Modern Trends in the Construction Industry; the Experience of Bilfinger Berger SE, Germany
NOTAP Workshop in LagosSeptember 2011
Modern trends
Multiservice Business Structure
Industrial Services
Power Services
Building and Facility Services
ConcessionsConstruction
Bilfinger Berger SE
Julius Berger Nigeria PLC, Abuja
Bilfinger Berger SE, MannheimBilfinger Berger Nigeria GmbH, Wiesbaden
48%
International Network
Nigeria Business of Bilfinger Berger
Planning Design Construction Maintenance
BB SE
Industrial Services
Leading service provider for the processing industry in Europe
Comprehensive range of products including full-service maintenance and complete solutions for demanding projects
28,000 employees at more than 130 locations in Europe and North America
Offshore Drilling, Scandinavia
Client Statoil
Volume € 250 million
Period 2010 - 2014 with an option for a four year extension
Range of services including scaffolding, insulation, corrosion protection
Offshore drilling rigs and processing ships as well as onshore locations in Norway and Denmark
Annual volume with industrial services for the North Sea oil and gas sector of approximately €280 million
Maintenance of Offshore Platforms, North Sea
Aluminum Plant, Norway
Client Norsk Hydro
Volume € 53 million
Period Since 1998
Outsourcing solution for maintenance and refractory lining
Scope of the order relates to the five locations: Ardal, Holmestrandt, Hayanger, Karmoy (pictured), Sunndal
Cement Factory, Nigeria
Client Dangote Industries Ltd.
Volume € 119 million
Period 2003-2004
Construction of cement plant and additional buildings
Capacity to produce 5 million tons of cement per year.
Power Services
Lifecycle service for power plants:delivery of components, repair, maintenance, inspection and spare parts service
Measures for service-life extenstions, modernization, efficiency enhancements and rehabilitation of power plants
Market leader in the manufacture of high-pressure piping systems
Steam generators, piping technology, power and environmental engineering as well as mechanical and apparatus engineering.
Power Plant, Poland
Client PGE Elektrownia Belchatow
Volume €460 million
Period 2010 – 2016
Modernization of six power plant blocks
Renewal of the steam generators
Design, manufacture and assembly of the modernized firing systems, pressure section and related systems
Manufacturing for Power Plants, South Africa
Client Hitachi Power Africa
Volume €90 million
Period 2009 – 2014
Manufacturing for the construction of the Medupi and Kusile power plants (12 x 750 MW)
Heating surface banks
Membrane walls
Collectors
Ammonia Plant, Trinidad and Venezuela
Client MAN Ferrostaal
Volume €12 million
Period 2007 – 2009
Six heat exchangers for ammonia plant
Up to four meters in diameter and 26 meters long
Building and Facility Services
Comprehensive range of real-estate related services
Building construction projects for private and public sector clients
Integrated technical, commercial and infrastructural services
Comprehensive range of products including consulting, development, financing, turnkey construction, maintenance and operation
Energy-conscious, resource efficient design, construction and operation
Construction-related services
Hof Schools, Germany
Client District of Hof
Volume €54 million
Period 2009 – 2011
Design, construction, rehabilitation and operation of four schools in the district of Hof
Awarded with the 2009 PPP prize from the Bavarian Construction Industry Association
Sonnenstein Castle, Germany
Client Sächsische Schweiz district-Osterzgebirge
Volume €32 million
Period 2010 – 2011
Design, reconstruction and conversion, financing and operation of district administration
PPP model
National Assembly, Nigeria
Client Federal Capital Development Authority (FCDA)
Volume €260 million
Period 2005 – 2010
Extension of the existing National Assembly
Design and turnkey construction of two five-storey representative office buildings for the House of Senate and the House of Representatives
Central Bank, Lagos Branch, Nigeria
Client Central Bank of Nigeria
Volume € 190 million
Period 2007 – 2012
Construction of a 19-storey high-rise building
Parking garage, generator house, fire- and police station
Construction
Design and construction of major infrastructure projects
Specialized technological expertise in areas including tunneling, bridge construction, foundation engineering, earthworks, road construction, hydraulic engineering and steel construction
Base Tunnel, Switzerland
Client AlpTransit Gotthard AG
Volume €740 million
Period 2002 – 2011
Six-kilometer long core section of the Gotthard Base Tunnel near Sedrun
57 kilometers total length
Construction site supply via two 800-meter shafts
Windpark, United Kingdom
Client Dong Energy, E.ON and Masdar
Volume €400 million
Period 2009 – 2012
Construction of the foundations for 175 wind turbines and two transformer stations
20 – 35 kilometers from the coast
Monopiles up to 60 meters in length
Foundation works
Windturbine and Airbus A380
Roads Project, Nigeria
Client Akwa Ibom State Government of Nigeria
Volume €746 million
Period 2007 - 2012
Construction work for 48 km
dualized (4-lane) motorway including 3 nos. of flyover bridges, a river bridge and 2 nos. of underground storm water drains
Bridge Projects, Lagos Ikoyi Lekki
A CONSTRUCTION COMPANY THAT BUILDSQUALITY SOLUTIONS
Concessions
Financing, delivery and operation of social and transport infrastructure on the basis of long-term concession contracts as private partner to the public sector
Motorway, United Kingdom
Client Transport Scotland
Volume €308 million (design and construction)
Period 2009 – 2011
Six-lane expansion of an18 kilometer long motorway section
To be operated for 30 years following completion
Motorway, Germany
Client NLSV Hannover
Volume €417 million (design and construction)
Period 2008 – 2012
Design and construction work for the six-lane expansion of a 73-kilometer long section of motorway
Renewal and expansion of the roadway and junctions
To be operated and maintained for a period of 30 years
Motorway, Norway
Client Vegdirektoratet
Volume €453 million
Start of operations 08/2009
Concession period 25 years
Design, financing, construction and operation of a 38-kilometer long four-lane highway
Seven tunnels
Six bridges
Julius Berger Nigeria
PLC
Bilfinger Berger SE
Ausbildungsplattform
KNOW-HOW OF PLANNING
TECHNICAL KNOW-HOW
PROCUREMENT / LOGISTICS
EXPERTISE OF MATERIALS
EDUCATION & TRAINING PLATFORM
Every day businessModern trends in Nigeria
Implementation of new Standards (NIS, EN, AASHTO, ASTM…)
New developments in material technology
Maintenance contracts
Rehabilitation
New equipment and machinery
Green building (LEED)
Public Private Partnership
Solar and wind energy
Thank you for your attention
…a journey of a thousand miles begins with a single step… Chinese saying