- MODERATE RISK WASTE FACILITY DESIGN EVOLUTION AT KING COUNTY James Neely NAHMMA 2012 Northwest Conference
- Slide 2
- PART ONE: PILOT HHW FACILITY MADE SEMI-PERMANENT
- Slide 3
- Factoria Transfer Station Pre-Development 2001
- Slide 4
- Pilot MRW Facility Opened Sept. 2002
- Slide 5
- Slide 6
- Slide 7
- Failure of Retractable Awning
- Slide 8
- Slide 9
- 2004: Pilot to Semi-Permanent Facility
- Slide 10
- INITIAL RESULTS
- Slide 11
- BE PREPARED FOR THE EXOTICS
- Slide 12
- CONSIDER OUTDOOR STORAGE NEEDS Type 4 Outdoor Explosives Magazine for Marine Flares
- Slide 13
- PART TWO: FINALLY A REAL FACILITY
- Slide 14
- REBUILT FACTORIA TRANSFER STATION AND MODERATE RISK WASTE FACILITY Opening Planned for 2015
- Slide 15
- DESIGN CONSIDERATIONS SUMMARY Size Ventilation and Fire Safety Ergonomics/Self Service Opportunities To Bulk or Not to Bulk Green Building Employee Comfort
- Slide 16
- CONCEPTUAL DESIGN
- Slide 17
- LOCAL EXHAUST VENTILATION
- Slide 18
- DIRECT VENTILATION- BEST
- Slide 19
- Slide 20
- Slide 21