashtra 12.05
7.727.72
-- 0.36 -
462462--
- 211 251
419
MaharashtraAmbad30-Jul-2008--
27180129I1332 Construction of 325 Dwelling Units at Ambad,Distt. Jalna, Maharashtra
Project Cancelled on
dated 30-May-11
------
- - ------
- - -
420
MaharashtraAmravati28-Jan-2009--
27070170I1575 Construction of 1128 DUs at Amravati, Phase-III, Dist. Amravati, Maharashtra
Project Cancelled on
dated 30-May-11
------
- - ------
- - -
421
MaharashtraAmravati28-Jan-2009--
27070170I1576 Construction of 1923 DUs at Amravati Phase-II, Dist. Amravati, Maharashtra
Project Cancelled on
dated 30-May-11
------
- - ------
- - -
422
MaharashtraAmravati22-Oct-2008--
27070170I1401 Construction of 1200 DUs for the town ofAmravati, Dist. Amravati, Maharashtra
Project Cancelled on
dated 19-Jul-12
------
- - ------
- - -
423
MaharashtraAnjangaon10-Dec-2008--
27070199I1453 Implementation of IHSDP at Anjangaon Surji,Distt. Amravati, Maharashtra
Project Cancelled on
dated 17-Sep-15
--7.14
-- - 7.14
------
- - -
424
MaharashtraArvi10-Dec-2008--
27080260I1466Revised in Implementation of IHSDP at Arvi,
Dist. Wardha, (329 DUs to 233 DUs),Maharashtra
5.94 3.853.850.99
0.50 - 233233--
- 233 -
425
MaharashtraAshta30-May-2011--
27350269I3779 Implementation of IHSDP at Ashta (950 DUs),Phase-II, Dist. Sangli, Maharashtra. 17.23
11.6411.64
-- 1.16 -
950950--
- 800 150
426
MaharashtraAshta27-Feb-2007--
27350269I1005 Implementation of IHSDP at Ashta (1256DUs), Phase-I, Dist. Sangli, Maharashtra. 15.99
12.7312.73
-- - -
12561256
-- - 1,256 -
Total of Madhya Pradesh for 50 project(s)
Sub-total of Achalpur for 2 project(s)
Sub-total of Ahmadnagar for 2 project(s)
Sub-total of Akola for 3 project(s)
* Project Cost and ACA Committed are recalculated after deducting cost of DUs alongwith proportionate cost of infrastructure dropped by CSMC.
Central Share HousesSanctionedReleasedAdjusted
SanctionedCompletedIn-progress
Monitoring Report dated 1st Jan 2019
IHSDP : State wise Report for latest Progress at Project & Town LevelProject Completed
Sr. No.
StateCityInitial SanctionedResent Sanctioned
Project Title Project Code NonStarter Occupied Un-
Occupied
Financial Progress (Rs in Crores) Physical Progress (Nos)
ProjectCost
UC Pending
Excess Central Share
33.22 24.3724.37
-- 1.16 -
22062206
-- - 2,056 150
427
MaharashtraAurangabad27-Feb-2007--
27190298I1006 617 DUs Implementation of IHSDP Schemefor the town of Aurangabad, Maharashtra 5.87
4.44.44
-- - 0.04
306306--
- 306 -
428
MaharashtraBalapur30-May-2011--
27050420I3772 Construction of 1652 Dwelling Units forBalapur, Dist. Akola, Maharashtra 40.38
24.1224.1212.06
- - 16521652
-- - 422 1,230
429
MaharashtraBaramati21-Mar-2007--
27250503I1007 259 Dwelling Units, IHSDP Scheme for thetown of Baramati, Maharashtra 3.41
2.312.31
-- 0.00 -
259259--
- 259 -
430
MaharashtraBhandara30-Sep-2008--
27100657JI6129 Revised in IHSDP project Bhandara City, Distt-Bhandara, Maharashtra 19.28
14.314.3
-- 1.02 -
980980--
- 951 29
431
MaharashtraBhandara30-May-2011--
27100657I3794Detailed Project Report of "Implementation of
IHSDP at Bhandara City, Phase-II, Dist.Bhandara"
38.75 26.4426.4413.22
2.64 - 15441544
-- - 1,493 51
58.03 40.7340.7313.22
3.66 - 25242524
-- - 2,444 80
432
MaharashtraBhiwandi30-Sep-2008--
27210716I1362 Construction of 616 DUs at Bhiwandi Dist.Thane, Maharashtra
Project Cancelled on
dated 30-May-11
------
- - ------
- - -
433
MaharashtraBhiwandi28-Feb-2009--
27210716I1936 Construction of 464 DUs at Bhiwandi, Dist:-Thane, Maharashtra
Project Cancelled on
dated 30-May-11
------
- - ------
- - -
434
MaharashtraBhokardan28-Jan-2009--
27180723I1579 Construction of 526 DUs at Bhokardhan Dist.Jalna, Maharashtra
Project Cancelled on
dated 12-Sep-11
------
- - ------
- - -
435
MaharashtraBuldana19-Oct-2007--
27040864I1008 892 DUs Implementation of IHSDP forBuldana City, , Dist. Buldana, Maharashtra 12.52
10.0210.02
-- 0.85 -
892816--
76 816 -
436
MaharashtraBuldana30-May-2011--
27040864I3775 Implementation of IHSDP At Buldana, Dist.Buldana, Phase - II, Maharashtra 37.11
19.99.95
-- 6.56 -
1395238144
1,013 238 -
49.64 29.9219.97
-- 7.41 -
22871054144
1,089 1,054 -
437
MaharashtraChalisgaon10-Jun-2011--
27030909I3832 Implementation of IHSDP at Chalisgaon, Dist:Jalgaon, Mahrashtra 19.98
11.8111.8
-- 8.37 -
696415--
281 - 415
438
MaharashtraChandrapur03-Feb-2009--
27130940I1662 IHSDP Scheme for 1179 DUs at Chandrapur,Maharashtra 6.94
4.7310.11
-- 1.76 5.38
276276--
- 276 -
439
MaharashtraChandur16-Dec-2008--
27070943I1481 347 DUs Implementation Of IHSDP atChandaur Railway, Dist. Amravati, Maharahtra 6.82
4.54.5--
0.00 - 347347--
- 347 -
440
MaharashtraChandur16-Dec-2008--
27070946I1482 Implementation Of IHSDP At Chandur Bazar,Dist. Amravati, Maharashtra 17.24
11.1711.17
-- 2.90 -
985730--
255 730 -
24.06 15.6715.67
-- 2.90 -
13321077
-- 255 1,077 -
441
MaharashtraChikhli13-Mar-2012--
27041035I4920 1924 DUs Implementation of IHSDP atChikhali, Maharashtra 45.94
22.6422.6411.32
12.31 - 19241271
-- 653 977 294
442
MaharashtraChopda28-Feb-2009--
27031087I1935 504 DUs Implementation of IHSDP at ChopdaDist. Jalgaon, Maharashtra 13.22
8.618.61
-- - -
504504--
- 504 -
443
MaharashtraChopda17-Jun-2011--
27031087I3850 Implementation of IHSDP at Chopda, Phase-II, District Jalgaon, Mahrashtra. 4.22
2.336.11
-- - 3.78
150150--
- 150 -
17.44 10.9314.72
-- - 3.78
654654--
- 654 -
Sub-total of Ashta for 2 project(s)
Sub-total of Bhandara for 2 project(s)
Sub-total of Buldana for 2 project(s)
Sub-total of Chandur for 2 project(s)
Sub-total of Chopda for 2 project(s)
* Project Cost and ACA Committed are recalculated after deducting cost of DUs alongwith proportionate cost of infrastructure dropped by CSMC.
Central Share HousesSanctionedReleasedAdjusted
SanctionedCompletedIn-progress
Monitoring Report dated 1st Jan 2019
IHSDP : State wise Report for latest Progress at Project & Town LevelProject Completed
Sr. No.
StateCityInitial SanctionedResent Sanctioned
Project Title Project Code NonStarter Occupied Un-
Occupied
Financial Progress (Rs in Crores) Physical Progress (Nos)
ProjectCost
UC Pending
Excess Central Share
444
MaharashtraDarwha10-Dec-2008--
27141162JI6548 Revised in IHSDP project at Darwha City,Dist. Yavatmal, Maharashtra 2.37
1.533.31
-- 0.03 1.78
9292--
- 92 -
445
MaharashtraDeolali Pravara20-Dec-2007--
27261199I5051Revised in sanctioned DPR- 333 DUs
Implementation of IHSDP at Deolali Pravara,Distt. Ahmednagar
3.84 3.073.68
-- - 0.61
278278--
- 278 -
446
MaharashtraDeoli27-Feb-2008--
27081200I1034 370 DUs IHSDP Scheme for the town ofDeoli, Maharashtra 2.23
1.662.51
-- 0.62 0.86
122111--
11 111 -
447
MaharashtraDesaiganj03-Feb-2009--
27121216I1664 504 DUs Implementation of IHSDP atDesaiganj, Dist. Gadchiroli, Maharashtra 12.05
7.737.73
-- 4.75 -
504502--
2 502 -
448
MaharashtraDeulgaon Raja10-Dec-2008--
27041219I1463193 DUs Implementation of IHSDP at
Deolgaon Raja City, Dist. Buldhana,Maharashtra
4.63 2.986.44
-- 2.45 3.46
1938523
85 - 85
449
MaharashtraDhule28-Feb-2009--
27021303I1938 Implementation of IHSDP scheme for 966Dwelling Units at Dhule, Maharashtra 23.57
14.7614.76
-- 0.00 -
966966--
- 324 642
450
MaharashtraDhule23-Mar-2012--
27021303I4914 1200 DUs Implementation of IHSDP at Dhule,Phase-II, Maharashtra 34.96
20.6120.6110.3
6.53 - 1200646100
454 80 566
58.53 35.3635.3610.3
6.53 - 21661612100
454 404 1,208
451
MaharashtraDigras30-May-2011--
27141321I3778 Revised Implementation of IHSDP at DigrasDist. Yeotmal, Maharashtra 15.12
9.446.94
-- 2.44 -
648450--
198 - 450
452
MaharashtraDondaicha-Warwade13-Feb-2008--
27021350I1036Construction of 1050 Dwelling Units at
Dondaicha-Warwade Ph-I, District Dhule,Mahrashtra
16.77 11.4311.43
-- - -
10501050
-- - 1,050 -
453
MaharashtraDondaicha-Warwade10-Dec-2008--
27021350I1454Construction of 1050 Dwelling Units at
Dondaicha-Warwade Ph-II, Dist. Dhule,Maharashtra
23.97 15.315.3
-- - -
10501050
-- - 1,050 -
454
MaharashtraDondaicha-Warwade10-Jun-2011--
27021350I3828Construction of 1100 DUs at Dondaicha
Warwade, Phase-III, District Dhule,Mahrashtra
27.00 16.8816.88
-- - -
1100948--
152 949 -
455
MaharashtraDondaicha-Warwade13-Mar-2012--
27021350I4916 Construction 596 DUs at Dondaicha -Warwade Ph-IV, Distt. Dhule, Maharashtra 17.47
10.5310.53
-- - -
596596--
- 596 -
85.22 54.1454.14
-- - -
37963644
-- 152 3,645 -
456
MaharashtraErandol06-Mar-2012--
27031408I4923 Implementation of IHSDP at Erandol City, Distjalgaon, Maharashtra 9.65
5.695.692.85
1.33 - 28884
204 - - 84
457
MaharashtraGangapur30-Jul-2008--
27191504I1331 Construction of 253 DUs at Gangapur, Distt.Aurangabad, Maharashtra
Project Cancelled on
dated 30-May-11
------
- - ------
- - -
458
MaharashtraGeorai30-Jul-2008--
27271542I1330 Construction of 107 DUs at Georai, Distt.Beed, Maharashtra
Project Cancelled on
dated 30-May-11
------
- - ------
- - -
459
MaharashtraHinganghat21-Mar-2007--
27081779I5229Revised in Sanctioned IHSDP Scheme for
construction of 369 DUs in 2 slum areas ofHinganghat Dist. Wardha.
2.57 2.065.59
-- 0.47 3.54
198198--
- 198 -
460
MaharashtraHingoli30-Sep-2008--
27161780JI6669 Revised in Implemantion of IHSDP at HingoliPhase-I , Distt-Hingoli, Maharashtra 12.02
7.8612.72
-- - 4.86
651651--
- 651 -
461
MaharashtraHingoli10-Dec-2008--
27161780JI6672 Revised in Implemantion of IHSDP at HingoliPhase-II , Distt-Hingoli, Maharashtra 12.23
8.128.24
-- 1.68 0.12
597597--
- 592 5
24.25 15.9820.96
-- 1.68 4.98
12481248
-- - 1,243 5
462
MaharashtraIchalkaranji19-Nov-2009--
27341822I2168 1488 DUs IHSDP Scheme for the town ofIchalkaranji, Distt-Kolhapur, Maharashtra 30.50
20.1920.19
-- 6.06 -
1488660--
828 660 -
Sub-total of Dhule for 2 project(s)
Sub-total of Dondaicha-Warwade for 4 project(s)
Sub-total of Hingoli for 2 project(s)
* Project Cost and ACA Committed are recalculated after deducting cost of DUs alongwith proportionate cost of infrastructure dropped by CSMC.
Central Share HousesSanctionedReleasedAdjusted
SanctionedCompletedIn-progress
Monitoring Report dated 1st Jan 2019
IHSDP : State wise Report for latest Progress at Project & Town LevelProject Completed
Sr. No.
StateCityInitial SanctionedResent Sanctioned
Project Title Project Code NonStarter Occupied Un-
Occupied
Financial Progress (Rs in Crores) Physical Progress (Nos)
ProjectCost
UC Pending
Excess Central Share
463
MaharashtraUran Islampur14-Dec-2006--
27354926I1182 Construction of 503 Dwelling Units for thetown of Islampur, Maharashtra 6.42
5.065.06
-- - -
503503--
- 503 -
464
MaharashtraJalgaon30-May-2011--
27031918I3771 Construction of 472 Dwelling Units at JalgaonCity, Dist. Jalgaon, Maharashtra 15.44
7.187.27
-- 2.47 0.09
47226084
128 - 260
465
MaharashtraJalna27-Apr-2007--
27181923I1011 Construction of 686 Dwelling Units for Jalnatown, Maharashtra
Project Cancelled on
dated 30-May-11
------
- - ------
- - -
466
MaharashtraJamner29-Oct-2007--
27035165I1200 Implementation of IHSDP Scheme (1238DUs) at Jamner, Maharashtra. 15.60
12.112.1
-- - -
12381104
-- 134 1,104 -
467
MaharashtraJaysingpur26-Sep-2007--
27341976I1012 Construction of 1098 DUs at Jaysinghpur City,Distt Kohlapur, Maharashtra
Project Cancelled on
dated 30-May-11
------
- - ------
- - -
468
MaharashtraKagal30-May-2011--
27342076I3780 Implementation of IHSDP at Kagal, Dist.Kolhapur, Maharashtra 24.10
16.6416.64
-- 1.66 -
1002884118
- 734 150
469
MaharashtraKalameshwar28-Jan-2009--
27092102I1578 Implementation of IHSDP at Kalmeshwar,Dist. Nagpur, Maharashtra 2.20
1.331.43
-- 0.18 0.11
9393--
- 93 -
470
MaharashtraKannad15-Jan-2009--
27192197I1548 Construction of 168 DUs at Kannad City, Dist.Aurangabad, Maharashtra
Project Cancelled on
dated 12-Sep-11
------
- - ------
- - -
471
MaharashtraKarad02-Feb-2007--
27312236I1013 152 DUs Implementation of IHSDP at KaradCity, Dist. Satara, Maharashtra 1.68
1.331.33
-- - -
152152--
- 111 41
472
MaharashtraKaranja22-Oct-2008--
27062243I1402 768 DUs Implementation of IHSDP at KaranjaCity, Maharashtra 1.70
1.096.54
-- 0.47 5.45
6464--
- 64 -
473
MaharashtraKatol27-Feb-2007--
27092307I5509Revised/Curtailment of Project cost in already
sanctioned IHSDP scheme of Katol, DistNagpur, Maharashtra
10.54 8.168.16
-- 0.29 -
735735--
- 735 -
474
MaharashtraKhamgaon27-Feb-2008--
27042385I10141430 Dwelling Units, Implementation of
IHSDP at Khamgaon Dist. Buldhana,Maharashtra
27.38 18.0518.05
-- 0.39 -
14301430
-- - 167 1,263
475
MaharashtraKhamgaon20-Mar-2012--
27042385I4926 Construction of 710 Dwelling Units atKhamgaon, Ph-II, Distt. Buldhana". 12.69
7.416.5--
3.57 - 405192--
213 192 -
40.06 25.4724.55
-- 3.97 -
18351622
-- 213 359 1,263
476
MaharashtraKhapa21-Mar-2007--
27092400I1016 Construction of 176 Dwelling Units at Khapa,Maharashtra 2.21
1.761.76
-- 0.00 -
176176--
- 90 86
477
MaharashtraKolhapur08-Dec-2006--
27342526I5528Revised project for Construction of 761
Dwelling Units for Kolhapur, Phase-I,Maharashtra
8.61 6.799.85
-- - 3.05
761761--
- 761 -
478
MaharashtraKolhapur29-Oct-2007--
27342526I5230 Revised Project- Implementation of IHSDP atKolhapur, Phase-II, (Infra) Maharashtra 6.07
4.8615.45
-- 1.48 10.59
InfraNANA
- - -
14.68 11.6525.29
-- 1.48 13.64
761761--
- 761 -
479
MaharashtraKopargaon28-Feb-2009--
27262553I1934 Construction of 1080 Dwelling Units atKopargaon, Maharashtra
Project Cancelled on
dated 12-Sep-11
------
- - ------
- - -
480
MaharashtraLatur28-Jan-2009--
27282741I1574Providing Infrastructure for the areas where
housing is done under VAMBAY schemes,Latur, Maharashtra
57.26 43.6243.62
-- 0.00 -
InfraNANA
- - -
481
MaharashtraLonar22-Oct-2008--
27042768I1404 700 DUs Revised in IHSDP Scheme for thetown of Lonar, Distt Buldana, Maharashtra 22.80
11.5811.58
-- 2.32 -
70063664
- - 636
Sub-total of Khamgaon for 2 project(s)
Sub-total of Kolhapur for 2 project(s)
* Project Cost and ACA Committed are recalculated after deducting cost of DUs alongwith proportionate cost of infrastructure dropped by CSMC.
Central Share HousesSanctionedReleasedAdjusted
SanctionedCompletedIn-progress
Monitoring Report dated 1st Jan 2019
IHSDP : State wise Report for latest Progress at Project & Town LevelProject Completed
Sr. No.
StateCityInitial SanctionedResent Sanctioned
Project Title Project Code NonStarter Occupied Un-
Occupied
Financial Progress (Rs in Crores) Physical Progress (Nos)
ProjectCost
UC Pending
Excess Central Share
482
MaharashtraLonar13-Mar-2012--
27042768I4915606 DUs Implementation of IHSDP at Lonar,
Phase-II, Distt Buldana under Green BuildingProjects
23.53 13.1713.176.59
7.23 - 606402--
204 - 402
46.33 24.7524.756.59
9.55 - 13061038
64 204 - 1,038
483
MaharashtraLonavala02-Feb-2007--
27252769I1018 Construction of 151 DUs at Lonawala City,Maharashtra.
Project Cancelled on
dated 30-May-11
------
- - ------
- - -
484
MaharashtraMalegaon28-Mar-2012--
27202881I4908Implementation of IHSDP scheme for 1440
DUs at Malegaon (Ph-16), Dist Nashik,Maharashtra
55.60 24.2124.2112.11
13.50 - 1440240
1200 - - 240
485
MaharashtraMalegaon23-Mar-2012--
27202881I4911Implementation of IHSDP scheme for 1440
DUs at Malegaon (Ph-17) Dist Nashik,Maharashtra
53.44 23.2323.2311.61
9.75 - 1440120
1320 - - 120
486
MaharashtraMalegaon23-Mar-2012--
27202881I4912Implementation of IHSDP scheme for 1440
DUs at Malegaon (Ph-18) Dist Nashik,Maharashtra
51.96 22.1522.1511.07
12.32 - 1440100
1340 - - 100
487
MaharashtraMalegaon23-Mar-2012--
27202881I4913Implementation of IHSDP scheme for 1440
DUs at Malegaon (Ph-19) Dist Nashik,Maharashtra
53.05 22.9422.9411.47
14.37 - 1440
951345
- - 95
488
MaharashtraMalegaon15-Jan-2009--
27202881I1551Implementation of IHSDP scheme for 1440
DUs at Malegaon Phase-I, Dist Nashik,Maharashtra
28.92 19.819.8
-- - -
14401440
-- - 500 940
489
MaharashtraMalegaon15-Jan-2009--
27202881I1552Implementation of IHSDP scheme for 1440
DUs at Malegaon Phase-II, Dist Nashik,Maharashtra
28.69 19.6219.62
-- - -
14401440
-- - - 1,440
490
MaharashtraMalegaon15-Jan-2009--
27202881I1553Implementation of IHSDP scheme for 1440
DUs at Malegaon Pase-III, Dist Nashik,Maharashtra
28.24 19.2619.26
-- 0.00 -
14401440
-- - - 1,440
491
MaharashtraMalegaon15-Jan-2009--
27202881I1554Implementation of IHSDP scheme for 1440
DUs at Malegaon Phase-IV, Dist Nashik,Maharashtra
28.44 19.4219.42
-- 7.77 -
1440960480
- - 960
492
MaharashtraMalegaon15-Jan-2009--
27202881I1558Implementation of IHSDP scheme for 1440
DUs at Malegaon Phase-V, Dist Nashik,Maharashtra
29.31 20.1120.11
-- - -
1440912528
- - 912
493
MaharashtraMalegaon15-Jan-2009--
27202881I1555Implementation of IHSDP scheme for 1440
DUs at Malegaon Phase-VI, Dist Nashik,Maharashtra
28.76 19.6719.679.84
9.40 - 1440672768
- - 672
494
MaharashtraMalegaon15-Jan-2009--
27202881I1556Implementation of IHSDP scheme for 1440
DUs at Malegaon Phase-VII, Dist Nashik,Maharashtra
28.92 19.819.8
-- - -
14401056384
- - 1,056
495
MaharashtraMalegaon15-Jan-2009--
27202881I1557 Construction of 1440 DUs at MahldeMalegaon Phase-VIII, Maharashtra
Project Cancelled on
dated 28-Mar-12
------
- - ------
- - -
415.34 230.21230.21
56.1 67.11 -
1584084757365
- 500 7,975
496
MaharashtraMalkapur10-Dec-2008--
27042887I1457 Implementation of IHSDP at Malkapur CityDist. Buldana, Maharashtra 3.06
2.083.47
-- 0.06 1.39
12498--
26 98 -
497
MaharashtraMehkar28-Mar-2012--
27043044I4909 Revised 1584 DUs for Implementation ofIHSDP at Mehkar City, Dist Buldana". 56.74
28.5728.5714.29
2.86 0.00 15841138446
- - 1,138
498
MaharashtraMohpa03-Jun-2008--
27093105I5508Revised/Curtailment of Project cost in already
sanctioned IHSDP scheme of Mohpa, DistNagpur, Maharashtra
5.00 3.243.24
-- 0.97 -
200193--
7 193 -
499
MaharashtraMowad30-May-2011--
27093135I3774 Implementation of IHSDP at Mowad, Tah.Narkhed, Dist. Nagpur, Maharashtra 5.99
3.725.02
-- - 1.30
280263
9 8 255 8
500
MaharashtraMudkhed03-Feb-2009--
27153144I1660 Implementation of IHSDP at Mudkhed (810DUs), Distt. Nanded, Maharashtra 18.69
10.588.96
3 - -
810810--
- 590 220
Sub-total of Lonar for 2 project(s)
Sub-total of Malegaon for 11 project(s)
* Project Cost and ACA Committed are recalculated after deducting cost of DUs alongwith proportionate cost of infrastructure dropped by CSMC.
Central Share HousesSanctionedReleasedAdjusted
SanctionedCompletedIn-progress
Monitoring Report dated 1st Jan 2019
IHSDP : State wise Report for latest Progress at Project & Town LevelProject Completed
Sr. No.
StateCityInitial SanctionedResent Sanctioned
Project Title Project Code NonStarter Occupied Un-
Occupied
Financial Progress (Rs in Crores) Physical Progress (Nos)
ProjectCost
UC Pending
Excess Central Share
501
MaharashtraMurtijapur20-Mar-2012--
27053195I4927 Implementation of IHSDP Ph-II 620 DwellingUnits at Murtijapur, Distt. Akola, Maharashtra 21.34
12.5312.536.27
- - 620620--
- 390 230
502
MaharashtraMurtijapur10-Dec-2008--
27053195I3328 Revised in project of 1003 Dwelling Units atMurtijapur, Dist. Akola, Maharashtra. 24.56
15.8315.83
-- - -
1003839164
- 731 108
45.90 28.3628.366.27
- - 16231459164
- 1,121 338
503
MaharashtraNaldurg09-Jan-2008--
27293276I1032 1206 Dwelling Units, IHSDP Scheme for thetown of Naldurg, Maharashtra 6.49
4.326.89
-- 0.87 2.57
37830276
- - 302
504
MaharashtraNandurbar10-Jun-2011--
27013302I3830 Implementation of IHSDP at Nandurbar, DisttNandurbar, Mahrashtra 27.02
15.2215.22
-- 7.61 -
1176876--
300 - 876
505
MaharashtraNarkhed18-May-2007--
27093337I5228 Revised project- Implementation of IHSDPscheme at Narkhed, Maharashtra 5.10
4.083.05
-- - -
448448--
- 448 -
506
MaharashtraNarkhed30-May-2011--
27093337I3795 Implementation of IHSDP at Narkhed CityPhase-II, Dist. Nagpur, Maharashtra 20.79
13.812.84
-- 2.40 -
86274030
92 740 -
507
MaharashtraNarkhed30-May-2011--
27093337I3796 Implementation of IHSDP at Narkhed City Ph-III, Dist. Nagpur, Maharashtra 12.04
7.98.75
-- 1.59 0.85
53743620
81 436 -
37.92 25.7924.63
-- 3.99 0.85
18471624
50 173 1,624 -
508
MaharashtraOsmanabad27-Feb-2007--
27293501I1020 Construction of 2399 Dwelling Units forOsmanabad, Maharashtra
Project Cancelled on
dated 20-May-14
--8.67
-- - 8.67
------
- - -
509
MaharashtraPanchgani20-Mar-2012--
27313597I4929 Construction of 76 Dwelling Units atPanchgani Dist Satara, Maharashtra
Project Cancelled on
dated 20-May-14
--1.04
-- - 1.04
------
- - -
510
MaharashtraPandharkaoda10-Dec-2008--
27143605I1465 Implementation of IHSDP at PandharkawadaCity, Dist. Yavatmal, Maharashtra 1.59
1.024.68
-- 0.00 3.66
6868--
- 68 -
511
MaharashtraParbhani28-Jan-2009--
27173652I1580 Construction of 2798 DUs at Parbhani, Dist.Parbhani, Maharashtra
Project Cancelled on
dated 12-Sep-11
------
- - ------
- - -
512
MaharashtraPartur15-Jan-2009--
27183664JI6131 Revised in IHSDP project at Partur, Dist.Jalna, Maharashtra 20.57
12.7812.78
-- 1.28 0.00
800595205
- 539 56
513
MaharashtraPathri28-Jan-2009--
27173689I1577 Construction of 757 DUs at Pathri Dist.Parbhani, Maharashtra
Project Cancelled on
dated 30-May-11
------
- - ------
- - -
514
MaharashtraPatur30-May-2011--
27053709I3773 Implementation of IHSDP at Patur (572 DUs),Dist. Akola, Maharashtra 14.62
8.818.814.4
5.34 - 572195--
377 195 -
515
MaharashtraPauni22-Oct-2008--
27103710I1403 Implementation of IHSDP Phase- I at Paunni,Distt. Bhandara, Maharashtra 1.01
0.771.17
-- 0.12 0.40
5050--
- 50 -
516
MaharashtraPauni15-Jan-2009--
27103710I1550 Implementation of IHSDP Phase- II at Paunni,Distt. Bhandara, Maharashtra 25.98
16.716.7
-- 1.67 -
978978--
- 978 -
26.99 17.4717.87
-- 1.79 0.40
10281028
-- - 1,028 -
517
MaharashtraPhaltan13-Jun-2007--
27313766I1021 Implementation of IHSDP at Phaltan (895DUs), Maharashtra
Project Cancelled on
dated 17-Sep-15
--3.62
-- - 3.62
------
- - -
518
MaharashtraPulgaon26-Nov-2008--
27083866JI6128 Revised in IHSDP project at Pulgaon , DisttWardha, Maharashtra 2.96
1.912.65
-- - 0.74
120102--
18 108 -
519
MaharashtraRahta Pimplas10-Jun-2011--
27263932I3831Implementation of IHSDP at Rahata, Dist:
Ahmednagar, (672 DUs to 456 DUs),Maharashtra
10.26 5.746.181.63
- 0.44 45614848
260 148 -
Sub-total of Murtijapur for 2 project(s)
Sub-total of Narkhed for 3 project(s)
Sub-total of Pauni for 2 project(s)
* Project Cost and ACA Committed are recalculated after deducting cost of DUs alongwith proportionate cost of infrastructure dropped by CSMC.
Central Share HousesSanctionedReleasedAdjusted
SanctionedCompletedIn-progress
Monitoring Report dated 1st Jan 2019
IHSDP : State wise Report for latest Progress at Project & Town LevelProject Completed
Sr. No.
StateCityInitial SanctionedResent Sanctioned
Project Title Project Code NonStarter Occupied Un-
Occupied
Financial Progress (Rs in Crores) Physical Progress (Nos)
ProjectCost
UC Pending
Excess Central Share
520
MaharashtraRajura03-Feb-2009--
27133979I5408Revision/ Curtailment of Project cost in
already sanctioned IHSDP scheme of Rajura,Distt Chandarpur, Maharashtra
12.73 8.4
10.87--
1.75 2.48 600572--
28 572 -
521
MaharashtraRamtek03-Jun-2008--
27094024I1337 IHSDP Project at Ramtek (265 DUs), DistrictNagpur, Maharashtra 1.39
1.061.94
-- 0.00 0.89
7272--
- 18 54
522
MaharashtraRisod30-Sep-2008--
27064099I5234 Revised project for construction of 458 DUs inslum areas of Risod, Dist. Washim. 6.34
5.038.12
-- 3.10 3.09
322192
5 125 192 -
523
MaharashtraSangli26-Sep-2007--
27354224I1023Implementation of IHSDP Scheme 175 DUs atBal Hanuman Colony-I & II, Sangli City, DisttSangli, Maharashtra
2.25 1.751.75
-- 0.88 -
175175--
- 175 -
524
MaharashtraSangli26-Feb-2009--
27354224I1901 3798 Dwelling Units at Sangli, Distt Sangli,Maharashtra 34.51
18.3331.18
-- 18.33 12.85
13951395
-- - 248 1,147
36.77 20.0832.93
-- 19.20 12.85
15701570
-- - 423 1,147
525
MaharashtraSavner27-Feb-2007--
27094303I5232 Revised in IHSDP Scheme for construction of222 DUs at Saoner Dist. Nagpur 1.18
0.952.94
-- 0.00 2.00
927220
- 72 -
526
MaharashtraSatara30-May-2011--
27314283I3777 Implementation of IHSDP scheme for 1473DUs at Satara, Dist. Satara, Maharashtra 36.78
22.1922.19
-- 2.22 -
1473932--
541 424 508
527
MaharashtraSawantwadi27-Feb-2008--
27334305I1022 IHSDP Scheme for the town of Sawantwadi(62 DUs), Maharashtra 1.34
0.810.81
-- - -
6262--
- 62 -
528
MaharashtraShahade30-May-2011--
27014348I3770 Construction of 1020 DUs at Shahada, Dist.Nandurbar, Mahrashtra
Project Cancelled on
dated 20-May-14
--9.29
-- - 9.29
------
- - -
529
MaharashtraShendurjana10-Dec-2008--
27074383I1459 Implementation of IHSDP at ShendurjanaGhat City Dist. Amravati, Maharashtra 2.64
1.73.56
-- 0.85 1.86
11055--
55 55 -
530
MaharashtraShirdi30-May-2011--
27264399I3776 Construction of 376 DUs at Shirdi, Dist.Ahmednagar, Maharashtra
Project Cancelled on
dated 20-May-14
--2.42
-- - 2.42
------
- - -
531
MaharashtraShirpur-Warwade22-Oct-2008--
27024401I5235Revised in IHSDP Scheme for construction of
210 DUs in 2 slum areas of Shirpur-WarwadeDist. Dhule.
4.86 3.13.3--
1.16 0.20 210210--
- 136 74
532
MaharashtraShrirampur27-Apr-2007--
27264420I1026 Implementation of IHSDP at Shriampur,Maharashtra 2.20
1.687.16
-- 0.69 5.49
234215--
19 222 -
533
MaharashtraSindkhed Raja10-Dec-2008--
27044465I1461 Implementation of IHSDP at sindkhed RajaCity, Distt. Buldana , Maharashtra
Project Cancelled on
dated 17-Sep-15
--3.81
-- - 3.81
------
- - -
534
MaharashtraSolapur14-Dec-2006--
27304530I1027Revised in sanctioned scheme IHSDP of
Solapur Municipal Corporation, Solapur,Maharashtra
4.44 3.324.65
-- - 1.33
460460--
- 388 72
535
MaharashtraTasgaon19-Oct-2007--
27354672I1028 Implementation of IHSDP at Tasgaon Dist.Sangh, Maharashtra. 4.42
3.523.52
-- - -
393393--
- 175 218
536
MaharashtraTelhara20-Mar-2012--
27054685I4928 945 DUs Implementation of IHSDP at TelharaDist. Akola, Maharashtra 27.54
14.5914.59
-- 5.00 -
945778--
167 778 -
537
MaharashtraTirora05-Feb-2008--
27114804JI6670 Revised in Sanctioned DPR - IHSDP at TiroraPh-I, District Gondia, Maharashtra. 7.65
5.035.030.4
0.08 - 454454--
- 454 -
538
MaharashtraTirora22-Oct-2008--
27114804JI6671 Revised in Sanctioned DPR - IHSDP at TiroraPh-II, District Gondia, Maharashtra. 9.65
7.318.12
-- 1.70 0.82
55146134
56 459 2
539
MaharashtraTirora30-May-2011--
27114804I3789 Implementation of IHSDP at Tirora City Phase-III, Dist. Gondia, Maharashtra 17.95
11.888.91
-- 1.98 -
90046263
375 450 12
Sub-total of Sangli for 2 project(s)
* Project Cost and ACA Committed are recalculated after deducting cost of DUs alongwith proportionate cost of infrastructure dropped by CSMC.
Central Share HousesSanctionedReleasedAdjusted
SanctionedCompletedIn-progress
Monitoring Report dated 1st Jan 2019
IHSDP : State wise Report for latest Progress at Project & Town LevelProject Completed
Sr. No.
StateCityInitial SanctionedResent Sanctioned
Project Title Project Code NonStarter Occupied Un-
Occupied
Financial Progress (Rs in Crores) Physical Progress (Nos)
ProjectCost
UC Pending
Excess Central Share
540
MaharashtraTirora30-May-2011--
27114804I3788 Implementation of IHSDP at Tirora City Phase-IV, Dist. Gondia, Maharashtra 21.91
14.811.1
-- 1.24 -
948624324
- 609 15
57.17 39.0133.16
0.4 5.00 0.82
28532001421
431 1,972 29
541
MaharashtraTuljapur21-Oct-2011--
27294852I4228 920 DUs Implementation of IHSDP atTuljapur, Dist Osmanabad, Maharashtra 12.26
6.466.6--
3.02 0.14 45018060
210 - 180
542
MaharashtraTumsar26-Nov-2008--
27104855JI6768 Revised in Sanctioned DPR - IHSDP Schemeof Tumsar, Dist. Bhandara, Maharashtra 4.57
2.553.51
-- 0.01 0.96
170170--
- 170 -
543
MaharashtraUmred10-Dec-2008--
27094901JI6130 Revised in IHSDP project at Umred City, Dist.Nagpur , Maharashtra 4.30
2.522.48
-- 0.00 -
170170--
- 170 -
544
MaharashtraUmri21-Oct-2011--
27153756I4208 656 DUs Implementation of IHSDP at Umri,Dist Nanded, Maharashtra 16.09
9.349.34
-- 1.36 -
656656--
- 272 384
545
MaharashtraVaijapur15-Jan-2009--
27194975I1547 Implementation of IHSDP Project at Vaijapur,Dist Aurangabad, Maharashtra 3.01
1.949.48
-- 1.94 7.54
124--
124 - - -
546
MaharashtraVita06-Mar-2012--
27355097I4924 396 Dwelling Units, Implementation of IHSDPat Vita, Dist. Sangli, Maharashtra 13.77
6.16.1--
2.04 - 396348--
48 348 -
547
MaharashtraWai03-Feb-2009--
27315108I1659 342 DUs Implementation of IHSDP at Wai,Distt. Satara, Maharashtra 4.11
2.74.53
-- 0.79 1.83
204144--
60 144 -
548
MaharashtraWardha30-Jul-2008--
27085122I5568 Revised in IHSDP project at Wardha, Distt.Wardha, Maharashtra 14.17
9.269.53
-- 0.95 0.27
634604--
30 604 -
549
MaharashtraWarud03-Feb-2009--
27075126I5231Revised in IHSDP Scheme for construction of
253 DUs in 3 slum areas of Warud Dist.Amravati.
5.89 4.214.21
-- 2.06 -
253253--
- 238 15
550
MaharashtraWashim21-Feb-2009--
27065127I1854 Revised in IHSDP Scheme for the town ofWashim, Phase-I, Maharasthra 24.00
14.7814.783.76
1.48 - 883821--
62 423 398
551
MaharashtraWashim13-Mar-2012--
27065127I4917 Construction of 699 Dwelling Units at Washim, Phase-II, Maharashtra
Project Cancelled on
dated 20-May-14
--7.17
-- - 7.17
------
- - -
24.00 14.7821.963.76
1.48 7.17 883821--
62 423 398
552
MaharashtraYavatmal10-Dec-2008--
27145138I5236Revised in IHSDP Scheme for construction of
972 DUs in 4 slum areas of Yavatmal, DisttAmravati.
12.64 8.899.31
-- 0.06 0.42
600600--
- 600 -
553
MaharashtraYevla20-Dec-2007--
27205149I5233 Revised in Sanctioned DPR- Implementationof IHSDP at Yeola, Maharashtra 1.37
1.094.13
-- - 3.03
132132--
- 132 -
1,903.54 1164.291313.77150.64
234.12 173.20 77885602499731
7,905 38,908 21,356
554
ManipurBishnupur30-Mar-2010--
14040810I2552 375 DUs Integrated Housing & SlumDevelopment Programme, Bishnupur, Manipur 6.15
4.734.73
-- - -
375375--
- 375 -
555
ManipurJiribam24-Mar-2008--
14072021I1178 288 DUs Integrated Housing & SlumDevelopment Programme, Jiribam, Manipur 4.48
3.383.38
-- - -
288288--
- 288 -
556
ManipurKakching30-Mar-2010--
14052089I2553 548 DUs Integrated Housing & SlumDevelopment Programme, Kakching, Manipur 8.64
6.616.61
-- - -
548548--
- 548 -
557
ManipurMoirang11-Feb-2009--
14043107I1774 663 DUs IHSDP Project for Moirang, Manipur 10.83 8.338.33
-- - -
663663--
- 663 -
558
ManipurThoubal24-Mar-2008--
14054779I1179 815 DUs Detailed Project Report underIHSDP at Thoubal, Phase-I, Manipur 12.02
8.998.99
-- 0.00 -
815815--
- 815 -
Sub-total of Washim for 1 project(s)
Total of Maharashtra for 119 project(s)including 7 project(s) which are completed
Sub-total of Tirora for 4 project(s)
* Project Cost and ACA Committed are recalculated after deducting cost of DUs alongwith proportionate cost of infrastructure dropped by CSMC.
Central Share HousesSanctionedReleasedAdjusted
SanctionedCompletedIn-progress
Monitoring Report dated 1st Jan 2019
IHSDP : State wise Report for latest Progress at Project & Town LevelProject Completed
Sr. No.
StateCityInitial SanctionedResent Sanctioned
Project Title Project Code NonStarter Occupied Un-
Occupied
Financial Progress (Rs in Crores) Physical Progress (Nos)
ProjectCost
UC Pending
Excess Central Share
559
ManipurThoubal28-Mar-2012--
14054779I4891 Construction of 1385 Dwelling Units atThoubal, Phase-II, Manipur
Project Cancelled on
dated 20-Jan-14
------
- - ------
- - -
560 ManipurManipur MUDA VAMBAY21-May-2009
14105183I2098GOI Subsidy Recommended from JNNURM
for Manipur MUDA Scheme No 18884 forComplete construction of 140 DU underVAMBAY Scheme.
1.26 0.320.32
-- 0.32 -
140140--
- 140 -
43.38 32.3532.35
-- 0.32 -
28292829
-- - 2,829 -
561
MeghalayaNongpoh11-Feb-2009--
17053451I1773 240 Dwelling Units IHSDP Project atNongpoh, Ri Bhoi, Meghalaya 6.75
3.663.55
-- 0.73 -
12811216
- - 112
562
MeghalayaTura27-Feb-2008--
17014860I943 456 Dwelling Units IHSDP project at Tura,Meghalaya 21.82
8.978.97
-- 4.48 -
456456--
- 48 408
563
MeghalayaWilliamnagar11-Feb-2009--
17025131I1772 Construction of 216 DUs IHSDP project atWilliamnagar, East Garo, Meghalaya
Project Cancelled on
dated 27-Feb-15
--3.18
-- - 3.18
------
- - -
28.57 12.6315.7
-- 5.21 3.18
58456816
- 48 520
564
MizoramChamphai20-Feb-2009--
15040918I2022 Construction of 74 Dwelling Units forChamphai Phase-I, Mizoram 1.54
1.331.33
-- - -
7474--
- 74 -
565
MizoramChamphai11-Feb-2009--
15040918I1777 Construction of 376 Dwelling Units forChamphai Phase-2, Mizoram 6.23
5.395.39
-- - -
376376--
- 376 -
7.77 6.726.72
-- - -
450450--
- 450 -
566
MizoramKolasib20-Feb-2009--
15022522I1804 Construction of 50 Dwelling Units at KolasibPhase-I, Mizoram 1.29
0.970.97
-- - -
5050--
- 50 -
567
MizoramKolasib11-Feb-2009--
15022522I1776 Construction of 250 Dwelling Units at KolasibPhase-2, Mizoram 5.76
4.234.23
-- - -
250250--
- 250 -
7.05 5.25.2--
- - 300300--
- 300 -
568
MizoramLunglei07-Mar-2008--
15062782I975 Construction of 500 Dwelling Units at Lungei,Mizoram 8.27
6.216.21
-- - -
500500--
- 500 -
569
MizoramMamit11-Feb-2009--
15012904I1779 Construction of 150 Dwelling Units for Mamit,Mizoram 3.52
2.62.6--
- - 150150--
- 150 -
570
MizoramSaiha11-Feb-2009--
15084170I1775 Construction of 200 Dwelling Units for Saiha,Mizoram 5.55
3.93.9--
- - 200200--
- 200 -
571
MizoramSaiha28-Mar-2012--
15084170I4892 Construction of 100 Dwelling Units for SaihaPhase-2, Mizoram
Project Cancelled on
dated 20-Jan-14
------
- - ------
- - -
5.55 3.93.9--
- - 200200--
- 200 -
572
MizoramSerchhip11-Feb-2009--
15054334I1778 Construction of 350 Dwelling Units forSerchhip, Mizoram 7.10
5.165.16
-- - -
350350--
- 350 -
573
MizoramLawngtlai28-Mar-2012--
1595194I4894 Construction of 200 Dwelling Units forLawngtlai, Mizoram
Project Cancelled on
dated 20-Jan-14
------
- - ------
- - -
574
MizoramSaitual28-Mar-2012--
15034176I4893 Construction of 300 Dwelling Units for Saitual,Mizoram
Project Cancelled on
dated 20-Jan-14
------
- - ------
- - -
39.27 29.7829.78
-- - -
19501950
-- - 1,950 -
Total of Manipur for 6 project(s)including 5 project(s) which are completed
Total of Meghalaya for 2 project(s)
Sub-total of Champhai for 2 project(s)
Sub-total of Kolasib for 2 project(s)
Sub-total of Saiha for 1 project(s)
Total of Mizoram for 8 project(s)including 8 project(s) which are completed
* Project Cost and ACA Committed are recalculated after deducting cost of DUs alongwith proportionate cost of infrastructure dropped by CSMC.
Central Share HousesSanctionedReleasedAdjusted
SanctionedCompletedIn-progress
Monitoring Report dated 1st Jan 2019
IHSDP : State wise Report for latest Progress at Project & Town LevelProject Completed
Sr. No.
StateCityInitial SanctionedResent Sanctioned
Project Title Project Code NonStarter Occupied Un-
Occupied
Financial Progress (Rs in Crores) Physical Progress (Nos)
ProjectCost
UC Pending
Excess Central Share
575
NagalandDimapur29-Dec-2006--
13061325I5068 Revised project for provision of Housing (2496 DUs) & Infrastructure facilities at Dimapur,Nagaland
69.47 40.740.7
-- 11.38 -
249612291267
- 2,016 -
576
NagalandMedziphema28-Mar-2012--
13065196I4895 Construction of 350 DUs at Medziphma Town,Nagaland
Project Cancelled on
dated 20-Jan-14
------
- - ------
- - -
577
NagalandTseminyu28-Mar-2012--
13075195I4896 Construction of 320 DUs for the town ofTseminyu, Nagaland
Project Cancelled on
dated 20-Jan-14
------
- - ------
- - -
578
NagalandNagaland SUDA VAMBAY21-May-2009
13075182I2097GOI Subsidy Recommended from JNNURM
for Nagaland SUDA Scheme No 18885 forComplete construction of 265 DU underVAMBAY Scheme.
2.39 0.60.6--
0.60 - 265265--
- 265 -
71.86 41.341.3
-- 11.98 -
276114941267
- 2,281 -
579
OdishaAngul09-Jan-2008--
21150217I1044Construction of 334 Dwelling Units IHSDP
Scheme for the town of Angul NAC (Ph-I),Odisha
5.66 4.124.12
-- - -
334334--
- 334 -
580
OdishaBalangir03-Feb-2009--
21240418I1666 Construction of 324 Dwelling Units IHSDPScheme for Balangir, Odisha 8.37
5.575.57
-- - -
324322
2 - 322 -
581
OdishaBaleshwar07-Mar-2008--
21080428I1186 Construction of 162 Dwelling Units IHSDPScheme for the town of Balasore, Odisha 3.28
2.152.15
-- - -
162162--
- 162 -
582
OdishaBaleshwar24-Feb-2009--
21080428I1847 Construction of 387 Dwelling Units IHSDPScheme for the town of Balasore, Odisha 9.15
6.186.18
-- - -
387387--
- 387 -
12.43 8.338.33
-- - -
549549--
- 549 -
583
OdishaBargarh09-Jan-2008--
21010521I1040 Construction of 732 Dwelling Units IHSDPScheme at Bargarh (Phase-I), Odisha 10.41
7.577.57
-- 1.76 -
732558174
- 552 6
584
OdishaBaripada03-Feb-2009--
21070534I1672 Construction of 474 Dwelling Units IHSDPScheme for Baripada, Odisha 7.57
5.257.75
-- 2.55 2.50
32126259
- 256 6
585
OdishaBhadrak03-Feb-2009--
21090643I1671 Construction of 238 Dwelling Units IHSDPScheme for the town of Bhadrak Ph-1, Odisha 4.71
3.083.36
-- 0.70 0.28
21820810
- 206 2
586
OdishaBhadrak24-Feb-2009--
21090643I2023160 New DUs & 6 Individual Toilet, IHSDP
Scheme for the town of Bhadrak, Phase-2,Odisha
3.25 2.161.32
-- 0.07 -
13611713
6 114 3
7.96 5.234.68
-- 0.78 0.28
35432523
6 320 5
587
OdishaBhawanipatna03-Feb-2009--
21260694I1673 Construction of 164 Dwelling Units IHSDPScheme for Bhawanipatna, Odisha 4.24
2.822.82
-- - -
164164--
- 164 -
588
OdishaBiramitrapur13-Feb-2008--
21050796I1047 Construction of 200 Dwelling Units IHSDPScheme for Biramitrapur, Odisha 3.52
2.42.4--
0.03 - 200200--
- 194 6
589
OdishaBerhamapur24-Feb-2009--
21190849I1853 Construction of 1202 Dwelling Units IHSDPProject for the town of Berhampur, Odisha 29.08
19.3419.349.03
7.34 - 11271048
79 - 929 119
590
OdishaBrajarajnagar13-Feb-2008--
21020851I1049 Construction of 177 Dwelling Units IHSDPScheme for the town of Brajaraj Nagar, Orissa 3.46
2.342.34
-- - -
177177--
- 177 -
591
OdishaVyasanagar13-Feb-2008--
21130875I1048 Construction of 1016 Dwelling Units IHSDPScheme for the town of Vyasanagar, Odisha 17.51
12.7412.74
-- 2.92 -
1016885131
- 870 15
592
OdishaCuttack22-Feb-2010--
21121116I2498Construction of 456 Dwelling Units for the
town of Cuttack, Phase-II, District Cuttack,Odisha
16.99 9.454.72
-- - -
456456--
- 456 -
593
OdishaDhenkanal09-Jan-2008--
21141293I5050 Revised IHSDP project for construction of 608Dwelling Units at Dhenkanal, Odisha 10.39
7.557.55
-- 1.67 -
60850880
20 508 -
Total of Nagaland for 2 project(s)
Sub-total of Baleshwar for 2 project(s)
Sub-total of Bhadrak for 2 project(s)
* Project Cost and ACA Committed are recalculated after deducting cost of DUs alongwith proportionate cost of infrastructure dropped by CSMC.
Central Share HousesSanctionedReleasedAdjusted
SanctionedCompletedIn-progress
Monitoring Report dated 1st Jan 2019
IHSDP : State wise Report for latest Progress at Project & Town LevelProject Completed
Sr. No.
StateCityInitial SanctionedResent Sanctioned
Project Title Project Code NonStarter Occupied Un-
Occupied
Financial Progress (Rs in Crores) Physical Progress (Nos)
ProjectCost
UC Pending
Excess Central Share
594
OdishaJajapur13-Feb-2008--
21131901I1051 Construction of 295 Dwelling Units IHSDPScheme for the town of Jajpur, Orissa. 5.09
3.73.7--
- - 295295--
- 295 -
595
OdishaJatani07-Mar-2008--
21171963I1050 Construction of 72 Dwelling Units IHSDPScheme for the town of Jatni, Odisha 1.24
0.90.9--
- - 7272--
- 67 5
596
OdishaJatani24-Feb-2009--
21171963I1850 Construction of 132 Dwelling Units IHSDPScheme for the town of Jatni Phase-II, Odisha 3.40
2.262.261.13
1.46 - 13211814
- 118 -
4.64 3.163.161.13
1.46 - 20419014
- 185 5
597
OdishaJeypur03-Feb-2009--
21291987I1667 Construction of 323 Dwelling Units IHSDPproject at Jeypore in Odisha 7.07
5.045.042.52
2.90 - 32327053
- 195 75
598
OdishaJharsuguda03-Feb-2009--
21022005I1668Construction of 786 Dwelling Units insitu
IHSDP project for the town of Jharsuguda,Odisha
19.83 13.1713.17
-- 6.54 -
78675333
- 742 11
599
OdishaKendrapara09-Jan-2008--
21102347I1045 Construction of 87 Dwelling Units IHSDPproject at Kendrapara (Ph.-I), Odisha 1.56
1.051.05
-- 0.00 -
87852
- 80 5
600
OdishaKeonjhargarh03-Feb-2009--
21062350I5069 Revised IHSDP project for 261 Dwelling Unitsat Keonjhagarh Municipality, Odisha 6.70
4.437.45
-- 1.01 3.01
26124021
- 215 25
601
OdishaKhariar Road09-Jan-2008--
21252413I1041 Construction of 305 Dwelling Units IHSDPproject at Khariar Road (Ph-I), Odisha 4.32
3.143.14
-- - -
305305--
- 305 -
602
OdishaKhordha09-Jan-2008--
21172458I1038 Construction of 91 Dwelling Units for the townof Khurda, Phase-1, Odisha 2.03
1.191.19
-- 0.75 -
916823
- 66 2
603
OdishaMalkangiri24-Feb-2009--
21302886I1852 Construction of 236 Dwelling Units for thetown of Malkangiri, Odisha 6.07
4.044.04
-- 0.75 -
23619244
- 182 10
604
OdishaNabarangapur24-Feb-2009--
21283220I1849 262 New DUs & 270 individual Toilet, IHSDPproject for the town of Nabarangpur, Odisha 5.56
4.022.01
-- 0.59 -
532424108
- 424 -
605
OdishaNayagarh07-Mar-2008--
21163386I1043 Construction of 226 Dwelling Units IHSDPproject for the town of Nayagarh, Odisha 4.66
3.073.07
-- 1.02 -
22619432
- 155 39
606
OdishaParlakhemundi24-Feb-2009--
21203657I1848 Construction of 307 Dwelling Units IHSDPproject for the town of Parlakhemundi, Odisha 5.64
3.732.49
-- 0.75 -
23017456
- 160 14
607
OdishaPatnagarh30-Mar-2011--
21243694I3650 Construction of 159 Dwelling Units IHSDPproject for Patnagarh, NAC, Odisha 4.11
2.722.720.5
0.00 - 159159--
- 158 1
608
OdishaPhulabani30-Mar-2011--
21213770I3651 Construction of 157 Dwelling Units IHSDPproject for the town of Phulbani, Odisha 4.06
2.72.7
1.35 0.63 -
15712730
- 127 -
609
OdishaRourkela09-Jan-2008--
21054059I1039 Construction of 124 Dwelling Units for thetown of Rourkela (Ph.-I), Odisha 2.31
1.521.52
-- - -
124124--
- 124 -
610
OdishaSambalpur03-Feb-2009--
21034201I1670 Construction of 613 Dwelling Units for thetown of Sampalpur Phase-1 & II, Odisha 15.44
10.255.12
-- 1.60 -
613240220
153 240 -
611
OdishaSonapur24-Feb-2009--
21234537I1882 Construction of 934 Dwelling Units IHSDPproject for the town of Subarnpur Odisha 23.63
15.6915.69
-- 10.20 -
934723211
- 723 -
612
OdishaTalcher07-Mar-2008--
21154637I1046 Construction of 155 Dwelling Units IHSDPproject for the town of Talcher, Odisha. 3.14
2.022.02
-- - -
155155--
- 155 -
613
OdishaJoda02-Mar-2012--
21062026I4508 Construction of 174 Dwelling Units IHSDPproject for the town of Joda, Odisha 4.87
3.053.051.52
1.38 - 17443
131 - 29 14
Sub-total of Jatani for 2 project(s)
* Project Cost and ACA Committed are recalculated after deducting cost of DUs alongwith proportionate cost of infrastructure dropped by CSMC.
Central Share HousesSanctionedReleasedAdjusted
SanctionedCompletedIn-progress
Monitoring Report dated 1st Jan 2019
IHSDP : State wise Report for latest Progress at Project & Town LevelProject Completed
Sr. No.
StateCityInitial SanctionedResent Sanctioned
Project Title Project Code NonStarter Occupied Un-
Occupied
Financial Progress (Rs in Crores) Physical Progress (Nos)
ProjectCost
UC Pending
Excess Central Share
614
OdishaBaudhgarh02-Mar-2012--
21220578I4489 149 DUs IHSDP project for the town of BapujiNagar Slum, at Baudhgarh NAC, Odisha 3.81
2.512.511.25
0.03 - 149149--
- 146 3
615
OdishaKochinda02-Mar-2012--
21032499I4488 Implementation of IHSDP project (177 DUs) atKuchinda NAC, Sambalpur, Odisha. 4.58
3.043.04
-- - -
177177--
- 177 -
616
OdishaJagatsinghapur02-Mar-2012--
21111877I5048 Construction of 162 Dwelling Units IHSDPproject for the town of Jagatsinghpur, Odisha 4.19
2.782.78
-- 0.37 -
162158
4 - 158 -
280.89 188.72180.59
17.3 47.00 5.80
12742110331530
179 10,672 361
617
PuducherryKaraikal24-Mar-2008--
34042237I1183 Construction of 216 multistories tenements atKaraikovilpattu, Karaikal, Puducherry 8.38
2.612.74
-- 0.00 0.13
21614472
- 47 97
8.38 2.612.74
-- 0.00 0.13
21614472
- 47 97
618
PunjabBareta22-Feb-2011--
03150520I3456 400 DUs Proposed Slum Rehabilitaion ProjectScheme-6, Bareta-I, Punjab
Project Cancelled on
dated 20-May-14
--3.96
-- - 3.96
------
- - -
619
PunjabBareta22-Feb-2011--
03150520I3457 240 DUs Proposed Slum Rehabilitaion ProjectScheme-10, Bareta-II, Punjab
Project Cancelled on
dated 20-May-14
--2.43
-- - 2.43
------
- - -
- --
6.39--
- 6.39 ------
- - -
620
PunjabBathinda22-Feb-2011--
03140575I3458 592 DUs Proposed Slum Rehabilitaion Projectat New Alam Bhatinda, Punjab.
Project Cancelled on
dated 20-May-14
--4.94
-- - 4.94
------
- - -
621
PunjabBathinda22-Feb-2011--
03140575I34681328 DUs Proposed In-Situ Slum
Rehabilitaion Project at JanatanagarBhatinda, Ph-II, Punajb
Project Cancelled on
dated 20-May-14
--11.64
-- - 11.64
------
- - -
- --
16.58--
- 16.58 ------
- - -
622
PunjabBhikhi22-Feb-2011--
03150700I3449 64 DUs Proposed Slum Rehabilitaion Projectat Ward 5, Bhikhi, Punjab.
Project Cancelled on
dated 20-May-14
--1.21
-- - 1.21
------
- - -
623
PunjabBhikhi22-Feb-2011--
03150700I3450 304 DUs Proposed Slum Rehabilitaion Projectat Ward 12, Bhikhi Ph-I, Punjab
Project Cancelled on
dated 20-May-14
--2.96
-- - 2.96
------
- - -
- --
4.16--
- 4.16 ------
- - -
624
PunjabBudhlada22-Feb-2011--
03150857I3451 384 DUs Proposed Slum Rehabilitaion Projectat Budhlada, Punjab
Project Cancelled on
dated 20-May-14
--3.45
-- - 3.45
------
- - -
625
PunjabJalandhar24-Jan-2008--
03041912I10522311 DUs (1163- new & 1148- upgrade) for
the town of Jalandhar, dist jalandhar Ph-II,Punjab
13.81 6.8618.4
-- - 11.54
818700118
- 758 -
626
PunjabJalandhar26-Sep-2007--
03041912I10531627 DUs (592-new & 1035-upgrade) IHSDP
Scheme at Jalandhar Phase-I, Dist Jalandhar,Punjab
3.18 1.627.15
-- - 5.53
39234151
- 388 -
16.98 8.4825.55
-- - 17.07
12101041169
- 1,146 -
627
PunjabMansa22-Feb-2011--
03152975I3452 240 DUs Proposed Slum Rehabilitaion Projectat Mansa, Punjab
Project Cancelled on
dated 20-May-14
--2.68
-- - 2.68
------
- - -
628
PunjabMaur22-Feb-2011--
03143020I3455 672 DUs Proposed Slum Rehabilitaion Projectat Maur Ward 9, 10, Punjab
Project Cancelled on
dated 20-May-14
--5.87
-- - 5.87
------
- - -
629
PunjabRajpura30-Sep-2008--
03173975I1375 720 DUs for Basera Resettlement Schemesfor Urban Poor of Rajpura, Punjab 21.01
8.228.22
-- 4.11 -
720370350
- 17 353
Total of Odisha for 38 project(s)including 9 project(s) which are completed
Total of Puducherry for 1 project(s)
Sub-total of Bareta for 0 project(s)
Sub-total of Bathinda for 0 project(s)
Sub-total of Bhikhi for 0 project(s)
Sub-total of Jalandhar for 2 project(s)
* Project Cost and ACA Committed are recalculated after deducting cost of DUs alongwith proportionate cost of infrastructure dropped by CSMC.
Central Share HousesSanctionedReleasedAdjusted
SanctionedCompletedIn-progress
Monitoring Report dated 1st Jan 2019
IHSDP : State wise Report for latest Progress at Project & Town LevelProject Completed
Sr. No.
StateCityInitial SanctionedResent Sanctioned
Project Title Project Code NonStarter Occupied Un-
Occupied
Financial Progress (Rs in Crores) Physical Progress (Nos)
ProjectCost
UC Pending
Excess Central Share
630
PunjabSardulgarh22-Feb-2011--
03154261I3453 704 DUs Proposed Slum Rehabilitaion Projectat Sardulgarh Ph-I, Punjab.
Project Cancelled on
dated 20-May-14
--7.04
-- - 7.04
------
- - -
631
PunjabSardulgarh22-Feb-2011--
03154261I3454 400 DUs Proposed Slum Rehabilitaion Projectat WARD NO.5 Sardulgarh. Ph-II, Punjab.
Project Cancelled on
dated 20-May-14
--3.71
-- - 3.71
------
- - -
632
PunjabBatala28-Mar-2012--
03010574I4919383 DUs (79-new, kitchen-152, toilet-63, both
kitchen & toilet-89 nos) at Batala, DistrictGurdaspur, Punjab
10.59 6.963.82
-- 3.82 -
1966180
55 117 -
633
PunjabJalalabad28-Mar-2012--
03111907I4921 542 Dwelling Units IHSDP Project atJalalabad, District Fazilka, Punjab 6.02
2.232.23
-- 0.01 -
271271--
- 249 22
54.60 25.989.71
-- 7.94 66.95
23971743599
55 1,529 375
634
RajasthanAlwar19-Oct-2007--
08060116I1201 2456 DUs Integrated Housing Project forSlum Dwellers of Alwar, Rajasthan
Project Cancelled on
dated 12-Sep-11
------
- - ------
- - -
635
RajasthanJhalawar and Jhalrapatan21-Mar-2007--
08321993I992 245 DUs IHSDP Scheme for Jhalawar town,Distt. Jhalawar, Rajasthan
Project Cancelled on
dated 12-Sep-11
------
- - ------
- - -
636
RajasthanAntah28-Feb-2012--
08310213JI6808Revised project for construction of 322 DUs
with infrastructure in Anta, Dist. Baran,Rajasthan
9.91 3.785.81
-- 1.73 2.03
32223389
- 322 -
637
RajasthanAnupgarh05-Aug-2010--
08010219JI6788Revised project for construction of 449 DUs
with infrastructure in Anoopgarh, Dist. SriGanganagar, Rajasthan
14.32 8.1310.75
-- - 2.62
449444
5 - 449 -
638
RajasthanAsind28-Sep-2006--
08240272I1180694 DUs (227- New & 467- Upgradation)
IHSDP Program for Asind Town, Bhilwaradistt. Rajasthan
4.43 3.413.91
-- 1.09 0.50
611402209
- 611 -
639
RajasthanBali28-Sep-2006--
08200429I976523 DUs (110- New & 413- Upgrade) IHSDP
Program (IHSDP) for Bali Town, Distt. Pali,Rajasthan
2.26 1.812.64
-- 0.00 0.83
37135318
- 371 -
640
RajasthanBalotra24-Jan-2008--
08170442I983447 DUs (304-new & 143- upgrade) IHSDP
Scheme for the construction of at Balotra,Rajasthan
8.48 5.475.47
-- - -
447447--
- 447 -
641
RajasthanBanswara05-Aug-2010--
08280491I2828Insitu 188 & Upgradation 29 DUs IHSDP
Scheme for the town of Banswara distt.Banswara, Rajasthan
3.31 1.81.33
-- - -
14612917
- 146 -
642
RajasthanBaran08-Dec-2006--
08310505I977 407 DUs (270- New & 137- Upgradation)IHSDP Scheme at Baran, Rajasthan 9.70
7.377.37
-- - -
407398
9 - 407 -
643
RajasthanBarmer24-Jan-2008--
08170540I984 1281 DUs (1071-new & 210- upgrade) IHSDPScheme for the town of Barmer, Rajasthan 23.71
15.2215.22
-- - -
12811235
46 - 1,281 -
644
RajasthanBegun28-Mar-2012--
08290593I4922 529 Dwelling Units IHSDP Scheme for thetown of Begun, Rajasthan
Project Cancelled on
dated 17-Jun-13
------
- - ------
- - -
645
RajasthanBhadra17-Jan-2011--
08020641I33671332 DUs (1153- New & 179- Upgrade) for
the town of Bhadra, District Hanumangarh,Rajasthan
37.69 24.2524.25
-- - -
13321332
-- - 1,332 -
646
RajasthanBhawani Mandi28-Sep-2006--
08320692I979114 DUs (97-New & 17- Upgrade) Relocation
and development of slum at Bhawani Mandi,Rajasthan
1.72 1.361.43
-- - 0.07
9797--
- 97 -
647
RajasthanBhilwara21-Mar-2007--
08240705I980 1704 DUs (652-new houses & 1052- upgrade) IHSDP Scheme for Bhilwara, Rajasthan 18.20
14.3715.1
-- - 0.74
15041504
-- - 1,504 -
648
RajasthanBhinmal27-Jan-2010--
08180712JI6828Revised project for construction of 500 DUs
with infrastructure in Bhinmal, Dist. Jalore,Rajasthan
8.54 4.275.38
-- - 1.11
500258242
- 416 -
649
RajasthanBikaner30-Mar-2006--
08030763I981Provision of Infrastructure facilites
(Community toilets, roads, & drainage) inBikaner, (Ph-I), Rajasthan
3.32 2.662.66
-- 0.04 -
InfraNANA
- - -
Total of Punjab for 5 project(s)
* Project Cost and ACA Committed are recalculated after deducting cost of DUs alongwith proportionate cost of infrastructure dropped by CSMC.
Central Share HousesSanctionedReleasedAdjusted
SanctionedCompletedIn-progress
Monitoring Report dated 1st Jan 2019
IHSDP : State wise Report for latest Progress at Project & Town LevelProject Completed
Sr. No.
StateCityInitial SanctionedResent Sanctioned
Project Title Project Code NonStarter Occupied Un-
Occupied
Financial Progress (Rs in Crores) Physical Progress (Nos)
ProjectCost
UC Pending
Excess Central Share
650
RajasthanBikaner30-Sep-2008--
08030763I13781216 DUs (1041- new houses & 175 upgrade)IHSDP Scheme for the town of Bikaner, (Ph-II), Rajasthan
1.76 0.7610.95
-- - 10.19
1707199
- 170 -
5.08 3.4213.61
-- 0.04 10.19
1707199
- 170 -
651
RajasthanBilara17-Jan-2011--
08150769I3366574 DUs (460- New & 114- Upgrade) IHSDP
Scheme for the town of Bilara, DistrictJodhpur, Rajasthan
8.53 5.724.68
-- 0.31 -
36731849
- 367 -
652
RajasthanChhabra28-Sep-2006--
08311003I982312 DUs (210- New & 102- Upgrade) IHSDP
Scheme for the town of Chhabra in 3 slums ofarea, Rajasthan
3.56 2.853.58
-- - 0.72
25121140
- 251 -
653
RajasthanChhoti Sadri17-Jan-2011--
08291026I3365 380 DUs (331- New & 49- Upgrade) for thetown of Chhoti Sadri, Pratapgarh, Rajasthan 6.71
4.524.521.41
- 0.00 280168112
- 280 -
654
RajasthanChittorgarh28-Sep-2006--
08291078I985540 DUs Upgradation of Infra facilities in
Gandhi Nagar Slum and planned resettlmentof part slum at Ram Devji ka Chanderia,Rajasthan
4.36 3.325.12
-- - 1.80
27219874
- 272 -
655
RajasthanChittorgarh05-Aug-2010--
08291078I2848433 DUs (380- New & 53- Upgrade) IHSDP
Scheme for the Town of Chittorgarh distt.Chittorgarh, Rajasthan
7.95 3.953.66
-- - -
237117120
- 237 -
12.31 7.278.78
-- - 1.80
509315194
- 509 -
656
RajasthanDeshnoke28-Feb-2012--
08031217I5012 391 Dwelling Units IHSDP Scheme atDeshnok, Dist Bikaner, Rajasthan 15.41
8.844.65
-- 4.65 -
372240116
16 356 -
657
RajasthanGangapur City26-Sep-2007--
08241505I986Implementation of IHSDP project (161 DUs) atGangapur City, Dist. Sawaimadhopur,Rajasthan
3.52 2.462.46
-- - -
161161--
- 161 -
658
RajasthanGulabpura30-Mar-2006--
08241657I987Provision of Infrastructure facilities (roads,
drainage & Community Centers) in Gulabpura,Rajasthan
1.24 11--
- - Infra
NANA
- - -
659
RajasthanHanumangarh21-Mar-2007--
08021719I988651 DUs (440-new & 211 upgrade) IHSDP
Scheme for the town of Hanumangarh,Rajasthan
22.25 17.5417.54
-- - -
651650
1 - 651 -
660
RajasthanJaisalmer26-Sep-2007--
08161894I9901042 DUs (941-new & 101- upgrade) IHSDP
Scheme at Jaiselmer City, Dist. Jaiselmer,Rajasthan
15.32 11.5612.64
-- 5.24 1.08
94836
912 - 948 -
661
RajasthanJaisalmer29-Sep-2010--
08161894I3069Insitu new construction of 1491 DUs and
Upgradation 6 DUs for the Town of Jaiselmer,Rajasthan
28.46 18.9721.87
-- 10.88 2.90
129966
1233 - 1,299 -
43.78 30.5334.51
-- 16.12 3.98
2247102
2145 - 2,247 -
662
RajasthanJaitaran14-Aug-2008--
08201896I1335 214 DUs (166-new houses & 48- upgrade) forthe town of Jaitaran Distt- Pali, Rajasthan 3.86
2.563.23
-- 0.18 0.67
17514134
- 164 -
663
RajasthanJalor30-Sep-2008--
08181924I1377 263 DUs (243-new & 20- upgradation) for thetown of Jhalore, Rajasthan 5.63
3.474.89
-- - 1.42
19212567
- 192 -
664
RajasthanJhalawar and Jhalrapatan28-Sep-2006--
08321995I991413 DUs (200- New & 213- Upgrade) IHSDP
Development of the Slums at Jhalarpatan,Rajasthan
1.94 1.51.58
-- - 0.08
173164
9 - 173 -
665
RajasthanJodhpur28-Feb-2012--
08152028I5010373 DUs (new insitu-42, 331- upgrade)
IHSDP Scheme Jodhpur Phase-III, DisttJodhpur, Rajasthan
12.58 5.515.512.75
3.21 - 373224149
- 373 -
666
RajasthanJodhpur24-Jan-2008--
08152028I978883 DUs (new-764 & 119-upgrade) IHSDP
Scheme for the town of Jodhpur Phase-I,Rajasthan
9.82 5.8
12.14--
- 6.35 454277177
- 454 -
667
RajasthanJodhpur27-Feb-2008--
08152028I9891832 DUs (new- 1599 & upgrade- 233 nos)
IHSDP Scheme for the town of Jodhpur Phase-II, Rajasthan
24.87 14.8613.26
-- 3.25 -
1033698335
- 1,033 -
Sub-total of Bikaner for 2 project(s)
Sub-total of Chittorgarh for 2 project(s)
Sub-total of Jaisalmer for 2 project(s)
* Project Cost and ACA Committed are recalculated after deducting cost of DUs alongwith proportionate cost of infrastructure dropped by CSMC.
Central Share HousesSanctionedReleasedAdjusted
SanctionedCompletedIn-progress
Monitoring Report dated 1st Jan 2019
IHSDP : State wise Report for latest Progress at Project & Town LevelProject Completed
Sr. No.
StateCityInitial SanctionedResent Sanctioned
Project Title Project Code NonStarter Occupied Un-
Occupied
Financial Progress (Rs in Crores) Physical Progress (Nos)
ProjectCost
UC Pending
Excess Central Share
47.27 26.1630.912.75
6.46 6.35 18601199661
- 1,860 -
668
RajasthanKaithoon26-Aug-2010--
08302085I3088Insitu new construction of 116 DUs and
Upgradation 211 DUs IHSDP Scheme for theKaithoon, distt. Kota, Rajasthan
5.06 3.453.45
-- 0.86 -
327321
6 - 327 -
669
RajasthanKekri14-Dec-2010--
08212339I3310 871 DUs (558- New & 313- Upgrade) for theTown of Kekri, district Ajmer, Rajasthan 10.07
6.9612.77
-- 0.00 5.81
537397140
- 537 -
670
RajasthanKota21-Mar-2007--
08302572I5488 Revised project 350 DUs for the town of KotaPhase-I, Rajasthan 10.50
4.048.52
-- 4.04 4.49
35027575
- 350 -
671
RajasthanKota09-Feb-2011--
08302572I3448 845 DUs IHSDP Scheme for the town of Kota(Phase II), Rajasthan. 28.58
15.1415.14
-- - -
845845--
- 845 -
672
RajasthanKota20-Jan-2012--
08302572I5070 Relocation of 752 dwelling units under IHSDPat Kota Phase-III, Rajasthan 33.91
13.346.67
-- - -
752400352
- 400 -
72.99 32.5230.33
-- 4.04 4.49
19471520427
- 1,595 -
673
RajasthanMangrol02-Mar-2012--
08312955I4528 476 DUs (439-insitu & 37-upgrade) IHSDPproject at Mangrol, Baran Dist., Rajasthan 19.79
10.4812.46.2
0.00 1.92 40331093
- 403 -
674
RajasthanNimbahera05-Aug-2010--
08293432I2868457 DUs (428- New & 29- Upgrade) for the
town of Nimbahera distt. Chittorgarh,Rajasthan
10.60 7.277.59
-- 1.40 0.31
43939049
- 439 -
675
RajasthanPali21-Mar-2007--
08203562I994 2722 DUs (1643-new & 1079- upgrade) forthe town of Pali, Rajasthan 22.06
17.6417.64
-- - -
27222339383
- 2,722 -
676
RajasthanFalna11-Oct-2006--
08203764I1181 361 DUs (290- New & 71- Upgrade) for thetown of Falna, Distt. Pali, Rajasthan 4.46
3.523.52
-- 0.00 0.00
361352
9 - 352 -
677
RajasthanPhalodi15-Jul-2009--
08153765I2050 764 DUs (605- New & 159- Upgrade) for thetown of Phalodi, Distt. Jodhpur, Rajasthan 23.27
13.7913.79
-- - -
764623135
6 758 -
678
RajasthanPhalodi28-Feb-2012--
08153765I5011 626 DUs (551-new & 75- upgrade) for PhalodiPhase-II, Distt., Jodhpur, Rajasthan 25.45
1111--
2.96 - 626267311
48 578 -
48.71 24.7924.79
-- 2.96 -
1390890446
54 1,336 -
679
RajasthanPilibanga29-Sep-2010--
08023784I3048 Construction of 244 DUs for the town ofPilibanga dist Hanumangarh, Rajasthan 6.41
4.274.27
-- 0.00 -
244235
9 - 244 -
680
RajasthanPindwara29-Sep-2010--
08193792I3068Construction of 622 DUs and Upgradation 64
DUs for the town of Pindwara dist SirohiRajasthan
13.26 88--
0.00 - 686424262
- 686 -
681
RajasthanPipar City28-Feb-2012--
08153795I5008 654 DUs (488-new & 166- upgrade) IHSDPScheme Pipar, Dist Jodhpur (Rajasthan) 24.76
12.7312.736.36
1.67 - 654654--
- 654 -
682
RajasthanPokaran15-Jul-2009--
08163812I2049 787 DUs (705- New & 82-Upgrade) for thetown of Pokran, Distt. Jaisalmer, Rajasthan 21.83
12.212.2
-- 0.00 -
787588199
- 787 -
683
RajasthanPratapgarh26-Sep-2007--
08293845I995590 DUs (insitu-590 & upgrade- 121)
Implementation of IHSDP project Pratapgarh,Rajasthan
8.70 5.67.2--
0.00 1.60 56647789
- 566 -
684
RajasthanRamganj Mandi02-Mar-2012--
08304000I456875 DUs (38-insitu & 37-upgrade) IHSDP
Scheme of Ramganj Mandi (75 DUs), Kota,Rajasthan
2.69 1.480.74
-- - -
756015
- 75 -
685
RajasthanRani Nagar28-Sep-2006--
08204033I996 19 Dwelling Units IHSDP Scheme at RaniNagar, Rajasthan 0.79
0.630.63
-- - -
1919--
- 19 -
686
RajasthanRawatbhata14-Dec-2010--
08294063I32881439 DUs (1375- New & 64- Upgrade) for the
Town of Rawatbhata district ChittorgarhRajasthan
23.67 16.325.16
-- 6.88 8.86
938518420
- 850 -
Sub-total of Phalodi for 2 project(s)
Sub-total of Jodhpur for 3 project(s)
Sub-total of Kota for 3 project(s)
* Project Cost and ACA Committed are recalculated after deducting cost of DUs alongwith proportionate cost of infrastructure dropped by CSMC.
Central Share HousesSanctionedReleasedAdjusted
SanctionedCompletedIn-progress
Monitoring Report dated 1st Jan 2019
IHSDP : State wise Report for latest Progress at Project & Town LevelProject Completed
Sr. No.
StateCityInitial SanctionedResent Sanctioned
Project Title Project Code NonStarter Occupied Un-
Occupied
Financial Progress (Rs in Crores) Physical Progress (Nos)
ProjectCost
UC Pending
Excess Central Share
687
RajasthanRawatsar26-Aug-2010--
08024064I3108Insitu new construction of 1278 DUs and
Upgradation of 120 DUs for the Town ofRawatsar, distt. Hanumangarh, Rajasthan
17.33 10.4518.51
-- 2.30 8.06
78273844
- 782 -
688
RajasthanSadri28-Sep-2006--
08204144I997 46 DUs (36- New & 10- Upgrade) IHSDPScheme for the town of Sadri, Rjasthan 1.29
1.031.03
-- - -
4646--
- 46 -
689
RajasthanSanchore27-Jan-2010--
08184214I2443 390 DUs (241- New & 149- Upgrade) IHSDPScheme for Sanchor, district Jalore, Rajasthan 2.26
0.972.66
-- - 1.69
16814820
- 168 -
690
RajasthanSangod14-Dec-2010--
08304225I3308 442 DUs (282- New & 160- Upgrade) for thetown of Sangod, district Kota, Rajasthan 3.97
2.73.04
-- 2.70 0.35
23218052
- 232 -
691
RajasthanSardarshahar02-Mar-2012--
08044259I4509 Construction of 1802 insitu dwelling units in17 slums of Sardarsahar Town, Rajasthan 35.34
15.3521.47
-- 0.00 6.12
1288967321
- 1,288 -
692
RajasthanSawai Madhopur29-Oct-2007--
08104304I1001976 DUs (782-new houses & 194- upgrade)
IHSDP Scheme for the town of SawaiMadhopur, Rjasthan
13.48 9.939.93
-- - -
976772204
- 976 -
693
RajasthanShahpura(M)02-Mar-2012--
08244365I4548 317 DUs (240-insitu & 77-upgrade) IHSDPScheme of Shahpura, Bhilwara, Rajasthan 11.16
5.255.25
-- - -
31729522
- 317 -
694
RajasthanSheoganj28-Feb-2012--
08194385I5009 Construction of 489 DUs (391 new & 98upgrade) in Sheoganj, Rajasthan 11.81
5.127.03
-- - 1.91
37232448
- 372 -
695
RajasthanSikar28-Sep-2006--
08134446I998 IHSDP Scheme 556 DUs for the town ofSikar, Rajasthan 2.51
22.18
-- - 0.17
256256--
- 256 -
696
RajasthanSojat08-Dec-2006--
08204527I999196 DUs (48- New & 148- Upgradation)
IHSDP Scheme for the town of Sojat,Rajasthan
3.16 2.532.53
-- 0.24 -
19615739
- 196 -
697
RajasthanSumerpur26-Aug-2010--
08204595I3089Construction of 469 DUs and Upgradation of
60 DUs for the Town of Sumerpur, Distt. Pali,Rajasthan
9.50 6.096.64
-- 1.30 0.55
489385104
- 489 -
698
RajasthanSuratgarh30-Sep-2008--
08014612I1376 1493 DUs (new houses- 897 & Upgradation-596) for the Town of Suratgarh , Rajasthan 35.05
22.122.1
-- 3.61 -
14931175318
- 1,493 -
699
RajasthanTakhatgarh15-Jul-2009--
08204629I2048 635 DUs (399- New & 236- Upgrade) for thetown of Takhatgarh, Distt. Pali, Rajasthan 15.03
8.399.25
-- 0.00 0.86
550304246
- 550 -
700
RajasthanTonk30-Mar-2006--
08224841I1000Augmentation of Infrastructure facilities in 3
slums and Rehabilitation scheme at BaherBasti, Tonk (Ph-I), Rajasthan
4.46 3.573.57
-- - -
136136--
- 136 -
701
RajasthanTonk14-Dec-2010--
08224841I3309 384 Dwelling Units IHSDP Scheme for theTown of Tonk Phase-II, Rajasthan 7.19
4.545.972.99
0.00 1.43 29246
246 - 16 30
11.65 8.119.542.99
0.00 1.43 428182246
- 152 30
702
RajasthanUdaipur20-Dec-2007--
08264865I10021737 DUs (1317-new & 420-upgrade)
Implementation of IHSDP at Udaipur,Rajasthan
23.66 15.4916.07
-- - 0.58
1687896786
5 887 9
816.44 492.4555.2219.72
58.54 77.82 36250270169159
75 34,560 39
703
SikkimSingtam18-Dec-2009--
11044477I2230Upgradation of 39 DUs & Infrastructure
Development for Notified Slum Area - Singtam, East Sikkim, Sikkim.
19.91 17.9217.92
-- 11.56 -
3939--
- 39 -
19.91 17.9217.92
-- 11.56 -
3939--
- 39 -
704
TamilnaduAcharapakkam27-Feb-2007--
33030017I1054 186 new houses for Acharapakkam TownPanchayat, Kancheepuram distt., Tamilnadu 2.25
1.81.8--
- - 186186--
- 186 -
705
TamilnaduAlampalayam29-Dec-2008--
33090078I1510 149 DUs IHSDP Scheme for Alampalayam,Distt. Namakkal, Tamilnadu 2.25
1.561.51
-- - -
149149--
- 149 -
Sub-total of Tonk for 2 project(s)
Total of Rajasthan for 66 project(s)including 6 project(s) which are completed
Total of Sikkim for 1 project(s)
* Project Cost and ACA Committed are recalculated after deducting cost of DUs alongwith proportionate cost of infrastructure dropped by CSMC.
Central Share HousesSanctionedReleasedAdjusted
SanctionedCompletedIn-progress
Monitoring Report dated 1st Jan 2019
IHSDP : State wise Report for latest Progress at Project & Town LevelProject Completed
Sr. No.
StateCityInitial SanctionedResent Sanctioned
Project Title Project Code NonStarter Occupied Un-
Occupied
Financial Progress (Rs in Crores) Physical Progress (Nos)
ProjectCost
UC Pending
Excess Central Share
706
TamilnaduArani27-Apr-2007--
33010232I1055139 DUs (60-new houses & 79-upgrade) for
Arani town Panchyat, Thiruvallurdistrict,Tamilnadu
1.69 1.361.36
-- - -
139139--
- 139 -
707
TamilnaduAriyalur28-Jan-2009--
33170243I1584 Construction of 378 New houses in AriyalurMuncipality, Ariyalur, Tamilnadu 7.89
6.046.04
-- - -
37836612
- 378 -
708
TamilnaduAruppukkottai05-Mar-2010--
33260259I2521Construction of 879 New Houses for
Arupukkottai Municipality, Virudhnagar,Tamilnadu
20.89 15.315.3
-- - -
879879--
- 879 -
709
TamilnaduAvalpoondurai28-Jan-2009--
33100305I1568Construction of 90 houses with infrastructure
for Avalpoondurai Town Panchayat, Erode,Tamilnadu
1.67 1.191.16
-- 0.00 -
9090--
- 90 -
710
TamilnaduBodinayakanur03-Feb-2009--
33250823I1647 Construction of 326 Dwelling Units singlestorieda at Bodinayakkanur, Tamilnadu 4.63
3.523.52
-- - -
326326--
- 326 -
711
TamilnaduChidambaram27-Apr-2007--
33181032I1056 IHSDP Scheme for 392 Dwelling UnitsChidambaram, Tamilnadu 4.17
3.343.34
-- - -
39237220
- 392 -
712
TamilnaduChinnamanur06-Mar-2012--
33251054I4954950 New houses with infrastructure for
Chinamanur Municipality Municipality Thenidistrict, Tamilnadu
15.82 10.4810.48
-- - -
950950--
- 950 -
713
TamilnaduCoonoor03-Feb-2009--
33111108I1648IHSDP Scheme for 221 DUs Single storied &
Upgradation 177 nos Toilet at CoonoorMunicipality, Tamil Nadu
5.35 3.623.53
-- - -
398398--
- 398 -
714
TamilnaduKambam28-Jan-2009--
33252150I1572 Construction of 325 New houses for Cumbum(Kambam) Muncipality, Theni, Tamilnadu 5.19
3.863.86
-- - -
325325--
- 325 -
715
TamilnaduDharapuram28-Jan-2009--
33101269I1588Construction of 188 New houses with
infrastructure for Dharapuram Muncipality,Erode, Tamilnadu
3.60 2.772.77
-- 0.00 -
188188--
- 188 -
716
TamilnaduDharmapuri29-Dec-2006--
33051279I1057 433 DUs (197- New & 236- Upgrade) for thetown of Dharmapuri, Tamilnadu 2.67
2.132.13
-- - -
433433--
- 433 -
717
TamilnaduDindigul24-Dec-2008--
33131330I1489 590 Dwelling Units and infrastructure facilitiesfor the town of Dindugul, Tamilnadu 9.72
7.457.450.47
0.00 - 590590--
- 590 -
718
TamilnaduEdappadi03-Feb-2009--
33081390I1649 Construction of 225 new houses for IdappadiMunicipality, Salem, Tamilnadu 4.74
3.623.620.09
- - 225225--
- 225 -
719
TamilnaduErode27-Feb-2007--
33101414I1058 Construction of 454 houses and infrastructurefacilities in Erode Municipality, Tamilnadu 5.03
4.034.03
-- - -
454454--
- 454 -
720
TamilnaduGangavalli29-Dec-2008--
33081509I1507 IHSDP Scheme for Gangavelli townpanchayat, Distt. Salem, Tamilnadu 2.66
1.911.91
-- - -
140140--
- 140 -
721
TamilnaduGobichettipalayam28-Jan-2009--
33101586I1591Construction of 177 New houses for
Gobichettipalayam Muncipality, Erode,Tamilnadu
2.56 1.951.95
-- 0.00 -
177177--
- 177 -
722
TamilnaduHosur13-Mar-2012--
33051805I4952608 new houses and infrastructure facilities in
Hosur Municipality, District Krishnagiri,Tamilnadu
13.39 9.279.27
-- - -
608608--
- 608 -
723
TamilnaduInam Karur28-Jan-2009--
33141841I1594Construction of 240 Houses and providing
infrastructure facilities for Inam KarurMuncipality, Karur Tamilnadu
5.00 3.873.87
-- - -
240240--
- 240 -
724
TamilnaduKanchipuram24-Dec-2008--
33032166I1493 IHSDP Scheme for the town ofKancheepuram (299 DUs), Tamilnadu 4.57
3.43.4--
0.00 0.00 299299--
- 299 -
725
TamilnaduKaraikkudi03-Feb-2009--
33232238I1650IHSDP Scheme of 195 Insitu DU with each
Rs. 1,07,000 with 26.40 sqm at Karaikudi,Tamil Nadu
4.15 3.213.21
-- - -
195195--
- 195 -
726
TamilnaduKarunguzhi27-Feb-2007--
33032277I1059 342 new houses for Karunguzhi TownPanchayat, Kancheepuram Distt., Tamilnadu 4.14
3.313.31
-- 0.00 -
342342--
- 342 -
* Project Cost and ACA Committed are recalculated after deducting cost of DUs alongwith proportionate cost of infrastructure dropped by CSMC.
Central Share HousesSanctionedReleasedAdjusted
SanctionedCompletedIn-progress
Monitoring Report dated 1st Jan 2019
IHSDP : State wise Report for latest Progress at Project & Town LevelProject Completed
Sr. No.
StateCityInitial SanctionedResent Sanctioned
Project Title Project Code NonStarter Occupied Un-
Occupied
Financial Progress (Rs in Crores) Physical Progress (Nos)
ProjectCost
UC Pending
Excess Central Share
727
TamilnaduKaruppur28-Jan-2009--
33082278I162882 new houses and 66 individual Toilet with
infrastructure to the slums in Karuppur TownPanchayat, Tamilnadu
1.57 1.121.12
-- 0.00 -
148148--
- 148 -
728
TamilnaduKarur28-Jan-2009--
33142279I1582Construction of 185 New houses and
infrastructure facilities for Karur Muncipality,Tamilnadu
3.29 2.532.46
-- 0.00 -
185185--
- 185 -
729
TamilnaduKodaikanal14-Dec-2006--
33132501I1060 Construction of 67 DUs in KodaikanalMuncipality, Dindigul, Tamilnadu 1.87
1.341.34
-- - -
6767--
- 67 -
730
TamilnaduKodaikanal28-Jan-2009--
33132501I1587Construction of 900 new houses and with
infrastructure in Kodaikanal Muncipality,Dindigul, Tamilnadu
18.89 12.4512.09
-- - -
900900--
- 900 -
20.76 13.7813.42
-- - -
967967--
- 967 -
731
TamilnaduKodumudi28-Jan-2009--
33102510I1569Construction of 75 new houses with
infrastructure to the slums in Kodumudi TownPanchayat, Erode, Tamilnadu
1.40 1
0.97--
- - 7575--
- 75 -
732
TamilnaduKovilpatti03-Feb-2009--
33282600I1651Construction of 112 New houses with
infrastructure for Kovilpatti Municipality,Tuticorin, Tamilnadu
2.39 1.851.85
-- - -
112112--
- 112 -
733
TamilnaduKrishnagiri28-Jan-2009--
33052604I1627Construction of 262 houses with
infrastructure for Krishnagiri Municipality,Krishnagiri, Tamilnadu.
4.96 3.823.72
-- - -
262262--
- 262 -
734
TamilnaduKuhalur28-Jan-2009--
33102624I1595Construction of 65 Houses with infrastructure
for Kugalur Town Panchayat, Erode,Tamilnadu
1.29 0.930.93
-- - -
6565--
- 65 -
735
TamilnaduKulithalai28-Feb-2012--
33142633I4710Construction of 306 houses with infrastructure
in Kulithalai Municipality, District Karur, TamilNadu
7.41 5.345.34
-- - -
306306--
- 300 6
736
TamilnaduKumarapalayam27-Feb-2007--
33092637I1061Construction of 80 new houses with
infrastructure for Komarapalayam,Municipality, Tamil Nadu
0.76 0.610.61
-- - -
8080--
- 80 -
737
TamilnaduKumbakonam27-Feb-2007--
33212640I1062Construction of 849 DUs (745 new houses &
104 upgrade) & Infrastructure facilities forKumbakonam Municipality Ph-I, II & III,Tamilnadu
13.14 6.726.72
-- 0.00 -
849735114
- 713 22
738
TamilnaduLakkampatti28-Jan-2009--
33102713I1590Construction of 81 Houses and 50 Individual
Toilet, with infrastructure for Lakkampatti townPanchayat, Erode, Tamilnadu
1.44 1.021.02
-- - -
131131--
- 131 -
739
TamilnaduMamallapuram02-Feb-2007--
33032903I1063Construction of 320 DUs for Mamallapuram
Town panchayat, Kancheepuram distt.,Tamilnadu
2.56 2.052.05
-- - -
320320--
- 320 -
740
TamilnaduManapparai14-Dec-2006--
33152914I1064 Construction of 120 houses with infrastructurefor Manapparai Municipality, Tamil Nadu 2.01
1.571.57
-- - -
120120--
- 120 -
741
TamilnaduMannargudi27-Feb-2007--
33202970I106569 houses & providing baisc amenities to
slum dwellers for Mannargudi Municipality,Tamilnadu
1.49 1.191.19
-- - -
6969--
- 69 -
742
TamilnaduMelur27-Apr-2007--
33243056I1066 502 DUs IHSDP Scheme for MelurMunicipality, Madurai Distt., Tamilnadu 7.99
6.396.39
-- - -
502502--
- 502 -
743
TamilnaduMettupalayam03-Feb-2009--
33123065I1959Construction of 72 New houses for
Mettupalayam Municipality, Tiruchirappalli,Tamilnadu
1.48 1.121.09
-- - -
7272--
- 72 -
744
TamilnaduMettur28-Jan-2009--
33083067I1571113 New houses and providing Infrastructure
facilities for Mettur Muncipality, Salem,Tamilnadu
2.42 1.871.83
-- - -
113113--
- 113 -
745
TamilnaduMohanur29-Dec-2008--
33093101I1509 161 Dwelling Units, IHSDP Scheme forMohannur, Distt. Namakkal, Tamilnadu 2.80
1.981.980.06
- - 161161--
- 161 -
746
TamilnaduNagapattinam14-Dec-2006--
33193235I1067IHSDP project for improvement of
infrastructure for Nagapattinam Municipality,Tamilnadu
0.78 0.620.62
-- - -
InfraNANA
- - -
Sub-total of Kodaikanal for 2 project(s)
* Project Cost and ACA Committed are recalculated after deducting cost of DUs alongwith proportionate cost of infrastructure dropped by CSMC.
Central Share HousesSanctionedReleasedAdjusted
SanctionedCompletedIn-progress
Monitoring Report dated 1st Jan 2019
IHSDP : State wise Report for latest Progress at Project & Town LevelProject Completed
Sr. No.
StateCityInitial SanctionedResent Sanctioned
Project Title Project Code NonStarter Occupied Un-
Occupied
Financial Progress (Rs in Crores) Physical Progress (Nos)
ProjectCost
UC Pending
Excess Central Share
747
TamilnaduNagercoil28-Jan-2009--
33303244I1592Construction of 214 Houses with infrastructurefor Nagercoil Muncipality, Kanyakumari,Tamilnadu
3.47 2.662.57
-- - -
214214--
- 214 -
748
TamilnaduNamakkal13-Feb-2008--
33093282I1082 440 DUs (new-385 & 55- upgrade) & infrafacilities for Namakkal Municipality, Tamilnadu 5.93
3.463.46
-- - -
440440--
- 440 -
749
TamilnaduNandivaram-Guduvancheri02-Feb-2007--
33033300I1068326 DUs with infrastructure to slum dwellers
for Nandhivaram Guduvancheri Townpanchayat, Tamilnadu
3.69 2.952.95
-- - -
326326--
- 326 -
750
TamilnaduP.Mettupalayam28-Jan-2009--
33103510I1593Construction of 78 Houses with infrastructure
for P.Mettupalayam Town Panchayat, Erode,Tamilnadu
1.27 0.890.86
-- - -
7878--
- 78 -
751
TamilnaduP.N.Patti28-Jan-2009--
33083511I1586Construction of 88 New houses & 65
Individual Toilet in P.N. Patty Town Panchayat,Salem Dist., Tamilnadu
1.62 1.151.15
-- - -
153153--
- 153 -
752
TamilnaduPalani28-Feb-2012--
33133545I4711Construction of 874 houses with infrastructure
in Palani Municipality, District Dindigual, TamilNadu
16.36 11.1111.11
-- - -
874874--
- 874 -
753
TamilnaduPallapalayam28-Jan-2009--
33103570I1567120 new houses with infrastructure to the
slums in Pallapalayam Town Panchayat,Erode, Tamilnadu
2.35 1.691.64
-- - -
120120--
- 120 -
754
TamilnaduParamakudi13-Mar-2012--
33273639I4951Construction of 520 new houses with
infrastructure in Paramakudi MunicipalityDistrict Ramanathapuram, Tamilnadu
7.15 4.544.54
-- - -
520520--
- 520 -
755
TamilnaduPattukkottai27-Feb-2007--
33213706I5075Revised project for construction of new
houses & infra facilities in PattukottaiMunicipality Thanjavur District Tamilnadu
11.24 8.768.76
-- - -
940940--
- 940 -
756
TamilnaduPerambalur27-Apr-2007--
33163733I1071 580 Dwelling Units, IHSDP Scheme forPerambalur town, Tamilnadu 6.26
4.984.98
-- - -
580580--
- 580 -
757
TamilnaduPeriyakulam13-Mar-2012--
33253740I4950Construction of 118 new houses with
infrastructure in Periyakulam Municipality,District Theni, Tamilnadu
2.16 1.421.42
-- - -
118118--
- 118 -
758
TamilnaduPollachi27-Apr-2007--
33123817I5074Revised project for construction of new
houses (669 DUs) with Infrastructure atPallachi Municipality Coimbatore.
5.73 4.585.17
-- - 0.59
669669--
- 669 -
759
TamilnaduPudukkottai27-Feb-2007--
33223855I5073Revised project for construction of 625 DUs &
infra facilities in PudukottaiMunicipality,Tamilnadu
10.82 8.659.8--
- 1.16 625625--
- 625 -
760
TamilnaduR.Pudupatti05-Jan-2009--
33093913I1511Construction of 153 houses with infrastructure
for R. Pudupatty Town Panchayat, Namakkal,Tamilnadu
2.14 1.461.4--
- - 153153--
- 153 -
761
TamilnaduRamanathapuram03-Feb-2009--
33273987I1653Construction of 277 houses with infrastructure
for Ramanathapuram Municipality,Ramanathapuram Tamilnadu
5.21 3.993.990.22
- - 277277--
- 277 -
762
TamilnaduRanipet03-Feb-2009--
33044039I1654Construction of 121 new houses and
infrastructure facilities for Ranipet Municipality,Vellore, Tamilnadu
2.58 22
0.05 - -
121121--
- 121 -
763
TamilnaduRasipuram28-Feb-2012--
33094045I4729Construction of 136 houses and infrastructure
facilities in Rasipuram Municipality, DistrictNammakkal, Tamil Nadu
3.34 2.372.37
-- - -
136136--
- 136 -
764
TamilnaduSalem24-Dec-2008--
33084187I1492 IHSDP Scheme for the town of Salem (1006DUs), Tamilnadu 15.58
10.8710.87
-- - -
10061006
-- - 1,006 -
765
TamilnaduSathyamangalam28-Jan-2009--
33104288I1630Construction of 198 New houses and 62
Individual toilet for SathyamangalamMuncipality, Salem, Tamilnadu
3.76 2.812.81
-- - -
260260--
- 260 -
766
TamilnaduSattur28-Feb-2012--
33264293I4728Construction of 341 houses with infrastructure
for Sattur Municipality, District Virudhunagar,Tamil Nadu
6.58 4.574.57
-- - -
341341--
- 341 -
767
TamilnaduSeerapalli29-Dec-2008--
33094313I1508Construction of 121 new houses and
providing infrastructure facilities for SeerapalliTown Panchayat
2.16 1.541.54
-- - -
121121--
- 121 -
* Project Cost and ACA Committed are recalculated after deducting cost of DUs alongwith proportionate cost of infrastructure dropped by CSMC.
Central Share HousesSanctionedReleasedAdjusted
SanctionedCompletedIn-progress
Monitoring Report dated 1st Jan 2019
IHSDP : State wise Report for latest Progress at Project & Town LevelProject Completed
Sr. No.
StateCityInitial SanctionedResent Sanctioned
Project Title Project Code NonStarter Occupied Un-
Occupied
Financial Progress (Rs in Crores) Physical Progress (Nos)
ProjectCost
UC Pending
Excess Central Share
768
TamilnaduSirkali14-Dec-2006--
33194492I1073IHSDP project for improvement of
infrastructure facilities for Sirkali Municipality,Tamilnadu
1.28 1.021.02
-- - -
5252--
- 52 -
769
TamilnaduSivagangai24-Dec-2008--
33234515I1490 155 DUs IHSDP scheme for the town ofSivagangai, Tamilnadu 2.90
2.222.16
-- - -
155155--
- 155 -
770
TamilnaduSivakasi03-Feb-2009--
33264518I1655Construction of 223 new houses and
providing infrastructure facilities for SivakasiMunicipality, Tamilnadu
4.57 3.133.13
-- - -
223223--
- 223 -
771
TamilnaduSriperumbudur02-Feb-2007--
33034563I1074370 new Houses for Sriperumbudur
Townpanchayat, Kancheepuramdistt.,Tamilnadu
4.28 3.423.42
-- 0.00 -
370370--
- 370 -
772
TamilnaduThanjavur27-Feb-2007--
33214715I5071Revised project for construction of 1180
houses & infrastructure facilities ThanjavurMunicipality, Tamilnadu
12.25 9.789.78
-- - -
11801180
-- - 1,180 -
773
TamilnaduThanthoni28-Jan-2009--
33144716I1583Construction of 200 New houses and
providing infrastructure facilities for ThanthoniMuncipality, Karur, Tamilnadu
4.10 3.173.17
-- 0.00 -
200200--
- 200 -
774
TamilnaduThedavur05-Jan-2009--
33084721I1513Construction of 115 New houses in
Thedavoor Town Panchayat, Salem District.Tamilnadu
2.30 1.651.65
-- - -
115115--
- 115 -
775
TamilnaduTheni Allinagaram28-Jan-2009--
33254724I1581 Construction of 180 new houses for TheniAllinagaram Municipality, Theni, Tamilnadu 3.85
2.922.920.14
- - 180180--
- 180 -
776
TamilnaduThiruvarur27-Feb-2007--
33204759I5072Revised project for construction of 560 DUs &
infrastructure facilities in ThiruvarurMunicipality, Tamilnadu
6.24 4.995.03
-- - 0.04
56051248
- 512 -
777
TamilnaduThuraiyur28-Jan-2009--
33154784I1589Construction of 602 Houses with infrastructurefor Thuraiyur Muncipality, Tiruchirapalli,Tamilnadu
8.61 6.546.540.48
0.97 - 60258517
- 585 -
778
TamilnaduTiruchengode28-Jan-2009--
33094808I1629 Construction of 422 New Houses InTiruchengode Muncipality, Salem, Tamilnadu 8.87
6.866.86
-- 0.00 -
422422--
- 422 -
779
TamilnaduTiruchirappalli13-Feb-2008--
33154809I1081Construction of 1208 DUs (1147-new & 61-
upgrade) with infrastructure for TiruchirappalliCorporation. Tamilnadu
19.96 10.9410.94
-- 0.00 -
12081208
-- - 1,208 -
780
TamilnaduTirukalukundram02-Feb-2007--
33034810I1076 276 DUs for Thirukkazhukundram townpanchayat, Kancheepuram Distt., Tamilnadu 2.89
2.312.31
-- 0.00 -
276276--
- 276 -
781
TamilnaduTirunelveli24-Dec-2008--
33294814I1494 2003 DUs (750-New & 1253 Upgradation) forthe town of Thirunelveli, Tamilnadu 20.00
15.5815.28
-- - -
20032003
-- - 2,003 -
782
TamilnaduTirupathur29-Dec-2006--
33044815I1077240 DUs (150- New & 90- Upgrade) for
improvement of Infrastructure for TirupatturMunicipality
3.45 2.742.74
-- - -
240240--
- 240 -
783
TamilnaduTiruppur27-Apr-2007--
33124819I11892060 DUs (478 new & 1582 upgrade) & infra
facilities in slums of Thirupur City MunicipalityCorporation, Tamilnadu
20.68 15.8315.83
-- - 0.00
20602060
-- - 2,060 -
784
TamilnaduTiruvannamalai24-Dec-2008--
33064823I1491 832 DUs (480- New & 352- Upgradation) forthe town of Thiruvanamalai, Tamilnadu 8.76
6.636.63
-- - -
832832--
- 832 -
785
Tamil NaduTNSCB (Scheme No. 18496) under VAMBAY21-May-2009
33025177I2088GOI Subsidy Recommended from JnNURM
for TNSCB to Complete Construction of 1443DU under VAMBAY Scheme.
20.09 3.433.43
-- - -
14431443
-- - 1,443 -
786
TamilnaduTuticorin24-Dec-2008--
33315175I1501 500 DUs (400- New & 100- Upgradation) forthe town of Tuticorin, Tamilnadu 8.02
5.85.64
-- - -
500500--
- 500 -
787
TamilnaduUdhagamandalam27-Feb-2007--
33114873I1079Construction of 1082 DUs (new-1032,
upgrade-50) & infra facilities for 16 slums inUdhagamandalam Municipality, Tamilnadu
12.68 10.1410.14
-- - -
10821082
-- - 1,082 -
788
TamilnaduUdumalaipettai03-Feb-2009--
33124877I1656 IHSDP Scheme for 160 DU Insitu atUdumalpet, Coimbatore, Tamilnadu 2.81
2.162.16
-- - -
160160--
- 160 -
* Project Cost and ACA Committed are recalculated after deducting cost of DUs alongwith proportionate cost of infrastructure dropped by CSMC.
Central Share HousesSanctionedReleasedAdjusted
SanctionedCompletedIn-progress
Monitoring Report dated 1st Jan 2019
IHSDP : State wise Report for latest Progress at Project & Town LevelProject Completed
Sr. No.
StateCityInitial SanctionedResent Sanctioned
Project Title Project Code NonStarter Occupied Un-
Occupied
Financial Progress (Rs in Crores) Physical Progress (Nos)
ProjectCost
UC Pending
Excess Central Share
789
TamilnaduUsilampatti06-Mar-2012--
33244934I4953460 DUs with infrastructure facilities for
Uslampatti Municipality, Madurai district,Tamilnadu
10.02 6.866.86
-- - -
460460--
- 460 -
790
TamilnaduUthukuli28-Jan-2009--
33104941I1570Construction of 61 new Houses with
infrastructure to the slums in Uthukuli TownPanchayat, Tamilnadu
1.12 0.80.77
-- - -
6161--
- 61 -
791
TamilnaduVaniyambadi03-Feb-2009--
33044997I1657 IHSDP Scheme for 105 Insitu DU atVaniyambadi Municipality, Vellore, Tamilnadu 2.25
1.741.74
-- 0.00 -
105105--
- 105 -
792
TamilnaduVeeraganur05-Jan-2009--
33085024I1512Construction of 231 New houses in
Veeraganur Town Panchayat, Salem Distt,Tamilnadu
3.75 2.632.63
-- 0.00 -
231231--
- 231 -
793
TamilnaduVellore13-Mar-2012--
33045041I4949Construction of 513 new houses with
infrastructure in Vellore Municipality, DistrictVellore, Tamilnadu
10.94 6.766.76
-- - -
513513--
- 513 -
794
TamilnaduVelur28-Jan-2009--
33095043I1585 Construction of 86 New houses for VelurTown Panchayat, Namakkal, Tamilnadu 1.37
0.960.96
-- - -
8686--
- 86 -
795
TamilnaduViluppuram03-Feb-2009--
33075083I1658 Construction of 502 new houses in VillupuramMunicipality, Tamilnadu 8.56
6.526.570.05
0.00 0.05 502502--
- 502 -
796
TamilnaduVirudhunagar28-Jan-2009--
33265090I1631 Construction of 676 houses with infrastructurefor Virudhunagar Muncipality, Tamilnadu 11.37
8.097.82
-- - -
676676--
- 676 -
797
TamilnaduWalajabad02-Feb-2007--
33035110I1080 506 DUs with infrastructure to slum dwellersfor Walajabad Town panchayat, Tamilnadu 4.80
3.843.84
-- - -
506506--
- 506 -
566.11 400.38400.34
1.57 0.97 1.83
3771537504
211 - 37,508 28
798
TelanganaBhuvangiri29-Oct-2007--
28080726I4759Revised project for infrastructure facilities in
34 slums at BHUVANGIRI, Nalgonda Dist.Telangana
10.80 8.648.64
-- - -
InfraNANA
- - -
799
TelanganaBodhan22-Oct-2008--
28020822I4760Revised project for provision of infrastructure
facilities at Bodhan, Nizamabad,Dist.Telangana
5.74 4.64.6--
- - Infra
NANA
- - -
800
TelanganaGadwal27-Feb-2007--
28071477I4860Revised- 513 houses (In-situ-460, Relocation-
53) with infrastructure in rehabilitation ofGadwal Municipality - Dist Mahbubnagar,Telangana
8.30 55--
- - 513513--
- 513 -
801
TelanganaGadwal27-Dec-2007--
28071477I5053Revised project for provision of infrastructure
facilities in 17 slums at Gadwal,Mahabubnagar Dist, Telangana
3.88 2.842.84
-- 1.42 -
InfraNANA
- - -
12.18 7.847.84
-- 1.42 -
513513--
- 513 -
802
TelanganaJangaon07-Nov-2007--
28091948I4762Revised project for provision of infrastructure
facilities in 15 slums at Jangaon, WarangalDist. Telangana
14.11 11.2911.29
-- - -
InfraNANA
- - -
803
TelanganaKarimnagar11-Oct-2006--
28032259I4853Revised- 2304 DUs at Chinthakunta &
Rekurthi Re-location colonies withinfrastructure in Karimnagar MC, Telangana
27.11 21.6921.69
-- 9.50 0.00
23042254
50 - 2,254 -
804
TelanganaKhammam11-Oct-2006--
28102387I4835Revised project for 1118 DUs with
infrastructure in Gudimalla Layout colonyKhammam Municipality, Andhra Pradesh
11.78 9.179.17
-- 4.88 -
1118850268
- 778 72
805
TelanganaKothagudem11-Oct-2006--
28102578I4856Revised project for 938 DUs in Patha
Kothagudem and Ramavaram Layout coloniesof Kothagudem Municipality Khammam Dist,Telangana
9.37 7.57.5--
4.86 - 938475463
- 475 -
806
TelanganaMahbubnagar21-Mar-2007--
28072825I4834Revised- Construction of 525 DUs with
infrastructure at Mahaboobnagar,Mahboobnagar Distt, Telangana
9.36 7.487.48
-- 3.63 -
525525--
- 525 -
807
TelanganaMahbubnagar06-Dec-2007--
28072825I4773Revised project for provision of infrastructure
facilities in slums at Mahbubnagar Dist,Telangana
12.22 9.789.78
-- 0.00 -
InfraNANA
- - -
21.58 17.2617.26
-- 3.63 -
525525--
- 525 -
Total of Tamilnadu for 94 project(s)including 27 project(s) which are completed
Sub-total of Gadwal for 2 project(s)
Sub-total of Mahbubnagar for 2 project(s)
* Project Cost and ACA Committed are recalculated after deducting cost of DUs alongwith proportionate cost of infrastructure dropped by CSMC.
Central Share HousesSanctionedReleasedAdjusted
SanctionedCompletedIn-progress
Monitoring Report dated 1st Jan 2019
IHSDP : State wise Report for latest Progress at Project & Town LevelProject Completed
Sr. No.
StateCityInitial SanctionedResent Sanctioned
Project Title Project Code NonStarter Occupied Un-
Occupied
Financial Progress (Rs in Crores) Physical Progress (Nos)
ProjectCost
UC Pending
Excess Central Share
808
TelanganaMancherial29-Oct-2007--
28012920I4774Revised project for provision of infrastructure
facilities in 6 slums at Mancherial, AdilabadDistt,Telangana
15.49 11.8211.82
-- - -
InfraNANA
- - -
809
TelanganaMiryalaguda29-Oct-2007--
28083083I4777Revised project for Cement Concrete Roads
in 24 slums of Miryalguda Municipality ofNalgonda Dist, Telangana
14.50 11.611.6
-- - -
InfraNANA
- - -
810
TelanganaMiryalaguda27-Feb-2007--
28083083I4830Revised DPR for 986 DUs (insitu 132 Nos andRelocation 854 Nos) at MiryalgudaMunicipality, Nalgonda Dist,Telangana
11.69 6.26.2--
3.04 - 98688799
- 887 -
26.18 17.7917.79
-- 3.04 -
98688799
- 887 -
811
TelanganaNalgonda27-Feb-2007--
28083277I4809Revised project for 401 DUs (insitu 278 Nos
and Relocation 123 Nos) at NalgondaMunicipality, Telangana
4.99 2.712.71
-- 1.53 -
401401--
- 401 -
812
TelanganaNalgonda29-Oct-2007--
28083277I4779Revised project for provison of infrastructure
facilities (CC Roads) in 24 slums of Nalgondamunicipality of Nalgonda Distt, Telangana
12.28 9.829.82
-- - -
InfraNANA
- - -
17.27 12.5312.53
-- 1.53 -
401401--
- 401 -
813
TelanganaNarayanpet27-Dec-2007--
28073331I4782Revised project for provision of infrastructure
facilities in 18 slums at NARAYANPET,Mahabubnagar Dist, Telangana
12.58 10.0710.07
-- - 0.00
InfraNANA
- - -
814
TelanganaNirmal28-Feb-2009--
28013436I4786Revised project for provision of infrastructure
facilities in 36 slums at Nirmal, Adilabad Dist,Telangana
10.26 8.218.21
-- - -
InfraNANA
- - -
815
TelanganaNizamabad11-Oct-2006--
28023442I4868 Revised- Construction of 1020 Houses underIHSDP for Nizamabad Dist, Telangana 9.48
7.557.55
-- 2.57 -
1020906114
- 906 -
816
TelanganaPalwancha22-Oct-2008--
28103585I4787Revised project for provision of infrastructure
facilities in 17 slums at Palwancha, KhammamDist, Telangana
4.50 3.63.6--
0.00 - Infra
NANA
- - -
817
TelanganaSangareddy11-Oct-2006--
28044221I4828Revised in sanctioned DPR construction of
480 Houses at Sangareddy Municipality ofMedak District, Telangana
6.79 3.563.96
-- 0.49 0.40
432240192
- 24 216
818
TelanganaSiddipet27-Dec-2007--
28044430JI6763Revised project for provisions of infrastructure
facilities in slums at Siddipet, Medak Distt.Telangana
3.86 3.093.18
-- - 0.09
InfraNANA
- - -
819
TelanganaSirsilla11-Oct-2006--
28034502I4859Revised- Construction of 1111 DUs with
infrastructure at Sircila Town, KarimnagarDist.,Telangana
13.22 10.5710.57
-- 6.76 -
11111005106
- 1,005 -
820
TelanganaSuryapet27-Feb-2007--
28084618I4831Revised- Construction of 1556 DUs at
Suryapet Municipality Nalgonda Distt,Telangana
18.50 9.829.82
-- 5.69 -
15561055501
- 1,055 -
821
TelanganaSuryapet29-Oct-2007--
28084618I4855Revised project for provision of infrastructure
facilities in 42 slums at Suryapet, NalgondaDist, Telangana
21.18 16.9416.94
-- - -
InfraNANA
- - -
39.68 26.7626.76
-- 5.69 -
15561055501
- 1,055 -
822
TelanganaTandur27-Dec-2007--
28064657I4833Revised project for providing of infrastructure
facilities Tanduru Ranga Reddy Dist,Telangana
12.75 10.210.2
-- - -
InfraNANA
- - -
823
TelanganaWanaparthi27-Feb-2007--
28075115I4829 Revised 384 DUs in 8 slums and infra facilities in 26 slums at Wanaparthy Municipality ofMahbubnagar District, Telangana
3.60 2.792.79
-- 0.00 -
384384--
- 384 -
824
TelanganaWanaparthi27-Dec-2007--
28075115I4794Revised project for construction of
infrastructure facilities in WanaparthyMunicipality, Mahboobnagar Dist, Telangana
11.74 9.399.39
-- - -
InfraNANA
- - -
15.34 12.1812.18
-- 0.00 -
384384--
- 384 -
825
TelanganaYellandu22-Oct-2008--
28105143I5428Revised project for provision of infrastructure
facilities in 08 slums at Yellandu, DisttKhamam, Telangana
2.42 1.941.94
-- 0.79 -
InfraNANA
- - -
Sub-total of Miryalaguda for 2 project(s)
Sub-total of Nalgonda for 2 project(s)
Sub-total of Suryapet for 2 project(s)
Sub-total of Wanaparthi for 2 project(s)
* Project Cost and ACA Committed are recalculated after deducting cost of DUs alongwith proportionate cost of infrastructure dropped by CSMC.
Central Share HousesSanctionedReleasedAdjusted
SanctionedCompletedIn-progress
Monitoring Report dated 1st Jan 2019
IHSDP : State wise Report for latest Progress at Project & Town LevelProject Completed
Sr. No.
StateCityInitial SanctionedResent Sanctioned
Project Title Project Code NonStarter Occupied Un-
Occupied
Financial Progress (Rs in Crores) Physical Progress (Nos)
ProjectCost
UC Pending
Excess Central Share
826
TelanganaZahirabad11-Oct-2006--
28045151I4861Revised - construction of 328 houses at
Zahirabad Municipality of Medak Dist.Telangana
Project Cancelled on
dated 27-Feb-15
--3.84
-- - 3.84
------
- - -
302.52 227.85232.18
-- 45.17 4.33
1128894951793
- 9,207 288
827
TripuraBelonia11-Feb-2009--
16020610I1780 499 DUs (457- New & 42- Upgradation) forBelonia Town, South Tripura, Tripura 8.74
7.677.67
-- - -
499499--
- 499 -
828
TripuraRanirbazar11-Feb-2009--
16014041I1781 651 DUs (584- New & 67- Upgradation) forRanibazaar Town, West Tripura, Tripura 11.27
9.939.93
-- - -
651651--
- 651 -
829
TripuraSonamura18-Dec-2009--
16014536I2229 820 DUs (511- New & 309 Upgradation) forSanamura Town, West Tripura, Tripura 8.29
7.117.11
-- - -
820820--
- 820 -
830
TripuraTeliamura29-Oct-2007--
16014686I1083 400 Dwelling Units, IHSDP Scheme forTeliamura Town, Tripura 7.19
6.336.33
-- 0.00 -
400400--
- 400 -
831
TripuraUdaipur18-Dec-2009--
16024864I2228 745 DUs (508- New & 237- Upgradation) forUdaipur town, South Tripura, Tripura 8.15
77--
- - 745745--
- 745 -
43.64 38.0538.05
-- 0.00 -
31153115
-- - 3,115 -
832
Uttar PradeshAchhalda26-Feb-2009--
09320019I1890 132 DUs IHSDP Project at Town areaAchalda Distt. Auraiya, UP 3.59
2.382.38
-- 0.00 -
132--
132 - - -
833
Uttar PradeshAfzalgarh28-Nov-2006--
09030035I1084 184 DUs for Slum Development at Kila,Afzalgarh, Distt. Bijnor, Uttar Pradesh 2.57
1.961.96
-- - 0.00
184184--
- 184 -
834
Uttar PradeshAjhuwa24-Feb-2009--
09440059I1839 144 DUs IHSDP Scheme for the town ofAjhuwa, Distt. Kaushambi, UP 3.45
2.282.28
-- - -
144144--
- 144 -
835
Uttar PradeshAkrampur17-Jan-2011--
09265186JI6750 Revised Project at Akrampur City (177 DUs),Dist. Unnao, Uttar Pradesh. 6.64
3.593.590.1
0.10 - 177177--
- 177 -
836
Uttar PradeshAligarh26-Nov-2008--
09120097I1440 IHSDP Scheme for the town of Aligarh (168DUs), Uttar Pradesh. 4.40
2.922.92
-- 0.01 -
168168--
- 168 -
837
Uttar PradeshAligarh03-Feb-2009--
09120097JI6979 Revised project at Aligarh (660 DUs to 384DUs), Uttar Pradesh 10.30
6.8611.32
-- - 4.46
384384--
- 341 43
838
Uttar PradeshAligarh24-Feb-2009--
09120097JI6980 Revised project at Aligarh (558 DUs to 425DUs), Uttar Pradesh 11.70
7.7310.16
-- - 2.42
425425--
- 425 -
26.40 17.5224.4
-- 0.01 6.88
977977--
- 934 43
839
Uttar PradeshAmraudha16-Dec-2008--
09330169I1473 72 Dwelling Units for the town of Amraudha,Distt. Kanpur Dehat, UP 1.79
1.181.18
-- 0.00 -
72--72
- - -
840
Uttar PradeshAmroha26-Feb-2009--
09060174JI7150 Revised Project at Amroha, 79 DUs (Insitu),Distt. J. P. Nagar, Uttar Pradesh 2.16
1.422.06
-- - 0.64
79763
- 76 -
841
Uttar PradeshAntu14-Feb-2009--
09430216JI6985 Revised project at Antu, Pratapgarh (579 DUsto 470 DUs), Uttar Pradesh 12.21
8.19.99
-- - 1.89
470470--
- 470 -
842
Uttar PradeshAshrafpur Kichhauchha14-Feb-2009--
09480267I1810 72 Dwelling Units for the town of Kichhaucha,Distt- Ambedkarnagar, UP 1.88
1.241.24
-- 0.01 -
7272--
- 72 -
843
Uttar PradeshAwagarh16-Dec-2008--
09170309I1475 96 Dwelling Units for Awagarh, Distt. Etah,Uttar Pradesh. 2.59
1.731.730.08
0.08 0.00 9696--
- 96 -
844
Uttar PradeshAzamgarh21-Feb-2009--
09610324JI6978 Revised project at Azamgarh (465 DUs to348 DUs), Uttar Pradesh 9.33
6.188.39
-- - 2.21
348348--
- 348 -
Total of Telangana for 28 project(s)including 16 project(s) which are completed
Total of Tripura for 5 project(s)including 4 project(s) which are completed
Sub-total of Aligarh for 3 project(s)
* Project Cost and ACA Committed are recalculated after deducting cost of DUs alongwith proportionate cost of infrastructure dropped by CSMC.
Central Share HousesSanctionedReleasedAdjusted
SanctionedCompletedIn-progress
Monitoring Report dated 1st Jan 2019
IHSDP : State wise Report for latest Progress at Project & Town LevelProject Completed
Sr. No.
StateCityInitial SanctionedResent Sanctioned
Project Title Project Code NonStarter Occupied Un-
Occupied
Financial Progress (Rs in Crores) Physical Progress (Nos)
ProjectCost
UC Pending
Excess Central Share
845
Uttar PradeshBabarpur Ajitmal26-Feb-2009--
09320329JI6987 Revised project at Babarpur, Distt. Auraiya(180 DUs to 168 DUs), Uttar Pradesh 3.78
2.453.24
-- - 0.79
168--
168 - - -
846
Uttar PradeshBachhrawan17-Jan-2011--
09280339JI7134 Revised Project at Bachhrawn, Raibareli, 180DUs (Insitu), Uttar Pradesh 6.09
3.613.610.1
0.99 - 18017010
- 170 -
847
Uttar PradeshBallia05-Mar-2010--
09630436JI6989 Revised project at Ballia (313 DUs to 150DUs), Uttar Pradesh 3.72
2.252.83
-- - 0.59
150150--
- 150 -
848
Uttar PradeshBanat30-Jul-2008--
09020455I1324 476 Dwelling Units for Banat town, Distt-Muzaffarnagar, Uttar Pradesh 10.36
6.56.5--
2.61 - 47643838
- 438 -
849
Uttar PradeshBaraut30-Jul-2008--
09080511JI6673 Revised project (160 DUs) at Baraut, Distt-Bagpat, Uttar Pradesh 3.37
2.292.84
-- - 0.55
160160--
- 160 -
850
Uttar PradeshBasti21-Feb-2009--
09550570JI6981 Revised project at Basti (163 DUs to 114DUs), Uttar Pradesh 3.14
2.063.01
-- - 0.95
114114--
- 114 -
851
Uttar PradeshBela Pratapgarh26-Feb-2009--
09430599JI6994Revised project at Nagar Palika Parishad
Belha, Distt., Pratapgarh (676 DUs to 421DUs), Uttar Pradesh
11.33 7.5512.12
-- - 4.57
421421--
- 421 -
852
Uttar PradeshBhikhampur30-Sep-2008--
09325170I1379 48 Dwelling Units for the town of BhikhampurDistt, Auraiya, Uttar Pradesh 1.18
0.810.81
-- 0.05 -
482424
- - 24
853
Uttar PradeshBidhuna30-Sep-2008--
09320751JI6986 Revised project at Bidhuna, Auraiya (600DUs to 564 DUs), Uttar Pradesh 13.10
8.819.98
-- 0.00 1.17
564168396
- - 168
854
Uttar PradeshBikapur22-Oct-2008--
09470764I1406 84 Dwelling Units for the Town of Beekapur,Distt. Faizabad, Uttar Pradesh 2.22
1.511.510.07
0.01 - 8484--
- - 84
855
Uttar PradeshBilariaganj30-May-2011--
09610771JI6982Revised project at Bilariyaganj Dstt.
Azamgarh (125 DUs to 111 DUs), UttarPradesh
2.83 1.241.26
-- - 0.02
111111--
- 111 -
856
Uttar PradeshBisanda Buzurg22-Oct-2008--
09400805I1416 IHSDP Scheme (96 DUs) for the town ofBisanda, Distt. Banda, Uttar Pradesh 2.77
1.781.78
-- - -
9696--
- - 96
857
Uttar PradeshBiswan22-Oct-2008--
09240815I1407 IHSDP Scheme (252 DUs) for the town ofBiswan, Distt. Sitapur, Uttar Pradesh 6.44
4.44.4--
- - 25222824
- - 228
858
Uttar PradeshBithoor22-Oct-2008--
09340817I1408 IHSDP Scheme for the town of Bithur (108DUs) Distt., Kanpur, Uttar Pradesh 2.86
1.951.95
-- - -
108108--
- 108 -
859
Uttar PradeshBugrasi30-May-2011--
09110861I3748 Construction of 239 DUs at Bugrasi (Ph-II),Dist. Bulandshahr, Uttar Pradesh 9.26
4.994.992.5
- - 239239--
- 239 -
860
Uttar PradeshBugrasi30-Jul-2008--
09110861I1328 Construction of 192 DUs at Bugrasi (Ph-I),Distt- Bulandshar, Uttar Pradesh 3.65
2.642.64
-- - -
192192--
- 80 112
12.91 7.637.632.5
- - 431431--
- 319 112
861
Uttar PradeshBulandshahr25-May-2010--
09110863I2648 Construction of 750 DUs with infrastructure atBulandshahar City, Dist. Bulandshahar, UP 23.87
14.8514.85
-- - -
750750--
- 750 -
862
Uttar PradeshChakia26-Nov-2008--
09660899I1446 Construction of 48 DUs at Chakia, Distt.Chandauli, Uttar Pradesh 1.18
0.770.77
-- 0.12 -
482424
- - 24
863
Uttar PradeshChandauli22-Oct-2008--
09660926JI7133 Revised Project at Chandauli, Phase-I, 132DUs, (Relocation) Uttar Pradesh 2.82
1.794.5--
- 2.71 1326072
- - 60
864
Uttar PradeshChandauli26-Nov-2008--
09660926JI7130 Revised Project at Chandauli, Phase-II, 60DUs, (Relocation) Uttar Pradesh 1.41
0.911.27
-- - 0.36
603624
- - 36
Sub-total of Bugrasi for 2 project(s)
* Project Cost and ACA Committed are recalculated after deducting cost of DUs alongwith proportionate cost of infrastructure dropped by CSMC.
Central Share HousesSanctionedReleasedAdjusted
SanctionedCompletedIn-progress
Monitoring Report dated 1st Jan 2019
IHSDP : State wise Report for latest Progress at Project & Town LevelProject Completed
Sr. No.
StateCityInitial SanctionedResent Sanctioned
Project Title Project Code NonStarter Occupied Un-
Occupied
Financial Progress (Rs in Crores) Physical Progress (Nos)
ProjectCost
UC Pending
Excess Central Share
4.23 2.75.78
-- - 3.07
1929696
- - 96
865
Uttar PradeshChhata30-Jul-2008--
09141010I1318 48 Dwelling Units for the Chhatta town, Distt-Mathura, Uttar Pradesh. 1.55
0.960.96
-- 0.01 -
4848--
- - 48
866
Uttar PradeshChhatari30-Jul-2008--
09111011I1327 112 Dwelling Units for the Chhattari town,Distt- Bulandshar, Uttar Pradesh. 2.69
1.951.95
-- - -
112112--
- 112 -
867
Uttar PradeshChhibramau10-Dec-2008--
09301018I1471 240 Dwelling Units for town of ChibbramauDistt., Kannauj, Uttar Pradesh 5.90
44--
0.00 - 240240--
- 240 -
868
Uttar PradeshChhibramau03-Feb-2009--
09301018I1640 648 Dwelling for the Chibramau Phase-2,Distt. Kannauj, Uttar Pradesh 15.91
10.810.8
-- 0.00 -
648456192
- 47 409
21.81 14.814.8
-- 0.00 -
888696192
- 287 409
869
Uttar PradeshChunar03-Feb-2009--
09691096I1639 216 Dwelling Units for the town of Chunar,Distt. Mirzapur, Uttar Pradesh. 5.97
3.913.91
-- - -
21618531
- 72 113
870
Uttar PradeshDadri08-Dec-2006--
09101121I1085 216 DUs for the town of Dadri, Distt GautamBudh Nagar, Uttar Pradesh 3.07
2.342.34
-- - -
216216--
- 216 -
871
Uttar PradeshDadri21-Feb-2009--
09101121JI7149Revised Project at Dadri Phase-II, Distt.
Gautam Budh Nagar, 154 DUs (Insitu), UttarPradesh
4.20 2.7811.54
-- - 8.76
15442
112 - 42 -
7.27 5.1213.88
-- - 8.76
370258112
- 258 -
872
Uttar PradeshDankaur08-Dec-2006--
09101149JI6990Revised project at Dankaur, Distt.- Gautam
Budhh Nagar (48 DUs to 36 DUs), UttarPradesh
0.49 0.370.5--
- 0.13 3636--
- 36 -
873
Uttar PradeshDasna07-Mar-2008--
09091165I1184 204 Dwelling Units for the town of Dasna,Uttar Pradesh 4.29
2.782.78
-- 0.00 -
204204--
- - 204
874
Uttar PradeshDerapur16-Dec-2008--
09335174I1483 72 Dwelling Units for the town of Derapur,Distt. Kanpur Dehat, Uttar Pradesh. 1.85
1.221.22
-- 0.01 -
72--72
- - -
875
Uttar PradeshDibiyapur26-Feb-2009--
09321310I1892 72 DUs Implementation of project at townarea Dibiyapur, Distt. Auriya, Uttar Pradesh 1.75
1.151.15
-- 0.57 -
72--72
- - -
876
Uttar PradeshDudhi30-May-2011--
09701361JI6848 Revised project at Dudhi, Sonbhadara (451DUs to 445 DUs), Uttar Pradesh 13.45
6.566.562.53
- - 44535095
- 350 -
877
Uttar PradeshEtah26-Nov-2008--
09171417I143996 Dwelling Units for the town of Etah
(Bhuteshwar Basti), Distt.- Etah, UttarPradesh.
2.58 1.721.72
-- - -
9696--
- 96 -
878
Uttar PradeshAyodhya03-Feb-2009--
09471424I1642 393 Dwelling Units at Faizabad City, Distt.Faizabad, Uttar Pradesh 17.24
12.2812.283.23
0.00 - 393386
7 - 386 -
879
Uttar PradeshAyodhya17-Jan-2011--
09471424I3356Construction of 1197 DUs with Infrastructure
at Faizabad City, Dist. Faizabad, UttarPradesh
41.95 25.3125.31
-- 0.00 -
11971163
34 - 1,163 -
59.19 37.5937.593.23
0.00 - 15901549
41 - 1,549 -
880
Uttar PradeshFaridnagar30-Sep-2008--
09091433I1370 288 DUs for the town of Faridanagar, NagarPanchayat Ghaziabad Dist., Uttar Pradesh 7.54
5.025.02
-- - 0.00
288288--
- 68 220
881
Uttar PradeshFarrukhabad-cum-Fatehgarh16-Dec-2008--
09291439I1480 72 DUs for the town of Farrukhabad T.A.Distt., Farrukhabad, Uttar Pradesh 1.89
1.281.28
-- 0.22 -
724824
- - 48
Sub-total of Chandauli for 2 project(s)
Sub-total of Chhibramau for 2 project(s)
Sub-total of Dadri for 2 project(s)
Sub-total of Ayodhya for 2 project(s)
* Project Cost and ACA Committed are recalculated after deducting cost of DUs alongwith proportionate cost of infrastructure dropped by CSMC.
Central Share HousesSanctionedReleasedAdjusted
SanctionedCompletedIn-progress
Monitoring Report dated 1st Jan 2019
IHSDP : State wise Report for latest Progress at Project & Town LevelProject Completed
Sr. No.
StateCityInitial SanctionedResent Sanctioned
Project Title Project Code NonStarter Occupied Un-
Occupied
Financial Progress (Rs in Crores) Physical Progress (Nos)
ProjectCost
UC Pending
Excess Central Share
882
Uttar PradeshFatehpur21-Feb-2009--
09421449I1825 216 Dwelling Units for the town of Fatehpur,Uttar Pradesh 5.17
3.313.31
-- - -
216216--
- 216 -
883
Uttar PradeshGhaziabad30-Sep-2008--
09095168I1369208 DUs for the Municipal Corporation of
Ghaziabad (Arthala), Ghaziabad Dist., UttarPradesh
5.62 3.763.76
-- 0.00 -
208208--
- 133 75
884
Uttar PradeshGhaziabad28-Nov-2006--
09091557I1087 1236 DUs for Sadampuri Slum at Dundahera,Ghaziabad, Uttar Pradesh 18.37
1414--
0.00 - 12361188
48 - 1,188 -
23.99 17.7617.76
-- 0.00 -
14441396
48 - 1,321 75
885
Uttar PradeshGhazipur05-Mar-2010--
09651558JI6829 Revised project of Ghazipur (420 DUs to 304DUs), Uttar Pradesh 8.68
5.425.421.67
2.61 - 30420599
- 205 -
886
Uttar PradeshGhiraur04-Mar-2011--
09181560JI6988 Revised project at Ghiror, Mainpuri (450 DUsto 208 DUs), Uttar Pradesh 5.65
3.14.81
-- - 1.71
208208--
- 208 -
887
Uttar PradeshGhorawal16-Dec-2008--
09701567JI6852 Revised project at Ghorawal (656 DUs to 512DUs), Uttar Pradesh 11.81
7.179.4--
- 2.23 512288224
- - 288
888
Uttar PradeshGokul30-Jul-2008--
09141606I1319 88 Dwelling Units for the town of Gokul, Distt-Mathura. Uttar Pradesh 2.83
1.761.76
-- - -
8888--
- 88 -
889
Uttar PradeshGola Gokaran Nath22-Oct-2008--
09231608I1428 120 DUs IHSDP Scheme for the town of Gola,Distt. Lakhimpur, Uttar Pradesh
Project Cancelled on
dated 26-Sep-13
--1.07
-- - 1.07
------
- - -
890
Uttar PradeshGopamau16-Dec-2008--
09251622I1476 Construction of 144 DUs at Gopamau, Distt.,Hardoi, Uttar Pradesh 3.80
2.532.531.26
- - 1447272
- - 72
891
Uttar PradeshGorakhpur21-Feb-2009--
09581627JI7089 Revised Project at Gorakhpur Dist Gorakhpur(433 DUs), Uttar Pradesh 10.40
6.7711.09
-- - 4.32
433433--
- 433 -
892
Uttar PradeshGorakhpur05-Mar-2010--
09581627JI6983Revised project at Nagar Nigam Distt.-
Gorakhpur (628 DUs to 218 DUs), UttarPradesh
4.71 2.725.4--
- 2.68 218211
7 - 211 -
15.11 9.4916.48
-- - 6.99
651644
7 - 644 -
893
Uttar PradeshGosainganj(NP)26-Nov-2008--
09471633I1432 72 DUs for the town of Gosaiganj, Distt.Faizabad, Uttar Pradesh. 1.92
1.31.3
0.06 0.00 -
7272--
- 64 8
894
Uttar PradeshHariharpur30-Sep-2008--
09561731I136372 DUs for the town of Jawahar Nagar,
Hariharpur Distt- Sant Kabir Nagar, UttarPradesh
2.00 1.421.42
-- - -
726012
- - 60
895
Uttar PradeshHariharpur30-Sep-2008--
09561731I136460 DUs for the town of Patel Nagar Ph-II,
Hariharpur Distt. Sant Kabir Nagar, UttarPradesh.
1.84 1.291.290.05
- - 604812
- - 48
896
Uttar PradeshHariharpur30-Jul-2008--
09561731I1321 72 Dwelling Units at Hariharpur, Distt. SantKabir Nagar. Uttar Pradesh 1.97
1.341.34
-- - -
72--72
- - -
897
Uttar PradeshHariharpur03-Feb-2009--
09561731JI7072 Revised project at Hariharpur Distt. Sant KabirNagar, (144 DUs) Uttar Pradesh 4.82
3.253.250.39
- - 144144--
- - 144
10.63 7.37.3
0.44 - -
34825296
- - 252
898
Uttar PradeshHasanpur24-Feb-2009--
09061742I1841 36 Dwelling Units for the Hasanpur town atDistt. J. P. nagar, Uttar Pradesh 0.81
0.530.53
-- 0.00 -
3636--
- - 36
899
Uttar PradeshHastinapur24-Feb-2009--
09071746I1846 582 Dwelling Units for the town of HastinapurPh-I, Meerut, Uttar Pradesh. 19.10
10.910.9
-- - -
58257210
- 572 -
900
Uttar PradeshHastinapur30-May-2011--
09071746JI6992 Revised project at Hastinapur Ph-II, Distt.-Meerut (306 DUs to 258 DUs), Uttar Pradesh 9.70
5.385.381.55
0.00 - 258258--
- 258 -
Sub-total of Ghaziabad for 2 project(s)
Sub-total of Gorakhpur for 2 project(s)
Sub-total of Hariharpur for 4 project(s)
* Project Cost and ACA Committed are recalculated after deducting cost of DUs alongwith proportionate cost of infrastructure dropped by CSMC.
Central Share HousesSanctionedReleasedAdjusted
SanctionedCompletedIn-progress
Monitoring Report dated 1st Jan 2019
IHSDP : State wise Report for latest Progress at Project & Town LevelProject Completed
Sr. No.
StateCityInitial SanctionedResent Sanctioned
Project Title Project Code NonStarter Occupied Un-
Occupied
Financial Progress (Rs in Crores) Physical Progress (Nos)
ProjectCost
UC Pending
Excess Central Share
28.80 16.2816.281.55
0.00 - 84083010
- 830 -
901
Uttar PradeshHyderabad28-Feb-2009--
09265176JI6674 Revised project 128 DUs at Hyderabad,Unnao Distt in Uttar Pradesh 3.20
2.132.79
-- - 0.67
128128--
- 128 -
902
Uttar PradeshJaswantnagar24-Feb-2009--
09311961I1838 228 DUs for the town of Jaswant Nagar(Phase-II), Distt. Etawah, Uttar Pradesh 5.66
3.723.72
-- - -
228--
228 - - -
903
Uttar PradeshJaswantnagar26-Nov-2008--
09311961I1435 240 DUs for the town of Jaswant Nagar(Phase-I), Distt. Etawah, Uttar Pradesh 6.02
4.114.11
-- - -
240240--
- - 240
11.68 7.837.83
-- - -
468240228
- - 240
904
Uttar PradeshJewar03-Feb-2009--
09101986JI7132 Revised Project at Jewar, G.B. Nagar 144DUs (Relocation), Uttar Pradesh 3.46
2.224.32
-- - 2.10
14412816
- - 128
905
Uttar PradeshJhalu30-Sep-2008--
09031996I1372 56 Dwelling Units for the town of Jhalu Distt-Bijnor, Uttar Pradesh 1.50
1.021.02
-- - -
5656--
- 56 -
906
Uttar PradeshJhalu26-Nov-2008--
09031996I1430 450 DUs (266- New & 184- Upgradation) forthe town of Jhalu, Distt., Bijnaur, Uttar Pradesh 5.78
3.773.770.21
- - 45044010
- 440 -
7.28 4.794.790.21
- - 50649610
- 496 -
907
Uttar PradeshJhinjhak26-Nov-2008--
09332006I1437 492 Dwelling Units for the town of Jhinjhak,Distt. Kanpur Dehat, Uttar Pradesh. 10.71
7.157.15
-- - -
492492--
- - 492
908
Uttar PradeshJoya24-Feb-2009--
09062044I1842 42 DUs IHSDP Scheme for the Joya town atDistt. J.P. Nagar, Uttar Pradesh. 0.93
0.610.61
-- 0.00 -
4242--
- - 42
909
Uttar PradeshKadaura22-Oct-2008--
09352065I1412 156 Dwelling Units for the town of Kadura,Distt. Jalaun, Uttar Pradesh. 4.25
2.712.71
-- - -
156156--
- - 156
910
Uttar PradeshKakori24-Feb-2009--
09272094I1836 629 Dwelling Units for the the Kakori, town,Distt. Lucknow, Uttar Pradesh 16.95
11.211.2
-- - -
629629--
- 629 -
911
Uttar PradeshKalpi22-Oct-2008--
09352135I1411 120 Dwelling Units for the Kalpi Town, Distt.Jalaun , Uttar Pradesh. 3.29
2.12.1--
- - 120120--
- 10 110
912
Uttar PradeshKhanpur30-Jul-2008--
09112398I1326 96 Dwelling Units at Khanpur, Distt-Bulandshar, Uttar Pradesh. 2.21
1.611.61
-- - -
9696--
- 96 -
913
Uttar PradeshKharkhoda30-Sep-2008--
09072418I1373 96 Dwelling Units for the town of KharkhaudaDistt- Meerut, Uttar Pradesh 2.66
1.811.81
-- 0.00 -
9696--
- - 96
914
Uttar PradeshKhurja30-May-2011--
09112467I3749 Construction of 119 DUs with infrastructure atKhurja Town, Dist. Bulandshahr, Uttar Pradesh 6.89
4.324.32
-- - -
119119--
- 119 -
915
Uttar PradeshKishni05-Mar-2010--
09182492JI6996 Revised project at Kisni, Distt. Mainpuri (748DUs to 439 DUs), Uttar Pradesh 11.57
7.087.080.55
- - 439439--
- 439 -
916
Uttar PradeshKoeripur17-Jan-2011--
09492512JI7152 Revised Project at Koeripur, Distt. Sultanpur,95 DUs, Uttar Pradesh 3.02
1.771.82
-- 1.73 0.04
9595--
- 95 -
917
Uttar PradeshKoraon14-Feb-2009--
09452559JI6833 Revised project at koraon, Allahabad (209DUs to 192 DUs), Uttar Pradesh 4.57
2.983.24
-- - 0.26
192192--
- 164 28
918
Uttar PradeshKosi Kalan24-Feb-2009--
09142568I1843 384 Dwelling Units for the town of Kosi- kalan,Distt. Mathura, Uttar Pradesh. 8.82
5.455.45
-- 0.07 -
38434836
- - 348
919
Uttar PradeshKunda22-Oct-2008--
09432647JI6851Revised project at nagar panchayat Kunda,
Pratapgarh (272 DUs to 160 DUs), UttarPradesh
3.78 2.333.95
-- - 1.63
160152
8 - 160 -
Sub-total of Jaswantnagar for 2 project(s)
Sub-total of Jhalu for 2 project(s)
Sub-total of Hastinapur for 2 project(s)
* Project Cost and ACA Committed are recalculated after deducting cost of DUs alongwith proportionate cost of infrastructure dropped by CSMC.
Central Share HousesSanctionedReleasedAdjusted
SanctionedCompletedIn-progress
Monitoring Report dated 1st Jan 2019
IHSDP : State wise Report for latest Progress at Project & Town LevelProject Completed
Sr. No.
StateCityInitial SanctionedResent Sanctioned
Project Title Project Code NonStarter Occupied Un-
Occupied
Financial Progress (Rs in Crores) Physical Progress (Nos)
ProjectCost
UC Pending
Excess Central Share
920
Uttar PradeshKurara22-Oct-2008--
09382665I1418 132 Dwelling Units for the Kurara Town, DisttHamirpur, Uttar Pradesh 3.58
2.292.290.11
0.62 - 132132--
- - 132
921
Uttar PradeshLar14-Feb-2009--
09602735JI6977 Revised project at Lar, Deoria (1527 DUs to1090 DUs), Uttar Pradesh 17.61
11.4614.02
-- 0.00 2.56
10901078
12 - 1,037 41
922
Uttar PradeshLal Gopalganj Nindaura14-Feb-2009--
09452716JI6832 Revised project at Lal Gopalganj, Allahabad(396 DUs to 366 DUs), Uttar Pradesh 6.84
4.295.11
-- - 0.82
366366--
- 366 -
923
Uttar PradeshLalganj25-May-2010--
09282719JI7109 Revised project for the town of Lalganj Distt:Raibareli, (105 DUs) Uttar Pradesh. 5.07
3.243.240.09
0.71 - 15013119
- 131 -
924
Uttar PradeshLawar28-Feb-2009--
09072744I1914 359 Dwelling Units for the town of Lawar,Distt. Meerut, Uttar Pradesh. 8.38
5.365.36
-- 0.01 -
359354
5 - 234 120
925
Uttar PradeshMahaban26-Feb-2009--
09142816I1886 Construction of 72 DUs with infrastructure atMahavan, Distt. Mathura, Uttar Pradesh 1.66
1.031.03
-- - -
72--72
- - -
926
Uttar PradeshMahoba22-Oct-2008--
09392838I1415 84 Dwelling Units, IHSDP Scheme for thetown of Mahoba, Uttar Pradesh 2.61
1.691.690.07
0.00 - 8484--
- 72 12
927
Uttar PradeshMahona21-Feb-2009--
09272840I1827 Construction of 762 DUs with infrastructurefacilities at Mahona, Dist. Lucknow 20.82
13.7813.78
-- 0.00 -
762762--
- 762 -
928
Uttar PradeshMaharajganj (NPP)05-Mar-2010--
09572842JI6850Revised project at Nagar Palika Parishad
Maharajganj, (399 DUs to 183 DUs), UttarPradesh
3.67 2.083.55
-- - 1.47
183183--
- 183 -
929
Uttar PradeshMalihabad24-Feb-2009--
09272884I1833 148 Dwelling Units at Malihabad, Distt.Lucknow, Uttar Pradesh 4.05
2.682.68
-- - -
148148--
- 148 -
930
Uttar PradeshManikpur22-Oct-2008--
09412960I1413 144 Dwelling Units for the town of Manikpur,Distt. Chitrakoot, Uttar Pradesh. 3.86
2.452.45
-- 1.34 -
144144--
- - 144
931
Uttar PradeshManjhanpur14-Feb-2009--
09442965I1809 120 DUs for the town of Manjhanpur, Distt-Kaushambi, Uttar Pradesh
Project Cancelled on
dated 26-Sep-13
--1.07
-- - 1.07
------
- - -
932
Uttar PradeshMaunath Bhanjan17-Jan-2011--
09623019JI6995 Revised project at Mau (479 DUs to 374DUs), Uttar Pradesh 14.87
8.278.272.9
2.90 - 374374--
- 374 -
933
Uttar PradeshMirzapur-cum-Vindhyachal03-Feb-2009--
09693084JI6831 Revised project at Mirzapur (457 DUs), UttarPradesh 12.70
8.514.27
-- - 5.78
45744710
- 457 -
934
Uttar PradeshMirzapur-cum-Vindhyachal05-Mar-2010--
09693084JI6849 Revised Project at Mirzapur (853 DUs to 850DUs), Uttar Pradesh 19.55
11.7316.31
-- - 4.59
850844
6 - 844 -
32.26 20.2230.59
-- - 10.36
13071291
16 - 1,301 -
935
Uttar PradeshMohammadabad(NP)16-Dec-2008--
09293095I1479 132 DUs for the town of Mohammadabad,Distt., Farrukhabad, Uttar Pradesh 3.19
2.152.150.11
0.11 - 132132--
- 89 43
936
Uttar PradeshMoradabad26-Nov-2008--
09043118I1434 48 DUs for the town of Moradabad, Distt.Moradabad, Uttar Pradesh. 1.31
0.870.87
-- 0.47 -
4848--
- 48 -
937
Uttar PradeshMoradabad24-Feb-2009--
09044203JI7151Revised Project at Moradabad (Bhatawali),
Distt. Moradabad, 127 DUs (Insitu), UttarPradesh
3.47 2.33.6--
- 1.30 127127--
- 127 -
4.77 3.174.47
-- 0.47 1.30
175175--
- 175 -
938
Uttar PradeshMughalsarai26-Nov-2008--
09663147JI7131 Revised Project at Mughalsarai, Distt.-Chandauli, 36 DUs (insitu), Uttar Pradesh 0.90
0.591.37
-- - 0.78
362412
- - 24
Sub-total of Mirzapur-cum-Vindhyachal for 2 project(s)
Sub-total of Moradabad for 2 project(s)
* Project Cost and ACA Committed are recalculated after deducting cost of DUs alongwith proportionate cost of infrastructure dropped by CSMC.
Central Share HousesSanctionedReleasedAdjusted
SanctionedCompletedIn-progress
Monitoring Report dated 1st Jan 2019
IHSDP : State wise Report for latest Progress at Project & Town LevelProject Completed
Sr. No.
StateCityInitial SanctionedResent Sanctioned
Project Title Project Code NonStarter Occupied Un-
Occupied
Financial Progress (Rs in Crores) Physical Progress (Nos)
ProjectCost
UC Pending
Excess Central Share
939
Uttar PradeshMughalsarai24-Feb-2009--
09663147JI6830Revised project at Mughalsarai, Dist.
Chandauli (273 DUs to 219 DUs), UttarPradesh
5.18 3.364.93
-- - 1.57
219219--
- 219 -
6.08 3.956.3--
- 2.35 25524312
- 219 24
940
Uttar PradeshMusafirkhana04-Mar-2011--
09493201JI7135 Revised Project at Musafirkhana Distt.Amethi, 125 DUs (insitu), Uttar Pradesh 4.19
2.454.95
-- - 2.50
1255966
- 59 -
941
Uttar PradeshMuzaffarnagar30-May-2011--
09023210JI6997 Revised project at Muzaffarnagar (255 DUs to146 DUs), Uttar Pradesh 4.11
2.093.08
-- - 0.98
146146--
- 146 -
942
Uttar PradeshNandgaon30-Jul-2008--
09143298JI7070 Revised Project at Nandgaon, Distt- Mathura(192 DUs) Uttar Pradesh 5.94
3.664.27
-- - 0.61
192192--
- - 192
943
Uttar PradeshNaraini26-Nov-2008--
09403317I1438 72 Dwelling Units for the Town of Naraina ,Distt- Banda , Uttar Pradesh 2.10
1.351.35
-- - -
7272--
- - 72
944
Uttar PradeshNawabganj(NPP)30-Sep-2008--
09203376I1368 48 Dwelling Units for the town of Nawabganj,Bareilly Distt, Uttar Pradesh 1.38
0.870.87
-- 0.00 0.00
4848--
- - 48
945
Uttar PradeshNawabganj(NP)28-Feb-2009--
09263377I1912 144 Dwelling Units for the Nawabganj, Distt.Unnao, Uttar Pradesh 3.60
2.392.39
-- - -
144144--
- 144 -
946
Uttar PradeshNehtaur28-Nov-2006--
09033397I108848 Dwelling Units for Slum development at
Chappagran, Nehtaur, Distt. Bijnor, UttarPradesh
0.70 0.530.53
-- - -
4848--
- 48 -
947
Uttar PradeshNyoria Husainpur05-Mar-2010--
09213469JI7108 Revised project at Neoria (Nuriya Husainpur),Distt- Pilibhit, (885 DUs) Uttar Pradesh 22.26
13.4215.76
-- - 2.33
885885--
- 885 -
948
Uttar PradeshNidhauli Kalan16-Dec-2008--
09173425I1474 60 Dwelling Units for the town of NidhauliKala, Distt. Etah, Uttar Pradesh 1.62
1.081.080.05
0.05 - 6060--
- 60 -
949
Uttar PradeshOrai22-Oct-2008--
09353495I1417 288 Dwelling Units for the town of Orai (Urai),Uttar Pradesh 7.16
4.54.5--
0.00 - 288288--
- 228 60
950
Uttar PradeshPipiganj25-Feb-2011--
09583798JI6991 Revised project at P.P. Ganj, Distt:-Gorakhpur(544 DUs to 350 DUs), Uttar Pradesh 7.03
3.325.65
-- - 2.32
35034010
- 340 -
951
Uttar PradeshPachperwa30-Jul-2008--
09523516I1325 48 Dwelling Units at Pachperwa, Distt.Balrampur, Uttar Pradesh 1.02
0.770.77
-- - -
4848--
- - 48
952
Uttar PradeshPadrauna04-Mar-2011--
09593527JI6993 Revised project at Padrauna, Kushi Nagar(912 DUs to 500 DUs), Uttar Pradesh 10.66
5.318.87
-- - 3.55
500500--
- 500 -
953
Uttar PradeshPali(NP)22-Oct-2008--
09373565I1414 144 Dwelling Units for the Pali town Distt.Lalitpur, Uttar Pradesh. 3.92
2.52.5--
0.00 - 144144--
- 64 80
954
Uttar PradeshParsadepur05-Mar-2010--
09283662JI7154 Revised Project at Parsadepur, Distt-Raibareli 495 DUs (Insitu), Uttar Pradesh 16.63
10.5121.78
-- 2.01 11.28
49545738
- 457 -
955
Uttar PradeshPhaphund26-Feb-2009--
09323767I1893 60 DUs at town area Phaphoond, Distt.Auriya, Uttar Pradesh 1.50
0.980.98
-- - -
60--60
- - -
956
Uttar PradeshPichhor22-Oct-2008--
09355171I1426 144 DUs for the Pichhor Near Bajrang Colony, Distt. Jhansi, Uttar Pradesh. 4.01
2.572.57
-- 0.29 0.00
144144--
- 36 108
957
Uttar PradeshPratapgarh City21-Feb-2009--
09433846JI6984 Revised project at Pratapgarh (531 DUs to410 DUs), Uttar Pradesh 10.91
7.269.41
-- - 2.14
410410--
- 410 -
958
Uttar PradeshRabupura08-Dec-2006--
09103916I1089 72 Dwelling Units for Rabupura, Distt. GautamBudh Nagar, Uttar Pradesh 0.84
0.640.64
-- - -
7272--
- 72 -
Sub-total of Mughalsarai for 2 project(s)
* Project Cost and ACA Committed are recalculated after deducting cost of DUs alongwith proportionate cost of infrastructure dropped by CSMC.
Central Share HousesSanctionedReleasedAdjusted
SanctionedCompletedIn-progress
Monitoring Report dated 1st Jan 2019
IHSDP : State wise Report for latest Progress at Project & Town LevelProject Completed
Sr. No.
StateCityInitial SanctionedResent Sanctioned
Project Title Project Code NonStarter Occupied Un-
Occupied
Financial Progress (Rs in Crores) Physical Progress (Nos)
ProjectCost
UC Pending
Excess Central Share
959
Uttar PradeshRaebareli08-Dec-2006--
09283920I1090 100 DUs for Dhaurashra Slum at Raebareli,Distt Raebareli, Uttar Pradesh 1.52
1.161.16
-- - 0.00
100100--
- 100 -
960
Uttar PradeshRaebareli25-Feb-2011--
09283920JI7136 Revised Project at Raibareli (07 Slums), 288DUs (Insitu), Uttar Pradesh 10.44
6.346.340.3
1.76 - 28825038
- 270 -
961
Uttar PradeshRaebareli30-Jul-2008--
09283920JI7156 Revised Project at Raebareli, Phase-II, 340DUs (Insitu), Distt Raebareli, Uttar Pradesh 12.19
8.4714.87
-- - 6.39
340340--
- 340 -
962
Uttar PradeshRaebareli17-Jan-2011--
09283920JI7110 Revised Project at Raebareli (601 DUs), DisttRaebareli, Uttar Pradesh 20.90
12.3212.321.11
4.01 - 601500101
- 510 -
45.05 28.334.691.41
5.77 6.39 13291190139
- 1,220 -
963
Uttar PradeshRamnagar(NP)24-Feb-2009--
09464009I1837 96 Dwelling Unitst at Ram Nagar , Distt.Barabanki, Uttar Pradesh. 2.59
1.721.72
-- 0.00 -
9696--
- 96 -
964
Uttar PradeshRampur14-Feb-2009--
09054013JI7153 Revised Project at Rampur, Phase-I, 120 DUs(Relocation), Uttar Pradesh 3.18
2.072.070.72
0.87 - 120120--
- - 120
965
Uttar PradeshRampur26-Feb-2009--
09054013JI7158 Revised Project at Rampur, Phase-II, 300DUs (Insitu), Uttar Pradesh 7.31
4.767.37
-- - 2.61
30028416
- 284 -
10.49 6.839.430.72
0.87 2.61 42040416
- 284 120
966
Uttar PradeshRasulabad(NP)26-Nov-2008--
09335173I1447 216 DUs for the town of Rasoolabad, Distt.Kanpur Dehat, Uttar Pradesh. 5.24
3.593.59
-- 0.00 -
216216--
- - 216
967
Uttar PradeshRaya30-Jul-2008--
09144066I1317 48 Dwelling Units for the town Raya Town ,Distt- Mathura, Uttar Pradesh 1.53
0.950.95
-- - -
4848--
- - 48
968
Uttar PradeshSadat26-Nov-2008--
09654140I1441 36 Dwelling Units for the town of Sadat, Distt.Ghazipur, Uttar Pradesh 0.93
0.610.61
-- - -
3636--
- 36 -
969
Uttar PradeshSaharanpur30-Jul-2008--
09014155JI6976 Revised project for the town of Saharanpur,Distt- Saheranpur, Uttar Pradesh 1.47
0.952.54
-- - 1.59
806416
- 64 -
970
Uttar PradeshSaharanpur28-Feb-2009--
09014155I1915 456 DUs (436- New & 20- Upgradation) atSaharanpur, Distt. Saharanpur, UP 11.75
7.327.32
-- 0.00 -
45644115
- 456 -
13.21 8.279.86
-- 0.00 1.59
53650531
- 520 -
971
Uttar PradeshSahjanwan30-Sep-2008--
09584163I1366 72 Dwelling Units for the Sehjanwa town atDistt- Gorakhpur, Uttar Pradesh. 1.94
1.181.18
-- - -
7272--
- 72 -
972
Uttar PradeshSalarganj30-Sep-2008--
09505169I1374 276 DUs for the town of Salarganj Distt-Behraich, Uttar Pradesh 5.48
3.645.13
-- - 1.49
276272
4 - - 272
973
Uttar PradeshSandila05-Aug-2010--
09254217I2788 Construction of 252 DUs with Infrastructure atSandia, Dist Hardoi, Uttar Pradesh. 8.00
4.684.682.34
0.07 - 25296
156 - - 96
974
Uttar PradeshSanoa30-Sep-2008--
09203376JI7155 Revised Project at Sanoa, 120 DUs(Relocation), Bareilly Distt, Uttar Pradesh 3.03
1.871.870.57
0.00 - 12010416
- - 104
975
Uttar PradeshSant Ravi Das Nagar14-Feb-2009--
09680640I1812 360 Dwelling Units at Sant Ravi Das Nagar(Bhadohi), Uttar Pradesh. 8.76
5.735.73
-- 1.07 -
36031050
- - 310
976
Uttar PradeshSarai Mir16-Dec-2008--
09614249I1477 144 Dwelling Units Implementation of IHSDPat Sarai Mir, Dist. Azamgarh, Uttar Pradesh
Project Cancelled on
dated 26-Sep-13
--1.28
-- - 1.28
------
- - -
977
Uttar PradeshSaurikh10-Dec-2008--
09304298JI7071 Revised project at Saurikh, Distt., Kannauj,(108 DUs) Uttar Pradesh 2.58
1.742.35
-- - 0.61
108108--
- 72 36
Sub-total of Raebareli for 4 project(s)
Sub-total of Rampur for 2 project(s)
Sub-total of Saharanpur for 2 project(s)
* Project Cost and ACA Committed are recalculated after deducting cost of DUs alongwith proportionate cost of infrastructure dropped by CSMC.
Central Share HousesSanctionedReleasedAdjusted
SanctionedCompletedIn-progress
Monitoring Report dated 1st Jan 2019
IHSDP : State wise Report for latest Progress at Project & Town LevelProject Completed
Sr. No.
StateCityInitial SanctionedResent Sanctioned
Project Title Project Code NonStarter Occupied Un-
Occupied
Financial Progress (Rs in Crores) Physical Progress (Nos)
ProjectCost
UC Pending
Excess Central Share
978
Uttar PradeshSewarhi19-Nov-2009--
09594343JI7088Revised project for 75 New & 6-Upgradation
DUs at Seorahi, Distt. Kushinagar (MalviyaNagar), Uttar Pradesh
1.10 0.681.36
-- - 0.68
81756
- 81 -
979
Uttar PradeshSewarhi19-Nov-2009--
09594343JI7073Revised project for 81 New & 19-
Upgradation DUs at Seorahi, Distt.Kushinagar (Ambedkar Nagar), Uttar Pradesh
1.29 0.781.32
-- - 0.54
1008317
- 100 -
2.39 1.452.68
-- - 1.23
18115823
- 181 -
980
Uttar PradeshShankargarh14-Feb-2009--
09454376I1815 407 Dwelling Units at Shankargarh, Distt.Allahabad, Uttar Pradesh 9.17
5.935.93
-- - -
407407--
- 407 -
981
Uttar PradeshShivli24-Feb-2009--
09334408I1844 132 Dwelling Units at Town area Shilvi, Distt.Kanpur Dehat, Uttar Pradesh 3.33
2.152.15
-- - -
132132--
- - 132
982
Uttar PradeshShivrajpur26-Nov-2008--
09344410I1433 132 DUs for the town of Shivrajpur, Distt.Kanpur, Uttar Pradesh 3.34
2.262.26
-- - -
132132--
- 132 -
983
Uttar PradeshSikandra24-Feb-2009--
09334443I1845 204 Dwelling Units at Town area Sikandra,Distt. Kanpur Dehat, Uttar Pradesh. 5.28
3.423.42
-- 0.00 -
204204--
- - 204
984
Uttar PradeshSingahi Bhiraura14-Feb-2009--
09234468I1808 108 DUs for the town of Bharouch, SingahiDistt. Lakhimpur Kheri, Uttar Pradesh 3.13
2.012.011.01
1.01 - 1086048
- - 60
985
Uttar PradeshSultanpur24-Feb-2009--
09494590JI7148 Revised Project at Ghasiganj, Sultanpur, 81DUs (Insitu), Uttar Pradesh 2.19
1.452.08
-- - 0.63
8181--
- 81 -
986
Uttar PradeshThakurdwara26-Nov-2008--
09044701I1436 210 DUs for the town of Thakurdwara, Distt.Moradabad, Uttar Pradesh. 5.57
3.693.69
-- 2.01 -
210210--
- - 210
987
Uttar PradeshThakurdwara17-Jan-2011--
09044701I3348 Construction of 864 DUs with infrastructure atThakurdwara, Dist. Moradabad, Uttar Pradesh. 29.26
15.215.2
-- 0.00 -
846846--
- 846 -
34.83 18.8918.89
-- 2.01 -
10561056
-- - 846 210
988
Uttar PradeshTirwaganj10-Dec-2008--
09304827I1470 312 DUs IHSDP Scheme for the town ofTirwa, Distt. Kannauj, Uttar Pradesh.
Project Cancelled on
dated 26-Sep-13
--2.49
-- - 2.49
------
- - -
989
Uttar PradeshTirwaganj03-Feb-2009--
09304827I1641 528 DUs IHSDP Scheme for the town of TirwaKhas Distt Kannauj, Uttar Pradesh
Project Cancelled on
dated 26-Sep-13
--3.93
-- - 3.93
------
- - -
- --
6.42--
- 6.42 ------
- - -
990
Uttar PradeshUgu28-Feb-2009--
09264879I1913 120 Dwelling Units for the Ugu town, Distt.Unnao, Uttar Pradesh. 3.06
2.032.03
-- - -
120120--
- 120 -
991
Uttar PradeshUjhani08-Dec-2006--
09194880I1091128 DUs for slum dwellers at land no-113,
Sanjarpur Road, Ujhani, Distt. Badaun, UttarPradesh.
1.29 0.980.98
-- 0.08 -
1289632
- 96 -
992
Uttar PradeshUmri Kalan26-Feb-2009--
09044904JI7157 Revised Project at Umarikalan, Distt.Moradabad, 262 DUs (Insitu), Uttar Pradesh 6.67
4.385.11
-- 1.09 0.73
262262--
- 262 -
993
Uttar PradeshUnnao26-Nov-2008--
09264918I1431 96 Dwelling Units for the town of Unnao, Distt.Unnao, Uttar Pradesh 2.51
1.721.72
-- - -
9696--
- 96 -
994
Uttar PradeshUtraula30-Sep-2008--
09524943I1365 60 Dwelling Units for the town of Utaraula,Distt- Balrampur , Uttar Pradesh. 1.74
1.211.210.05
- 0.00 6060--
- - 60
995
Uttar PradeshVrindavan26-Feb-2009--
09145100I1884 276 Dwelling Units at Vrindavan, Distt.Mathura, Uttar Pradesh. 6.31
3.93.9--
0.28 - 276276--
- - 276
987.67 624.41741.9523.77
29.96 117.55 37818345133305
- 27,043 7,556
Sub-total of Sewarhi for 2 project(s)
Sub-total of Thakurdwara for 2 project(s)
Sub-total of Tirwaganj for 0 project(s)
Total of Uttar Pradesh for 159 project(s)including 21 project(s) which are completed
* Project Cost and ACA Committed are recalculated after deducting cost of DUs alongwith proportionate cost of infrastructure dropped by CSMC.
Central Share HousesSanctionedReleasedAdjusted
SanctionedCompletedIn-progress
Monitoring Report dated 1st Jan 2019
IHSDP : State wise Report for latest Progress at Project & Town LevelProject Completed
Sr. No.
StateCityInitial SanctionedResent Sanctioned
Project Title Project Code NonStarter Occupied Un-
Occupied
Financial Progress (Rs in Crores) Physical Progress (Nos)
ProjectCost
UC Pending
Excess Central Share
996
UttarakhandAlmora22-Feb-2010--
05090106I2488 Construction of 217 DUs at Almora NagarPanchayat, Distt- Almora, Uttrakhand 1.61
0.822.11
-- - 1.29
4242--
- 42 -
997
UttarakhandChampawat22-Feb-2010--
05100916I2489 Construction of 73 DUs at Champavat NagarPanchayat, Distt- Champavat, Uttrakhand 3.81
2.152.15
-- - -
7373--
- 73 -
998
UttarakhandDineshpur08-Feb-2010--
05121332I2368Construction of 387 DUs at Dineshpur Nagar
Panchayat Distt. Udham Singh Nagar,Uttrakhand
8.03 4.773.5--
0.30 - 264177--
87 177 -
999
UttarakhandHaldwani-cum-Kathgodam22-Feb-2010--
05111704I2491 422 DUs for Kulyalpura, Jawaharnagar &Naibasti, Kathgodam, Uttrakhand 4.61
2.312.97
-- 0.99 0.66
1649767
- 97 -
1,000
UttarakhandHaldwani-cum-Kathgodam22-Feb-2010--
05111704I2490501 DUs at Gosai Nagar, Indira Nagar (W) &
Indira Nagar (E) Slum Area, Haldwani,Uttrakhand
6.75 3.263.26
-- 0.81 -
251188--
63 188 -
11.35 5.576.23
-- 1.80 0.66
41528567
63 285 -
1,001
UttarakhandJaspur27-Jan-2010--
05121959I2442 Construction of 192 DUs at Nagar Palika,Jaspur, Dist-Udham Singh Nagar, Uttrakhand 3.15
2.033.05
-- 0.02 1.02
96--96
- - -
1,002
UttarakhandJaspur30-Mar-2010--
05121959I2554 Construction of 48 DUs at Jaspur Phase-II,Distt- Udham Singh Nagar, Uttrakhand 1.21
0.720.94
-- 0.02 0.21
3736--
1 36 -
4.36 2.753.98
-- 0.04 1.23
1333696
1 36 -
1,003
UttarakhandKaladhungi16-Feb-2010--
05112096I2454 Construction of 290 DUs at Kaladungi, Distt-Nainital, Uttrakhand 7.34
4.466.37
-- - 1.91
203203--
- 203 -
1,004
UttarakhandKashipur08-Feb-2010--
05122289I2350 Construction of 428 DUs at Kashipur NagarPalika, Disttt. Udhamsingh Nagar, Uttrakhand 6.34
3.76.27
-- 0.02 2.58
227226--
1 226 -
1,005
UttarakhandKichha22-Feb-2010--
05122470I2492Construction of 159 DUs at Kichcha Nagar
Panchayat, Distt Udham Singh Nagar,Uttrakhand
4.50 2.732.56
-- - -
127127--
- 127 -
1,006
UttarakhandLalkuan08-Feb-2010--
05112722I2349 Construction of 100 DUs at Lalkuan NagarPanchayat Distt. Nainital, Uttrakhand 3.59
2.41.8--
0.60 - 100
--100
- - -
1,007
UttarakhandLandhaura27-Jan-2010--
05132729I2441 Construction of 264 DUs at Nagar PanchyatLanduara, Distt-Haridwar, Uttrakhand 10.10
6.334.74
-- 2.49 -
26484
180 - - 84
1,008
UttarakhandLandhaura30-Mar-2010--
05132729I2555 Construction of 100 DUs at Landaura Phase-II, Distt- Haridwar, Uttrakhand 2.58
1.261.26
-- 0.13 -
10090--
10 90 -
12.68 7.596.01
-- 2.62 -
364174180
10 90 84
1,009
UttarakhandMahua Dabra08-Feb-2010--
05122846I2348Construction of 266 DUs at Mahuadabra
Nagar Panchayat Distt. Udham Singh Nagar,Uttrakhand
9.25 5.595.59
-- 0.04 -
266264--
2 264 -
1,010
UttarakhandMahua Kheraganj08-Feb-2010--
05122847I2328Construction of 403 DUs at Mahuakhera Ganj
Nagar Panchayat Distt. Udham Singh Nagar,Uttrakhand
7.83 4.576.93
-- 0.10 2.35
266260--
6 260 -
1,011
UttarakhandManglaur05-Mar-2010--
05132951I2519 461 DUs for Manglaur Nagar Palika Parishad,Manglaur, Uttrakhand 6.62
3.193.23
-- 0.21 0.05
227215--
12 215 -
1,012
UttarakhandMussoorie16-Feb-2010--
05053203I2455 96 Housing Units for IDH Mussorie Nagar,Plika Parishad, Mussorie, Uttrakhand 2.12
1.111.33
-- - 0.22
40328
- - 32
1,013
UttarakhandPauri27-Dec-2007--
05063711I1092 178 DUs IHSDP Scheme for Pauri, Distt.,Pauri Garhwal, Uttrakhand 3.68
1.842.25
-- 0.32 0.42
145140--
5 140 -
Sub-total of Haldwani-cum-Kathgodam for 2 project(s)
Sub-total of Jaspur for 2 project(s)
Sub-total of Landhaura for 2 project(s)
* Project Cost and ACA Committed are recalculated after deducting cost of DUs alongwith proportionate cost of infrastructure dropped by CSMC.
Central Share HousesSanctionedReleasedAdjusted
SanctionedCompletedIn-progress
Monitoring Report dated 1st Jan 2019
IHSDP : State wise Report for latest Progress at Project & Town LevelProject Completed
Sr. No.
StateCityInitial SanctionedResent Sanctioned
Project Title Project Code NonStarter Occupied Un-
Occupied
Financial Progress (Rs in Crores) Physical Progress (Nos)
ProjectCost
UC Pending
Excess Central Share
1,014
UttarakhandPithoragarh08-Feb-2010--
05073810I2308 Construction of 200 DUs at PithauragarhNagar Palika, Distt. Pithauragarh, Uttrakhand 9.43
5.396.26
-- 0.00 0.88
172172--
- 172 -
1,015
UttarakhandRudrapur20-Mar-2012--
05124118I4948 Construction of 378 Dwelling Units IHSDPproject at Rudrapur, Uttrakhand
Project Cancelled on
dated 20-May-14
--3.68
-- - 3.68
------
- - -
1,016
UttarakhandSrinagar27-Dec-2007--
05064560I1093 Construction of 53 Dwelling Units at Srinagar,Uttrakhand 0.95
0.470.66
-- - 0.19
3838--
- 38 -
1,017
UttarakhandVikasnagar05-Mar-2010--
05055073I2520 194 DUs for Vikas Nagar, Slum Area in 6ward, Dehradun, Uttrakhand 2.75
1.792.17
-- 0.01 0.38
160159--
1 159 -
106.27 60.8873.09
-- 6.06 15.84
32622623451
188 2,507 116
1,018
West BengalAlipurduar07-Mar-2008--
19020098I1094 420 DUs for the town of Alipurduar (Ph-I),Jalpaiguri, West Bengal 8.24
5.925.92
-- - -
420420--
- 420 -
1,019
West BengalAlipurduar08-Feb-2010--
19020098I2371 300 DUs for the town of Alipurduar (Ph-II),Jalpaiguri, West Bengal
Project Cancelled on
dated 18-Aug-11
------
- - ------
- - -
8.24 5.925.92
-- - -
420420--
- 420 -
1,020
West BengalArambag30-Jul-2008--
19120230I1315 522 Dwelling Units for the town of Arambagh,District- Hugly, West Bengal 9.96
7.978--
- 0.03 520352168
- 352 -
1,021
West BengalAshoknagar Kalyangarh05-Feb-2008--
19110266I1139 848 DUs for the town of AshokenagarKalyangarh, Phase-I, West Bengal 16.40
11.7611.76
-- - -
848848--
- 848 -
1,022
West BengalAshoknagar Kalyangarh08-Feb-2010--
19110266I2432300 DUs for the town of Ashokenagar-
Kalyangarh (PH-II), 24- Parganas (North),West Bengal
Project Cancelled on
dated 18-Aug-11
------
- - ------
- - -
16.40 11.7611.76
-- - -
848848--
- 848 -
1,023
West BengalBaduria09-Jan-2008--
19110366I1134 516 DUs for the town of Baduria (PH-I), Norht24 Paragans, West Bengal 10.30
7.417.41
-- - -
51649620
- 496 -
1,024
West BengalBaduria08-Feb-2010--
19110366I2433 300 DUs for the town of Baduria (PH-II), Norht24 Paragans, West Bengal
Project Cancelled on
dated 18-Aug-11
------
- - ------
- - -
10.30 7.417.41
-- - -
51649620
- 496 -
1,025
West BengalBerhampore05-Feb-2008--
19070386I1140 168 Dwelling Units for the Town ofBerhampur, West Bengal 1.96
0.972.04
-- - 1.07
8080--
- 80 -
1,026
West BengalBalurghat24-Dec-2008--
19050445I1496 790 DUs for the town of Balurghat (Phase-I),Dakshin Dinajpur, Westbengal 15.77
12.6212.62
-- - -
790790--
- 790 -
1,027
West BengalBalurghat08-Feb-2010--
19050445I2434 300 DUs for the town of Balurghat (Phase-II),Dakshin Dinajpur, West Bengal
Project Cancelled on
dated 18-Aug-11
------
- - ------
- - -
15.77 12.6212.62
-- - -
790790--
- 790 -
1,028
West BengalBangaon10-Dec-2008--
19110468I1467 767 Dwelling Units for the town of Bongaon,24-Parganas (North), West Bengal. 13.42
10.7311.71
-- - 0.98
703703--
- 703 -
1,029
West BengalBankura26-Sep-2007--
19130482I1095 415 Dwelling Units for the town of Bankura(PH-I), Bankura, West Bengal 6.58
4.924.92
-- 0.16 -
415415--
- 415 -
1,030
West BengalBankura08-Feb-2010--
19130482I2435 300 Dwelling Units for the town of Bankura(PH-II), Bankura, West Bengal
Project Cancelled on
dated 18-Aug-11
------
- - ------
- - -
Total of Uttarakhand for 21 project(s)
Sub-total of Alipurduar for 1 project(s)
Sub-total of Ashoknagar Kalyangarh for 1 project(s)
Sub-total of Baduria for 1 project(s)
Sub-total of Balurghat for 1 project(s)
* Project Cost and ACA Committed are recalculated after deducting cost of DUs alongwith proportionate cost of infrastructure dropped by CSMC.
Central Share HousesSanctionedReleasedAdjusted
SanctionedCompletedIn-progress
Monitoring Report dated 1st Jan 2019
IHSDP : State wise Report for latest Progress at Project & Town LevelProject Completed
Sr. No.
StateCityInitial SanctionedResent Sanctioned
Project Title Project Code NonStarter Occupied Un-
Occupied
Financial Progress (Rs in Crores) Physical Progress (Nos)
ProjectCost
UC Pending
Excess Central Share
6.58 4.924.92
-- 0.16 -
415415--
- 415 -
1,031
West BengalBarddhaman28-Nov-2006--
19090515I1187 1629 Dwelling Units for the town of Burdwan,West Bengal 22.40
16.9917.03
-- - 0.04
16251617
8 - 1,617 -
1,032
West BengalBasirhat27-Apr-2007--
19110563I1096 1069 Dwelling Units for the town of Basirhat,West Bengal 15.43
11.3311.35
-- 0.11 0.02
10671067
-- - 1,067 -
1,033
West BengalBasirhat08-Feb-2010--
19110563I2436 300 Dwelling Units for the Town of Basirthat(PH-II), 24-Parganas (North), West Bengal
Project Cancelled on
dated 18-Aug-11
------
- - ------
- - -
15.43 11.3311.35
-- 0.11 0.02
10671067
-- - 1,067 -
1,034
West BengalBeldanga24-Dec-2008--
19070601I1497 362 Dwelling Units for the town of Beldanga(Phase- I), Murshidabad, West Bengal 6.17
4.944.94
-- - -
362362--
- 362 -
1,035
West BengalBirnagar09-Jan-2008--
19100799I1133 300 Dwelling Units for the town of Birnagar(PH-I), Nadia, West Bengal 5.93
4.274.27
-- 0.00 -
300300--
- 300 -
1,036
West BengalBirnagar08-Feb-2010--
19100799I2372 305 Dwelling Units for the town of Birnagar(PH-II), Nadia, West Bengal
Project Cancelled on
dated 18-Aug-11
------
- - ------
- - -
5.93 4.274.27
-- 0.00 -
300300--
- 300 -
1,037
West BengalBishnupur07-Mar-2008--
19130811I1098 364 Dwelling Units for the town of Bishnupur,West Bengal 7.00
5.025.02
-- 0.00 -
36432341
- 323 -
1,038
West BengalBolpur24-Jan-2008--
19080832I1097 573 Dwelling Units for the town of Bolpur,West Bengal 9.92
7.027.02
-- - -
573573--
- 573 -
1,039
West BengalChakdaha28-Sep-2006--
19100895I1101 887 Dwelling Units for the town of Chakdaha,West Bengal 15.20
12.1612.16
-- - -
887887--
- 887 -
1,040
West BengalChakdaha26-Feb-2009--
19100895I1896 440 Dwelling Units for the town of Chakdaha,Nadia, West Bengal 8.69
6.396.39
-- - -
440440--
- 440 -
23.89 18.5518.55
-- - -
13271327
-- - 1,327 -
1,041
West BengalChandrakona07-Mar-2008--
19150939I1100 350 Dwelling Units for the town ofChandrakona, West Bengal 6.99
5.035.03
-- - -
350350--
- 350 -
1,042
West BengalContai30-Jul-2008--
19151107I1309 636 DUs for the town of Contai (Phase-I),District- Purba Mednipur, West Bengal 12.35
9.59.5--
- - 636636--
- 636 -
1,043
West BengalContai08-Feb-2010--
19151107I2373 300 Dwelling Units for the town of Contai (PH-II), Purba Medinipur, West Bengal
Project Cancelled on
dated 18-Aug-11
------
- - ------
- - -
12.35 9.59.5--
- - 636636--
- 636 -
1,044
West BengalCooper's Camp07-Mar-2008--
19101109I1099 450 Dwelling Units for the town of CoopersCamp, West Bengal 8.90
6.46.4--
- - 450450--
- 450 -
1,045
West BengalDainhat24-Jan-2008--
19091126I1105 390 Dwelling Units for the town of Dainhat,West Bengal 7.21
5.145.14
-- - -
390390--
- 390 -
1,046
West BengalDainhat08-Feb-2010--
19091126I2374 300 Dwelling Units for the town of Dainhat (Ph-II), Burdwan, West Bengal
Project Cancelled on
dated 18-Aug-11
------
- - ------
- - -
7.21 5.145.14
-- - -
390390--
- 390 -
Sub-total of Contai for 1 project(s)
Sub-total of Dainhat for 1 project(s)
Sub-total of Bankura for 1 project(s)
Sub-total of Basirhat for 1 project(s)
Sub-total of Birnagar for 1 project(s)
Sub-total of Chakdaha for 2 project(s)
* Project Cost and ACA Committed are recalculated after deducting cost of DUs alongwith proportionate cost of infrastructure dropped by CSMC.
Central Share HousesSanctionedReleasedAdjusted
SanctionedCompletedIn-progress
Monitoring Report dated 1st Jan 2019
IHSDP : State wise Report for latest Progress at Project & Town LevelProject Completed
Sr. No.
StateCityInitial SanctionedResent Sanctioned
Project Title Project Code NonStarter Occupied Un-
Occupied
Financial Progress (Rs in Crores) Physical Progress (Nos)
ProjectCost
UC Pending
Excess Central Share
1,047
West BengalDalkhola24-Jan-2008--
19041135I1103 360 Dwelling Units for the town of Dalkhola,West Bengal 6.44
4.584.58
-- - -
360360--
- 360 -
1,048
West BengalDalkhola08-Feb-2010--
19041135I2437 300 Dwelling Units for the town of Dalkhola(PH-II), Uttar Dinajpur, West Bengal
Project Cancelled on
dated 18-Aug-11
------
- - ------
- - -
6.44 4.584.58
-- - -
360360--
- 360 -
1,049
West BengalDarjeeling29-Dec-2008--
19011159I1502 890 Dwelling Units for Darjeeling Distt.Darjeeling, West Bengal 16.18
11.8915.18
-- - 3.29
697554143
- 554 -
1,050
West BengalDhuilya07-Mar-2008--
19161302I1102 400 Dwelling Units for the town of Dhuliyan,West Bengal 8.00
5.765.76
-- 0.00 -
400400--
- 400 -
1,051
West BengalDhupguri05-Feb-2008--
19021305I1141 509 Dwelling Units for the town of Dhupguri,West Bengal 10.16
7.317.31
-- - -
509509--
- 509 -
1,052
West BengalDiamond Harbour13-Feb-2009--
19181308I1800591 DUs for the town of Diamond Harbour, Ph-I, West Bengal, South 24 Paragans, WestBengal
8.78 7.027.98
-- - 0.96
52042298
- 422 -
1,053
West BengalDinhata07-Mar-2008--
19031333I1106 319 Dwelling Units for the town of Dinhata,West Bengal 6.25
4.494.49
-- - 0.00
319319--
- 319 -
1,054
West BengalDubrajpur24-Jan-2008--
19081359I1104 416 Dwelling Units for the town of Dubrajpur,West Bengal 8.10
5.825.83
-- - 0.01
415415--
- 415 -
1,055
West BengalEgra05-Feb-2008--
19151394I1142 332 DUs for the town of Egra (Phase-I), EastMedinipur, West Bengal 6.64
4.784.78
-- 0.00 -
332332
-- - 332 -
1,056
West BengalEgra08-Feb-2010--
19151394I2375 300 DUs for the town of Egra (PH-II), EastMedinipur, West Bengal
Project Cancelled on
dated 18-Aug-11
------
- - ------
- - -
6.64 4.784.78
-- 0.00 -
332332--
- 332 -
1,057
West BengalEnglish Bazar24-Dec-2008--
19061406I1495 852 DUs for the town of Englishbazar (Phase-I), Maldah, Westbengal 16.74
13.413.4
-- 1.38 -
85282131
- 821 -
1,058
West BengalGangarampur02-Feb-2007--
19051508I1107 685 DUs for the town of Gangarampur,Dakshin Dinajpur, West Bengal 12.06
8.748.74
-- - -
685685--
- 685 -
1,059
West BengalGangarampur26-Feb-2009--
19051508I1898 467 DUs for the town of Gangarampur,Dakshin Dinajpur, West Bengal 9.91
7.337.33
-- 0.35 -
46742938
- 429 -
21.97 16.0716.07
-- 0.35 -
11521114
38 - 1,114 -
1,060
West BengalGhatal28-Nov-2006--
19151551I1111 352 DUs for the town of Ghatal, PachimMedinipur, West Bengal 5.06
3.693.69
-- - 0.00
352352--
- 352 -
1,061
West BengalGhatal08-Feb-2010--
19151551I2376 300 DUs for the town of Ghatal (PH-II),Pachim Medinipur, West Bengal
Project Cancelled on
dated 18-Aug-11
------
- - ------
- - -
5.06 3.693.69
-- - 0.00
352352--
- 352 -
1,062
West BengalGobardanga02-Feb-2007--
19111585I1113 500 DUs for the town of Gobardanga, North24 Paraganas West Bengal 7.70
5.575.57
-- 0.27 -
500500--
- 500 -
1,063
West BengalGobardanga08-Feb-2010--
19111585I2377 300 DUs for the town of Gobardanga (PH-II),North 24 Paraganas West Bengal
Project Cancelled on
dated 18-Aug-11
------
- - ------
- - -
7.70 5.575.57
-- 0.27 -
500500--
- 500 -
Sub-total of Dalkhola for 1 project(s)
Sub-total of Egra for 1 project(s)
Sub-total of Gangarampur for 2 project(s)
Sub-total of Ghatal for 1 project(s)
Sub-total of Gobardanga for 1 project(s)
* Project Cost and ACA Committed are recalculated after deducting cost of DUs alongwith proportionate cost of infrastructure dropped by CSMC.
Central Share HousesSanctionedReleasedAdjusted
SanctionedCompletedIn-progress
Monitoring Report dated 1st Jan 2019
IHSDP : State wise Report for latest Progress at Project & Town LevelProject Completed
Sr. No.
StateCityInitial SanctionedResent Sanctioned
Project Title Project Code NonStarter Occupied Un-
Occupied
Financial Progress (Rs in Crores) Physical Progress (Nos)
ProjectCost
UC Pending
Excess Central Share
1,064
West BengalGuskara05-Feb-2009--
19091684I1633 450 Dwelling Units for the town of Gushkara,West Bengal 8.44
6.756.8--
- 0.05 447447--
- 447 -
1,065
West BengalHabra24-Jan-2008--
19111690I1108 896 DUs IHSDP Scheme for the town ofHabra, West Bengal 15.21
10.5710.57
-- 0.00 -
89686828
- 868 -
1,066
West BengalHaldia28-Sep-2006--
19151702I1114 645 DUs IHSDP Scheme for the town ofHaldia, West Bengal 8.61
6.896.89
-- - 0.00
645645--
- 645 -
1,067
West BengalHaldia05-Feb-2009--
19151702I1632 795 DUs IHSDP Project for the town ofHaldia, West Bengal 15.89
12.7212.72
-- - -
795795--
- 795 -
24.50 19.619.6
-- - 0.00
14401440
-- - 1,440 -
1,068
West BengalHaldibari09-Jan-2008--
19031703I1132 304 Dwelling Units, IHSDP Project for theTown of Haldibari, West Bengal 5.70
4.084.08
-- - -
304304--
- 304 -
1,069
West BengalHaldibari08-Feb-2010--
19031703I2438 300 DUs for the town of Haldibari (PH-II),Coochbehar, West Bengal
Project Cancelled on
dated 18-Aug-11
------
- - ------
- - -
5.70 4.084.08
-- - -
304304--
- 304 -
1,070
West BengalIslampur07-Mar-2008--
19041857I1115 IHSDP Scheme for the town of Islampur (370DUs), West Bengal 6.65
4.734.77
-- - 0.04
367367--
- 367 -
1,071
West BengalJalpaiguri27-Apr-2007--
19021925I1118 625 DUs IHSDP Scheme for the town ofJalpaiguri, West Bengal 15.69
11.5511.55
-- - -
625625--
- 625 -
1,072
West BengalJalpaiguri08-Feb-2010--
19021925I2439 300 DUs for the town of Jalpaiguri (PH-II),Jalpaiguri, West Bengal
Project Cancelled on
dated 18-Aug-11
------
- - ------
- - -
15.69 11.5511.55
-- - -
625625--
- 625 -
1,073
West BengalJangipur27-Apr-2007--
19071949I1119 344 DUs IHSDP Scheme for the town ofJangipur, West Bengal 7.19
5.335.33
-- - -
344344--
- 344 -
1,074
West BengalJangipur05-Feb-2009--
19071949I1634 650 DUs for the town of Jangipur (Phase 2),Murshidabad, West Bengal 10.05
8.048.04
-- - -
650650--
- 650 -
17.24 13.3713.37
-- - -
994994--
- 994 -
1,075
West BengalJaynagar Mazilpur09-Jan-2008--
19181975I1136 225 DUs IHSDP Scheme for the town ofJoynagar, West Bengal 4.68
3.223.22
-- - -
225225--
- 225 -
1,076
West BengalJhalda29-Dec-2008--
19141994I1506 408 Dwelling Units for Jhalda, Distt. Purulia,West Bengal 7.98
6.386.38
-- 0.42 -
40835850
- 358 -
1,077
West BengalJhargram28-Nov-2006--
19152001I1120 645 DUs IHSDP Scheme for the Town ofJhargram, West Bengal 9.62
77--
- - 645645--
- 645 -
1,078
West BengalJhargram10-Dec-2008--
19152001I1468 IHSDP Scheme for the Town of Jhargram (Phase-II) West Bengal 3.35
2.683.2--
- 0.51 172172--
- 172 -
12.97 9.6810.19
-- - 0.51
817817--
- 817 -
1,079
West BengalJiaganj-Azimganj24-Jan-2008--
19072016I1117 593 DUs for the town of Jiaganj-Azimganj,Murshidabad, West Bengal 11.11
7.947.94
-- - -
593593--
- 593 -
1,080
West BengalJiaganj-Azimganj05-Feb-2009--
19072016I1638 521 DUs for the Town of Jiaganj-Azimganj(Phase-2), Murshidabad, West Bengal 5.93
4.758.16
-- - 3.41
303303--
- 303 -
Sub-total of Haldia for 2 project(s)
Sub-total of Haldibari for 1 project(s)
Sub-total of Jalpaiguri for 1 project(s)
Sub-total of Jangipur for 2 project(s)
Sub-total of Jhargram for 2 project(s)
* Project Cost and ACA Committed are recalculated after deducting cost of DUs alongwith proportionate cost of infrastructure dropped by CSMC.
Central Share HousesSanctionedReleasedAdjusted
SanctionedCompletedIn-progress
Monitoring Report dated 1st Jan 2019
IHSDP : State wise Report for latest Progress at Project & Town LevelProject Completed
Sr. No.
StateCityInitial SanctionedResent Sanctioned
Project Title Project Code NonStarter Occupied Un-
Occupied
Financial Progress (Rs in Crores) Physical Progress (Nos)
ProjectCost
UC Pending
Excess Central Share
17.05 12.6916.1
-- - 3.41
896896--
- 896 -
1,081
West BengalKaliaganj30-Jul-2008--
19042116I1311 400 DUs for the Town of Kaliyaganj Town,District- Uttar Dinipur, West Bengal 7.95
6.366.36
-- 0.00 -
400400--
- 400 -
1,082
West BengalKalimpong30-Jul-2008--
19012118I1313 567 DUs for the town of Kalimpong town,District-Darjeeling West Bengal 11.65
9.329.59
-- - 0.27
551551--
- 551 -
1,083
West BengalKalna28-Nov-2006--
19092129I1121 IHSDP Scheme for the town of Kalna (1060DUs), West Bengal 14.68
10.6910.69
-- - 0.00
10601059
1 - 1,059 -
1,084
West BengalKandi30-Jul-2008--
19072172I1312 555 DUs for the town of Kandi (Phase-I), DisttMurshidabad, West Bengal 8.98
7.187.18
-- 1.00 -
555550
5 - 550 -
1,085
West BengalKandi08-Feb-2010--
19072172I2378 300 DUs for the town of Kandi (PH-II),Murshidabad, West Bengal
Project Cancelled on
dated 18-Aug-11
------
- - ------
- - -
8.98 7.187.18
-- 1.00 -
555550
5 - 550 -
1,086
West BengalKatwa29-Dec-2008--
19092318I1505 650 DUs IHSDP Scheme for Katwa, Distt.Burdwan, West Bengal 10.90
8.728.72
-- - -
650650--
- 650 -
1,087
West BengalKharagpur27-Apr-2007--
19152402I1122 272 DUs IHSDP Scheme for the town ofKhargpur (Phase-I), West Bengal 4.57
3.343.42
-- - 0.08
266261
5 - 261 -
1,088
West BengalKharagpur27-Apr-2007--
19152402I1123 232 DUs IHSDP Scheme for the town ofKhargpur (Phase-II), West Bengal 3.81
2.792.95
-- - 0.15
220211
9 - 211 -
1,089
West BengalKharagpur27-Apr-2007--
19152402I1124 306 DUs IHSDP Scheme for the town ofKhargpur (Phase-III), West Bengal 5.00
3.633.86
-- 0.04 0.23
288288--
- 288 -
13.38 9.7710.22
-- 0.04 0.45
77476014
- 760 -
1,090
West BengalKharar05-Feb-2008--
19152406I1143 Implementation of IHSDP Scheme (300 DUs)at KhararTown, West Bengal 5.32
3.773.77
-- - -
300300--
- 300 -
1,091
West BengalCooch Behar02-Feb-2007--
19032497I1185 632 Dwelling Units for the town ofCoochbehar, Ph-I, West Bengal 8.82
6.386.75
-- 4.15 0.37
59749899
- 498 -
1,092
West BengalCooch Behar26-Feb-2009--
19032497I1897 320 Dwelling Units for the town ofCoochbehar, Ph-2, West Bengal 4.89
3.625.11
-- - 1.48
227227--
- 227 -
13.71 10
11.86--
4.15 1.86 82472599
- 725 -
1,093
West BengalKrishnanagar14-Mar-2008--
19102605I1148 640 DUs for the town of Krishnanagar (PH-I),Nadia, West Bengal 12.80
9.229.22
-- - -
640640--
- 640 -
1,094
West BengalKrishnanagar08-Feb-2010--
19102605I2388 300 DUs IHSDP Scheme for the town ofKrishnanagar (PH-II), Nadia, West Bengal
Project Cancelled on
dated 18-Aug-11
------
- - ------
- - -
12.80 9.229.22
-- - -
640640--
- 640 -
1,095
West BengalKhirpai05-Feb-2008--
19152614I1144 Implementation of IHSDP Scheme (300 DUs)at Khirpai Town, West Bengal 5.16
3.653.69
-- 0.70 0.04
297296
1 - 296 -
1,096
West BengalKurseong30-Jul-2008--
19012675I1334 565 Dwelling Units for the Town of Kurseong,Darjeeling, West Bengal 11.99
9.599.59
-- 1.36 -
565565--
- 565 -
1,097
West BengalMal09-Jan-2008--
19022877I1137 465 DUs IHSDP Scheme for Mal Municipality,West Bengal 7.00
4.864.86
-- 0.00 -
465465--
- 465 -
Sub-total of Jiaganj-Azimganj for 2 project(s)
Sub-total of Kandi for 1 project(s)
Sub-total of Kharagpur for 3 project(s)
Sub-total of Cooch Behar for 2 project(s)
Sub-total of Krishnanagar for 1 project(s)
* Project Cost and ACA Committed are recalculated after deducting cost of DUs alongwith proportionate cost of infrastructure dropped by CSMC.
Central Share HousesSanctionedReleasedAdjusted
SanctionedCompletedIn-progress
Monitoring Report dated 1st Jan 2019
IHSDP : State wise Report for latest Progress at Project & Town LevelProject Completed
Sr. No.
StateCityInitial SanctionedResent Sanctioned
Project Title Project Code NonStarter Occupied Un-
Occupied
Financial Progress (Rs in Crores) Physical Progress (Nos)
ProjectCost
UC Pending
Excess Central Share
1,098
West BengalMathabhanga28-Nov-2006--
19033008I1125 181 DUs IHSDP Prooject for the town ofMathabhanga, West Bengal 3.19
2.322.32
-- 0.00 -
181181--
- 181 -
1,099
West BengalMathabhanga26-Feb-2009--
19033008I1895 402 DUs for the town of Mathabhanga,Coochbehar, West Bengal 8.56
6.346.34
-- - -
402402--
- 402 -
11.75 8.658.65
-- 0.00 -
583583--
- 583 -
1,100
West BengalMedinipur02-Feb-2007--
19153032I1126 948 DUs for the town of Midnapore, PachimMedinipore, West Bengal 15.73
11.6311.63
-- - -
948948--
- 948 -
1,101
West BengalMedinipur08-Feb-2010--
19153032I2409 300 DUs for the town of Midnapore (PH-II),Pachim Medinipore, West Bengal
Project Cancelled on
dated 18-Aug-11
------
- - ------
- - -
15.73 11.6311.63
-- - -
948948--
- 948 -
1,102
West BengalMekhliganj07-Mar-2008--
19033047I1109 294 DUs IHSDP Scheme for the town ofMekhliganj, West Bengal 5.22
3.713.71
-- - -
294294--
- 294 -
1,103
West BengalMemari24-Jan-2008--
19093058I1110 621 DUs IHSDP Scheme for the town Memari, West Bengal 11.25
88--
0.31 - 621621--
- 621 -
1,104
West BengalMemari08-Feb-2010--
19093058I2408 300 DUs for the town of Memari (PH-II),Burdwan, West Bengal
Project Cancelled on
dated 18-Aug-11
------
- - ------
- - -
11.25 88--
0.31 - 621621--
- 621 -
1,105
West BengalMirik30-Jul-2008--
19013081I1314 423 Dwelling Units for the Town of Mirik,District- Darjeeling, West Bengal 7.96
6.366.36
-- - -
423423--
- 423 -
1,106
West BengalMurshidabad30-Jul-2008--
19073194I1310 497 DUs for the town of Murshidabad town,District- Murshidabad West Bengal 8.74
6.746.74
-- 0.56 -
497492
5 - 492 -
1,107
West BengalNabadwip24-Jan-2008--
19103217I1112 735 Dwelling Units for the town of Nabadwip,West Bengal 5.35
3.687.25
-- - 3.57
373373--
- 373 -
1,108
West BengalNabadwip08-Feb-2010--
19103217I2410 300 DUs for the town of Nabadwip (PH-II),Nadia, West Bengal
Project Cancelled on
dated 18-Aug-11
------
- - ------
- - -
5.35 3.687.25
-- - 3.57
373373--
- 373 -
1,109
West BengalOld Malda30-Jul-2008--
19063488I1308 550 DUs for the town of Old Malda town,District- Malda, West Bengal 10.78
8.638.63
-- - -
550548
2 - 548 -
1,110
West BengalPuruliya26-Sep-2007--
19143889I1127 Implementation of IHSDP Scheme (611 DUs)at Purulia town, West Bengal 5.60
4.296.18
-- - 1.89
42435074
- 350 -
1,111
West BengalRaghunathpur13-Feb-2009--
19143926I1801 400 DUs IHSDP scheme for the town ofRaghunathpur, Ph. I, West Bengal 7.90
6.326.32
-- 0.12 -
400400--
- 400 -
1,112
West BengalRaiganj02-Feb-2007--
19043936I1128 2000 DUs IHSDP Scheme for the town ofRaiganj, West Bengal 26.28
19.8119.81
-- - -
20002000
-- - 2,000 -
1,113
West BengalRaiganj08-Feb-2010--
19043936I2440 300 DUs for the town of Raiganj (PH-II), UttarDinajpur, West Bengal
Project Cancelled on
dated 18-Aug-11
------
- - ------
- - -
26.28 19.8119.81
-- - -
20002000
-- - 2,000 -
1,114
West BengalRamjibanpur05-Feb-2008--
19154003I1145 300 DUs IHSDP Scheme for the town ofRamjibanpur, West Bengal 5.27
3.743.79
-- 0.09 0.05
296296--
- 296 -
Sub-total of Mathabhanga for 2 project(s)
Sub-total of Medinipur for 1 project(s)
Sub-total of Memari for 1 project(s)
Sub-total of Nabadwip for 1 project(s)
Sub-total of Raiganj for 1 project(s)
* Project Cost and ACA Committed are recalculated after deducting cost of DUs alongwith proportionate cost of infrastructure dropped by CSMC.
Central Share HousesSanctionedReleasedAdjusted
SanctionedCompletedIn-progress
Monitoring Report dated 1st Jan 2019
IHSDP : State wise Report for latest Progress at Project & Town LevelProject Completed
Sr. No.
StateCityInitial SanctionedResent Sanctioned
Project Title Project Code NonStarter Occupied Un-
Occupied
Financial Progress (Rs in Crores) Physical Progress (Nos)
ProjectCost
UC Pending
Excess Central Share
1,115
West BengalRampurhat29-Dec-2008--
19084023I1504 603 Dwelling Units for Rampurhat, Distt.Birbhum, West Bengal 10.89
8.718.71
-- - -
60351192
- 511 -
1,116
West BengalRanaghat28-Nov-2006--
19104025I1129 155 DUs IHSDP Scheme for the town ofRanaghat, West Bengal 2.97
2.172.17
-- - -
155155--
- 155 -
1,117
West BengalRanaghat05-Feb-2009--
19104025I1635 IHSDP Scheme for the town of Ranaghat(Phase 2) Nadia, West Bengal 4.98
3.984.6--
- 0.62 257257--
- 257 -
7.94 6.156.77
-- - 0.62
412412--
- 412 -
1,118
West BengalSainthia24-Jan-2008--
19084174I1116 340 DUs IHSDP Scheme for the town ofSainthia, West Bengal 6.67
4.794.79
-- - -
340340--
- 340 -
1,119
West BengalSantipur05-Feb-2008--
19104241I1146 357 Dwelling Units, IHSDP Scheme for thetown of Santipur, West Bengal 3.81
2.755.13
-- - 2.39
191191--
- 191 -
1,120
West BengalSonamukhi28-Nov-2006--
19134535I1130 200 DUs IHSDP Scheme for the town ofSonamukhi, West Bengal 3.74
2.722.72
-- - -
200200--
- 200 -
1,121
West BengalSuri29-Dec-2008--
19084615I1503 728 DUs IHSDP Scheme for Suri, Distt.Birbhum, West Bengal 5.17
4.135.79
-- 2.27 1.65
26017882
- 178 -
1,122
West BengalTaherpur05-Feb-2008--
19104627I1147 390 DUs IHSDP Scheme for the town ofTaherpur, West Bengal 7.76
4.974.97
-- 0.00 -
390390--
- 390 -
1,123
West BengalTaherpur08-Feb-2010--
19104627I2429 300 DUs for the town of Taherpur NotifiedArea Authority (PH-II), Nadia, West Bengal
Project Cancelled on
dated 18-Aug-11
------
- - ------
- - -
7.76 4.974.97
-- 0.00 -
390390--
- 390 -
1,124
West BengalTaki28-Nov-2006--
19114631I1131 307 DUs for the town of Taki, North 24Parganas, West Bengal 5.42
3.943.94
-- 0.00 -
307307--
- 307 -
1,125
West BengalTaki05-Feb-2009--
19114631I1637 504 DUs for the town of Taki (Phase 2) , North24 Parganas, West Bengal 6.99
5.595.59
-- - -
50445351
- 453 -
12.41 9.539.53
-- 0.00 -
81176051
- 760 -
1,126
West BengalTamluk10-Dec-2008--
19154653I1469 IHSDP Scheme for the town of Tamluk(Phase-I) , West Bengal 8.94
7.157.15
-- - -
45643521
- 435 -
1,127
West BengalTarakeswar30-Jul-2008--
19124662I1316 584 DUs for the town of Tarkeswar town,District- Hoogly West Bengal 9.89
7.917.91
-- - -
584478106
- 478 -
1,128
West BengalTarakeswar08-Feb-2010--
19124662I2430 300 DUs for the town of Tarkeswar (PH-II),Hooghly, West Bengal
Project Cancelled on
dated 18-Aug-11
------
- - ------
- - -
9.89 7.917.91
-- - -
584478106
- 478 -
1,129
West BengalTufanganj09-Jan-2008--
19034851I1138 308 DUs for the town of Tufanganj,CoochBehar, West Bengal 6.11
4.394.39
-- - -
308308--
- 308 -
1,130
West BengalTufanganj08-Feb-2010--
19034851I2431 300 DUs for the town of Tufanganj (PH-II),Cooch behar, West Bengal
Project Cancelled on
dated 18-Aug-11
------
- - ------
- - -
6.11 4.394.39
-- - -
308308--
- 308 -
1,131
West BengalSiliguri28-Nov-2006--
19025164I1197 1998 Dwelling Units for the town of Siliguri,Phase-I, West Bengal 30.55
22.9829.46
-- - 6.47
15591559
-- - 1,559 -
Sub-total of Taki for 2 project(s)
Sub-total of Tarakeswar for 1 project(s)
Sub-total of Tufanganj for 1 project(s)
Sub-total of Ranaghat for 2 project(s)
Sub-total of Taherpur for 1 project(s)
* Project Cost and ACA Committed are recalculated after deducting cost of DUs alongwith proportionate cost of infrastructure dropped by CSMC.
Central Share HousesSanctionedReleasedAdjusted
SanctionedCompletedIn-progress
Monitoring Report dated 1st Jan 2019
IHSDP : State wise Report for latest Progress at Project & Town LevelProject Completed
Sr. No.
StateCityInitial SanctionedResent Sanctioned
Project Title Project Code NonStarter Occupied Un-
Occupied
Financial Progress (Rs in Crores) Physical Progress (Nos)
ProjectCost
UC Pending
Excess Central Share
1,132
West BengalSiliguri14-Mar-2008--
19025164I1198 1206 Dwelling Units at Siliguri, Phase II,WestBengal 18.47
12.9914.06
-- - 1.07
11141106
8 - 1,106 -
1,133
West BengalSiliguri05-Feb-2009--
19025164I1636 1859 DUs IHSDP Scheme for Siliguri (Phase3), Darjeeling, West Bengal 24.22
19.3728.79
-- - 9.42
12511251
-- - 1,251 -
73.23 55.3572.31
-- - 16.96
39243916
8 - 3,916 -
1,134
West BengalPanskura27-Apr-2007--
19155166I1199 498 DUs IHSDP Scheme for the town ofPanskura, East Medinipur, West Bengal 7.31
5.295.29
-- - -
498498--
- 498 -
1,135
West BengalPanskura08-Feb-2010--
19155166I2428 300 DUs for the town of Panskura (PH-II),East Medinipur, West Bengal
Project Cancelled on
dated 18-Aug-11
------
- - ------
- - -
7.31 5.295.29
-- - -
498498--
- 498 -
1,136 West BengalSJDA (VAMBAY)21-May-2009
19172527I2096GOI Subsidy Recommended from JNNURM
for West Bengal SJDA Scheme No 18665 forComplete construction of 75 DUs underVAMBAY Scheme.
0.64 0.150.15
-- 0.15 -
7575--
- 75 -
1,137
West BengalNalhati09-Jan-2008--
19113260I1135 330 Dwelling Units for the town of Nalhati,West Bengal 6.78
4.894.89
-- 0.00 0.00
330330--
- 330 -
883.58 663.06703.23
-- 13.44 40.17
49435482491186
- 48,249 -
9,591.01 6161.456770.86333.72
685.43 750.48 45195139385144175
13,925 3,67,449 42,262 Total of IHSDP for 1030 project(s)including 175 project(s) which are completed
Sub-total of Siliguri for 3 project(s)
Sub-total of Panskura for 1 project(s)
Total of West Bengal for 95 project(s)including 8 project(s) which are completed
* Project Cost and ACA Committed are recalculated after deducting cost of DUs alongwith proportionate cost of infrastructure dropped by CSMC.