Making the Transition

Scrum – An agile development approach that emphasizes close communication through daily stand-up meetings.

Scrum master – The team member who facilitates scrum meetings and works to remove blocks that prevent team members from proceeding with their work.

Iteration – A short period of time in which a full software development cycle occurs.

Backlog – The repository for all requirements and wish list items for the project.

Capacity – The maximum amount of hours a team member can work during one iteration.

Terminology

Page 3: Mobile and agile   the floating writer's survival kit

3 © 2008 NetIQ Corporation. All rights reserved.

Making the Transition

Moving from specs to user story documents−Shorter, more fluid documents−Allows for easier refinement and rework upon customer

feedback−Helps floating writers not get bogged down in lengthy specs

when they are brought on to the project

Paper prototyping with screenshots and detailed functionality information

Design Documents

Page 4: Mobile and agile   the floating writer's survival kit

4 © 2008 NetIQ Corporation. All rights reserved.

Making the Transition

Use three drafts: first draft, approval draft, quality edit draft.

Write doc for a feature in the iteration it is developed and tested.

Keep the user story open until Dev/QE has reviewed the documentation for technical accuracy.

Consider doing away with a formal first draft for more mature products and documentation libraries.

Use the full approval draft as a means to show the new documentation in context of the entire book.

Adapting Your Review Cycle

Page 5: Mobile and agile   the floating writer's survival kit

5 © 2008 NetIQ Corporation. All rights reserved.

Making the Transition

QE and Development no longer have to review an entire book (or multiple books) during one of the busiest times of the release cycle.

Info Dev gets more thorough reviews since QE and Dev have more time each iteration to review pieces of the documentation.

The documentation is more technically accurate and of a higher quality due to more thorough reviews.

The floating writer’s needed capacity for an approval draft is reduced because most of the work has already been done in previous iterations.

If you have multiple books on multiple products, there is not as big of a hit all at once on your time.

Floating writers have a more complete document with which to work for an iteration or two.

Adapting Your Review Cycle - Advantages

Page 6: Mobile and agile   the floating writer's survival kit

6 © 2008 NetIQ Corporation. All rights reserved.

Gaining Clout on the Product Team

Page 7: Mobile and agile   the floating writer's survival kit

7 © 2008 NetIQ Corporation. All rights reserved.

Gaining Clout on the Product Team

Take the initiative to get involved in ALL parts of the product development.

Attend scrum meetings for the projects in which you’re involved.

Be detailed and specific when asking questions or giving information to others.

Pave the way for any other writers that may join the team later.

Speak Up!

Page 8: Mobile and agile   the floating writer's survival kit

8 © 2008 NetIQ Corporation. All rights reserved.

Gaining Clout on the Product Team

Bad: “I’m working on the installer.”

Good: “I’m working on the new installer screens that contain user credentials for accessing the database. I need some help with text on these new screens, so I’ll be coming to talk to Info Dev later today or tomorrow about this.”

Bad: “I’m working on the Customer X issue.”

Good: “Customer X is having a problem where when they run security checks against their SQL Server 2005 endpoints, they’re getting data that doesn’t make sense. When I looked in the XML file for the security check, I realized the check was coded incorrectly to run only against SQL 2000 endpoints. I’m fixing the code in the check file so it can run against SQL 2000 or 2005 endpoints.”

Sample Scrum Topics – Development

Page 9: Mobile and agile   the floating writer's survival kit

9 © 2008 NetIQ Corporation. All rights reserved.

Gaining Clout on the Product Team

Bad: “I’m running test cases.”

Good: “I’m running test cases for Feature X. I’m about 75% done with those, but can’t seem to get the modify function to work, so I’m blocked on those test cases.”

Bad: “I’m writing test cases.”

Good: “I’m writing positive and negative test cases for Feature Y. We need to make sure it works when the correct parameters are put in, but we should also look for what happens when we put nonsense characters in for parameter values. Developer Joe, let’s get together later to talk about whether there are any restrictions on special characters in the parameter field.”

Sample Scrum Topics – QE

Page 10: Mobile and agile   the floating writer's survival kit

10

© 2008 NetIQ Corporation. All rights reserved.

Gaining Clout on the Product Team

Bad: “I’m working on the User Guide.”

Good: “I’m creating a new chapter in the User Guide for Feature X. I’ve talked with Development and received all the information I need to complete the draft, but will go back to them tomorrow for them to take a look at what I wrote to ensure it’s technically accurate.”

Bad: “I’m creating the help for Feature X.”

Good: “I am about done creating the help structure for the wizard Feature X uses. Developer Sally, I’ll need to get with you to show you what I did in the mapping file so we can hook up the help to the wizard page code. I’m also adding these topics to the .chm file’s table of contents.”

Sample Scrum Topics – Information Development

Page 11: Mobile and agile   the floating writer's survival kit

11

© 2008 NetIQ Corporation. All rights reserved.

Gaining Clout on the Product Team

Show an interest in the requirements, design, and thought behind the design of the product.

Attend any and all release planning and iteration planning meetings.

Offer to help improve text in the GUI.−English is second language for many developers.−It might only take a label change for window to be much more

clear.

Be a usability advocate.

Have the writer working on the feature interact with the developer/QE person working on the feature. Don’t funnel all information through one person.

Be Involved

Page 12: Mobile and agile   the floating writer's survival kit

12

© 2008 NetIQ Corporation. All rights reserved.

Gaining Clout on the Product Team

Don’t assume the product works like the developer tells you it does.

Install and maintain your own builds of the product.−Allows you to better determine if there is a technical or usability

issue in the product.−Lets floating writers quickly and easily access the product to

reduce amount of time it takes to be effective on the team.

Gain your team’s trust by having a solid understanding of the product.

Make more informed suggestions for change.

Take Ownership of Technical Accuracy

Page 13: Mobile and agile   the floating writer's survival kit

13

© 2008 NetIQ Corporation. All rights reserved.

Planning the Release

Page 14: Mobile and agile   the floating writer's survival kit

14

© 2008 NetIQ Corporation. All rights reserved.

Planning the Release

Do resource planning on an iteration-by-iteration basis.− Have a manager or coordinating lead look at resources across projects.− Have iteration planning meetings.

Create a review schedule appropriate to the project.− Ensure approval draft comes after Feature Complete.− Have pieces of documentation reviewed during active Development

iterations.− Ensure quality edit draft occurs during a hardening iteration.− Work on doc-specific tasks and bugs in early iterations.

Ally with product management.− Support Info Dev in numerous ways.− Can be a wealth of information about customers and their use of our

products.

Page 15: Mobile and agile   the floating writer's survival kit

15

© 2008 NetIQ Corporation. All rights reserved.

Planning the Release

Page 16: Mobile and agile   the floating writer's survival kit

16

© 2008 NetIQ Corporation. All rights reserved.

Creating User Stories

Page 17: Mobile and agile   the floating writer's survival kit

17

© 2008 NetIQ Corporation. All rights reserved.

Creating User Stories

What is a user story?− A software system requirement− Defines what is to be built− Prioritized, make up the backlog− Stories may be related together as “features” or “themes”

Page 18: Mobile and agile   the floating writer's survival kit

18

© 2008 NetIQ Corporation. All rights reserved.

Creating User Stories

Independent – Can be worked on without pulling in other stories, can be scheduled in any order

Negotiable – Allows flexibility with engineering team, implies it is understandable (easy to pick up)

Valuable – Frames stories from customer perspective

Estimatable – Allows lead/manager to pull floating writers on to project based on their capacity and estimate of time needed for story

Sized appropriately – Lets floating writers focus on smaller pieces and move on and off project more smoothly

Testable – Lets floating writers see what the feature is supposed to do upfront and can write more thorough documentation upfront

Good User Stories – Benefits to Floating Writers

Page 19: Mobile and agile   the floating writer's survival kit

19

© 2008 NetIQ Corporation. All rights reserved.

Creating User Stories

Specific – Helps in understanding and prevents overlap, which is useful when pulling writers on and off projects from iteration to iteration.

Measurable – Helps floating writers know when to mark the task as complete so they can move on to other projects if needed.

Achievable – Helps determine if task is realistic.

Relevant – Helps determine if task relates to fulfilling the user story, thus contributing to the release.

Time-boxed – Helps floating writers know how much work remains and whether the task will be done within the iteration.

User Story Tasks – Benefits to Floating Writers

Page 20: Mobile and agile   the floating writer's survival kit

20

© 2008 NetIQ Corporation. All rights reserved.

Creating User Stories

Bad example:

Discovery and registration

Discover and register the supported operating system, applications, web servers, or database instances monitored by an agent on a Windows computer.

Good example:

Good User Story Example.fm

Examples

Page 21: Mobile and agile   the floating writer's survival kit

21

© 2008 NetIQ Corporation. All rights reserved.

Planning the Iteration

Page 22: Mobile and agile   the floating writer's survival kit

22

© 2008 NetIQ Corporation. All rights reserved.

Planning the Iteration

Work with your lead or manager to spread your workload so you can delegate scrum meeting attendance to others.

Attend scrums that pertain to your highest priority project only.

Ask the scrum master to send status emails for the meetings so you know what you missed.

Ensure you have a presence on your team so your team doesn’t forget you when you’re not there.

Coping with Multiple Projects and Scrums

Page 23: Mobile and agile   the floating writer's survival kit

23

© 2008 NetIQ Corporation. All rights reserved.

Planning the Iteration

Consider previous iteration estimates.

Include vacation and non-iteration responsibilities, such as meetings, customer support, time for planning, etc. (approximately 25% of each team member’s time).

Do not include the first or last day of the iteration.

Ensure Development finishes early so QE and Info Dev have time to complete their tasks before the iteration ends.

Determining Capacity

Page 24: Mobile and agile   the floating writer's survival kit

24

© 2008 NetIQ Corporation. All rights reserved.

Planning the Iteration

Meredith is a team member for Project A and Project B.

Iteration 1 for Project A is Feb. 7-20.

Iteration 3 for Project B is Feb. 5-18.

Project B has a planning day Feb. 15, so Meredith’s capacity for Feb. 15 on Project A is 0.

Capacity Example

Page 25: Mobile and agile   the floating writer's survival kit

25

© 2008 NetIQ Corporation. All rights reserved.

Planning the IterationCapacity Example

Page 26: Mobile and agile   the floating writer's survival kit

26

© 2008 NetIQ Corporation. All rights reserved.

Planning the Iteration

Create more accurate estimates by applying a standard number of hours per page of doc based on the level of source material.

Plug in your tasks based on the information in the user story to quickly estimate the amount of work needed to complete your tasks.

Compare the number of hours required to complete tasks to total hours of team member capacity.

Sizing Documentation Work

Page 27: Mobile and agile   the floating writer's survival kit

27

© 2008 NetIQ Corporation. All rights reserved.

Planning the IterationSizing Documentation Work - Example

Page 28: Mobile and agile   the floating writer's survival kit

28

© 2008 NetIQ Corporation. All rights reserved.

Contact Information

Page 29: Mobile and agile   the floating writer's survival kit

29

© 2008 NetIQ Corporation. All rights reserved.

Contact Information

Alyssa FoxInformation Development ManagerNetIQ [email protected]

Meredith KramerLead Information DeveloperNetIQ [email protected]

Page 30: Mobile and agile   the floating writer's survival kit

NetIQ Confidential Information


Top Related