Managing the implementation of investment projects Project administration Contract management Expertise in arbitration proceedings at the Arbitration Court of the Chamber of
Commerce of Serbia and international arbitrations Design of technological and production processes in construction Optimizing the use of construction machinery and equipment Measurement and evaluation of works during the implementation of investment
projects Planning and control of the implementation of the works in the investment projects Reliability optimization of production systems in construction Design of organizational structures in the construction enterprises Design of organizational structures for implementation of investment projects Human resource management Design and implementation of information systems at the company level and at the
project level Design and implementation of databases Designing construction technology and organization
Our core areas of expertise are:
CPM CONSULTING d.o.o. was founded in the year 2010
2015 - present
Key project references of CPM Consulting doo and our resident associates:
2014 - 2015 Conducting specialization of internal staff for the company
Energotehnika - Južna Bačka in area of Project Management and application of General and Special Terms - FIDIC
Study for Contractor Kolubara doo Mionica - Analysis of delays and additional costs claimable towards the Investor - Belgrade Land Development Agency
2014 - 2015 TENT - Preliminary design of performance management of works
and Preliminary design of construction technology and organization
Comparative analysis of the price of the works for the construction of the South Stream pipeline through Serbia, including the construction of two compressor stations
NAAR - Training courses ARRA and JLS for the preparation of infrastructural projects
Development of the Contractor’s Claim - GP Hidrotehnika - Hidroenergetika for the project: Construction of the sewer interceptor tunnel -Višnjica (section from km 5 + 867.00 to km 12 + 638.30)
2013 - present
Key project references of CPM Consulting doo and our resident associates:
Contract Management - Protection of contractual position of the Investor Koridori Srbije on all LOT’s - Corridor X - E-80 (Nis - Bulgarian border) and E-75 (Nis - Macedonian border). The scope of work includes the analysis and assessment of the Variations and Compensation Claims submitted by all of the Contractors towards Investor, implemented through Sub-consultancy agreement with Egis International
2013 - present
Key project references of CPM Consulting doo and our resident associates:
Contract Management on the Project of Reconstruction of the Copper Smelter and construction of Sulfuric acid plant - RTB Bor, including the analysis of submitted Variations and Compensation Claims on behalf of Contractor SNC Lavalin, as well as development Compensation Claims for the Investor to be submitted to the Contractor
2012 - 2013
Key project references of CPM Consulting doo and our resident associates:
Expertise in arbitration proceedings before the Arbitration Court of the Chamber of Commerce in Serbia in regard with dispute claims for ATLAS facility in Block 41, Belgrade
Expertise in arbitration proceedings before the Arbitration Court of the Chamber of Commerce in Serbia in regard with dispute claims for a facility GTC in Block 19A, Belgrade
2012 Techno-economic analysis of the solutions including three types
of pavements: flexible, semi-rigid and rigid for part of the highway from Pirot to the border with Bulgaria
Editing design solution by replacing tunnel variant in accordance with Value Engineering - total value of 2.5 million euros in the section Sukovo-Dimitrovgrad bypass
2011
2010 - 2012
Key project references of CPM Consulting doo and our resident associates:
Contract Management including development of Variation Order and Claim’s on section Sukovo bypass
Contract Management including development of Variation Order and Claim’s for LOT 1, section Pirot East – Sukovo
Contract Management including development of Variation Order and Claim’s for LOT 1 and LOT 2 on the bypass around Dimitrovgrad
Management of implementation of works on the construction of the petrochemical complex (Hydrocracker Complex) for deep oil refining worth approximately $ 4,500.000.000, in the city of Kirishi, Russia