Content
Mini-Hydropower
Classification & characteristics
Basic scheme design & components
Important parameters
Opportunities and constraints
Sources and further reading
![Page 3: Mini-Hydropower: Introduction and Overvie · Mini-Hydropower: Introduction and Overview Peter Schragl Lima, 13 noviembre 2012. Content ... Powerchannel and penstock Long penstock](https://reader031.vdocuments.us/reader031/viewer/2022022009/5aebb2487f8b9a45568d6afe/html5/thumbnails/3.jpg)
Classification of small scale hydropower
Hydropower
Class
Capacity
Range
Small up to 10 MW
(20 MW Peru )
Mini up to 1 MW
Micro up to 100 kW
Pico up to 5 kW
![Page 4: Mini-Hydropower: Introduction and Overvie · Mini-Hydropower: Introduction and Overview Peter Schragl Lima, 13 noviembre 2012. Content ... Powerchannel and penstock Long penstock](https://reader031.vdocuments.us/reader031/viewer/2022022009/5aebb2487f8b9a45568d6afe/html5/thumbnails/4.jpg)
Characteristics
Run of the river schemes
Decentralized power generation
Grid connected or isolated mini-grid
Plant operation with lower automation level
Often limited available data for detailed design
![Page 5: Mini-Hydropower: Introduction and Overvie · Mini-Hydropower: Introduction and Overview Peter Schragl Lima, 13 noviembre 2012. Content ... Powerchannel and penstock Long penstock](https://reader031.vdocuments.us/reader031/viewer/2022022009/5aebb2487f8b9a45568d6afe/html5/thumbnails/5.jpg)
Basic scheme design
Powerchannel and penstock Long penstock
![Page 6: Mini-Hydropower: Introduction and Overvie · Mini-Hydropower: Introduction and Overview Peter Schragl Lima, 13 noviembre 2012. Content ... Powerchannel and penstock Long penstock](https://reader031.vdocuments.us/reader031/viewer/2022022009/5aebb2487f8b9a45568d6afe/html5/thumbnails/6.jpg)
Basic scheme design
Mill leat Barrage / Dam
![Page 7: Mini-Hydropower: Introduction and Overvie · Mini-Hydropower: Introduction and Overview Peter Schragl Lima, 13 noviembre 2012. Content ... Powerchannel and penstock Long penstock](https://reader031.vdocuments.us/reader031/viewer/2022022009/5aebb2487f8b9a45568d6afe/html5/thumbnails/7.jpg)
Basic scheme design
![Page 8: Mini-Hydropower: Introduction and Overvie · Mini-Hydropower: Introduction and Overview Peter Schragl Lima, 13 noviembre 2012. Content ... Powerchannel and penstock Long penstock](https://reader031.vdocuments.us/reader031/viewer/2022022009/5aebb2487f8b9a45568d6afe/html5/thumbnails/8.jpg)
Basic scheme design – Weir and Intake
![Page 9: Mini-Hydropower: Introduction and Overvie · Mini-Hydropower: Introduction and Overview Peter Schragl Lima, 13 noviembre 2012. Content ... Powerchannel and penstock Long penstock](https://reader031.vdocuments.us/reader031/viewer/2022022009/5aebb2487f8b9a45568d6afe/html5/thumbnails/9.jpg)
Basic scheme design – Weir and Intake
![Page 10: Mini-Hydropower: Introduction and Overvie · Mini-Hydropower: Introduction and Overview Peter Schragl Lima, 13 noviembre 2012. Content ... Powerchannel and penstock Long penstock](https://reader031.vdocuments.us/reader031/viewer/2022022009/5aebb2487f8b9a45568d6afe/html5/thumbnails/10.jpg)
Basic scheme design – Weir and Intake
![Page 11: Mini-Hydropower: Introduction and Overvie · Mini-Hydropower: Introduction and Overview Peter Schragl Lima, 13 noviembre 2012. Content ... Powerchannel and penstock Long penstock](https://reader031.vdocuments.us/reader031/viewer/2022022009/5aebb2487f8b9a45568d6afe/html5/thumbnails/11.jpg)
Important parameters
![Page 12: Mini-Hydropower: Introduction and Overvie · Mini-Hydropower: Introduction and Overview Peter Schragl Lima, 13 noviembre 2012. Content ... Powerchannel and penstock Long penstock](https://reader031.vdocuments.us/reader031/viewer/2022022009/5aebb2487f8b9a45568d6afe/html5/thumbnails/12.jpg)
Important parameters
HEAD (H)
![Page 13: Mini-Hydropower: Introduction and Overvie · Mini-Hydropower: Introduction and Overview Peter Schragl Lima, 13 noviembre 2012. Content ... Powerchannel and penstock Long penstock](https://reader031.vdocuments.us/reader031/viewer/2022022009/5aebb2487f8b9a45568d6afe/html5/thumbnails/13.jpg)
Important parameters
Head Detailed topographic maps
Topographic survey
Direct head measurements
Flow Gauging stations
Correlation of catchment area
Modelling of catchment area
![Page 14: Mini-Hydropower: Introduction and Overvie · Mini-Hydropower: Introduction and Overview Peter Schragl Lima, 13 noviembre 2012. Content ... Powerchannel and penstock Long penstock](https://reader031.vdocuments.us/reader031/viewer/2022022009/5aebb2487f8b9a45568d6afe/html5/thumbnails/14.jpg)
Important parameters
Mountainous terrain
Many rivers and streams
High yearly precipitation
Region Height above
sea level (m)
Yearly rainfall
(mm)
Coast
(Costa)
0 – 500 40
Highland
(Sierra)
500 – 6780 600
Forrest
(Selva)
400 – 1000 3000 – 4000
![Page 15: Mini-Hydropower: Introduction and Overvie · Mini-Hydropower: Introduction and Overview Peter Schragl Lima, 13 noviembre 2012. Content ... Powerchannel and penstock Long penstock](https://reader031.vdocuments.us/reader031/viewer/2022022009/5aebb2487f8b9a45568d6afe/html5/thumbnails/15.jpg)
Opportunities and constraints
Large Hydro
Gas
Other
Small Hydro
Power Generation of one day with peak demand in 2011
Source: Memoria Anual COES 2011
![Page 16: Mini-Hydropower: Introduction and Overvie · Mini-Hydropower: Introduction and Overview Peter Schragl Lima, 13 noviembre 2012. Content ... Powerchannel and penstock Long penstock](https://reader031.vdocuments.us/reader031/viewer/2022022009/5aebb2487f8b9a45568d6afe/html5/thumbnails/16.jpg)
Opportunities and constraints
Hydrological
Region
Sites Cumulative
Technical
Potential (MW)
Pacific 02 17 322,55
Pacific 04 5 65,40
Atlantic 07 46 1066,73
Atlantic 10 6 355,32
Atlantic 11 1 91,99
Atlantic 12 4 102,35
Atlantic 13 21 141,10
Total 100 2 145,44
Best 100 potential hydropower projects (1-100 MW)
Source: Atlas del potencial hidroeléctrico del Perú, 2011
![Page 17: Mini-Hydropower: Introduction and Overvie · Mini-Hydropower: Introduction and Overview Peter Schragl Lima, 13 noviembre 2012. Content ... Powerchannel and penstock Long penstock](https://reader031.vdocuments.us/reader031/viewer/2022022009/5aebb2487f8b9a45568d6afe/html5/thumbnails/17.jpg)
Opportunities and constraints
Excerpt of 100 potential hydropower projects (1-100 MW)
Source: Atlas del potencial hidroeléctrico del Perú, 2011
![Page 18: Mini-Hydropower: Introduction and Overvie · Mini-Hydropower: Introduction and Overview Peter Schragl Lima, 13 noviembre 2012. Content ... Powerchannel and penstock Long penstock](https://reader031.vdocuments.us/reader031/viewer/2022022009/5aebb2487f8b9a45568d6afe/html5/thumbnails/18.jpg)
Opportunities and constraints
Hydropower tradition in Peru Large Hydropower > 50% of total power generation in 2011
Small Hydropower is still dormant ~1%
Great hydropower potential (Small HP > 2000 MW)
European Union – Free Trade Agreement
Standardized Processes – Continuous Tenders
Atlas for Hydropower Potential in Peru
Growing economy and growing energy demand
![Page 19: Mini-Hydropower: Introduction and Overvie · Mini-Hydropower: Introduction and Overview Peter Schragl Lima, 13 noviembre 2012. Content ... Powerchannel and penstock Long penstock](https://reader031.vdocuments.us/reader031/viewer/2022022009/5aebb2487f8b9a45568d6afe/html5/thumbnails/19.jpg)
Opportunities and constraints
A successful project
combines…
…ensure coverage of all
aspects and include
partners who supplement
your expertise
![Page 20: Mini-Hydropower: Introduction and Overvie · Mini-Hydropower: Introduction and Overview Peter Schragl Lima, 13 noviembre 2012. Content ... Powerchannel and penstock Long penstock](https://reader031.vdocuments.us/reader031/viewer/2022022009/5aebb2487f8b9a45568d6afe/html5/thumbnails/20.jpg)
Importance of reliable partners and quality products
![Page 21: Mini-Hydropower: Introduction and Overvie · Mini-Hydropower: Introduction and Overview Peter Schragl Lima, 13 noviembre 2012. Content ... Powerchannel and penstock Long penstock](https://reader031.vdocuments.us/reader031/viewer/2022022009/5aebb2487f8b9a45568d6afe/html5/thumbnails/21.jpg)
Sources and further reading
1. Atlas del potencial hidroeléctrico del Perú, 2011 Ministerio de Energía y Minas http://sigfoner.minem.gob.pe/hidro/Site/hgis/atlas.html
2. Photovoltaik und Kleinwasserkraft Zielmarktanalyse Peru – mit Profilen der Marktakteure, 2012 Deutsch-Peruanische Industrie- und Handelskammer www.exportinitiative.bmwi.de
3. GOOD & BAD of Mini Hydro Power, 2009 The ASEAN Centre for Energy (ACE) http://www.aseanenergy.org http://agmhp.aseanenergy.org