![Page 1: Mayo Renewable Power-Killala · Mayo Renewable Power-Killala Progress Report March 2016 MRP-a. MRP-a MRP - Killala March 2016 ... MRP Progress Report - March 2016 –Image 08](https://reader033.vdocuments.us/reader033/viewer/2022042220/5ec6b4d27965b564650c51fb/html5/thumbnails/1.jpg)
Mayo Renewable Power-Killala
Progress Report March 2016
MR
P-K
illal
a
![Page 2: Mayo Renewable Power-Killala · Mayo Renewable Power-Killala Progress Report March 2016 MRP-a. MRP-a MRP - Killala March 2016 ... MRP Progress Report - March 2016 –Image 08](https://reader033.vdocuments.us/reader033/viewer/2022042220/5ec6b4d27965b564650c51fb/html5/thumbnails/2.jpg)
MR
P-K
illal
aMRP - Killala March 2016
• Siteworks• Works including general ducting and
drainage continue to all areas.• Sprinkler mains installation is
substantially complete• Main access road Kerbing has
commenced
• Turbine Hall• Construction of the Turbine Plinth
has commenced, 1st pour has been completed, reinforcement for 2nd pour is being placed.
• 1st section of floor slab has been poured.
• Control Building• Steel Frame is complete.• 1st floor concrete slabs are in place.• 1st floor slab has been poured.
• Boiler House• Piling for foundations is complete• Reinforcement placement for both
North and South Boiler foundations has commenced
• Monthly Environmental monitoring is continuing by external monitoring specialist (NVM)
• Monthly monitoring report has been issued for
• July - February• February (21st March).
• There have been 234 people ‘inducted’ on site to date
• Currently there are approximately 100 people working on site.
General Summary
• We continue to record the details of all job seekers who call to the site offices.This information is maintained in site database and is shared with each sub-contractor as packages are let. This database currently contains the details of 249 people.
• Killala ‘Services Available’ signage being reviewed by Community Representatives
• Works to Turning Lanes on R314 – Crash Barriers well advanced
![Page 3: Mayo Renewable Power-Killala · Mayo Renewable Power-Killala Progress Report March 2016 MRP-a. MRP-a MRP - Killala March 2016 ... MRP Progress Report - March 2016 –Image 08](https://reader033.vdocuments.us/reader033/viewer/2022042220/5ec6b4d27965b564650c51fb/html5/thumbnails/3.jpg)
MRP Progress Report - March 2016 – Image 01
Turbine Plinth – Reinforcement
![Page 4: Mayo Renewable Power-Killala · Mayo Renewable Power-Killala Progress Report March 2016 MRP-a. MRP-a MRP - Killala March 2016 ... MRP Progress Report - March 2016 –Image 08](https://reader033.vdocuments.us/reader033/viewer/2022042220/5ec6b4d27965b564650c51fb/html5/thumbnails/4.jpg)
MRP Progress Report - March 2016 – Image 02
Turbine Hall – 1st Section Of Floor Preparation
![Page 5: Mayo Renewable Power-Killala · Mayo Renewable Power-Killala Progress Report March 2016 MRP-a. MRP-a MRP - Killala March 2016 ... MRP Progress Report - March 2016 –Image 08](https://reader033.vdocuments.us/reader033/viewer/2022042220/5ec6b4d27965b564650c51fb/html5/thumbnails/5.jpg)
MRP Progress Report - March 2016 – Image 03
Control Building – 1st Floor Screed Pour
![Page 6: Mayo Renewable Power-Killala · Mayo Renewable Power-Killala Progress Report March 2016 MRP-a. MRP-a MRP - Killala March 2016 ... MRP Progress Report - March 2016 –Image 08](https://reader033.vdocuments.us/reader033/viewer/2022042220/5ec6b4d27965b564650c51fb/html5/thumbnails/6.jpg)
MRP Progress Report - March 2016 – Image 04
Control Building – 1st Floor Screed Pour Complete
![Page 7: Mayo Renewable Power-Killala · Mayo Renewable Power-Killala Progress Report March 2016 MRP-a. MRP-a MRP - Killala March 2016 ... MRP Progress Report - March 2016 –Image 08](https://reader033.vdocuments.us/reader033/viewer/2022042220/5ec6b4d27965b564650c51fb/html5/thumbnails/7.jpg)
MRP Progress Report - March 2016 – Image 05
Switch-room – Substructure / Blockwork Commenced
![Page 8: Mayo Renewable Power-Killala · Mayo Renewable Power-Killala Progress Report March 2016 MRP-a. MRP-a MRP - Killala March 2016 ... MRP Progress Report - March 2016 –Image 08](https://reader033.vdocuments.us/reader033/viewer/2022042220/5ec6b4d27965b564650c51fb/html5/thumbnails/8.jpg)
MRP Progress Report - March 2016 – Image 06
Boiler – North Raft Reinforcement
![Page 9: Mayo Renewable Power-Killala · Mayo Renewable Power-Killala Progress Report March 2016 MRP-a. MRP-a MRP - Killala March 2016 ... MRP Progress Report - March 2016 –Image 08](https://reader033.vdocuments.us/reader033/viewer/2022042220/5ec6b4d27965b564650c51fb/html5/thumbnails/9.jpg)
MRP Progress Report - March 2016 – Image 07
Boiler – South Raft Reinforcement
![Page 10: Mayo Renewable Power-Killala · Mayo Renewable Power-Killala Progress Report March 2016 MRP-a. MRP-a MRP - Killala March 2016 ... MRP Progress Report - March 2016 –Image 08](https://reader033.vdocuments.us/reader033/viewer/2022042220/5ec6b4d27965b564650c51fb/html5/thumbnails/10.jpg)
MRP Progress Report - March 2016 – Image 08
Western Carpark – Rock Breaking and Preparation
![Page 11: Mayo Renewable Power-Killala · Mayo Renewable Power-Killala Progress Report March 2016 MRP-a. MRP-a MRP - Killala March 2016 ... MRP Progress Report - March 2016 –Image 08](https://reader033.vdocuments.us/reader033/viewer/2022042220/5ec6b4d27965b564650c51fb/html5/thumbnails/11.jpg)
MRP Progress Report - March 2016 – Image 09
MLO – Prefabricated off site
![Page 12: Mayo Renewable Power-Killala · Mayo Renewable Power-Killala Progress Report March 2016 MRP-a. MRP-a MRP - Killala March 2016 ... MRP Progress Report - March 2016 –Image 08](https://reader033.vdocuments.us/reader033/viewer/2022042220/5ec6b4d27965b564650c51fb/html5/thumbnails/12.jpg)
MRP Progress Report - March 2016 – Image 10
Aerial View of Site