Six Sigma through the Supply Chain
Overview
Six Sigma through the Supply Chain
Overview
![Page 2: Microsoft PowerPoint - (25) Craig Davidson Presentation](https://reader034.vdocuments.us/reader034/viewer/2022051818/549586bcac7959ff2d8b4ea4/html5/thumbnails/2.jpg)
2
Supply Chain Overview
Retail PharmacyWholesaler
Supplier
Manufacturer National Chain Pharmacy
Acute Care Facility
Six Sigma Quality
![Page 3: Microsoft PowerPoint - (25) Craig Davidson Presentation](https://reader034.vdocuments.us/reader034/viewer/2022051818/549586bcac7959ff2d8b4ea4/html5/thumbnails/3.jpg)
3
McKesson Progress
Since 2003 McKesson has completed 822 projects, and has 205 projects currently active.
•14 Supplier Projects•132 McKesson Focused Projects•59 Direct Customer Impact Projects
By Project Type
•380 DMAIC•494 Baseline•153 Translation
![Page 4: Microsoft PowerPoint - (25) Craig Davidson Presentation](https://reader034.vdocuments.us/reader034/viewer/2022051818/549586bcac7959ff2d8b4ea4/html5/thumbnails/4.jpg)
4
OverviewOverview
• Suppliers• Wholesaler• Customers
![Page 5: Microsoft PowerPoint - (25) Craig Davidson Presentation](https://reader034.vdocuments.us/reader034/viewer/2022051818/549586bcac7959ff2d8b4ea4/html5/thumbnails/5.jpg)
5
Supplier Projects
•Lead Time Delivery
•Quality of Delivery
•Aging on Products
•Communications
![Page 6: Microsoft PowerPoint - (25) Craig Davidson Presentation](https://reader034.vdocuments.us/reader034/viewer/2022051818/549586bcac7959ff2d8b4ea4/html5/thumbnails/6.jpg)
6
Sample Project – Quality of Delivery
Opportunity– Quantity Debits Occurrences = 973 / $972,369– AddBacks PODs = 263 / $125,592– AddBacks Free Astrays = 552 / $822,855
Key Findings– Supplier X ranks #1 in quantity debit occurrences and dollars– In-transit times can exceed 12 days, creating a free-astray situation– Issues with damage due to packaging methods
Targeted Improvements– Reduction of Supplier X Quantity Debit creations
Targeted Benefits– Reduction of: In-transit damage and reduced transit times to reflect
contract payment terms of 1% net 15 days for Supplier X
![Page 7: Microsoft PowerPoint - (25) Craig Davidson Presentation](https://reader034.vdocuments.us/reader034/viewer/2022051818/549586bcac7959ff2d8b4ea4/html5/thumbnails/7.jpg)
7
Nashville DC #020
Key Findings
– Three skids were over packed and leaning, packed skid was over 90 inches tall
– Bottom boxes were skin prep trays (00179) of approx 5 pound each
– Top boxes were scrub care prep (4465B) approx 25 pounds each.
– McKesson PO#s 419235, 437633, 446970
![Page 8: Microsoft PowerPoint - (25) Craig Davidson Presentation](https://reader034.vdocuments.us/reader034/viewer/2022051818/549586bcac7959ff2d8b4ea4/html5/thumbnails/8.jpg)
8
Nashville DC #020
![Page 9: Microsoft PowerPoint - (25) Craig Davidson Presentation](https://reader034.vdocuments.us/reader034/viewer/2022051818/549586bcac7959ff2d8b4ea4/html5/thumbnails/9.jpg)
9
Nashville DC #020
![Page 10: Microsoft PowerPoint - (25) Craig Davidson Presentation](https://reader034.vdocuments.us/reader034/viewer/2022051818/549586bcac7959ff2d8b4ea4/html5/thumbnails/10.jpg)
10
Improvements
Improvements Efforts
– Working with Supplier X to address packaging and pallet build considerations making for more accurate and efficient receiving.
– Brainstorming session with joint McKesson and Supplier X participation.
– Created List of Improvement Ideas• Supplier to look at palleting process• Data shows larger single orders having statistically significant impact on
defect, McKesson to order smaller quantities more frequently.• McKesson discussing change in policy
![Page 11: Microsoft PowerPoint - (25) Craig Davidson Presentation](https://reader034.vdocuments.us/reader034/viewer/2022051818/549586bcac7959ff2d8b4ea4/html5/thumbnails/11.jpg)
11
OverviewOverview
• Suppliers• Wholesaler• Customers
![Page 12: Microsoft PowerPoint - (25) Craig Davidson Presentation](https://reader034.vdocuments.us/reader034/viewer/2022051818/549586bcac7959ff2d8b4ea4/html5/thumbnails/12.jpg)
12
Wholesaler Projects
•Efficiency of Resources
•Order Quality
•Financial Impact
•Communications
•Productivity
![Page 13: Microsoft PowerPoint - (25) Craig Davidson Presentation](https://reader034.vdocuments.us/reader034/viewer/2022051818/549586bcac7959ff2d8b4ea4/html5/thumbnails/13.jpg)
13
Sample Project – Order Quality
In order to increase sales, reduce inventory write-offs this project will improve the order filling at the Slidell Distribution Center. Currently the DC's Quality Index is approximately .10%. A goal of this project is to reduce the Quality Index to .05%. In addition this project will focus on reducing the defects seen by the Customers.
![Page 14: Microsoft PowerPoint - (25) Craig Davidson Presentation](https://reader034.vdocuments.us/reader034/viewer/2022051818/549586bcac7959ff2d8b4ea4/html5/thumbnails/14.jpg)
14
Baseline Performance
Defect Breakdown by Rx and OTCCTQ D U OP DPMO Low er UpperRx
Rx Shorts 54 27932 1 4933 1453 2522Rx Overages 41 27932 1 1468 1054 1991
Rx Wrong Items 23 27932 1 823 522 1235
OTCOTC Shorts 60 12535 1 4787 3655 6157
OTC Overages 53 12535 1 4228 3169 5527OTC Wrong Items 18 12535 1 1436 851 2269
Wrong Item X's being trackedWrong Item s D U OP DPMO Low er Upper
Label Slid 22 41 1 536585 374248 693441Same shelf 29 41 1 707317 544626 838701Wrong Bay 3 41 1 73171 15351 199246
Location Overf ill 4 41 1 97561 27228 231315Wrong Product 10 41 1 243902 123633 403046
![Page 15: Microsoft PowerPoint - (25) Craig Davidson Presentation](https://reader034.vdocuments.us/reader034/viewer/2022051818/549586bcac7959ff2d8b4ea4/html5/thumbnails/15.jpg)
15
Improvement Ideas
• Training • Picking clips • Shelf dividers • Location tags• Requiring amount to be entered for Rx and OTC• Stocking Procedures-
– a. Some locations have too much product on the shelf, these should be moved to a larger shelf location or be put in a backuplocation if available.
– b. Plastic not being cut also is showing some impact on the number of shorts and overages.
• RF units have scratches on the display glass.
![Page 16: Microsoft PowerPoint - (25) Craig Davidson Presentation](https://reader034.vdocuments.us/reader034/viewer/2022051818/549586bcac7959ff2d8b4ea4/html5/thumbnails/16.jpg)
16
Improvements
Total Defects CTQ D U OP DPMO Lower Upper
Overage 94 40467 1 2,323 1,878 2,842Short 114 40467 1 2,817 2,324 3,383
Wrong Item 41 40467 1 1,013 727 1,374
Total Defects CTQ D U OP DPMO Lower Upper
Overage 324 230984 1 1,403 1,254 1,564Short 424 230984 1 1,836 1,665 2,019
Wrong Item 147 230984 1 636 538 748
Old
New
![Page 17: Microsoft PowerPoint - (25) Craig Davidson Presentation](https://reader034.vdocuments.us/reader034/viewer/2022051818/549586bcac7959ff2d8b4ea4/html5/thumbnails/17.jpg)
17
OverviewOverview
• Suppliers• Wholesaler• Customers
![Page 18: Microsoft PowerPoint - (25) Craig Davidson Presentation](https://reader034.vdocuments.us/reader034/viewer/2022051818/549586bcac7959ff2d8b4ea4/html5/thumbnails/18.jpg)
18
Customer Projects
•Internal Quality
•Financial Impact
•Customer Satisfaction
•Inventory Control
•Regulatory Compliance
![Page 19: Microsoft PowerPoint - (25) Craig Davidson Presentation](https://reader034.vdocuments.us/reader034/viewer/2022051818/549586bcac7959ff2d8b4ea4/html5/thumbnails/19.jpg)
19
Sample Project – Hospital X
•Assist in implementing Six Sigma•Structure•Project Selection•Mentoring/Testing
•Provide Training•Greenbelt•Blackbelt•Executive
![Page 20: Microsoft PowerPoint - (25) Craig Davidson Presentation](https://reader034.vdocuments.us/reader034/viewer/2022051818/549586bcac7959ff2d8b4ea4/html5/thumbnails/20.jpg)
20
Project Funnel (High Level)
Hospital X Project Funnel Quality
& Safety
Clinica
l Visi
onPhysic
ian Support
and D
evelopment
Continuum of C
are
Organ
izatio
nal Deve
lopment
Public Polic
y & A
dvoca
cy
Community O
ut Rea
ch
Ease o
f Impro
vemen
t Pro
ject
Finance
Project Area 10 7 7 4 7 2 1 10 10 RANKPro 7 Scope 9 9 9 1 9 9 3 1 9 404Patient Sat 3 3 3 3 9 9 3 1 9 268Supply Chain 3 9 9 1 3 1 1 1 9 284outpatient growth 3 9 9 3 3 1 1 3 9 312Improve admissions to Hartwycks 1 1 1 9 1 1 1 3 9 190Pharm Robot ROI 3 1 3 1 1 1 1 3 9 192Staff Competency 9 9 3 9 9 1 1 1 9 376talent management 9 3 3 3 9 1 3 3 9 332employee sat 9 3 3 3 9 1 1 3 9 330JCHO Safety Goals 9 3 1 3 9 3 3 1 9 302IHI (save 100,000 lives) 9 3 3 1 3 9 1 3 9 296Length of Stay / Varinace of Care 9 3 1 3 3 1 1 1 9 254Phy. Practice - Discharge 9 3 1 3 3 1 1 1 9 254Clinical documentation program 3 1 9 1 3 1 1 3 9 248ITPMO 3 1 3 1 3 1 1 3 9 206Desc. Spending 3 3 3 1 3 1 1 9 1 200LUR's 3 1 1 1 3 1 1 3 9 192Eval of phsych patients 9 1 1 1 3 1 1 3 3 192Safety Report System 9 1 1 1 3 3 1 1 3 176Charge capture 1 1 3 1 3 1 1 1 9 166Pharmacy - Timeliness 3 1 3 1 1 1 1 3 3 132Rev. cycle 1 1 3 1 3 1 1 1 3 106
![Page 21: Microsoft PowerPoint - (25) Craig Davidson Presentation](https://reader034.vdocuments.us/reader034/viewer/2022051818/549586bcac7959ff2d8b4ea4/html5/thumbnails/21.jpg)
21
Funnel to Project
• Pro 7 Scope– At Hospital X, the appropriate care measures for eligible patients
diagnosed with Acute Myocardial Infarction (AMI) is not meeting our compliance goal of 100%. We scored 82% in 2004 and 87% for the first half of 2005. As a result we are not reported in the top 10% of NJ hospitals that provide the best care for AMI patients.
• Patient Satisfaction– Patient Satisfaction has been identified as one of three major initiatives for
Hospital X for 2005-2006. During the 2Q 2005, 3W was one of several nursing units with patient satisfaction scores below the mean score for the hospital system. Of the top 10 priority index (importance of aspect of patient visit most important to them), 3W achieved a score of 77.8 in the area of communication of information to patient/familiy regarding condition or treatment (2nd on the top 10). This score was well below what was necessary to reach the 80th percentile
• Supply Chain– Financial viability has been identified as one of three major initiatives for
Hospital X 2005-2006. In FY 2004-2005, a revenue loss was identified in the Emergency Room (ER) which prompted a charge capture project to be initiated. During this project, it was identified that charges for medications being maintained as floor stock or in the Omnicell (automated inventory unit) are not consistently being captured.
![Page 22: Microsoft PowerPoint - (25) Craig Davidson Presentation](https://reader034.vdocuments.us/reader034/viewer/2022051818/549586bcac7959ff2d8b4ea4/html5/thumbnails/22.jpg)
22
Accomplishments to Date
•One Executive Class Completed
•Project Funnel (High Level) Completed
•Three Blackbelts Trained
•Three Projects Underway (in Analyze/ Improve)
•One Introductory class completed
![Page 23: Microsoft PowerPoint - (25) Craig Davidson Presentation](https://reader034.vdocuments.us/reader034/viewer/2022051818/549586bcac7959ff2d8b4ea4/html5/thumbnails/23.jpg)
23
Supply Chain Overview
Retail PharmacyWholesaler
Supplier
Manufacturer National Chain Pharmacy
Acute Care Facility
Six Sigma Quality