![Page 1: Master Plans for Urban Water Infrastructure in The …...Water and Wastewater Master Plan Update Implementation Strategy 96 November 200909 Figure 5–2 York Region Wastewater Servicing](https://reader030.vdocuments.us/reader030/viewer/2022040608/5ec620079cf3233e631d4a15/html5/thumbnails/1.jpg)
Master Plans for Urban Water Infrastructure in The City of Vaughan
City-Wide Water & Wastewater Master Plan Class EA
APPENDIX B York Region Water & Wastewater Projects
JUNE 2014
The Municipal Infrastructure Group Ltd.
8800 Dufferin Street, Suite 2000 Vaughan ON CA L4K 5X6
tel 905.738.5700 fax 905.738.0065
In association with: Fabian Papa & Partners Inc. 216 Chrislea Road, Suite 501 Woodbridge ON CA L4L 8S5
tel 905.264.2420 fax 905.264.2441
Prepared on behalf of:
The City of Vaughan Development/Transportation
Engineering Department 2141 Major Mackenzie Drive
Vaughan, ON L6A 1T1 tel: 905-832-8585 fax: 905-832-6145
![Page 2: Master Plans for Urban Water Infrastructure in The …...Water and Wastewater Master Plan Update Implementation Strategy 96 November 200909 Figure 5–2 York Region Wastewater Servicing](https://reader030.vdocuments.us/reader030/viewer/2022040608/5ec620079cf3233e631d4a15/html5/thumbnails/2.jpg)
this report has been formatted for double-sided printing
![Page 3: Master Plans for Urban Water Infrastructure in The …...Water and Wastewater Master Plan Update Implementation Strategy 96 November 200909 Figure 5–2 York Region Wastewater Servicing](https://reader030.vdocuments.us/reader030/viewer/2022040608/5ec620079cf3233e631d4a15/html5/thumbnails/3.jpg)
main report
Master Plan Update
N O V E M B E R 2 0 0 9
Servicing for a Safe and Healthy Environment
![Page 4: Master Plans for Urban Water Infrastructure in The …...Water and Wastewater Master Plan Update Implementation Strategy 96 November 200909 Figure 5–2 York Region Wastewater Servicing](https://reader030.vdocuments.us/reader030/viewer/2022040608/5ec620079cf3233e631d4a15/html5/thumbnails/4.jpg)
Water and Wastewater Master Plan Update Implementation Strategy
95 November 200909
Figure 5–1 York Region Water Servicing by 2031
![Page 5: Master Plans for Urban Water Infrastructure in The …...Water and Wastewater Master Plan Update Implementation Strategy 96 November 200909 Figure 5–2 York Region Wastewater Servicing](https://reader030.vdocuments.us/reader030/viewer/2022040608/5ec620079cf3233e631d4a15/html5/thumbnails/5.jpg)
Water and Wastewater Master Plan Update Implementation Strategy
96 November 200909
Figure 5–2 York Region Wastewater Servicing by 2031.