BHEL BPLID Area Title Drg_No Purpose Sch. Sub
166 RE JOINTS GA Of RE Joint for Condenser Inlet/Outlet. 1800 NB (Pressure Balance Type)
BP-DG-314-133-0001 A 26/11/2008
167 RE JOINTS Gen. Arrgt. Of RE Joint for CW Pump Discharge 1800 NB (Conventional Type)
BP-DG-314-133-0002 A 26/11/2008
168 RE JOINTS Gen. Arrgt. Of RE Joint for ACW Pump Discharge 600 NB (Conventional Type)
BP-DG-314-133-0003 A 26/11/2008
169 RE JOINTS Gen. Arrgt. Of RE Joint for RW Pump Discharge 600 NB (Conventional Type)
BP-DG-314-133-0004 A 26/11/2008
170 FLASH TANKS General Arragt. of Cond. Expansion Tank BP-DG-314-147-0001 A 26/11/2008
171 FLASH TANKS General Arragt. of Cond. Recovery Tank BP-DG-314-147-0002 A 26/11/2008
172 MISC TANKS General Arrgt.of ECW Tank BP-DG-314-167-0001 A 26/11/2008
173 MISC TANKS General Arrgt.of Clean Oil Tank BP-DG-314-167-0002 A 26/11/2008
174 MISC TANKS General Arrgt.of Dirty oil Tank BP-DG-314-167-0003 A 26/11/2008
175 MISC TANKS General Arrgt.of Oil Unloading Vessel BP-DG-314-167-0004 A 26/11/2008
176 BF VALV Arrgt. Of F1800 B.F.Valve With Elect. Actuator (CW Pump Discharge)
BP-DG-314-165-0001 A 26/11/2008
177 BF VALV Arrgt. Of F1800 B.F.Valve With Elect. Actuator (CW Pump Discharge Header)
BP-DG-314-165-0002 A 26/11/2008
178 BF VALV Arrgt. Of F1800 B.F.Valve With Elect. Actuator (Condenser Inlet)
BP-DG-314-165-0003 A 26/11/2008
179 BF VALV Arrgt. Of F1800 B.F.Valve With Elect. Actuator (Condenser Outlet)
BP-DG-314-165-0004 A 26/11/2008
180 BF VALV Arrgt. Of F1400 B.F.Valve With Elect. Actuator (CW System)
BP-DG-314-165-0005 A 26/11/2008
181 BF VALV Arrgt. Of F1000 B.F.Valve With Elect. Actuator (CW System)
BP-DG-314-165-0006 A 26/11/2008
182 BF VALV Arrgt. Of F1000 B.F.Valve With Manual Operator (CW System)
BP-DG-314-165-0007 A 26/11/2008
183 BF VALV Arrgt. Of F600 B.F.Valve With Electrical Actuator (ACW/ECW/PW System)
BP-DG-314-165-0008 A 26/11/2008
184 BF VALV Arrgt. Of F600 B.F.Valve With Manual Operator & Limit Switch (ACW System)
BP-DG-314-165-0009 A 26/11/2008
185 BF VALV Arrgt. Of F600 B.F.Valve With Manual Operator (ACW/ECW System)
BP-DG-314-165-0010 A 26/11/2008
186 BF VALV Arrgt. Of F500 B.F.Valve With Electrical Actuator (CW/ECW/PW System)
BP-DG-314-165-0011 A 26/11/2008
187 BF VALV Arrgt. Of F500 B.F.Valve With Manual Operator (ECW System)
BP-DG-314-165-0012 A 26/11/2008
188 BF VALV Arrgt. Of F450 B.F.Valve With Electrical Actuator (Acw System)
BP-DG-314-165-0013 A 26/11/2008
189 BF VALV Arrgt. Of F400 B.F.Valve With Electrical Actuator (ECW/PW System)
BP-DG-314-165-0014 A 26/11/2008
190 BF VALV Arrgt. Of F400 B.F.Valve With Manual Operator (ECW System)
BP-DG-314-165-0015 A 26/11/2008
05 December 2008 Page 2 of 49
191 BF VALV Data Sheet & living diagram for Electrical Actuator BP-DG-314-165-0016 A 26/11/2008
192 BF VALV Painting Scheme for Butterfly Valves BP-DG-314-165-0017 A 26/11/2008
193 XFR GTG Outline General Arrangement BP-DG-314-301-0001 A 26/11/2008
194 XFR GTG OGA Part list BP-DG-314-301-0002 A 26/11/2008
195 XFR GTG Foundation Plan BP-DG-314-301-0003 A 26/11/2008
196 XFR GTG HV Bushing BP-DG-314-301-0004 A 26/11/2008
197 XFR GTG LV Bushing BP-DG-314-301-0005 A 26/11/2008
198 XFR GTG Neutral Bushing BP-DG-314-301-0006 A 26/11/2008
199 XFR GTG Roller Arrangement BP-DG-314-301-0007 A 26/11/2008
200 XFR GTG LV Busduct Mtg. Arrangement BP-DG-314-301-0008 A 26/11/2008
201 XFR GTG Shipping Diagram BP-DG-314-301-0009 A 26/11/2008
202 XFR GTG Rating and Diagram Plate BP-DG-314-301-0010 A 26/11/2008
203 XFR GTG Valve Schedule Plate BP-DG-314-301-0011 A 26/11/2008
204 XFR GTG GA of Cooler Control Cabinet BP-DG-314-301-0012 A 26/11/2008
205 XFR GTG Cooler control scheme BP-DG-314-301-0013 A 26/11/2008
206 XFR GTG Transformer Technical Data Sheet BP-DG-314-301-0014 A 26/11/2008
207 XFR GTG Customer’s Inspection Test Schedule BP-DG-314-301-0015 A 26/11/2008
208 XFR STG Outline General Arrangement BP-DG-314-301-0021 A 26/11/2008
209 XFR STG OGA Part list BP-DG-314-301-0022 A 26/11/2008
210 XFR STG Foundation Plan BP-DG-314-301-0023 A 26/11/2008
211 XFR STG HV Bushing BP-DG-314-301-0024 A 26/11/2008
212 XFR STG 36kV, 12500A LV Bushing BP-DG-314-301-0025 A 26/11/2008
213 XFR STG 36kV, 630A HV Neutral Bushing BP-DG-314-301-0026 A 26/11/2008
214 XFR STG Roller Arrangement BP-DG-314-301-0027 A 26/11/2008
215 XFR STG LV Busduct Mtg. Arrangement BP-DG-314-301-0028 A 26/11/2008
216 XFR STG Shipping Diagram BP-DG-314-301-0029 A 26/11/2008
217 XFR STG Rating and Diagram Plate BP-DG-314-301-0030 A 26/11/2008
218 XFR STG Valve Schedule Plate BP-DG-314-301-0031 A 26/11/2008
219 XFR STG GA of Cooler Control Cabinet BP-DG-314-301-0032 A 26/11/2008
220 XFR STG Cooler control scheme BP-DG-314-301-0033 A 26/11/2008
221 XFR STG Transformer Technical Data Sheet BP-DG-314-301-0034 A 26/11/2008
222 XFR STG Customer’s Inspection Test Schedule BP-DG-314-301-0035 A 26/11/2008
223 BFP MOTOR BFP Motor GA Drawing BP-DG-314-139-0001 A 26/08/2009
224 BFP MOTOR Motor Data Sheet / Curve BP-DG-314-139-0002 A 26/08/2009
225 BFP MOTOR Main Terminal Box Drawing BP-DG-314-139-0003 A 26/08/2009
226 BFP MOTOR Neutral TB Drawing BP-DG-314-139-0004 A 26/08/2009
227 BFP MOTOR RTD/BTD TB Drawing BP-DG-314-139-0005 A 26/08/2009
228 BFP MOTOR CT Secondary TB BP-DG-314-139-0006 A 26/08/2009
229 BFP MOTOR Heater TB Drawing BP-DG-314-139-0007 A 26/08/2009
05 December 2008 Page 3 of 49
230 BFP MOTOR Test procedure for Type Test BP-DG-314-139-0008 A 26/08/2009
231 BFP MOTOR Type Test Certificate BP-DG-314-139-0009 A 26/08/2009
232 CEP MOTOR CEP Motor GA Drawing BP-DG-314-143-0001 A 26/08/2009
233 CEP MOTOR Motor Data Sheet / Curves BP-DG-314-143-0002 A 26/08/2009
234 CEP MOTOR Main Terminal Box Drawing BP-DG-314-143-0003 A 26/08/2009
235 CEP MOTOR Heater TB Drawing BP-DG-314-143-0004 A 26/08/2009
236 CEP MOTOR RTD/BTD TB Drawing BP-DG-314-143-0005 A 26/08/2009
237 CEP MOTOR Neutral TB Drawing BP-DG-314-143- 0006 A 26/08/2009
238 CEP MOTOR Test Procedure for Medium Range Motors BP-DG-314-143-0007 A 26/08/2009
239 CEP MOTOR Painting Specification for HT Motors BP-DG-314-143-0008 A 26/08/2009
240 CEP MOTOR Type Test Certificate BP-DG-314-143-0009 A 26/08/2009
241 CWP MOTOR Motor GA Drawing BP-DG-314-165-0001 A 26/08/2009
242 CWP MOTOR Motor Data Sheet / Curve BP-DG-314-165-0002 A 26/08/2009
243 CWP MOTOR Main Terminal Box Drawing BP-DG-314-165-0003 A 26/08/2009
244 CWP MOTOR Neutral TB Drawing BP-DG-314-165-0004 A 26/08/2009
245 CWP MOTOR Heater TB Drawing BP-DG-314-165-0005 A 26/08/2009
246 CWP MOTOR RTD / BTD TB Drawing BP-DG-314-165-0006 A 26/08/2009
247 CWP MOTOR CT Secondary TB BP-DG-314-165-0007 A 26/08/2009
248 CWP MOTOR Type Test Certificate BP-DG-314-165-0008 A 26/08/2009
249 CPHRC MTR Motor GA Drawing BP-DG-314-165-0010 A 26/08/2009
250 CPHRC MTR Motor Data Sheet / Curve BP-DG-314-165-0011 A 26/08/2009
251 CPHRC MTR Main Terminal Box Drawing BP-DG-314-165-0012 A 26/08/2009
252 CPHRC MTR Neutral TB Drawing BP-DG-314-165-0013 A 26/08/2009
253 CPHRC MTR Heater TB Drawing BP-DG-314-165-0014 A 26/08/2009
254 CPHRC MTR RTD / BTD TB Drawing BP-DG-314-165-0015 A 26/08/2009
255 CPHRC MTR CT Secondary TB BP-DG-314-165-0016 A 26/08/2009
256 CPHRC MTR Type Test Certificate BP-DG-314-165-0017 A 26/08/2009
257 ECW MOTOR Motor GA Drawing BP-DG-314-165-0020 A 26/08/2009
258 ECW MOTOR Motor Data Sheet / Curve BP-DG-314-165-0021 A 26/08/2009
259 ECW MOTOR Main Terminal Box Drawing BP-DG-314-165-0022 A 26/08/2009
260 ECW MOTOR Neutral TB Drawing BP-DG-314-165-0023 A 26/08/2009
261 ECW MOTOR Heater TB Drawing BP-DG-314-165-0024 A 26/08/2009
262 ECW MOTOR RTD / BTD TB Drawing BP-DG-314-165-0025 A 26/08/2009
263 ECW MOTOR CT Secondary TB BP-DG-314-165-0026 A 26/08/2009
264 ECW MOTOR Type Test Certificate BP-DG-314-165-0027 A 26/08/2009
265 ACW MOTOR Motor GA Drawing BP-DG-314-165-0030 A 27/05/2009
266 ACW MOTOR Motor Data Sheet / Curve BP-DG-314-165-0031 A 27/05/2009
267 ACW MOTOR Main Terminal Box Drawing BP-DG-314-165-0032 A 27/05/2009
268 ACW MOTOR Neutral TB Drawing BP-DG-314-165-0033 A 27/05/2009
05 December 2008 Page 4 of 49
269 ACW MOTOR Heater TB Drawing BP-DG-314-165-0034 A 27/05/2009
270 ACW MOTOR RTD / BTD TB Drawing BP-DG-314-165-0035 A 27/05/2009
271 ACW MOTOR CT Secondary TB BP-DG-314-165-0036 A 27/05/2009
272 ACW MOTOR Type Test Certificate BP-DG-314-165-0037 A 27/05/2009
273 SWP MOTOR Motor GA Drawing BP-DG-314-165-0050 A 27/05/2009
274 SWP MOTOR Motor Data Sheet / Curve BP-DG-314-165-0051 A 27/05/2009
275 SWP MOTOR Main Terminal Box Drawing BP-DG-314-165-0052 A 27/05/2009
276 SWP MOTOR Neutral TB Drawing BP-DG-314-165-0053 A 27/05/2009
277 SWP MOTOR Heater TB Drawing BP-DG-314-165-0054 A 27/05/2009
278 SWP MOTOR RTD / BTD TB Drawing BP-DG-314-165-0055 A 27/05/2009
279 SWP MOTOR CT Secondary TB BP-DG-314-165-0056 A 27/05/2009
280 SWP MOTOR Type Test Certificate BP-DG-314-165-0057 A 27/05/2009
281 PRT. PANEL OGA Drawing of Generator, GT and UAT Protection Panel
BP-DG-314-305-0001 A 25/02/2009
282 PRT. PANEL Schematic Drawing of Generator, GT and UAT Protection Panel
BP-DG-314-305-0002 A 25/02/2009
283 SW GEAR FOUNDATION DRAWING BP-DG-314-505-001 A 31/12/2008
284 SW GEAR LAYOUT DRAWING FOR 52 panels BP-DG-314-505-003 A 31/12/2008
285 SW GEAR LAYOUT DRAWING FOR 52 panels BP-DG-314-505-004 A 31/12/2008
286 SW GEAR KEYDIAGRAM FOR 52 panels BP-DG-314-505-005 A 31/12/2008
287 SW GEAR KEYDIAGRAM FOR 52 panels BP-DG-314-505-006 A 31/12/2008
288 SW GEAR SCHEMATIC DIAGRAM,INCOMER-1 BP-DG-314-505-007 A 28/02/2009
289 SW GEAR SCHEMATIC DIAGRAM,FPT BP-DG-314-505-008 A 28/02/2009
290 SW GEAR SCHEMATIC DIAGRAM,TRANSFORMER FEEDER-1 BP-DG-314-505-009 A 28/02/2009
291 SW GEAR SCHEMATIC DIAGRAM,TIE BP-DG-314-505-010 A 28/02/2009
292 SW GEAR SCHEMATIC DIAGRAM,BUSCOUPLER BP-DG-314-505-011 A 28/02/2009
293 SW GEAR SCHEMATIC DIAGRAM,BUSPT BP-DG-314-505-012 A 28/02/2009
294 SW GEAR SCHEMATIC DIAGRAM, MF BP-DG-314-505-013 A 28/02/2009
295 SW GEAR SCHEMATIC DIAGRAM, MFD BP-DG-314-505-014 A 28/02/2009
296 SW GEAR SCHEMATIC DIAGRAM,TRUNKING CUM BUSPT BP-DG-314-505-015 A 28/02/2009
297 SW GEAR FEEDER EARTHING TRUCK BP-DG-314-505-016 A 28/02/2009
298 SW GEAR BREAKER EARTHING TRUCK BP-DG-314-505-017 A 28/02/2009
299 SW GEAR DATASHEET BP-DG-314-505-018 A 28/02/2009
300 SW GEAR LEGEND OF DEVICES BP-DG-314-505-019 A 28/02/2009
05 December 2008 Page 5 of 49
BHEL EDNID Area Title Drg_No Purpose Sch. Sub
118 GT CONTROLS OGA, QP, TP OF MARKVI SYSTEM A 18/02/2009
119 GT CONTROLS WRITE-UP ON MARKVI SYSTEM I 18/02/2009
120 GT CONTROLS O&M MANUALS OF MARKVI SYSTEM I 28/04/2010
121 GTG & STG EXCITATION
OGA, QP, TP OF STATIC EXCITATION SYSTEM A 18/02/2009
122 GTG & STG EXCITATION
SCHEMATIC DRGS OF STATIC EXCITATION SYSTEM I 28/04/2010
123 GTG & STG EXCITATION
O&M MANUALS OF STATIC EXCITATION SYSTEM I 28/04/2010
124 STN C&I CONFIGURATION DIAGRAM DCS & HMIPIS A 03/06/2009
125 STN C&I OVEALL GENERAL ARRANGEMENT DCS (TG & STATION)
A 25/03/2009
126 STN C&I PARTITIONING DIAGRAM (FUNCTION GROUPING) DCS (TG & STATION)
A 03/06/2009
127 STN C&I POWER SUPPLY GROUNDING AND EARTHING FOR maxDNA SYSTEM
I 25/03/2009
128 STN C&I SYSTEM DESIGN PHILOSOPHY DCS (TG & STATION) A 03/06/2009
129 STN C&I QUALITY PLAN & TP OF DCS (TG & STATION) A 25/03/2009
130 STN C&I O & M MANUALS FOR TG CONTROLS I 07/07/2010
131 STN C&I O & M MANUALS FOR STATION C&I CONTROLS I 07/07/2010
132 STN C&I SYSTEM DESCRIPTION HMIPIS I 03/06/2009
133 STN C&I QUALITY PLAN & TEST PROTOCOL HMIPIS A 25/03/2009
134 STN C&I BILL OF MATERIALS HMIPIS A 03/06/2009
135 STN C&I DATA SHEET OF LVS I 08/07/2009
136 STN C&I OVEALL GENERAL ARRANGEMENT HMIPIS - CRT DESK
A 25/03/2009
137 STN C&I POWER DISTRIBUTION SCHEME OF HMIPIS I 03/06/2009
138 STN C&I NETWORK CONNECTION DIAGRAM OF HMIPIS I 03/06/2009
139 STN C&I DATA SHEET & INSTRUMENT LIST TEMPERATURE ELEMENTS
A 03/06/2009
140 STN C&I DATA SHEET & INSTRUMENT LIST E/P CONVERTERS A 03/06/2009
141 STN C&I IMPULSE AND SAMPLE PIPE - BOM A 03/06/2009
142 STN C&I TRANSMITTER RACKS / ENCLOSURES DRGS (GA ,LAYOUT, WIRING /TUBING ETC) & COMPONENT DATA SHEET.
A 03/06/2009
143 STN C&I INSTALLATION SCHEME FOR INSTRUMENTS A 03/06/2009
144 STN C&I DRG AND DATA SHEET FOR ANALYTICAL INSTRUMENTS
A 03/06/2009
145 STN C&I DATA SHEET & INSTRUMENT LIST PRESSURE/DIFF. PRESSURE GAUGE
A 03/06/2009
146 STN C&I DATA SHEET & INSTRUMENT LIST PRESSURE/DIFF. PRESSURE SWITCH
A 03/06/2009
05 December 2008 Page 6 of 49
147 STN C&I DATA SHEET & INSTRUMENT LIST LEVEL SWITCH A 03/06/2009
148 STN C&I DATA SHEET & INSTRUMENT LIST TEMP. GAUGE A 03/06/2009
149 STN C&I DATA SHEET FOR AIR FILTER REGULATOR I 03/06/2009
150 STN C&I DATA SHEET FOR VIBRATION MONITORING SYSTEM A 03/06/2009
151 STN C&I DATA SHEET & DRG.FOR LVL TRANSMITTER A 03/06/2009
152 STN C&I UPS & BATTERIES - DRG. AND DATA SHEETS + LOAD DATA & SIZING CALCULATION
A 08/07/2009
153 STN C&I DATA SHEET FOR INSTRUMENTAION CABLE A 03/06/2009
154 STN C&I DATA SHEET FOR THERMOCOUPLE EXTN. CABLE A 03/06/2009
155 STN C&I MASTER CLOCK DRAWING AND DATA SHEET A 03/06/2009
156 STN C&I DATA SHEET AND DRAWING FOR JUNCTION BOX I 08/07/2009
157 STN C&I DATA SHEET AND DRAWING FOR CJC BOX A 08/07/2009
158 STN C&I DATA SHEET & DRG FOR HART MANAGEMENT SYSTEM
A 08/07/2009
159 STN C&I DATA SHEET &DRG.FOR HYDROSTATIC TYPE LVL TRANSMITTER
A 03/06/2009
160 STN C&I DATA SHEETS FOR LABORATORY INSTRUMENTS I 18/08/2010
161 STN C&I O & M MANUALS-BOUGHT OUT ITEMS I 18/08/2010
162 STN C&I OGA OF UNIT CONTROL PANEL A 08/07/2009
163 STN C&I SCHEMATIC DIAGRAM OF UNIT CONTROL PANEL I 08/07/2009
164 STN C&I OGA OF ECP A 08/07/2009
165 STN C&I SCHEMATIC DIAGRAM OF ECP I 08/07/2009
05 December 2008 Page 7 of 49
BHEL HWRID Area Title Drg_No Purpose Sch. Sub
1 PED Foundation Plan 013100B1153 I 20/08/2008
2 PED Load on Foundation 013100B1151 I 20/08/2008
3 PED List of Embedded parts 213100B1152 I 20/08/2008
4 PED Laydown Space for major components of steam turbine with loading data
113100B1016 I 23/07/2008
5 PED Turbine lube oil system schemes 113100B1101 A 17/09/2008
6 PED Write up lub oil system scheme NA I 17/09/2008
7 PED Turbine gland seal steam system scheme 113100B1121 A 17/09/2008
8 PED Write up on gland seal steam system scheme NA I 17/09/2008
9 PED Turbine drain system scheme 1-13100-B1131 A 17/09/2008
10 PED Write up on drain system scheme NA I 17/09/2008
11 PED Condensate spray scheme for HP,IP & LP bypass system
213100B1141 A 15/10/2008
12 PED Write up on condensate spray scheme NA I 15/10/2008
13 PED HP,IP,LP Turbine system scheme (return/drain/vent)
013100B1142 A 17/09/2008
14 PED Write up on HP,IP,LP turbine system scheme NA I 17/09/2008
15 PED Control Oil system scheme (ESV & IV) 213100B1111 A 01/10/2008
16 PED Oil Room arrangement 113100B1004 I 03/09/2008
17 ST IP/LP Bypass valve Data sheets A 30/04/2008
18 PED Data sheet of lube oil pumps A 30/04/2008
19 PED Turbine drainage piping layout 013126B1001 A 04/02/2009
20 PED Condensate spray piping layout (IP & LP Bypass valve)
013109B1001 A 07/01/2009
21 PED Lube Oil Piping layout drgs 013111B1001 A 04/02/2009
22 PED Turbine Gland seal steam piping layout drawings 013105B1001 A 18/03/2009
23 PED Control oil piping Layout (IP & LP bypass valve) 213155B1001 A 15/04/2009
24 PED GA drg & PID of Lube Oil centrifuge unit A 30/04/2008
25 ST Influence factor of shafting due to misalignment 3-13100-B1008 I 25/06/2008
26 ST W-Up on Load cases , reqd stiffness & dynamic reqmts for turbine foundation
STE-TM-004 I 25/06/2008
27 ST O & M manual for turbine I 31/03/2010
28 PED Oil canal details 113100B1001 I 03/09/2008
29 PED Major connection location 013100B1003 I 10/09/2008
30 PED List of terminal details 413100B1001 I 31/12/2008
31 PED Foundation details of HPSU for LPBP valve 313100B1104 I 26/11/2008
32 PED Foundation details of HPSU for ESV & IV 313100B1105 I 26/11/2008
33 CIE List of feeder loads 4-18000-63-151 I 23/07/2008
05 December 2008 Page 8 of 49
34 CIE Turbine supervisory write up 4-18000-63-448 A 20/08/2008
35 CIE Write up on TSC (analog control) 4-18000-63-427 I 15/10/2008
36 CIE Write up on DTC 4-18000-63-442 I 15/10/2008
37 CIE Write up on IP/LP Bypass system (Analog control) I 12/11/2008
38 CIE Write up on gland seal steam pressure control (analog control)
4-18000-63-057 I 12/11/2008
39 CIE Turbine valve sensor arrangement 4-18000-63-022 I 11/03/2009
40 CIE Measuring points on TG bearings 4-18000-63-021 I 12/11/2008
41 CIE Turbine protection & Trip system 4-18000-63-116 A 26/11/2008
42 CIE Instrument List 4-18000-63-001 A 18/02/2009
43 CIE Temperature & Pressure tappings (beyond turbine integral systems)
4-18000-63-171 I 26/11/2008
44 CIE List of Recorders 4-18000-63-003 A 18/02/2009
45 CIE List of Indicators 4-18000-63-004 A 18/02/2009
46 CIE Write up on AVT 4-18000-63-446 I 12/11/2008
47 CIE Cabling diagram 4-18000-63-222 A 10/12/2008
48 CIE Logic Diagram (SGC) for Oil System 4-18000-63-071 A 04/02/2009
49 CIE Logic diagram (SGC) for Steam Turbine 4-18000-63-072 A 04/02/2009
50 CIE Fire Protection logics for Turbine 4-18000-63-111 A 04/02/2009
51 CIE Logic diagram (SGC) for condenser Air Evacuation system
4-18000-63-073 A 11/03/2009
52 CIE List of Annunciations 4-18000-63-002 A 18/02/2009
53 CIE Logic Diagram for AVT 4-18000-63-103 A 07/01/2009
54 CIE List & Layout of Junction Boxes 4-18000-63-020 I 04/02/2009
55 CIE Expansion, vibration scheme 4-18000-63-023 A 04/02/2009
56 CIE INST LIST FOR GTG GENERATOR C&I 4-18000-63G-011 I 26/11/2008
57 CIE SCH.DIAGRAM FOR DC EOP MOTOR STARTER PANEL 4-18000-63S-278 I 17/09/2008
58 CIE SCH.DIAG. FOR CONTROL CABINET FOR DC SEAL OIL MOTOR FOR GTG
4-18000-63G-279 I 17/09/2008
59 CIE SCH.DIAGRAM FOR GENERATOR C&I CABINET 4-18000-63S-280 I 17/09/2008
60 CIE LOGIC DIAG. FOR GENERATOR GAS DRYING 4-18000-63-094 A 12/11/2008
61 CIE OGA DRG FOR GENERATOR C & I CABINETS 4-18000-63-276 I 01/10/2008
62 CIE SCH.DIAGRAM FOR GAS ANALYSER CABINTES 4-18000-63-275 I 12/11/2008
63 CIE WRITE - UP ON LOGICS FOR GENERATOR AUX. C&I 4-18000-63-418 I 12/11/2008
64 CIE LIST AND LOGIC DIAGRAM FOR ALARMS AND ATRS OF GENERATOR & AUX.
4-18000-63G-100 A 12/11/2008
65 CIE SCH. DIAGRAM FOR DC JOP MOTOR STARTER PANEL 4-18000-63S-277 I 17/09/2008
66 CIE O&M MANUALS FOR GENERATOR C&I. I 27/10/2010
67 CIE WRITE - UP FOR GENERATOR C&I 4-18000-63-417 I 12/11/2008
68 CIE LOGIC DIAG. FOR GENERATOR BEARING EXHAUST 4-18000-63-095 A 12/11/2008
69 CIE LOGIC DIAG. FOR GENERATOR SEAL OIL 4-18000-63-096 A 12/11/2008
05 December 2008 Page 9 of 49
70 CIE INST LIST FOR STG GENERATOR C&I 4-18000-63S-011 I 18/02/2009
71 CIE HPSU LOGIC FOR MAIN GOVERNING 4-18000-63-262 I 24/06/2009
72 CIE HPSU LOGIC FOR LP & IP BYPASS 4-18000-63-261 I 24/06/2009
73 CIE W'UP & LOGIC LP & IP BYPASS PROTECTION 4-18000-63-440 I 24/06/2009
74 HXE GA of condenser 01601070054C146 A 06/08/2008
75 HXE Design memorandum & sizing calculation of condenser
HE-10738-16010-C146 A 23/07/2008
77 HXE GA of turbine Oil Coolers 01650170016C146 A 06/08/2008
78 HXE Condenser Data sheets HE-DS-10738-16010-C I 06/08/2008
79 HXE Turbine Oil Cooler data sheet HE-10738-16501-D I 23/07/2008
80 HXE Gland Steam Condenser 01620570008C146 I 06/08/2008
81 HXE GSC data sheet HE-10739-16205-D I 06/08/2008
82 HXE GA of fan exhauster for gland steam condenser and data sheet
I 30/04/2008
83 HXE GA of vacuum pumps I 30/04/2008
84 HXE Vacuum pump data sheet A 30/04/2008
85 GTG Generator Instrumentation Scheme 01390001315 A 25/06/2008
86 GTG Generator Seal oil System 11490001161 A 25/06/2008
87 GTG Generator Gas System scheme 01490001258 A 25/06/2008
88 GTG Generator waste Gas System 11490001162 A 25/06/2008
89 GTG Generator waste fluid system 21490001112 A 25/06/2008
90 GTG List of designations fopr auxiliary System Scheme TGE-2617 I 25/06/2008
91 GTG Slip ring Shaft instrumentation scheme 31430001010 A 25/06/2008
92 GTG Generator O/L 01390001314 I 25/06/2008
93 GTG GA of Slip ring Shaft assy. 01430001008 I 25/06/2008
94 GTG Foundation details of Generator Aux. Equipmt. 11500001075 I 25/06/2008
95 GTG Laydown space requirement for generator components
31390001051 I 25/06/2008
96 GTG List of Valves for generator systems TGE-2630 I 17/09/2008
97 GTG Terminal point list for generator pipe connections TGE-2628 I 17/09/2008
98 GTG Data Sheet for Generator, Exciter and Auxiliary systems
4033-0439 I 15/10/2008
99 GTG H2 Cooler Piping 0-150-00-01461 I 29/04/2009
100 GTG Generator piping plan 0-150-00-01459 I 29/04/2009
101 GTG O & M manual for Generator I 28/04/2010
102 STG Generator Instrumentation Scheme 01390001316 A 25/06/2008
103 STG Generator Seal oil System 11490001163 A 25/06/2008
104 STG Generator Gas System scheme 01490001261 A 25/06/2008
105 STG Generator waste Gas System 11490001164 A 25/06/2008
106 STG Generator waste fluid system 21490001113 A 25/06/2008
05 December 2008 Page 10 of 49
107 STG List of designations fopr auxiliary System Scheme TGE-2618 I 25/06/2008
108 STG Slip ring Shaft instrumentation scheme 31430001009 A 25/06/2008
109 STG Generator O/L 1390001313 I 25/06/2008
110 STG GA of Slip ring Shaft assy. 01430001007 I 25/06/2008
111 STG Foundation details of Generator Aux. Equipmt. 11500001076 I 25/06/2008
112 STG List of Valves for generator systems TGE-2631 I 17/09/2008
113 STG Terminal point list for generator pipe connections TGE-2629 I 17/09/2008
114 STG Data Sheet for Generator, Exciter and Auxiliary systems
4033-0440 I 15/10/2008
115 STG H2 Cooler Piping 0-150-00-01462 I 29/04/2009
116 STG Generator piping plan 0-150-00-01460 I 29/04/2009
117 STG O & M manual for Generator I 28/04/2010
1259 STG Laydown Space requirement for Generator Components
31390001051 I 25/06/2008
1260 PED Foundation Plan 013100B1154 I 20/08/2008
1261 PED Turbine lube oil system schemes 113100B1102 A 17/09/2008
1262 PED Turbine lube oil system schemes 113100B1103 A 17/09/2008
1263 PED Control Oil system scheme (IP & LP Bypass Valve) 313100B1112 A 01/10/2008
1264 PED Condensate spray piping layout (LPT exhaust) 013109B1002 A 07/01/2009
1265 PED Lube Oil Piping layout drgs 013111B1002 A 04/02/2009
1266 PED Lube Oil Piping layout drgs 013111B1003 A 04/02/2009
1267 PED Lube Oil Piping layout drgs 013111B1004 A 04/02/2009
1268 PED Lube Oil Piping layout drgs 013111B1005 A 04/02/2009
1269 PED Turbine Gland seal steam piping layout drawings 013105B1002 A 18/03/2009
1270 PED Turbine Gland seal steam piping layout drawings 013105B1003 A 18/03/2009
1271 PED Turbine Gland seal steam piping layout drawings 013105B1004 A 18/03/2009
1272 PED Turbine Gland seal steam piping layout drawings 013105B1005 A 18/03/2009
1273 PED Turbine Gland seal steam piping layout drawings 013105B1006 A 18/03/2009
1274 PED Turbine Gland seal steam piping layout drawings 013105B1007 A 18/03/2009
1276 PED Control oil piping Layout (ESV & IV) 013112B1001 A 15/04/2009
1277 PED Legend 21310001000 I 17/09/2008
1278 PED Valve details (Turbine integral systems) 313137B1000 I 31/12/2008
1279 PED GA Waste oil tank 213100B1017 I 12/11/2008
1280 PED GA Leakage/dirty oil tank and pump 213100B1015 I 12/11/2008
1281 CIE SCH.DIAG. FOR CONTROL CABINET FOR DC SEAL OIL MOTOR FOR STG
4-18000-63S-279 I 17/09/2008
1282 CIE LIST AND LOGIC DIAGRAM FOR ALARMS AND ATRS OF GENERATOR & AUX. FOR STG
4-18000-63S-100 A 12/11/2008
05 December 2008 Page 11 of 49
BHEL HYDID Area Title Drg_No Purpose Sch. Sub
301 Gas Turbine Description of Design Features of Gas Turbine I 15/10/2008
302 Gas Turbine General Arrangement and Sectional Drawing of Gas Turbine at different levels and different positions(BHEL Desc GA of GTG and Auxiliaries)
1-366-09-89007 I 06/08/2008
303 Gas Turbine Lay Down Areas of Gas Turbine Plan View & Sections 2-36609-89001 A 11/06/2008
304 Gas Turbine Foundation Plan & Elevation with Loading of Gas Turbine & Generator
A 30/04/2008
305 Gas Turbine Foundation Plan & Elevation with Loading of Air intake system
A 30/04/2008
306 Gas Turbine Layout & Loading of Gas Conditioning Skid A 30/04/2008
307 Gas Turbine Assembly drawing of Gas Turbine ( part of O&M manual)
I 29/04/2009
308 Gas Turbine Part List and drawing of Gas Turbine ( part of O&M manual)
I 29/04/2009
309 Gas Turbine Detailed Data Sheet of Gas Turbine I 26/11/2008
310 Gas Turbine Materials of Construction of Gas Turbine I 26/11/2008
311 Gas Turbine Gas Turbine Performance curves (correction curves) I 10/12/2008
312 Gas Turbine Gas Turbine Stratup characteristics (indicating ignition point, main flame ON, selfsustaining speed, synchronization, Loading and variation in Exhaust Temperature)
I 26/11/2008
313 Gas Turbine Gas Turbine - Operation Philosophy ( part O&M manual)
I 29/04/2009
314 Gas Turbine Gas Turbine - Maintenance Philosophy ( part of O&M manual)
I 29/04/2009
315 Gas Turbine Gas Turbine - Gaseous Fuel quality requirements (GT Fuel gas recommendations)
GT10197 I 23/07/2008
316 Gas Turbine Gas Turbine - Intake Air quality requirements I 20/08/2008
317 Gas Turbine Writeup on Integral Fuel Gas System 2-366-33-89004 I 15/10/2008
318 Gas Turbine Writeup on Scheme of Control Devices 2-366-26-89004 I 15/10/2008
319 Gas Turbine Writeup on Lubricating oil & Jacking Oil system 2-366-27-89004 A 15/10/2008
320 Gas Turbine Writeup on Gas Turbine Equipment Cooling water system
2-366-31-89004 A 15/10/2008
321 Gas Turbine Writeup on Control (Hydraulic) oil system and Trip oil system
2-366-38-89004 I 15/10/2008
322 Gas Turbine Writeup on Ventillation and Heating system 2-366-41-89004 I 15/10/2008
323 Gas Turbine Writeup on Gas Turbine Instrumentation diagram (sensor locations) (part of O&M manual)
I 29/04/2009
324 Gas Turbine Writeup on Gas Turbine cooling and sealing air system
2-366-28-89004 I 15/10/2008
325 Gas Turbine Writeup on Atomising air and Purge Air system I 15/10/2008
326 Gas Turbine Writeup on Ignition Gas system I 30/04/2008
327 Gas Turbine Writeup on Blow-off system I 30/04/2008
05 December 2008 Page 12 of 49
328 Gas Turbine Writeup on Seal Air System 2-366-28-89004 I 15/10/2008
329 Gas Turbine Writeup on Cooling Air system 2-366-28-89004 I 15/10/2008
330 Gas Turbine Writeup on Gas Detection system 2-366-63-89004 I 15/10/2008
331 Gas Turbine Writeup on Gas Turbine fire protection and CO2 release system
2-366-36-89004 I 15/10/2008
332 Gas Turbine Writeup on Compressor online & offline wash system
2-366-58-89004 I 15/10/2008
333 Gas Turbine Writeup on Generator water cooling system (part of 22 e)
I 30/04/2008
334 Gas Turbine Writeup on Scheme for field interconnection I 10/12/2008
335 Gas Turbine Writeup on Scheme for starting means 2-366-32-89004 I 15/10/2008
336 Gas Turbine Writeup on Scheme for air flow Inlet and Exhaust system
2-366-47-89004 I 15/10/2008
337 Gas Turbine Writeup on Scheme for IGV 2-366-46-89004 I 15/10/2008
338 Gas Turbine Writeup on Device Summary GT15071 I 29/10/2008
339 Gas Turbine a. Design Memorendum I 15/10/2008
340 Gas Turbine b. Sizing calculation of Air Intake System I 15/10/2008
341 Gas Turbine c. General Arrangement of Air Intake system I 15/10/2008
342 Gas Turbine d. Data Sheet of Air Intake Filtration House and Intake Duct
A 15/10/2008
343 Gas Turbine e. Data Sheet of Air Intake Filters A 15/10/2008
344 Gas Turbine f. Diagram (Schematic) of Air Intake system including Pulse cleaning system
I 15/10/2008
345 PED a. Design Memorendum I 23/07/2008
346 PED b. P&ID of Off base Fuel Gas Supply and Conditioning system
I 23/07/2008
347 PED c. Piping Layout drawing for Fuel Gas supply system A 15/10/2008
348 PED d. Equipment Layout drawing for Fuel Gas conditioning system
A 15/10/2008
349 PED e. Sizing calculation for Knockout Drum, Filter/ separators and Pressure Control Station
A 20/08/2008
350 PED e. General Arrangement Drawing for following equipment: Knockout Drum, Filter/ separators and Pressure Control Station
I 15/10/2008
351 PED f. Data sheet for following equipment: Knockout Drum, Filter/ separators and Pressure Control Station
I 20/08/2008
352 PED g. Data Sheet / GA drawing of Gas Flow meter / Chromatograph
I 20/08/2008
353 PED h. Data Sheet of various valves in Gas line (Isolating valves, control valves and safety valves)
I 15/10/2008
354 Gas Turbine b. Lube Oil Pumps (MOP, AOP, EOP, JOP),Control Oil Pump, Oil Vapor Exhausters, Filters/ strainers
I 04/02/2009
355 Gas Turbine c. Lube oil coolers A 04/02/2009
05 December 2008 Page 13 of 49
356 Gas Turbine g. GT Ventillation fans / motors, Exhaust frame cooling fans/ motors
I 04/02/2009
357 Gas Turbine h. Atomizing air compressor and motor I 04/02/2009
358 Gas Turbine i. Gas Turbine Turning gear with motor I 04/02/2009
359 Gas Turbine j. Fuel Gas and Fuel oil Stop valve and Control valve
I 04/02/2009
360 Gas Turbine l. Portable Lube oil purification system A 04/02/2009
361 Gas Turbine Gas Turbine PG Test Scheme and Procedue (in Simple cycle)
A 04/02/2009
362 Gas Turbine Factory run test procedure for GT A 15/10/2008
363 Gas Turbine O&M Manual for Gas Turbine I 29/04/2009
364 Gas Turbine Outline, FDN interface GT & GEN 1-366-15-89003 S01-S0 I 25/06/2008
365 Gas Turbine WT &CG of gas turbine I 15/10/2008
366 Gas Turbine Foundation interface, exhaust system I 30/04/2008
367 Gas Turbine Foundation interface, inlet system I 30/04/2008
368 Gas Turbine Foundation interface, off-base eqpt I 10/12/2008
369 Gas Turbine GT package connections, piping I 04/02/2009
370 Gas Turbine Shipping weights & dimensions GTEK/W7/30/2008/PP I 23/07/2008
371 Gas Turbine Lube oil recommendations GT10198 I 23/07/2008
372 Gas Turbine Cooling water recommendations GT10507 I 23/07/2008
373 Gas Turbine Symbols piping GT10374 I 23/07/2008
374 Gas Turbine Utility consumption details GTEF/UTILITY/ PPCLB/ I 23/07/2008
375 Gas Turbine Gas turbine and accessory equipment preservation GT10371 I 23/07/2008
376 Gas Turbine Painting schedule GTEG/PPCL/FR9FA/001 I 23/07/2008
377 Gas Turbine Lubricants schedule I 23/07/2008
378 Gas Turbine Control Write up and Operational Philospy of GT I 30/04/2008
379 Gas Turbine MOD write up on HOD Scheme for GT (IGV) I 30/04/2008
380 Gas Turbine Drive List I 30/04/2008
381 EDN-B'LRE List of SOE Signals A 30/04/2008
382 Gas Turbine Cabinet Details for Gas Turbine C&I I 30/04/2008
383 Gas Turbine Power Measuremt & Synchronising Scheme I 30/04/2008
384 Gas Turbine List of Control Panels I 30/04/2008
385 Gas Turbine Instrument installation drawings I 30/04/2008
386 EDN-B'LRE Details GT MMI (for operation & Control Functions and Engg. Function)
I 30/04/2008
387 PEM Bus Utilisation calculation details I 30/04/2008
388 Gas Turbine Data sheet of various C&I items I 30/04/2008
389 EDN-B'LRE Power supply Arrangement for Computer & Peripherials
I 30/04/2008
390 EDN-B'LRE List of Indicators & Recorders I 30/04/2008
391 EDN-B'LRE List of Annunciations I 30/04/2008
05 December 2008 Page 14 of 49
392 EDN-B'LRE Functional Diagram of GT & Auxs & OPN Logic A 30/04/2008
393 Gas Turbine Cable Schedule & Interconnection I 29/04/2009
394 Gas Turbine GT Auxiliary Load List GTEI/PPCL/1526 A 23/07/2008
395 Gas Turbine Single Line Diagram for GT MCC I 13/08/2008
396 Gas Turbine Scheme and GA of GT MCC I 04/02/2009
397 Gas Turbine List of panels GTEI/PPCL/1522 I 23/07/2008
398 Gas Turbine Cable schedule I 29/04/2009
399 Gas Turbine Scheme for Battery & Charger I 04/02/2009
400 Gas Turbine Battery & Charger sizing calculation I 20/08/2008
401 Gas Turbine Cable Data Sheet I 04/02/2009
402 BFP ESTIMATED PERFORMANCE CURVE OF BP A 14/05/2008
403 BFP ESTIMATED PERFORMANCE CURVE OF BFP A 14/05/2008
404 BFP GENERAL ARRANGEMENT OF BFP SET A 28/05/2008
405 BFP GA OF R.C. VALVE FOR BFP(FOR LAYOUT PURPOSE) I 25/06/2008
406 BFP GA OF SUCTION STRAINER FOR BFP&CEP (FOR LAYOUT PURPOSE)
I 25/06/2008
407 BFP INSTRUMENT SCHEDULE OF BFP SET A 25/06/2008
408 BFP P&I DIAGRAM OF FEED WATER SYSTEM FOR BFP SET A 25/06/2008
409 BFP P&I DIAGRAM OF SEALING & COOLING WATER SYSTEM FOR BFP SET
A 25/06/2008
410 BFP P&I DIAGRAM OF LUBE OIL & WORKING OIL SYSTEM FOR BFP SET
A 25/06/2008
411 BFP SEQUENTIAL INTERLOCKING CONDITIONS OF BFP SET
A 25/06/2008
412 BFP TECHNICAL DATA SHEET OF BFP & IT'S AUXILIARIES A 23/07/2008
413 BFP ACW & INSTRUMENT AIR REQUIREMENT FOR BFP & CEP
I 25/06/2008
414 BFP ELECTRICAL LOAD LIST OF BFP & CEP I 14/05/2008
415 BFP CROSS SECTIONAL DRAWING OF BP I 11/06/2008
416 BFP CROSS SECTIONAL DRAWING OF BFP I 11/06/2008
417 BFP LUBRICATION SCHEDULE FOR BFP, BP & CEP I 25/06/2008
418 CEP ESTIMATED PERFORMANCE CURVE OF CEP A 14/05/2008
419 CEP GENERAL ARRANGEMENT & FOUNDATION DETAILS OF CEP
A 28/05/2008
420 CEP GA OF SUCTION STRAINER FOR CEP(LAYOUT PURPOSE)
I 25/06/2008
421 CEP INSTRUMENTATION SCHEDULE OF CEP A 25/06/2008
422 CEP INSTRUMENTATION SCHEME OF CEP A 25/06/2008
423 CEP SEALING AND COOLING WATER SCHEME OF CEP I 25/06/2008
424 CEP SEQUENTIAL INTERLOCKING CONDITIONS OF CEP A 11/06/2008
425 CEP TECHNICAL DATA SHEET OF CEP A 11/06/2008
05 December 2008 Page 15 of 49
426 CEP CROSS SECTIONAL DRAWING OF CEP I 11/06/2008
427 CWP EST. PERFORMANCE CURVE OF CWP A 28/05/2008
428 CWP GA & FOUNDATION DETAILS OF CWP A 25/06/2008
429 CWP SECTIONAL ASSEMBLY OF CWP I 23/07/2008
430 CWP TECHNICAL DATA OF CWP I 23/07/2008
431 CWP SCHEDULE OF INSTRUMENTS OF CWP I 20/08/2008
432 CWP INSTRUMENT SCHEME OF CWP I 20/08/2008
433 CWP REPORT ON SUMP MODEL STUDIES I 20/08/2008
434 HXE GA OF SPRAY CUM TRAY DEAERATOR 1-163-10-11314 A 20/06/2008
435 HXE STAND PIPE ASSLY FOR DEARATOR 2-163-19-11XXX I 30/06/2008
436 HXE PLATFORM ASSLY FOR DEAERATOR 2-163-35-11XXX I 30/06/2008
437 HXE GA OF PERFORMANCE GAS HEATER 2-166-80-00484 I 30/06/2008
1283 Gas Turbine 125V DC Battery & Charger sizing calculation GTEI/PPCL/1523 I 29/10/2008
1327 HXE DATA SHEET FOR DEAERATOR CW-CM-9472-C-O-M-0 A
05 December 2008 Page 16 of 49
BHEL ISGID Area Title Drg_No Purpose Sch. Sub
700 DG Technical data sheet for Engine IS – 4 – DS – 588 – 800 A 18/02/2009
701 DG Technical data sheet for Alternator IS – 4 – DS – 588 – 800 A 18/02/2009
702 DG Technical data sheet for DG set IS – 4 – DS – 588 – 800 A 18/02/2009
703 DG Technical data sheet for Acoustic IS – 4 – DS – 588 – 800 A 18/02/2009
704 DG Technical data sheet for Battery IS – 4 – DS – 588 – 800 A 18/02/2009
705 DG Technical data sheet for Battery charger IS – 4 – DS – 588 – 800 A 18/02/2009
706 DG GA of Engine IS – 3 – DG – 588 – 800 I 18/02/2009
707 DG GA of Alternator (Standard drg.) IS – 3 – DG – 588 – 800 I 18/02/2009
708 DG GA drawing for DG set IS – 3 – DG – 588 – 800 I 18/02/2009
709 DG GA of DG set with Acoustic enclosure IS – 3 – DG – 588 – 800 I 18/02/2009
710 DG GA drawing for fuel tank (990 ltrs) IS – 3 – DG – 588 – 800 I 18/02/2009
711 DG Layout Plan for DG set IS – 3 – DG – 588 – 800 A 18/03/2009
712 DG Foundation plan for Acoustic enclosure IS – 3 – DG – 588 – 800 I 18/03/2009
713 DG DG set Base frame drawing IS – 3 – DG – 588 – 800 I 18/03/2009
714 DG Insert plate details for Exhaust pipe supports IS – 3 – DG – 588 – 800 I 18/03/2009
715 DG QAP for DG set IS – 4 – QP – 588 – 800 A 18/03/2009
716 DG Generator Control Panel scheme IS – 3 – DG – 588 – 800 A 29/04/2009
717 DG Auxiliary distribution board drawing. IS – 3 – DG – 588 – 800 I 29/04/2009
718 DG QAP for control panel & Aux. dist. board IS – 4 – QP – 588 – 800 A 10/06/2009
719 DG O &M Manual IS – 4 – OM – 588 – 80 I 09/12/2009
05 December 2008 Page 17 of 49
BHEL JHSID Area Title Drg_No Purpose Sch. Sub
747 Aux Trfr Outline General Arrangement A 28/01/2009
748 Aux Trfr Table of fittings for OGA A 28/01/2009
749 Aux Trfr Foundation Plan of Transformer A 28/01/2009
750 Aux Trfr Foundation Plan for 320 Dia. Roller A 28/01/2009
751 Aux Trfr Rating & Diagram plate A 28/01/2009
752 Aux Trfr Valve Schedule plate A 28/01/2009
753 Aux Trfr Oil filling instruction plate A 28/01/2009
754 Aux Trfr HV Bushing Assembly A 28/01/2009
755 Aux Trfr LV & LVN Bushing Assembly A 28/01/2009
756 Aux Trfr Schematic diagram of OLTC A 28/01/2009
757 Aux Trfr G A of Marshalling Box A 28/01/2009
758 Aux Trfr Diagram of Cooler control gear A 28/01/2009
05 December 2008 Page 18 of 49
BHEL PEMID Area Title Drg_No Purpose Sch. Sub
461 C&I DRIVE CONTROL PHILOSOPHY(Station C&I) PE-DM-314-145-I002 A 03/09/2008
462 C&I SCHEDULE OF INSTRUMENTS(Station C&I) PE-SC-314-145-I102 I 04/02/2009
463 C&I CONTROL VALVES DATA SHEETS PE-TS-314-145-I104 A 24/09/2008
464 C&I FLOW ELEMENTS DATA SHEETS PE-TS-314-145-I105 A 24/09/2008
465 C&I SENSOR/TRANSMITTER GROUPING(Station C&I) PE-SC-314-145-I106 I 10/06/2009
466 C&I SWAS SCHEME PE-DG-314-145-I110 A 29/10/2008
467 C&I BINARY DRIVE LIST(Station C&I) PE-SC-314-145-I200 I 10/12/2008
468 C&I BINARY I/O LIST(Station C&I) PE-SC-314-145-I201 I 20/05/2009
469 C&I ALARM SCHEDULE PE-DG-314-145-I202 A 24/06/2009
470 C&I CONTROL SCHEME FOR DM MAKEUP PUMPS & HRSG FILL PUMPS
PE-DG-314-145-I216 A 11/03/2009
471 C&I CONTROL SCHEME FOR DMCW PUMPS PE-DG-314-145-I218 A 29/04/2009
472 C&I CONTROL SCHEME FOR ACWP PE-DG-314-145-I222 A 20/05/2009
473 C&I BINARY DRIVE CONTROL SCHEME FOR MISC. DRIVE(Station C&I)
PE-DG-314-145-I223 A 13/05/2009
474 C&I CONTROL SCHEME FOR CWP. PE-DG-314-145-I224 A 20/05/2009
475 C&I AUTOMATIC PLANT STARTUP/SHUTDOWN LOGICS PE-DG-314-145-I250 A 05/08/2009
476 C&I CONTROL SCHEME FOR WATER SYSTEM MISC. PUMPS
PE-DG-314-145-I271 A 08/04/2009
477 C&I CONTROL SCHEME FOR HP DOSING PUMPS PE-DG-314-145-I272 A 03/06/2009
478 C&I CONTROL SCHEME FOR LP DOSING PUMPS PE-DG-314-145-I273 A 10/06/2009
479 C&I CONTROL SCHEME FOR COLTCS PE-DG-314-145-I314 A 29/07/2009
480 C&I CONTROL SCHEME FOR SELF CLEANING STRAINER PE-DG-314-145-I275 A 05/08/2009
481 C&I CONTROL SCHEME FOR COOLING TOWERS PE-DG-314-145-I276 A 22/07/2009
482 C&I ANALOG DRIVE LIST(Station C&I) PE-SC-314-145-I300 I 26/11/2008
483 C&I ANALOG I/O LIST(Station C&I) PE-SC-314-145-I301 I 06/05/2009
484 C&I ANALOG CONTROL SCHEME PE-DG-314-145-I302 A 25/02/2009
485 C&I HP BYPASS CONTROL SCHEME PE-DG-314-145-I303 A 25/11/2009
486 C&I CCR/EER/COMPUTER ROOM LAYOUT PE-DG-314-145-I401 A 15/04/2009
487 C&I SWAS ROOM LAYOUT PE-DG-314-145-I403 A 16/09/2009
488 C&I PLANT SCHEMATICS PE-DG-314-145-I501 A 22/07/2009
489 C&I DISPLAYS (GROUP,BAR,TREND,PROFILE,CHARACT) PE-SC-314-145-I502 I 16/09/2009
490 C&I LOGS (TREND,POST TRIP,HOURLY,SHIFT,DAILY) PE-SC-314-145-I511 I 02/09/2009
491 C&I LTS POINTS LIST PE-SC-314-145-I516 I 07/10/2009
492 C&I PERFORMANCE CALCULATION WRITE-UP PE-DM-314-145-I550 A 28/10/2009
493 C&I CABLE INTERCONNECTION FOR BINARY DRIVES PE-DG-314-145-I611 I 16/12/2009
494 C&I CABLE INTERCONNECTION FOR BINARY SIGNALS PE-DG-314-145-I621 I 13/01/2010
495 C&I CABLE INTERCONNECTION FOR ANALOG DRIVES PE-DG-314-145-I631 I 16/12/2009
05 December 2008 Page 19 of 49
496 C&I CABLE INTERCONNECTION FOR ANALOG SIGNALS PE-DG-314-145-I641 I 13/01/2010
497 C&I SEQ. CONTROL SCHEME FOR HP BFPS PE-DG-314-145-I231 A 08/04/2009
498 C&I SEQ. CONTROL SCHEME FOR LP BFPS PE-DG-314-145-I232 A 01/04/2009
499 C&I SEQ. CONTROL SCHEME FOR CPH RECIRCULATION PUMPS
PE-DG-314-145-I233 A 13/05/2009
500 MAIN MECH LEGEND SHEET PE-DC-314-100-D001 A 06/08/2008
501 MAIN MECH P & ID - STEAM SYSTEM PE-DC-314-100-D002 A 06/08/2008
502 MAIN MECH P & ID - FEED WATER SYSTEM PE-DC-314-100-D003 A 06/08/2008
503 MAIN MECH P & ID - CONDENSATE SYSTEM PE-DC-314-100-D004 A 06/08/2008
504 MAIN MECH P & ID - DM WATER SYSTEM PE-DG-314-100-D005 A 06/08/2008
505 MAIN MECH P & ID - CENTRAL LUBE OIL PURIFICATION SYSTEM PE-DG-314-100-D006 A 06/08/2008
506 MAIN MECH BASE LOAD, 31.7 DEG C AMBIENT, 60% RH, 0% MAKEUP-GT AGEING 3500 HRS
PE-DC-314-100-D101 I 25/06/2008
507 MAIN MECH 80% LOAD, 31.7 DEG C AMBIENT, 60% RH, 0% MAKEUP-GT AGEING 3500 HRS
PE-DC-314-100-D102 I 25/06/2008
508 MAIN MECH 60% LOAD, 31.7 DEG C AMBIENT, 60% RH, 0% MAKEUP-GT AGEING 3500 HRS
PE-DC-314-100-D103 I 25/06/2008
509 MAIN MECH BASE LOAD, 31.7 DEG C AMBIENT, 60% RH, 0% MAKEUP-GT NEW & CLEAN
PE-DC-314-100-D104 I 25/06/2008
510 MAIN MECH 80% LOAD, 31.7 DEG C AMBIENT, 60% RH, 0% MAKEUP-GT NEW & CLEAN
PE-DC-314-100-D105 I 25/06/2008
511 MAIN MECH 60% LOAD, 31.7 DEG C AMBIENT, 60% RH, 0% MAKEUP-GT NEW & CLEAN
PE-DC-314-100-D106 I 25/06/2008
512 MAIN MECH BASE LOAD, 0.0 DEG C AMBIENT, 60% RH, 0% MAKEUP-GT NEW & CLEAN
PE-DC-314-100-D107 I 25/06/2008
513 MAIN MECH 80% LOAD, 0.0 DEG C AMBIENT, 60% RH, 0% MAKEUP-GT NEW & CLEAN
PE-DC-314-100-D108 I 25/06/2008
514 MAIN MECH 60% LOAD, 0.0 DEG C AMBIENT, 60% RH, 0% MAKEUP-GT NEW & CLEAN
PE-DC-314-100-D109 I 25/06/2008
515 MAIN MECH BASE LOAD, 45 DEG C AMBIENT, 60% RH, 0% MAKEUP-GT NEW & CLEAN
PE-DC-314-100-D110 I 25/06/2008
516 MAIN MECH 80% LOAD, 45 DEG C AMBIENT, 60% RH, 0% MAKEUP-GT NEW & CLEAN
PE-DC-314-100-D111 I 25/06/2008
517 MAIN MECH 60% LOAD, 45 DEG C AMBIENT, 60% RH, 0% MAKEUP-GT NEW & CLEAN
PE-DC-314-100-D112 I 25/06/2008
518 MAIN MECH COMBINED CYCLE CORRECTION CURVE - AMBIENT TEMPERATURE
PE-DG-314-100-D301 I 09/12/2009
519 MAIN MECH COMBINED CYCLE CORRECTION CURVE - AMBIENT PRESSURE
PE-DG-314-100-D302 I 09/12/2009
520 MAIN MECH COMBINED CYCLE CORRECTION CURVE - RELATIVE HIMIDITY
PE-DG-314-100-D303 I 09/12/2009
521 MAIN MECH COMBINED CYCLE CORRECTION CURVE - FUEL LHV PE-DG-314-100-D304 I 09/12/2009
522 MAIN MECH COMBINED CYCLE CORRECTION CURVE - FREQUENCY
PE-DG-314-100-D305 I 09/12/2009
523 MAIN MECH COMBINED CYCLE CORRECTION CURVE- GT PERF DEGRADATION
PE-DG-314-100-D306 I 09/12/2009
05 December 2008 Page 20 of 49
524 MAIN MECH COMBINED CYCLE CORRECTION CURVE- POWER FACTOR
PE-DG-314-100-D307 I 09/12/2009
525 MAIN MECH HOT START-UP CURVE OF COMBINED CYCLE PLANT PE-DG-314-100-D311 I 09/12/2009
526 MAIN MECH WARM START-UP CURVE OF COMBINED CYCLE PLANT
PE-DG-314-100-D312 I 09/12/2009
527 MAIN MECH COLD START-UP CURVE OF COMBINED CYCLE PLANT
PE-DG-314-100-D313 I 09/12/2009
528 MAIN MECH PIPE SCHEDULE PE-DC-314-100-D401 A 25/06/2008
529 MAIN MECH VALVE SCHEDULE PE-DC-314-100-D402 A 25/06/2008
530 MAIN MECH CEP SIZING CALCULATION PE-DC-314-100-D601 A 09/07/2008
531 MAIN MECH HP/IP BFP SIZING CALCULATION PE-DC-314-100-D602 A 09/07/2008
532 MAIN MECH LP BFP SIZING CALCULATION PE-DC-314-100-D603 A 09/07/2008
533 MAIN MECH CPHRCP SIZING CALCULATION PE-DC-314-100-D604 A 09/07/2008
534 MAIN MECH NPSH CALCULATION FOR HP/IP BFP / BOOSTER PUMP
PE-DC-314-100-D605 A 20/08/2008
535 MAIN MECH NPSH CALCULATION FOR LP BFP PE-DC-314-100-D606 A 20/08/2008
536 MAIN MECH NPSH CALCULATION FOR CEP PE-DC-314-100-D607 A 20/08/2008
537 MAIN MECH DESIGN BASIS DOCUMENT PE-DC-314-100-D701 I 11/06/2008
538 MAIN MECH FUNCTIONAL WRITEUP FOR BOTTOMING CYCLE PE-DC-314-100-D702 I 06/08/2008
539 MAIN MECH PLANT OPERATION PHILOSOPHY PE-DC-314-100-D703 I 30/07/2008
540 MAIN MECH PG TEST WRITEUP PE-DC-314-100-D704 I 11/11/2009
541 ELE LAYOUT DESIGN PHILOSOPHY FOR ELECTRICAL EQUIPMENT LAYOUT
PE-DC-314-100-E999 A 16/07/2008
542 ELE LAYOUT CABLING LAYOUT BELOW DC BATTERY ROOM PE-DG-314-100-E016 A 20/08/2008
543 ELE LAYOUT LAYOUT OF TRANSFORMER YARD PE-DG-314-100-E001 A 25/06/2008
544 ELE LAYOUT LAYOUT OF MAIN SWITCHGEAR ROOM PE-DG-314-100-E006 A 09/07/2008
545 ELE LAYOUT LAYOUT OF DC BATTERY ROOM PE-DG-314-100-E009 A 06/08/2008
546 ELE LAYOUT CABLING LAYOUT BELOW MAIN SWITCHGEAR ROOM
PE-DG-314-100-E013 A 06/08/2008
547 ELE LAYOUT CABLE TRAY LAYOUT ON HRSG PLATFORMS PE-DG-314-100-E038 A 31/12/2008
548 ELE LAYOUT LAYOUT OF CABLING INTERCONNECTIONS BTW MAIN PLANT & AUX PLANT AREAS
PE-DG-314-100-E042 A 24/12/2008
549 ELE LAYOUT CABLING LAYOUT IN 0.0M AB BAY PE-DG-314-100-E112 A 03/09/2008
550 MV SWGR SLD FOR UNIT SWITCHBOARD PE-DC-314-505-E001 A 03/09/2008
551 MV SWGR LOGIC DIAGRAM FOR 6.6KV SWITCHGEAR PE-DG-314-505-E002 A 24/09/2008
552 MV SWGR CT/VT SIZING CALCULATIONS FOR MV SWITCHBOARDS
PE-DG-314-505-E004 I 17/09/2008
553 MV SWGR LOGIC DIAGRAM FOR BTS PANEL PE-DG-314-505-E005 A 01/10/2008
554 LV SWGR ELECTRICAL LOAD DATA (BOARD WISE) PE-DC-314-506-E004 I 05/11/2008
555 LV SWGR CONTROL LOGIC FOR 415V SWGR PE-DG-314-506-E003 A 24/09/2008
556 CABLES & CABLING
DESIGN CALCULATIONS FOR MV CABLES SELECTION & SIZING
PE-DC-314-507-E001 A 30/07/2008
05 December 2008 Page 21 of 49
557 CABLES & CABLING
DESIGN CALCULATIONS FOR LV CABLES SELECTION & SIZING
PE-DC-314-507-E002 A 03/09/2008
558 CABLES & CABLING
CABLING PHILOSOPHY PE-DC-314-507-E004 A 23/07/2008
559 CABLES & CABLING
TYPICAL DETAILS OF CABLE TRAYS AND ACCESSORIES
PE-DG-314-507-E005 A 03/09/2008
560 CABLES & CABLING
TYPICAL INSTALLATION DETAILS FOR CABLE TRAY SUPPORT SYSTEM
PE-DG-314-507-E006 A 16/07/2008
561 DC SYSTEM DESIGN MEMORANDUM FOR 220V DC SYSTEM PE-DC-314-508-E001 A 30/07/2008
563 GROUNDING & LIGHTNING PROTECTION
DESIGN MEMORANDUM FOR LIGHTNING PROTECTION SYSTEM
PE-DC-314-509-E002 A 20/08/2008
564 GROUNDING & LIGHTNING PROTECTION
TYPICAL BELOW GROUND EARTHING DETAILS PE-DG-314-509-E003 A 09/07/2008
565 GROUNDING & LIGHTNING PROTECTION
TYPICAL ABOVE GROUND EARTHING DETAILS PE-DG-314-509-E004 I 16/07/2008
566 GROUNDING & LIGHTNING PROTECTION
BELOW GRADE GROUNDING SYSTEM LAYOUT FOR MAIN POWER PLANT AREA
PE-DG-314-509-E005 A 23/07/2008
567 GROUNDING & LIGHTNING PROTECTION
LIGHTNING PROTECTION ARRANGEMENT FOR MAIN PH BUILDING
PE-DG-314-509-E006 I 17/09/2008
568 PROTECTION & CONTROL SYSTEM
CT & VT CALCULATIONS FOR GENERATOR CIRCUIT METERING & PROTECTION [STG]
PE-DC-314-510-E003 I 24/09/2008
569 PROTECTION & CONTROL SYSTEM
RELAY SETTINGS CHART FOR GENERATOR CIRCUIT PROTECTION [STG]
PE-DC-314-510-E004 I 06/05/2009
570 PROTECTION & CONTROL SYSTEM
LIST OF CIRCUIT BREAKERS FOR ELECTRICAL SYSTEM AND THEIR CONTROL LOCATION
PE-DC-314-510-E014 A 20/08/2008
571 PROTECTION & CONTROL SYSTEM
ANALOG INPUT/OUTPUT LIST FOR ELECTRICAL SYSTEM
PE-DC-314-510-E015 A 29/10/2008
572 PROTECTION & CONTROL SYSTEM
BINARY INPUT/OUTPUT LIST FOR ELECTRICAL SYSTEM
PE-DC-314-510-E016 A 05/11/2008
573 PROTECTION & CONTROL SYSTEM
CT & VT CALCULATIONS FOR GENERATOR CIRCUIT METERING & PROTECTION [GTG]
PE-DC-314-510-E053 I 27/08/2008
574 PROTECTION & CONTROL SYSTEM
RELAY SETTINGS CHART FOR GENERATOR CIRCUIT PROTECTION [GTG]
PE-DC-314-510-E054 I 15/04/2009
575 PROTECTION & CONTROL SYSTEM
SLD FOR GENERATOR CIRCUIT METERING & PROTECTION [STG]
PE-DG-314-510-E001 A 10/09/2008
576 PROTECTION & CONTROL SYSTEM
LOGIC DIAGRAM FOR GENERATOR CIRCUIT PROTECTION & ANNUNCIATION [STG]
PE-DG-314-510-E002 A 17/09/2008
05 December 2008 Page 22 of 49
577 PROTECTION & CONTROL SYSTEM
SYNCHRONISING SCHEME PE-DG-314-510-E011 A 24/09/2008
578 PROTECTION & CONTROL SYSTEM
FRONT VIEW OF ELECTRICAL CONTROL PANEL (ECP)
PE-DG-314-510-E012 A 15/10/2008
579 PROTECTION & CONTROL SYSTEM
INTERFACE SCHEME FOR ELECTRICAL CONTROL PANEL (ECP)
PE-DG-314-510-E013 I 22/10/2008
580 PROTECTION & CONTROL SYSTEM
LOGIC DIAGRAM FOR ELECTRICAL CONTROL PANEL AND ASSOCIATED DDCMIS
PE-DG-314-510-E017 A 26/11/2008
581 PROTECTION & CONTROL SYSTEM
ALARM SCHEDULE FOR ELECTRICAL CONTROL PANEL (ECP)
PE-DG-314-510-E019 I 19/11/2008
582 PROTECTION & CONTROL SYSTEM
PLANT ELECTRICAL SCHEMATICS FOR DDCMIS PE-DG-314-510-E021 A 26/11/2008
583 PROTECTION & CONTROL SYSTEM
SLD FOR GENERATOR CIRCUIT METERING & PROTECTION [GTG]
PE-DG-314-510-E051 A 20/08/2008
584 PROTECTION & CONTROL SYSTEM
LOGIC DIAGRAM FOR GENERATOR CIRCUIT PROTECTION & ANNUNCIATION [GTG]
PE-DG-314-510-E052 A 03/09/2008
585 PUBLIC ADDRESS SYSTEM
DESIGN MEMORANDUM FOR PUBLIC ADDRESS SYSTEM
PE-DC-314-557-E001 A 10/09/2008
586 LIGHTING & LOW VOLTAGE SERVICES
DESIGN MEMORANDUM FOR LIGHTING & LV POWER SERVICES
PE-DC-314-558-E001 A 13/08/2008
587 EMERGENCY DG DESIGN CALCULATION FOR EMERGENCY SUPPLY DG SIZING
PE-DC-314-561-E001 A 20/08/2008
588 ELECTRICAL SYSTEM DESIGN
RELAY SETTINGS CHART FOR MV SYSTEM (OTHER THAN MOTORS)
PE-DC-314-565-E004 I 15/04/2009
589 ELECTRICAL SYSTEM DESIGN
RELAY SETTINGS CHART FOR LV AC AUXILIARY SYSTEM
PE-DC-314-565-E005 I 29/04/2009
590 ELECTRICAL SYSTEM DESIGN
DESIGN CALCULATION FOR GENERATOR AND MV SYSTEM
PE-DC-314-565-E002 A 16/07/2008
591 ELECTRICAL SYSTEM DESIGN
ELECTRICAL SINGLE LINE DIAGRAM FOR AUXILIARY POWER DISTRIBUTION
PE-DG-314-565-E001 A 09/07/2008
592 CHEMICAL DOSING SYSTEM
DESIGN MEMORANDUM FOR HP/LP CHEMICAL DOSING SYSTEM ALONG WITH P&ID
PE-DC-314-154-A001 A 25/06/2008
593 EFFLUENT TREATMENT PLANT.
DESIGN MEMORANDUM FOR EFFLUENT TREATMENT PLANT.
PE-DC-314-164-A001 A 16/07/2008
594 PRE TREATMENT PLANT.
DESIGN MEMORANDUM FOR PRETREATMENT PLANT ALONG WITH P&ID
PE-DC-314-158-A001 A 09/07/2008
595 SIDE STREAM FILTRATION PLANT
DESIGN MEMORANDUM FOR SIDE STREAM FILTRATION PLANT
PE-DC-314-156B-A001 A 30/07/2008
05 December 2008 Page 23 of 49
596 CHLORINATION DESIGN MEMORANDUM FOR CHLORINATION (CW SYSTEM) & CHLORINE DIOXIDE SYSTEM(FOR PTP & CW SYSTEM)
PE-DC-314-174-A001 A 30/07/2008
597 CHEMICAL LAB. DESIGN MEMORANDUM FOR CHEMICAL LAB. PE-DC-314-175-A006 A 17/09/2008
598 ELEVATORS DESIGN MEMORANDUM FOR ELEVATORS PE-DC-314-502-A001 A 23/07/2008
599 CW TREATMENT SYSTEM
DESIGN MEMORANDUM FOR CW TREATMENT SYSTEM
PE-DC-314-154-A001 A 16/07/2008
600 FIRE PROTECTION SYSTEM
DESIGN MEMORANDUM FOR FIRE PROTECTION SYSTEM
PE-DC-314-552-A010 A 03/09/2008
601 AIR CONDITIONING SYSTEM
DESIGN MEMORANDUM FOR AIR CONDITIONING SYSTEM
PE-DC-314-553-A001 A 06/08/2008
602 VENTILATION SYSTEM
DESIGN MEMORANDUM FOR VENTILATION SYSTEM
PE-DG-314-554-A001 A 06/08/2008
603 COMPRESSED AIR SYSTEM
DESIGN MEMORANDUM FOR COMPRESSED AIR SYSTEM
PE-DC-314-555-A001 A 03/09/2008
604 COMPRESSED AIR SYSTEM
IA DISTRIBUTION SCHEME PE-DC-314-555-A002 A 03/09/2008
605 COMPRESSED AIR SYSTEM
SA DISTRIBUTION SCHEME PE-DC-314-555-A003 A 03/09/2008
606 EOT CRANE DESIGN MEMORANDUM FOR GT/ST HALL EOT CRANE
PE-DC-314-501-A001 A 25/06/2008
607 EOT CRANE,MISC CRANES & LIFTING DEVICES
DESIGN MEMORANDUM FOR CW PUMPHOUSE EOT CRANE, SINGLE GIRDER MISC. CRANES & HOISTS
PE-DC-314-563-A001 A 06/08/2008
608 GENERAL PAINTING SCHEDULE PE-DC-314-999-A001 I 27/08/2008
609 MECH LAYOUT THERMAL INSULATION DESIGN CRITERIA PE-DC-314-100-M033 A 03/09/2008
610 MECH LAYOUT THERMAL INSULATION APPLICATION PROCEDURE PE-DC-314-100-M034 I 09/07/2008
611 MECH LAYOUT PLOT PLAN PE-DG-314-100-M001 A 16/07/2008
612 MECH LAYOUT MAIN EQUIPMENT PLAN AT EL 0.0M PE-DG-314-100-M002 A 16/07/2008
613 MECH LAYOUT EQUIPMENT LAYOUT OF GT BUILDING PE-DG-314-100-M003 A 16/07/2008
614 MECH LAYOUT GAS TURBINE BUILDING CROSS SECTION PE-DG-314-100-M004 A 16/07/2008
615 MECH LAYOUT LAYDOWN OF GAS TURBINE COMPONENTS PE-DG-314-100-M005 A 30/07/2008
616 MECH LAYOUT GENERAL ARRANGEMENT AND X-SECTON OF BFP BUILDING
PE-DG-314-100-M006 A 29/10/2008
617 MECH LAYOUT COMPOSITE PIPING PLAN (STG BUILDING) PE-DG-314-100-M020 A 29/10/2008
618 MECH LAYOUT COMPOSITE PIPING PLAN AT 0.0M EL (BFP BUILDING)
PE-DG-314-100-M021 A 29/10/2008
619 MECH LAYOUT COMPOSITE PIPING PLAN AT 9.5M EL (BFP BUILDING)
PE-DG-314-100-M022 A 29/10/2008
620 MECH LAYOUT COMPOSITE PIPING PLAN AT 14.0M EL (BFP BUILDING)
PE-DG-314-100-M023 A 03/12/2008
621 MECH LAYOUT COMPOSITE PIPING- PIPE RACK AREA (LOWER TIER)
PE-DG-314-100-M031 A 07/01/2009
622 MECH LAYOUT COMPOSITE PIPING- PIPE RACK AREA (UPPER TIER) PE-DG-314-100-M032 A 07/01/2009
05 December 2008 Page 24 of 49
623 WATER SYSTEM CW/ACW SYSTEM WRITE UP PE-DC-314-165-N002 A 03/09/2008
624 WATER SYSTEM EQPT SIZING CALCULATION FOR CW ACW DMCW AND PLANT WATER SYSTEM
PE-DC-314-172-N003 A 22/10/2008
625 WATER SYSTEM CW PUMP SIZING CALCULATION PE-DC-314-165-N112 A 01/10/2008
626 WATER SYSTEM P&ID FOR CW/ACW SYSTEM PE-DG-314-165-N001 A 20/08/2008
627 WATER SYSTEM CW PUMP HOUSE GA PE-DG-314-165-N101 A 29/10/2008
628 WATER SYSTEM PLANT WATER SYSTEM WRITE UP PE-DC-314-172-N002 A 15/10/2008
629 WATER SYSTEM SUMP PUMPS WRITE UP PE-DC-314-172-N005 A 28/01/2009
630 WATER SYSTEM P&ID FOR PLANT WATER SYSTEM PE-DG-314-172-N001 A 15/10/2008
631 WATER SYSTEM DM COOLING WATER SYSTEM WRITE UP PE-DC-314-179-N002 A 03/09/2008
632 WATER SYSTEM P&ID FOR DM COOLING WATER SYSTEM PE-DG-314-179-N001 A 03/09/2008
1253 COMPRESSED AIR SYSTEM
P&ID FOR IA & SA SYSTEM WITH CONVENTIONAL HOC AIR DRYER AND ROTARY DRYER
PE-DG-314-555-A501 A 03/09/2008
1254 CW SYSTEM DESIGN MEMORANDUM FOR CW SYSTEM PE-DC-314-156A-A001 A 30/04/2008
1255 MECH LAYOUT EQUIPMENT LAYOUT OF STEAM TURBINE BUILDING AT 8.5M
PE-DG-314-100-M007 A 29/10/2008
1256 MECH LAYOUT EQUIPMENT LAYOUT OF STEAM TURBINE BUILDING AT 13.5M
PE-DG-314-100-M008 A 29/10/2008
1257 MECH LAYOUT STEAM TURBINE BUILDING – CROSS SECTION PE-DG-314-100-M009 A 29/10/2008
1258 MECH LAYOUT EQUIPMENT LAYOUT OF STEAM TURBINE BUILDING AT 0.0M
PE-DG-314-100-M006 A 29/10/2008
1294 MAIN MECH DM WATER STORAGE TANK SIZING CALCULATION PE-DC-314-100-D611 A 30/04/2008
1295 MAIN MECH RESERVE FEED WATER TANK SIZING CALCULATION PE-DC-314-100-D612 A 30/04/2008
1296 C&I CABLE BLOCK DIAGRAM PE-DG-314-145-I003 A 30/04/2008
1297 C&I UPS SINGLE LINE DIAGRAM & WRITEUP PE-DG-314-145-I004 A 30/04/2008
1299 C&I INSTRUMENT STUB DETAILS(PRESSURE/TEMPERATURE)
PE-DG-314-145-I101 A 30/04/2008
1300 CHEMICAL LAB. DESIGN MEMORANDUM FOR CHEMICAL LAB EQUIPMENT
PE-DC-314-175-A001 A 30/04/2008
1303 CHEMICAL DOSING SYSTEM
P&ID FOR AMMONIA DOSING SYSTEM (PART OF DESIGN MEMORANDUM)
PE-DG-314-154-A002 A 25/06/2008
1304 CHEMICAL DOSING SYSTEM
P&ID FOR NAOH DOSING SYSTEM (PART OF DESIGN MEMORANDUM)
PE-DG-314-154-A003 A 25/06/2008
1305 CHEMICAL DOSING SYSTEM
P&ID FOR HYDRAZINE DOSING SYSTEM (PART OF DESIGN MEMORANDUM)
PE-DC-314-154-A003 A 25/06/2008
1306 CHEMICAL DOSING SYSTEM
P&ID FOR PHOSPHATE DOSING SYSTEM (PART OF DESIGN MEMORANDUM)
PE-DC-314-154-A004 A 25/06/2008
1310 GROUNDING & LIGHTNING PROTECTION
DESIGN MEMORANDUM FOR EARTHING SYSTEM PE-DG-314-509-E001 A 02/07/2008
1322 MECH LAYOUT GENERAL ARRANGEMENT & X-SECTION OF BFP BUILDING
PE-DG-314-100-M010 A 30/04/2008
1323 MECH LAYOUT DESIGN MEMORANDUM OF THERMAL INSULATION PE-DM-314-169-M001 A 30/04/2008
1324 CABLES & CABLING
TYPICAL INSTALLATION DETAILS FOR CABLE TRAY SUPPORT SYSTEM
PE-DC-314-507-E007 A
05 December 2008 Page 25 of 49
12/12/20081754 CIVIL DESIGN CRITERION FOR CIVIL ,STRUCTURAL AND ARCHITECTURAL WORK
PE‐DC‐314‐600‐C001 I 11TH DEC '08
1755 CIVIL ARCHITECTURAL STANDARD DETAIL ‐ GENERAL FINISHES & MISC DETAIL
PE‐DG‐314‐600‐C001 I 15TH MAY '09
1756 CIVIL STANDARD DETAILS OF CHAIN LINK FENCING AND GATES PE‐DG‐314‐600‐C002 I 17TH SEPTEMBER '09
1757 CIVIL STANDARD DETAILS OF M.S. GATE PE‐DG‐314‐600‐C003 I 17TH SEPTEMBER '09
1758 CIVIL DESIGN OF ROADS AND DRAINS PE‐DC‐314‐603‐C001 A 31 ST JAN '09
1759 CIVIL LAYOUT OF ROADS AND DRAINS PE‐DG‐314‐603‐C001 A 31 ST JAN '09
1760 CIVIL DETAIL OF ROADS AND DRAINS PE‐DG‐314‐603‐C002 A 31 ST JAN '09
1761 CIVIL TOPOGRAPHICAL SURVEY DRAWING PE‐DG‐314‐601‐C001 I 22 ND MAY '08
1762 CIVIL GRADING PLAN PE‐DG‐314‐601‐C002 A 19 TH NOV '08
1763 CIVIL GEO‐TECH INVESTIGATING LAYOUT PE‐DG‐314‐602‐C001 A 17 TH JUNE '08
1764 CIVIL ARCHITECHTURAL PLAN , SECTIONS, ELEVATIONS OF BOUNDARY WALL
PE‐DG‐314‐606‐C002 SH 1 OF 2
A 18TH SEPTEMBER '08
1765 CIVIL ARCHITECHTURAL PLAN , SECTIONS, ELEVATIONS OF BOUNDARY WALL
PE‐DG‐314‐606‐C002 SH 2 OF 2
A 18TH SEPTEMBER '08
1766 CIVIL PLANT BOUNDARY WALL ‐ G.A. AND FOUNDATION DETAILS PE‐DG‐314‐606‐C001 A 18TH SEPTEMBER '08
1767 CIVIL DESIGN OF TEST PILE PE‐DC‐314‐607‐C001 A 31 ST OCT '08
1768 CIVIL REINFORCEMENT DRAWING OF TEST PILE PE‐DG‐314‐607‐C001 A 31 ST OCT '08
1769 CIVIL DESIGN OF JOB PILE PE‐DC‐314‐607‐C002 A 4TH NOV '09
1770 CIVIL REINFORCEMENT DRAWING OF JOB PILE PE‐DG‐314‐607‐C002 A 4TH NOV '09
1771 CIVIL CANTEEN BLDG ‐ ANALYSIS AND DESIGN PE‐DC‐314‐610‐C001 I 15TH SEPT '09
1772 CIVIL CANTEEN BLDG ‐ ARCHITECTURAL PLAN AND SECTION PE‐DG‐314‐610‐C001 I 4TH SEPT '09
1773 CIVIL CANTEEN BLDG ‐ ARCHITECTURAL ELEVATIONS AND MISC DETAILS PE‐DG‐314‐610‐C002 I 15TH SEPT '09
1774 CIVIL CANTEEN BLDG ‐ LAYOUT & RC DETAILS OF COLUMNS AND FOUNDATIONS
PE‐DG‐314‐610‐C003 I 10TH SEPT '09
1775 CIVIL CANTEEN BLDG ‐ LAYOUT & RC DETAILS OF BEAM AND SLAB PE‐DG‐314‐610‐C004 I 25TH SEPT '09
1776 CIVIL GTG BUILDING ‐ DESIGN OF COLUMN FOUNDATIONS AND PLINTH BEAMS
PE‐DC‐314‐611‐C001 A 25TH DEC '08
1777 CIVIL GTG BUILDING ‐ DESIGN OF FLOOR SLAB PE‐DC‐314‐611‐C002 A 9 TH APRIL '09
1778 CIVIL GTG BUILDING ‐ DESIGN OF ROOF SLAB PE‐DC‐314‐611‐C003 A 19TH APRIL'09
1779 CIVIL GTG BUILDING‐MISC RCC DESIGN PE‐DC‐314‐611‐C004 I 1 ST MAY '09
1780 CIVIL GCB ROOM ‐ ANALYSIS AND DESIGN PE‐DC‐314‐611‐C005 I 9 TH MARCH '09
Page 26 of 49
12/12/20081781 CIVIL GCB ROOM ‐ DESIGN OF FLOOR AND ROOF SLABS PE‐DC‐314‐611‐C006 I 25TH MARCH '09
1782 CIVIL GGS ROOM ‐ ANALYSIS AND DESIGN PE‐DC‐314‐611‐C007 I 14 TH APRIL '09
1783 CIVIL GTG BUILDING ‐ 3D ANALYSIS OF STEEL FRAMING MODEL PE‐DC‐314‐612‐C001 A 11TH DEC '08
1784 CIVIL GTG BUILDING ‐ DESIGN OF CRANE GIRDER(95 T) PE‐DC‐314‐612‐C002 A 30TH DEC '08
1785 CIVIL GTG BUILDING ‐ DESIGN OF CRANE GIRDER(50 T) PE‐DC‐314‐612‐C003 A 7TH JAN '09
1786 CIVIL GTG BUILDING ‐ DESIGN OF SUPERSTRUCTURE COLUMN & BASE PLATE,BOLT
PE‐DC‐314‐612‐C004 A 18TH FEB '09
1787 CIVIL GTG BUILDING ‐ DESIGN OF BRACINGS, WALL BEAMS,MAIN GIRDERS
PE‐DC‐314‐612‐C005 A 23RD JAN '09
1788 CIVIL GTG BUILDING ‐ DESIGN OF SECONDARY BEAMS AT MISCELLANEOUS FLOOR LEVEL
PE‐DC‐314‐612‐C006 A 17TH FEB '08
1789 CIVIL GTG BUILDING ‐ DESIGN OF PURLIN AND ROOF TRUSS PE‐DC‐314‐612‐C007 A 5 TH JAN '08
1790 CIVIL GTG BUILDING ‐ DESIGN OF STAIRCASE PE‐DC‐314‐612‐C008 A 11TH MARCH '09
1791 CIVIL GTG BUILDING ‐ DESIGN OF MISC STEEL STRUCTURES PE‐DC‐314‐612‐C009 A 7TH MAY '09
1792 CIVIL GTG BUILDING ‐ DESIGN OF GABLE END COLUMNS ,BASE PLATE AND BEAMS
PE‐DC‐314‐612‐C010 A 24TH APRIL '09
1793 CIVIL GTG BUILDING ‐ DESIGN OF SIDE GIRTS AND CLADDING RUNNER DETAILS
PE‐DC‐314‐612‐C011 I 29th APRIL '09
1794 CIVIL RCC WORKS ‐ NOTES AND STANDARD DETAILS PE‐DG‐314‐611‐C001 I 15TH FEB '09
1795 CIVIL GTG BUILDING ‐ GROUND FLOOR PLAN PE‐DG‐314‐611‐C002 A 5 TH MARCH '09
1796 CIVIL GTG BUILDING ‐ PLAN AT INTERMEDIATE FLOOR LEVEL PE‐DG‐314‐611‐C003 I 10 TH MARCH '09
1797 CIVIL GTG BUILDING ‐ ROOF PLAN & DETAILS PE‐DG‐314‐611‐C004 I 17 TH MARCH '09
1798 CIVIL GTG BUILDING ‐ NORTH & SOUTH ELEVATION PE‐DG‐314‐611‐C005 A 15 TH MAY '09
1799 CIVIL GTG BUILDING ‐ EAST & WEST ELEVATION PE‐DG‐314‐611‐C006 A 18 TH MAY '09
1800 CIVIL GTG BUILDING ‐ GENERAL SECTION,WALL SECTION AND DETAIL PE‐DG‐314‐611‐C007 A 8TH MAY '09
1801 CIVIL GTG BUILDING ‐ DOOR & WINDOW AND FINISH SCHEDULE PE‐DG‐314‐611‐C008 I 15TH MAY'09
1802 CIVIL GTG BUILDING ‐ GA OF COLUMN FOUNDATIONS (PILING) PE‐DG‐314‐611‐C009 A 25TH DEC '08
1803 CIVIL GTG BUILDING ‐ GA OF COLUMN FOUNDATIONS (PILE CAP) PE‐DG‐314‐611‐C010 A 2ND JAN '09
1804 CIVIL GTG BUILDING ‐ RC DETAILS OF COLUMN FOUNDATION PE‐DG‐314‐611‐C011 A 10TH JAN '09
1805 CIVIL GTG BUILDING ‐ GA OF GROUND FLOOR /INTERMEDIATE FLOOR PE‐DG‐314‐611‐C012 A 24th MARCH '09
1806 CIVIL GTG BUILDING ‐ RC DETAILS OF GROUND FLOOR INTERMEDIATE FLOOR
PE‐DG‐314‐611‐C013 A 9 TH APRIL '09
1807 CIVIL GTG BUILDING ‐ GA OF ROOF SLAB PE‐DG‐314‐611‐C014 A 11TH APRIL '09
Page 27 of 49
12/12/20081808 CIVIL GTG BUILDING ‐ RC DETAIL OF ROOF SLAB PE‐DG‐314‐611‐C015 A 19TH APRIL'09
1809 CIVIL GTG BUILDING ‐ GA & RC DETAIL OF MISC RCC WORKS PE‐DG‐314‐611‐C016 I 1ST MAY '09
1810 CIVIL GCB ROOM ‐ GENARAL ARRANGEMENT PE‐DG‐314‐611‐C019 A 9TH MARCH '09
1811 CIVIL GCB ROOM ‐ RC DETAILS PE‐DG‐314‐611‐C020 I 25 TH MARCH '09
1812 CIVIL GGS ROOM ‐ GA OF GGS ROOM PE‐DG‐314‐611‐C023 I 14 TH APRIL '09
1813 CIVIL GGS ROOM ‐ RC DETAIL OF GGS ROOM PE‐DG‐314‐611‐C024 I 24 TH APRIL '09
1814 CIVIL STRUCTURAL STEEL WORK ‐ NOTES AND STANDARD DETAILS PE‐DG‐314‐612‐C001 I 13TH JAN '09
1815 CIVIL GTG BUILDING ‐ STEEL FRAMING PLAN & DETAILS AT ROOF LEVEL( TRUSS & PURLIN DETAIL)
PE‐DG‐314‐612‐C002 A 5 TH JAN '09
1816 CIVIL GTG BUILDING ‐ STEEL FRAMING PLAN & DETAILS AT CRANE GIRDER LEVEL( GANTRY GIRDER DETAIL‐ 50 T)
PE‐DG‐314‐612‐C003 A 30TH DEC '08
1817 CIVIL GTG BUILDING ‐ STEEL FRAMING PLAN & DETAILS AT CRANE GIRDER LEVEL( GANTRY GIRDER DETAIL‐ 95 T)
PE‐DG‐314‐612‐C004 A 7TH JAN '08
1818 CIVIL GTG BUILDING ‐ STEEL FRAMING PLAN & DETAILS AT MISC. PLATFORM LEVELS
PE‐DG‐314‐612‐C005 A 23RD JUNE '09
1819 CIVIL GTG BUILDING ‐ STEEL FRAMING ELEVATIONS AND DETAILS OF BRACINGS AND WALL BEAMS (A ROW)
PE‐DG‐314‐612‐C006 A 18TH FEB '09
1820 CIVIL GTG BUILDING ‐ STEEL FRAMING ELEVATIONS AND DETAILS OF BRACINGS AND WALL BEAMS (B ROW)
PE‐DG‐314‐612‐C007 A 10TH FEB '09
1821 CIVIL GTG BUILDING ‐ STEEL FRAMING ELEVATIONS AND DETAILS OF BRACINGS AND WALL BEAMS (C ROW)
PE‐DG‐314‐612‐C008 A 23RD JAN '09
1822 CIVIL GTG BUILDING ‐ STEEL FRAMING DETAILS COLUMN SCHEDULE & BASE PLATE
PE‐DG‐314‐612‐C009 A 18TH FEB '09
1823 CIVIL GTG BUILDING ‐ STEEL FRAMING STAIR AND MISC. DETAILS PE‐DG‐314‐612‐C010 A 17 TH MARCH '09
1824 CIVIL GTG BUILDING ‐ STEEL FRAMING DETAILS OF SIDE GIRTS AND CLADDING RUNNERS DETAIL
PE‐DG‐314‐612‐C011 I 29 TH APRIL '09
1825 CIVIL GTG BUILDING ‐ STEEL FRAMING DETAILS OF GABLE END PE‐DG‐314‐612‐C012 A 24TH APRIL '09
1826 CIVIL GTG BUILDING ‐ MISC STEEL WORK PE‐DG‐314‐612‐C013 A 7TH MAY '09
1827 CIVIL STG & CONTROL BUILDING ‐ DESIGN OF MAIN COLUMN FOUNDATIONS AND PLINTH BEAMS
PE‐DC‐314‐611‐C015 A 14TH JAN '09
1828 CIVIL STG & CONTROL BUILDING ‐ DESIGN OF ROOF SLAB PE‐DC‐314‐611‐C016 A 9TH MARCH '09
1829 CIVIL STG & CONTROL BUILDING ‐ DESIGN OF CEP PIT PE‐DC‐314‐611‐C017 A 25TH MAY '09
1830 CIVIL STG & CONTROL BUILDING ‐ DESIGN OF FLOOR SLABS AT 13.5M PE‐DC‐314‐611‐C018 A 13TH APRIL '09
1831 CIVIL STG & CONTROL BUILDING ‐ DESIGN OF FLOOR SLABS AT 8.5M PE‐DC‐314‐611‐C019 A 25TH MARCH '09
1832 CIVIL STG & CONTROL BUILDING ‐ DESIGN OF FLOOR SLABS IN BC BAY PE‐DC‐314‐611‐C020 A 8TH MAY '09
1833 CIVIL STG & CONTROL BUILDING ‐ DESIGN OF AUX COLUMNS FOUNDATION
PE‐DC‐314‐611‐C021 A 24TH FEB '09
1834 CIVIL STG & CONTROL BUILDING ‐ 3D ANALYSIS OF STEEL FRAMING MODEL
PE‐DC‐314‐612‐C020 A 12TH JAN '09
Page 28 of 49
12/12/20081835 CIVIL STG & CONTROL BUILDING ‐ DESIGN OF CRANE GIRDER(130 T) PE‐DC‐314‐612‐C021 A 28TH JAN '09
1836 CIVIL STG & CONTROL BUILDING ‐ DESIGN OF SUPERSTRUCTURE COLUMN & BASE PLATE ,BOLTS
PE‐DC‐314‐612‐C022 A 17TH FEB '09
1837 CIVIL STG & CONTROL BUILDING ‐ DESIGN OF BRACINGS,WALL BEAMS & GIRDERS
PE‐DC‐314‐612‐C023 A 25TH FEB '09
1838 CIVIL STG & CONTROL BUILDING ‐ DESIGN OF TRUSS PE‐DC‐314‐612‐C024 A 10TH FEB '09
1839 CIVIL STG & CONTROL BUILDING ‐ DESIGN OF SECONDARY BEAMS AT 4M AND 9.5M FLOOR LEVELS (BC BAY)
PE‐DC‐314‐612‐C025 A 29TH APRIL '09
1840 CIVIL STG & CONTROL BUILDING ‐ DESIGN OF SECONDARY BEAMS AT 13.5M AND 19M FLOOR LEVELS(BC BAY)
PE‐DC‐314‐612‐C026 A 13TH JUNE '09
1841 CIVIL STG & CONTROL BUILDING ‐ DESIGN OF SECONDARY BEAMS AT 8.5 M AND 13.5M FLOOR LEVELS AND ROOF (AB BAY)
PE‐DC‐314‐612‐C027 A 26TH MARCH '09
1842 CIVIL STG & CONTROL BUILDING ‐ DESIGN OF PURLIN PE‐DC‐314‐612‐C028 A 10TH FEB '09
1843 CIVIL STG & CONTROL BUILDING ‐ DESIGN OF STAIRCASE PE‐DC‐314‐612‐C029 I 20TH AUGUST '09
1844 CIVIL STG & CONTROL BUILDING ‐ DESIGN OF AUX COLUMNS ,BASE PLATE & BOLTS
PE‐DC‐314‐612‐C030 A 24TH FEB '09
1845 CIVIL STG & CONTROL BUILDING ‐ DESIGN OF GABLE END PE‐DC‐314‐612‐C031 A 16TH JUNE '09
1846 CIVIL STG & CONTROL BUILDING ‐ DESIGN OF OIL CANAL FRAMING PE‐DC‐314‐612‐C032 A 28TH JULY '09
1847 CIVIL STG ‐ DESIGN OF FLOOR SLAB AT 0.0 M PE‐DC‐314‐612‐C033 A 23RD APRIL'09
1848 CIVIL STG & CONTROL BLDG. ‐ GROUND FLOOR PLAN (AB & BC BAY ) PE‐DG‐314‐611‐C030 A 23TH APRIL '09
1849 CIVIL STG & CONTROL BLDG. ‐ FLOOR PLAN AT 3.5 M,& MEZZANINE FLOOR PLAN
PE‐DG‐314‐611‐C031 A 25TH MARCH '09
1850 CIVIL STG & CONTROL BLDG. ‐ OPERATING FLOOR PE‐DG‐314‐611‐C032 A 13TH APRIL '09
1851 CIVIL STG & CONTROL BLDG. ‐ ROOF PLAN PE‐DG‐314‐611‐C033 I 9TH MARCH '09
1852 CIVIL STG & CONTROL BLDG. ‐ ELEVATIONS‐ NORTH, SOUTH PE‐DG‐314‐611‐C034 A 24TH MAY '09
1853 CIVIL STG & CONTROL BLDG. ‐ ELEVATIONS ‐ EAST, WEST PE‐DG‐314‐611‐C035 A 24TH MAY '09
1854 CIVIL STG & CONTROL BLDG. ‐ GENERAL SECTION,WALL SECTIONS AND MISC DETAIL
PE‐DG‐314‐611‐C036 I 29TH APRIL '09
1855 CIVIL STG & CONTROL BLDG. ‐ DOOR , WINDOW ,TOILET AND FINISH SCHEDULE
PE‐DG‐314‐611‐C037 A 29TH MAY '09
1856 CIVIL STG BLDG. ‐ STAIRCASE DETAIL PE‐DG‐314‐611‐C038 I 20TH AUGUST '09
1857 CIVIL STG & CONTROL BLDG. ‐ GA OF MAIN COLUMN FOUNDATION (PILING LAYOUT)
PE‐DG‐314‐611‐C040 SH 1
A 14TH JAN '09
1858 CIVIL STG & CONTROL BLDG. ‐ GA OF MAIN COLUMN FOUNDATION (PILE CAP )
PE‐DG‐314‐611‐C040 SH 2
A 5TH FEB '09
1859 CIVIL STG & CONTROL BLDG. ‐ RC DETAILS OF MAIN COLUMN FOUNDATION
PE‐DG‐314‐611‐C041 A 10TH FEB '09
1860 CIVIL STG & CONTROL BLDG. ‐ GA AND RC DETAIL OF CEP PIT PE‐DG‐314‐611‐C042 A 25TH MAY '09
1861 CIVIL STG & CONTROL BLDG. ‐ GA AND RC DETAIL OF AUX COLUMN FOUNDATION
PE‐DG‐314‐611‐C043 A 24TH FEB '09
Page 29 of 49
12/12/20081862 CIVIL STG & CONTROL BLDG. ‐ GA AND RC DETAIL OF GROUND FLOOR SLAB AT EL. 0.0
PE‐DG‐314‐611‐C044 A 23RD APRIL '09
1863 CIVIL STG & CONTROL BLDG. ‐ GA & RC DETAIL OF MEZZ. FLOOR AT EL.8.5 M.
PE‐DG‐314‐611‐C045 A 25TH MARCH '09
1864 CIVIL STG & CONTROL BLDG. ‐ GA AND RC DETAILS OF OPERATING FLOORS AT EL. 13.5 M
PE‐DG‐314‐611‐C046 A 13TH APRIL '09
1865 CIVIL STG & CONTROL BLDG. ‐ GA & RC DETAILS OF OIL CANAL & OIL ROOM
PE‐DG‐314‐611‐C047 A 29TH JULY '09
1866 CIVIL STG & CONTROL BLDG. ‐ GA AND RC DETAILS OF ROOF(AB BAY) PE‐DG‐314‐611‐C048 A 9TH MARCH '09
1867 CIVIL MISC RCC DRAWINGS PE‐DG‐314‐611‐C049 A 31ST AUG '09
1868 CIVIL STG & CONTROL BLDG. ‐ GA AND RC DETAILS OF FLOORS (BC BAY) PE‐DG‐314‐611‐C050 A 8TH MAY '09
1869 CIVIL STG & CONTROL BLDG. ‐ STEEL FRAMING PLAN AND DETAILS AT ROOF LVL( TRUSS & PURLIN DETAIL)
PE‐DG‐314‐612‐C035 A 10TH FEB '09
1870 CIVIL STG & CONTROL BLDG. ‐ STEEL FRAMING PLAN AND DETAILS AT CRANE GIRDER LEVEL(GANTRY DETAIL)
PE‐DG‐314‐612‐C036 A 28TH JAN '09
1871 CIVIL STG & CONTROL BLDG. ‐ STEEL FRAMING PLAN AND DETAILS FOR OPERATING FLOOR AT EL (+) 13.5
PE‐DG‐314‐612‐C037 A 26TH MARCH'09
1872 CIVIL STG & CONTROL BLDG. ‐ STEEL FRAMING ELEVATION AUXILLARY COLUMN,BASE PLATE AND BOLTS
PE‐DG‐314‐612‐C038 A 17TH FEB'09
1873 CIVIL STG & CONTROL BLDG. ‐ STEEL FRAMING PLAN AND DETAILS FOR MISC PLATFORMS
PE‐DG‐314‐612‐C039 A 7TH JULY'09
1874 CIVIL STG & CONTROL BLDG. ‐ STEEL FRAMING PLAN AND DETAILS FOR OIL CANAL
PE‐DG‐314‐612‐C040 A 28TH JULY '09
1875 CIVIL STG & CONTROL BLDG. ‐ DETAILS OF BRACINGS AND WALL BEAMS A ROW,MAIN COLUMN AND BASE PLATE
PE‐DG‐314‐612‐C041 A 17TH FEB '09
1876 CIVIL STG & CONTROL BLDG. ‐ STEEL FRAMING ELEVATION AND DETAILS OF BRACINGS AND WALL BEAMS B ROW AND GIRDERS
PE‐DG‐314‐612‐C042 A 27TH FEB '09
1877 CIVIL STG & CONTROL BLDG. ‐ STEEL FRAMING ELEVATION AND DETAILS OF BRACINGS AND WALL BEAMS C ROW AND GIRDERS
PE‐DG‐314‐612‐C043 A 20TH MARCH '09
1878 CIVIL STG & CONTROL BLDG. ‐ STEEL FRAMING PLAN AND DETAILS OF MEZZ. FLOOR AT EL (+) 8.5M
PE‐DG‐314‐612‐C044 A 20TH APRIL '09
1879 CIVIL STG & CONTROL BLDG. ‐ STEEL FRAMING PLAN AND DETAILS OF MAIN BEAMS
PE‐DG‐314‐612‐C045 A 9TH APRIL '09
1880 CIVIL STG & CONTROL BLDG. ‐ STEEL FRAMING PLAN AND DETAILS OF SECONDARY BEAMS AT 4M(BC BAY)
PE‐DG‐314‐612‐C046 A 29TH APRIL '09
1881 CIVIL STG & CONTROL BLDG. ‐ STEEL FRAMING PLAN AND DETAILS OF SECONDARY BEAMS AT 8.5M(BC BAY)
PE‐DG‐314‐612‐C047 A 29TH MAY '09
1882 CIVIL STG & CONTROL BLDG. ‐ STEEL FRAMING PLAN AND DETAILS OF SECONDARY BEAMS AT 13.5M(BC BAY)
PE‐DG‐314‐612‐C048 A 13TH JUNE '09
1883 CIVIL STG & CONTROL BLDG. ‐ STEEL FRAMING PLAN AND DETAILS OF SECONDARY BEAMS AT 19M(BC BAY)
PE‐DG‐314‐612‐C049 A 23RD JUNE '09
1884 CIVIL STG & CONTROL BLDG. ‐ STEEL FRAMING PLAN AND DETAILS FOR GABLE END
PE‐DG‐314‐612‐C050 A 16TH JUNE '09
1885 CIVIL STG & CONTROL BLDG. ‐ STEEL FRAMING ‐ MISC. DETAILS OF CLADDING RUNNERS ETC
PE‐DG‐314‐612‐C051 A 12TH AUGUST '09
1886 CIVIL STG & CONTROL BLDG. ‐ STEEL FRAMING DETAILS OF STAIRCASE PE‐DG‐314‐612‐C052 I 20TH AUGUST '09
1887 CIVIL STG & CONTROL BLDG. ‐ STEEL FRAMING DETAILS OF WIND GIRDER PE‐DG‐314‐612‐C053 A 20TH JUNE '09
1888 CIVIL STG & CONTROL BLDG. ‐ MISC STEEL FRAMING DETAILS PE‐DG‐314‐612‐C054 A 10TH SEPTEMBER '09
Page 30 of 49
12/12/20081889 CIVIL STATIC ANALYSIS OF STG FOUNDATION PE‐DC‐314‐613‐C001 A 24TH JAN '09
1890 CIVIL DYNAMIC ANALYSIS OF STG FOUNDATION PE‐DC‐314‐613‐C002 A 18TH FEB '09
1891 CIVIL DESIGN OF RAFT FOUNDATION PE‐DC‐314‐613‐C003 A 31ST MARCH '09
1892 CIVIL DESIGN OF COLUMNS AND BEAMS PE‐DC‐314‐613‐C004 A 24TH MARCH '09
1893 CIVIL DESIGN OF TOP DECK PE‐DC‐314‐613‐C005 A 7TH MAY '09
1894 CIVIL DESIGN OF PLATFORMS BEAMS PE‐DC‐314‐613‐C006 A 9TH JULY '09
1895 CIVIL GA PLAN & SECTION (PILING LAYOUT) PE‐DG‐314‐613‐C001 A 24TH JAN '09
1896 CIVIL GA AT RAFT LEVEL PE‐DG‐314‐613‐C002 A 4TH MARCH '09
1897 CIVIL RC DETAILS OF RAFT PE‐DG‐314‐613‐C003 A 17TH MARCH '09
1898 CIVIL RC DETAILS OF COLUMN PE‐DG‐314‐613‐C004 A 31ST MARCH '09
1899 CIVIL RC DETAILS OF BEAMS PE‐DG‐314‐613‐C005 A 9TH APRIL '09
1900 CIVIL STRUCTURAL DETAILS OF PLATFORMS PE‐DG‐314‐613‐C006 A 9TH JULY '09
1901 CIVIL GA OF TOP DECK PE‐DG‐314‐613‐C007 A 7TH MAY '09
1902 CIVIL RC DETAIL OF TOP DECK SH‐1 PE‐DG‐314‐613‐C008 A 15TH MAY '09
1903 CIVIL RC DETAIL OF TOP DECK SH‐2 PE‐DG‐314‐613‐C009 A 26TH MAY '09
1904 CIVIL LIST & DETAIL OF EMBEDMENTS PE‐DG‐314‐613‐C010 A 26TH AUGUST '09
1905 CIVIL BFP BLDG. ‐ 3D ANALYSIS OF STRUCTURAL FRAMING MODEL PE‐DC‐314‐614‐C001 A 4TH FEB '09
1906 CIVIL BFP BLDG. ‐ DESIGN OF CRANE GIRDER PE‐DC‐314‐614‐C002 I 17TH FEB '09
1907 CIVIL BFP BLDG. ‐ DESIGN OF SUPERSTRUCTURE COLUMN & MAIN BEAMS,BASE PLATE& BOLTS
PE‐DC‐314‐614‐C003 A 17TH JAN '09
1908 CIVIL BFP BLDG. ‐ DESIGN OF BRACINGS AND WALL BEAMS PE‐DC‐314‐614‐C004 A 26TH FEB '09
1909 CIVIL BFP BLDG. ‐ DESIGN OF SECONDARY BEAMS AT MISCELLANEOUS FLOOR LEVELS AND ROOF
PE‐DC‐314‐614‐C005 A 30TH MARCH '09
1910 CIVIL BFP BLDG. ‐ DESIGN OF STAIRCASE PE‐DC‐314‐614‐C006 I 17TH JAN '09
1911 CIVIL BFP BLDG. ‐ DESIGN OF COLUMN FOUNDATIONS AND PLINTH BEAMS
PE‐DC‐314‐614‐C007 A 26TH JAN '09
1912 CIVIL BFP BLDG. ‐ DESIGN OF SLABS PE‐DC‐314‐614‐C008 I 20TH JUNE '09
1913 CIVIL BFP BLDG. ‐ DESIGN OF HP BFP FOUNDATION PE‐DC‐314‐614‐C009 A 31ST MAY '09
1914 CIVIL BFP BLDG. ‐ DESIGN OF LP BFP FOUNDATION AND MISC. WORKS PE‐DC‐314‐614‐C010 A 5TH JUNE '09
1915 CIVIL BFP BLDG. ‐ PLANS PE‐DG‐314‐614‐C001 A 17TH FEB '09
Page 31 of 49
12/12/20081916 CIVIL BFP BLDG. ‐ SECTIONS PE‐DG‐314‐614‐C002 A 25TH MAY '09
1917 CIVIL BFP BLDG. ‐ ELEVATION ALONG WITH NORTH,SOUTH ,WEST & EAST VIEW
PE‐DG‐314‐614‐C003 A 12TH MAY '09
1918 CIVIL BFP BLDG. ‐ STEEL FRAMING PLAN AND DETAILS AT ROOF LEVEL PE‐DG‐314‐614‐C005 A 30TH MARCH '09
1919 CIVIL BFP BLDG. ‐ STEEL FRAMING PLAN AND DETAILS FOR FLOOR PE‐DG‐314‐614‐C006 A 20TH MARCH '09
1920 CIVIL BFP BLDG. ‐ STEEL FRAMING ELEVATION AND DETAILS OF BRACING & WALL BEAM
PE‐DG‐314‐614‐C007 A 26TH FEB '09
1921 CIVIL BFP BLDG. ‐ STEEL FRAMING DETAILS ‐ COLUMN SCHEDULE,BASE PLATE AND BOLTS
PE‐DG‐314‐614‐C008 A 17TH JAN '09
1922 CIVIL BFP BLDG. ‐ STEEL FRAMING DETAILS OF STAIR PE‐DG‐314‐614‐C009 I 17TH JAN '09
1923 CIVIL BFP BLDG. ‐ GA AND RC DETAIL OF FOUNDATIONS PE‐DG‐314‐614‐C010 A 26TH JAN '09
1924 CIVIL BFP BLDG. ‐ GA AND RC DETAIL OF GROUND FLOOR SLAB PE‐DG‐314‐614‐C011 I 25TH JUNE'09
1925 CIVIL BFP BLDG. ‐ GA OF HPBFP FOUNDATION PE‐DG‐314‐614‐C012 A 12TH MAY '09
1926 CIVIL BFP BLDG. ‐ RC DETAILS OF HPBFP FOUNDATION PE‐DG‐314‐614‐C013 A 31ST MAY '09
1927 CIVIL BFP BLDG. ‐ GA OF LPBFP FOUNDATION PE‐DG‐314‐614‐C014 A 28TH MAY '09
1928 CIVIL BFP BLDG. ‐ RC DETAILS OF LPBFP FOUNDATION PE‐DG‐314‐614‐C015 A 5TH JUNE '09
1929 CIVIL BFP BLDG. ‐ GA AND RC DETAIL OF FLOORS PE‐DG‐314‐614‐C016 I 20TH JUNE '09
1930 CIVIL BFP BLDG. ‐ GA AND RC DETAIL OF ROOF LVL AND CRANE GIRDER PE‐DG‐314‐614‐C017 I 15TH JULY '09
1931 CIVIL HRSG AREA ‐ ANALYSIS AND DESIGN OF HRSG FOUNDATION PE‐DC‐314‐617‐C001 A 26 TH NOV '08
1932 CIVIL HRSG AREA ‐ DESIGN OF STACK FOUNDATION PE‐DC‐314‐617‐C002 A 19 TH DEC '08
1933 CIVIL HRSG AREA ‐ DESIGN OF BYPASS STACK FOUNDATION PE‐DC‐314‐617‐C003 A 15TH JULY '09
1934 CIVIL HRSG AREA ‐ GT AUXILIARIES ‐ DESIGN OF GAS CONDITIONING SKID PE‐DC‐314‐617‐C004 I 23RD JUNE '09
1935 CIVIL HRSG AREA ‐ GT AUXILIARIES ‐ DESIGN OF MISCELLENEOUS FOUNDATIONS
PE‐DC‐314‐617‐C005 I 15TH JULY '09
1936 CIVIL HRSG AREA ‐ GA OF HRSG FOUNDATION (PILING LAYOUT) PE‐DG‐314‐617‐C001 A 26 TH NOV '08
1937 CIVIL HRSG AREA ‐ RC DETAILS OF HRSG FOUNDATION PE‐DG‐314‐617‐C002 A 16 TH DEC '08
1938 CIVIL HRSG AREA ‐ GA OF STACK FOUNDATION (PILING LAYOUT) PE‐DG‐314‐617‐C003 A 19 TH DEC '08
1939 CIVIL HRSG AREA ‐ RC DETAILS OF STACK FOUNDATION PE‐DG‐314‐617‐C004 A 29 TH DEC '08
1940 CIVIL HRSG AREA ‐ GA OF BYPASS STACK FOUNDATION (PILING LAYOUT) PE‐DG‐314‐617‐C005 A 15TH JULY '09
1941 CIVIL HRSG AREA ‐ RC DETAILS OF BYPASS STACK FOUNDATION PE‐DG‐314‐617‐C006 A 23RD JULY '09
1942 CIVIL HRSG AREA ‐ GT AUXILIARIES ‐ GAAND RC DETAILS OF GAS CONDITIONING SKID
PE‐DG‐314‐617‐C007 I 23RD JUNE '09
Page 32 of 49
12/12/20081943 CIVIL HRSG AREA ‐ GT AUXILIARIES ‐ GA OF MISCELLENEOUS FOUNDATIONS
PE‐DG‐314‐617‐C008 I 15TH JULY '09
1944 CIVIL HRSG AREA ‐ GT AUXILIARIES ‐ R.C DETAILS OF MISCELLENEOUS FOUNDATIONS
PE‐DG‐314‐617‐C009 I 23RD JULY '09
1945 CIVIL TRANSFORMER YARD ‐DESIGN OF GENERATOR TRANSFORMER FOUNDATION & FB WALL ‐GTG AREA
PE‐DC‐314‐622‐C001 A 17TH FEB '09
1946 CIVIL TRANSFORMER YARD ‐ DESIGN OF GENERATOR TRANSF. FDN AND FIRE BARRIER WALL ‐ STG AREA
PE‐DC‐314‐622‐C002 A 19TH MARCH '09
1947 CIVIL TRANSFORMER YARD ‐ DESIGN OF UNIT AUX. TRANSFORMER FOUNDATION AND FIRE BARRIER WALL
PE‐DC‐314‐622‐C003 A 9TH APRIL '09
1948 CIVIL TRANSFORMER YARD ‐ DESIGN OF AUX. SERVICE TRANSFORMER FOUNDATION
PE‐DC‐314‐622‐C004 A 23RD JUNE '09
1949 CIVIL TRANSFORMER YARD ‐ DESIGN OF TRENCHES AND BUS DUCT FOUNDATION
PE‐DC‐314‐622‐C005 I 23RD JULY '09
1950 CIVIL TRANSFORMER YARD ‐ DESIGN OF RETENTION OIL PIT PE‐DC‐314‐622‐C006 I 17TH SEPTEMBER '09
1951 CIVIL TRANSFORMER YARD ‐ GA OF GENERATOR TRANSFORMER FOUNDATION ‐GTG AREA
PE‐DG‐314‐622‐C001 A 17TH FEB '09
1952 CIVIL TRANSFORMER YARD ‐ RC DETAIL OF GENERATOR TRANSFORMER FOUNDATION ‐GTG AREA
PE‐DG‐314‐622‐C002 A 26TH FEB '09
1953 CIVIL TRANSFORMER YARD ‐ GA OF GENERATOR TRANSF. FDN ‐ STG AREA
PE‐DG‐314‐622‐C003 A 19TH MARCH '09
1954 CIVIL TRANSFORMER YARD ‐ RC DETAIL OF GENERATOR TRANSF. FDN ‐ STG AREA
PE‐DG‐314‐622‐C004 A 26TH MARCH '09
1955 CIVIL TRANSFORMER YARD ‐ GA OF UNIT AUX. TRANSFORMER FOUNDATION
PE‐DG‐314‐622‐C005 A 9TH APRIL '09
1956 CIVIL TRANSFORMER YARD ‐ RC DETAIL OF UNIT AUX. TRANSFORMER FOUNDATION
PE‐DG‐314‐622‐C006 A 22ND APRIL '09
1957 CIVIL TRANSFORMER YARD ‐ GA OF AUX. SERVICE TRANSFORMER FOUNDATION
PE‐DG‐314‐622‐C007 A 23RD JUNE '09
1958 CIVIL TRANSFORMER YARD ‐ RC DETAIL OF AUX. SERVICE TRANSFORMER FOUNDATION
PE‐DG‐314‐622‐C008 A 29TH JUNE '09
1959 CIVIL TRANSFORMER YARD ‐ LAYOUT OF TRANSFORMER YARD & TRENCHES ‐ GTG AREA
PE‐DG‐314‐622‐C009 I 23RD JULY '09
1960 CIVIL TRANSFORMER YARD ‐ LAYOUT OF TRANSFORMER YARD & TRENCHES ‐ STG AREA
PE‐DG‐314‐622‐C010 I 6TH AUGUST '09
1961 CIVIL TRANSFORMER YARD ‐ RC DETAILS OF TRANSFORMER YARD & TRENCHES ‐ GTG AREA
PE‐DG‐314‐622‐C011 I 25TH AUGUST '09
1962 CIVIL TRANSFORMER YARD ‐ RC DETAILS OF TRANSFORMER YARD & TRENCHES ‐ STG AREA
PE‐DG‐314‐622‐C012 I 4TH SEPTEMBER '09
1963 CIVIL TRANSFORMER YARD ‐ GA & RC DETAIL OF RETENTION OIL PIT PE‐DG‐314‐622‐C013 I 17TH SEPTEMBER '09
1964 CIVIL TRANSFORMER YARD ‐ SECTIONS AND DETAILS OF TRNCHES PE‐DG‐314‐622‐C014 I 24TH SEPTEMBER '09
1965 CIVIL CLARIFIED WATER PH ‐ 3D ANALYSIS OF FRAMING MODEL PE‐DC‐314‐636‐C001 A 10TH MARCH '09
1966 CIVIL CLARIFIED WATER PH ‐ DESIGN OF SUMP RAFT AND WALL PE‐DC‐314‐636‐C002 I 18TH MARCH '09
1967 CIVIL CLARIFIED WATER PH ‐ DESIGN OF COLUMS AND BEAMS PE‐DC‐314‐636‐C003 A 24TH JUNE '09
1968 CIVIL CLARIFIED WATER PH ‐ DESIGN OF FLOOR AND ROOF SLAB PE‐DC‐314‐636‐C004 I 24TH APRIL '09
1969 CIVIL CLARIFIED WATER PH ‐ ARCHITECTURAL OPERATING FLOOR & ROOF PLAN
PE‐DG‐314‐636‐C001 A 18TH MARCH '09
Page 33 of 49
12/12/20081970 CIVIL CLARIFIED WATER PH ‐ ARCHITECTURAL ELEVATIONS & MISC DETAILS
PE‐DG‐314‐636‐C002 A 26TH MARCH '09
1971 CIVIL CLARIFIED WATER PH ‐ GA & RC DETAILS OF RESERVOIR PE‐DG‐314‐636‐C003 A 10TH MARCH '09
1972 CIVIL CLARIFIED WATER PH ‐ GA DETAILS OF SUMP WALL, RAFT & COLUMN FDNS
PE‐DG‐314‐636‐C005(SH 1)
I 18TH MARCH '09
1973 CIVIL CLARIFIED WATER PH ‐ RC DETAILS OF SUMP WALL, RAFT & COLUMN FDNS
PE‐DG‐314‐636‐C005(SH 2)
I 26TH MARCH '09
1974 CIVIL CLARIFIED WATER PH ‐ GA & RC DETAILS OF OP. FLOOR SLAB PE‐DG‐314‐636‐C007 I 24TH APRIL '09
1975 CIVIL CLARIFIED WATER PH ‐ GA AND RC DETAIL OF SUPER STR COLUMN , BEAMS AND WALL
PE‐DG‐314‐636‐C008 A 24TH JUNE '09
1976 CIVIL CLARIFIED WATER PH ‐ GA & RC DETAIL OF PUMP HOUSE ROOF PE‐DG‐314‐636‐C010 I 7TH JULY '09
1977 CIVIL CLARIFIED WATER PH ‐ GA & RC DETAIL OF MAINTANCE BAY/ELECT ANNEXI
PE‐DG‐314‐636‐C011 A 24TH JULY '09
1978 CIVIL CLARIFIED WATER PH ‐ MISC AND CRANE/MONORAIL DETAIL PE‐DG‐314‐636‐C012 I 24TH JULY '09
1979 CIVIL CHLORINATION PLANT BLDG. ‐ ANALYSIS AND DESIGN PE‐DC‐314‐637‐C001 I 4TH JUNE '09
1980 CIVIL CHLORINATION PLANT BLDG. ‐ DESIGN OF COLUMN FOUNDATION PE‐DC‐314‐637‐C002 I 10TH JUNE '09
1981 CIVIL CHLORINATION PLANT BLDG ‐ DESIGN OF COLUMNS, BEAMS AND ROOF SLAB
PE‐DC‐314‐637‐C003 I 30TH JUNE '09
1982 CIVIL CHLORINATION PLANT BLDG ‐ DESIGN OF MISCELLANEOUS EQUIPMENT FOUNDATIONS
PE‐DC‐314‐637‐C004 I 7TH AUGUST'09
1983 CIVIL CHLORINATION PLANT BLDG. ‐ DESIGN OF GROUND FLOOR SLAB PE‐DC‐314‐637‐C005 I 7TH AUGUST'09
1984 CIVIL CHLORINATION PLANT BLDG.‐ PLAN PE‐DG‐314‐637‐C001 I 10TH JUNE '09
1985 CIVIL CHLORINATION PLANT BLDG. ‐ SECTION AND MISC DETAILS PE‐DG‐314‐637‐C002 I 30TH JUNE '09
1986 CIVIL CHLORINATION PLANT BLDG. ‐ ELEVATIONS PE‐DG‐314‐637‐C003 I 8TH JULY '09
1987 CIVIL CHLORINATION PLANT BLDG. ‐ GA AND RC DETAIL OF COLUMN FOUNDATIONS
PE‐DG‐314‐637‐C007 I 10TH JUNE '09
1988 CIVIL CHLORINATION PLANT BLDG ‐ DETAILS OF COLUMN ,BEAMS AND ROOF SLAB
PE‐DG‐314‐637‐C008 I 30TH JUNE '09
1989 CIVIL CHLORINATION PLANT BLDG ‐ GA AND RC DETAIL OF GROUND FLOOR
PE‐DG‐314‐637‐C009 I 7TH AUGUST'09
1990 CIVIL CHLORINATION PLANT BLDG ‐ GA AND RC DETAIL OF MISC. EQUIPMENT FOUNDATION
PE‐DG‐314‐637‐C013 I 7TH AUGUST'09
1991 CIVIL FACILITY BLDG. ‐ PLANS PE‐DG‐314‐640‐C001 A 30TH MARCH '09
1992 CIVIL FACILITY BLDG. ‐ ELEVATIONS ‐ NORTH, SOUTH PE‐DG‐314‐640‐C002 A 21ST APRIL '09
1993 CIVIL FACILITY BLDG. ‐ ELEVATIONS ‐ EAST, WEST PE‐DG‐314‐640‐C004 A 21ST APRIL '09
1994 CIVIL FACILITY BLDG. ‐ SECTIONS & DETAILS PE‐DG‐314‐640‐C004 A 21ST APRIL '09
1995 CIVIL FACILITY BLDG. ‐ DETAILS OF FALSE CEILING & MISC. DETAILS PE‐DG‐314‐640‐C005 A 19ST APRIL '09
1996 CIVIL FACILITY BLDG. ‐ MISC DETAILS PE‐DG‐314‐640‐C006 I 27TH APRIL '09
Page 34 of 49
12/12/20081997 CIVIL FACILITY BLDG. ‐ 3D ANALYSIS AND DESIGN PE‐DC‐314‐640‐C001 A 19TH MARCH '09
1998 CIVIL FACILITY BLDG. ‐ DESIGN OF SUPERSTRUCTURE COLUMNS AND BEAMS
PE‐DC‐314‐640‐C002 A 19TH MARCH '09
1999 CIVIL FACILITY BLDG. ‐ DESIGN OF FOUNDATION PE‐DC‐314‐640‐C003 A 19TH MARCH '09
2000 CIVIL FACILITY BLDG. ‐ DESIGN OF FLOOR & ROOF SLAB PE‐DC‐314‐640‐C004 I 9TH APRIL '09
2001 CIVIL FACILITY BLDG. ‐ DESIGN OF STAIRCASE PE‐DC‐314‐640‐C005 I 19TH MAY '09
2002 CIVIL FACILITY BLDG. ‐ GA & RC DETAILS OF ROOF PE‐DG‐314‐640‐C010 I 22ND APRIL '09
2003 CIVIL FACILITY BLDG. ‐ LAYOUT AND RC DETAIL OF FOUNDATIONS PE‐DG‐314‐640‐C012 A 19TH MARCH '09
2004 CIVIL FACILITY BLDG. ‐ LAYOUT AND RC DETAIL OF GROUND FLOOR PE‐DG‐314‐640‐C013 I 22ND APRIL'09
2005 CIVIL FACILITY BLDG. ‐ FLOOR PLAN AT EL.(+) 3.5 M PE‐DG‐314‐640‐C014 A 9TH APRIL'09
2006 CIVIL FACILITY BLDG. ‐ FLOOR PLAN AT EL.(+) 9.0 M PE‐DG‐314‐640‐C015 A 16TH APRIL'09
2007 CIVIL FACILITY BLDG. ‐ FLOOR PLAN AT EL.(+) 13.5 M PE‐DG‐314‐640‐C016 A 6TH MAY'09
2008 CIVIL FACILITY BLDG. ‐ G.A AND R.C DETAIL OF STAIRS PE‐DG‐314‐640‐C017 I 19TH MAY '09
2009 CIVIL O & M BLDG. ‐ 3D ANALYSIS OF FRAME MODEL PE‐DC‐314‐608‐C001 A 9TH APRIL '09
2010 CIVIL O & M BLDG. ‐ DESIGN OF COLUMN FOUNDATION,COLUMNS ,BEAMS AND SLABS
PE‐DC‐314‐608‐C002 A 29TH APRIL '09
2011 CIVIL O & M BLDG. ‐ DESIGN OF MISC FOUNDATION PE‐DC‐314‐608‐C003 I 29TH JULY '09
2012 CIVIL O & M BLDG. ‐ DESIGN OF ROOF PE‐DC‐314‐608‐C004 I 28TH MAY '09
2013 CIVIL O & M BLDG. ‐ DESIGN OF GROUND FLOOR PE‐DC‐314‐608‐C005 A 29TH JULY '09
2014 CIVIL O & M BLDG. ‐ DESIGN OF INTERMEDIATE FLOORS PE‐DC‐314‐608‐C006 A 10TH JUNE '09
2015 CIVIL O & M BLDG. ‐ PLAN & SECTION PE‐DG‐314‐608‐C001 A 13TH MAY '09
2016 CIVIL O & M BLDG. ‐ ELEVATION (NORTH,SOUTH,EAST & WEST) PE‐DG‐314‐608‐C002 A 30th MAY '09
2017 CIVIL O & M BLDG. ‐ MISC DETAILS PE‐DG‐314‐608‐C003 I 29TH JULY '09
2018 CIVIL O & M BLDG. ‐ GA AND RC DETAILS OF COLUMN FOUNDATION PE‐DG‐314‐608‐C005 A 29TH APRIL '09
2019 CIVIL O & M BLDG. ‐ RC DETAIL OF COLUMNS ,BEAMS AND SLABS PE‐DG‐314‐608‐C006 A 13TH MAY '09
2020 CIVIL O & M BLDG. ‐ GA & RC DETAILS OF ROOF PE‐DG‐314‐608‐C007 I 28TH MAY '09
2021 CIVIL O & M BLDG. ‐ GA AND RC DETAIL OF GROUND FLOOR PE‐DG‐314‐608‐C008 A 29TH JULY '09
2022 CIVIL O & M BLDG. ‐ GA AND RC DETAIL OF INTERMEDIATE FLOORS PE‐DG‐314‐608‐C009 A 10TH JUNE '09
2023 CIVIL ADMIN BLDG. ‐ ANALYSIS AND DESIGN PE‐DC‐314‐641‐C001 A 11TH AUGUST '09
Page 35 of 49
12/12/20082024 CIVIL ADMIN BLDG. ‐ DESIGN OF COLUMN FOUNDATION,COLUMNS ,BEAMS AND SLABS
PE‐DC‐314‐641‐C002 A 27TH AUGUST '09
2025 CIVIL ADMIN BLDG. ‐ PLANS & SECTIONS PE‐DG‐314‐641‐C001 A 27TH AUGUST '09
2026 CIVIL ADMIN BLDG. ‐ ELEVATION (NORTH,SOUTH,EAST & WEST) PE‐DG‐314‐641‐C002 A 8TH SEPTEMBER '09
2027 CIVIL ADMIN BLDG. ‐ MISC DETAILS PE‐DG‐314‐641‐C003 I 29TH SEPTEMBER '09
2028 CIVIL ADMIN BLDG. ‐ GA AND RC DETAILS OF COLUMN FOUNDATION PE‐DG‐314‐641‐C005 A 27TH AUGUST '09
2029 CIVIL ADMIN BLDG. ‐ RC DETAIL OF COLUMNS ,BEAMS AND SLABS PE‐DG‐314‐641‐C006 A 8TH SEPTEMBER '09
2030 CIVIL ADMIN BLDG. ‐ GA & RC DETAILS OF ROOF PE‐DG‐314‐641‐C007 I 16TH SEPTEMBER '09
2031 CIVIL ADMIN BLDG. ‐ LAYOUT AND RC DETAIL OF GROUND FLOOR PE‐DG‐314‐641‐C008 A 29TH SEPTEMBER '09
2032 CIVIL CAR PARK. ‐ PLAN , SECTION AND ELEVATION (NORTH,SOUTH,EAST & WEST)
PE‐DC‐314‐641‐C010 A 6TH NOVEMBER '09
2033 CIVIL CAR PARK. ‐ DESIGN OF COLUMN FOUNDATION,COLUMNS ,BEAMS AND SLABS
PE‐DC‐314‐641‐C011 I 16TH NOVEMBER '09
2034 CIVIL CAR PARK.‐ G.A AND RC DETAIL OF COLUMNS ,BEAMS AND SLABS AND FOUNDATIONS
PE‐DG‐314‐641‐C012 I 16TH NOVEMBER '09
2035 CIVIL GATE HOUSE ‐ ANALYSIS AND DESIGN PE‐DC‐314‐650‐C001 I 27TH OCTOBER '09
2036 CIVIL ARCH GATE HOUSE. ‐ PLAN , SECTION ,ELEVATIONS AND MISC DETAILS
PE‐DG‐314‐650‐C001 I 27TH OCTOBER '09
2037 CIVIL GATE HOUSE ‐ GA AND RC DETAILS PE‐DG‐314‐650‐C002 I 27TH OCTOBER '09
2038 CIVIL DG BLDG. ‐ ANALYSIS AND DESIGN PE‐DC‐314‐642‐C001 I 9TH JUNE '09
2039 CIVIL DG BLDG. ‐ DESIGN OF COLUMN FOUNDATION,COLUMNS ,BEAMS AND SLABS
PE‐DC‐314‐642‐C002 I 20TH JUNE '09
2040 CIVIL DG BLDG. ‐ DESIGN OF MISC FOUNDATION PE‐DC‐314‐642‐C003 I 27TH JULY '09
2041 CIVIL DG BLDG. ‐ PLAN & SECTION PE‐DG‐314‐642‐C001 I 17TH JULY '09
2042 CIVIL DG BLDG. ‐ELEVATIONS AND MISC DETAILS PE‐DG‐314‐642‐C002 I 27TH JULY '09
2043 CIVIL DG BLDG. ‐ GA AND RC DETAILS OF GROUND FLOOR AND MISC FOUNDATION DETAIL
PE‐DG‐314‐642‐C003 I 27TH JULY '09
2044 CIVIL DG BLDG. ‐ GA AND RC DETAILS OF COLUMN FOUNDATION PE‐DG‐314‐642‐C004 I 20TH JUNE '09
2045 CIVIL DG BLDG. ‐ RC DETAIL OF COLUMNS ,BEAMS AND SLABS PE‐DG‐314‐642‐C005 I 7TH JULY '09
2046 CIVIL DG BLDG. ‐ GA & RC DETAILS OF ROOF PE‐DG‐314‐642‐C006 I 17TH JULY '09
2047 CIVIL DESIGN OF GAS TURBINE FOUNDATION PE‐DC‐314‐643‐C001 A 9TH JAN '09
2048 CIVIL GA OF GAS TURBINE FOUNDATION (PILING LAYOUT) PE‐DG‐314‐643‐C001 A 9TH JAN '09
2049 CIVIL GA OF GAS TURBINE FOUNDATION PE‐DG‐314‐643‐C002 A 20TH JAN '09
2050 CIVIL RC DETAILS OF GAS TURBINE FOUNDATION ‐SHT 1 PE‐DG‐314‐643‐C003 A 4TH FEB '09
Page 36 of 49
12/12/20082051 CIVIL RC DETAILS OF GAS TURBINE FOUNDATION ‐SHT 2 PE‐DG‐314‐643‐C004 A 17TH FEB '09
2052 CIVIL AIR COMPRESSOR BUILDING ‐ ANALYSIS AND DESIGN PE‐DC‐314‐647‐C001 I 18TH JULY '09
2053 CIVIL AIR COMPRESSOR BUILDING ‐ DESIGN OF COLUMN FOUNDATION,COLUMNS,BEAMS AND SLAB
PE‐DC‐314‐647‐C002 I 26th AUGUST '09
2054 CIVIL AIR COMPRESSOR BUILDING ‐ DESIGN OF MISC FOUNDATION OR RCC STR
PE‐DC‐314‐647‐C003 I 26TH AUGUST '09
2055 CIVIL AIR COMPRESSOR BUILDING‐ DESIGN OF ROOF PE‐DC‐314‐647‐C004 I 12TH AUGUST '09
2056 CIVIL AIR COMPRESSOR BUILDING ‐ DESIGN OF GROUND FLOOR SLAB PE‐DC‐314‐647‐C005 I 26TH AUGUST '09
2057 CIVIL AIR COMPRESSOR BUILDING ‐ PLANS SECTIONS , ELEVATIONS AND MISC DETAILS
PE‐DG‐314‐647‐C001 I 20TH AUGUST '09
2058 CIVIL AIR COMPRESSOR BUILDING ‐ GA AND RC DETAIL OF COLUMN FOUNDATION AND COLUMNS
PE‐DG‐314‐647‐C002 I 26TH AUGUST '09
2059 CIVIL AIR COMPRESSOR BUILDING ‐ GA OF BEAMS AND ROOF SLAB PE‐DG‐314‐647‐C003 I 24TH JULY '09
2060 CIVIL AIR COMPRESSOR BUILDING‐ RC DETAIL OF BEAMS AND ROOF SLAB
PE‐DG‐314‐647‐C004 I 12TH AUGUST '09
2061 CIVIL AIR COMPRESSOR BUILDING‐ G.A AND RC DETAIL OF MISC FOUNDATION AND GROUND FLOOR SLAB
PE‐DG‐314‐647‐C005 I 26TH AUGUST '09
2062 CIVIL AIR WASHER BIULDING ‐ ANALYSIS AND DESIGN PE‐DC‐314‐648‐C001 I 3RD FEB '09
2063 CIVIL AIR WASHER BIULDING ‐ DESIGN OF MISC FOUNDATION OR RCC STR
PE‐DC‐314‐648‐C002 I 12 TH MARCH '09
2064 CIVIL AIR WASHER BIULDING ‐ DESIGN OF ROOF /FLOOR SLAB PE‐DC‐314‐648‐C004 I 12 TH MARCH '09
2065 CIVIL AIR WASHER BUILDING GTG ‐ PLANS SECTIONS , ELEVATIONS AND MISC DETAILS
PE‐DG‐314‐647‐C001 I 23RD JAN '09
2066 CIVIL AIR WASHER BUILDING GTG ‐ GA AND RC DETAIL OF COLUMN FOUNDATION AND COLUMNS
PE‐DG‐314‐647‐C002 I 3RD FEB '09
2067 CIVIL AIR WASHER BUILDING GTG‐ G.A AND RC DETAIL OF BEAMS AND ROOF SLAB
PE‐DG‐314‐647‐C003 I 27TH FEB '09
2068 CIVIL AIR WASHER BUILDING STG ‐ G.A AND RC DETAIL OF MISC FOUNDATION/STR
PE‐DG‐314‐647‐C004 I 12 TH MARCH '09
2069 CIVIL AIR WASHER BUILDING STG ‐ PLANS SECTIONS , ELEVATIONS AND MISC DETAILS
PE‐DG‐314‐647‐C005 I 23RD JAN '09
2070 CIVIL AIR WASHER BUILDING STG ‐ GA AND RC DETAIL OF COLUMN FOUNDATION AND COLUMNS
PE‐DG‐314‐647‐C006 I 3RD FEB '09
2071 CIVIL AIR WASHER BUILDING STG‐ G.A AND RC DETAIL OF BEAMS AND ROOF SLAB
PE‐DG‐314‐647‐C008 I 27TH FEB '09
2072 CIVIL AIR WASHER BUILDING STG ‐ G.A AND RC DETAIL OF MISC FOUNDATION/STR
PE‐DG‐314‐647‐C009 I 12 TH MARCH '09
2073 CIVIL CW PUMP HOUSE ‐ ANALYSIS AND DESIGN PE‐DC‐314‐653‐C001 A 21ST JAN '09
2074 CIVIL CW PUMP HOUSE ‐ DESIGN OF CRANE GIRDER PE‐DC‐314‐653‐C002 I 10TH FEB '09
2075 CIVIL CW PUMP HOUSE ‐ DESIGN OF COLUMNS AND BEAMS OF PUMP HOUSE
PE‐DC‐314‐653‐C003 A 19TH FEB '09
2076 CIVIL CW PUMP HOUSE ‐ DESIGN OF MISC FLOORS AND ROOF SLABS OF PUMP HOUSE
PE‐DC‐314‐653‐C004 A 15 TH MAY '09
2077 CIVIL CW PUMP HOUSE ‐ DESIGN OF COLUMN FOUNDATION ,COLUMN , BEAM AND SLAB OF MAINTANANCE BAY
PE‐DC‐314‐653‐C005 A 16TH APRIL '09
Page 37 of 49
12/12/20082078 CIVIL CW PUMP HOUSE ‐ DESIGN OF COLUMN FOUNDATION ,COLUMN , BEAM AND SLAB OF ELECTRICAL ANNEXI
PE‐DC‐314‐653‐C006 A 26TH MARCH '09
2079 CIVIL CW PUMP HOUSE ‐ DESIGN OF OPERATING FLOOR SLAB PE‐DC‐314‐653‐C007 A 5TH JUNE '09
2080 CIVIL CW PUMP HOUSE ‐ DESIGN OF THRUST BLOCK AND MANHOLES PE‐DC‐314‐653‐C008 A 7TH JULY '09
2081 CIVIL CW PUMP HOUSE ‐ DESIGN OF SUMP WALL AND RAFT PE‐DC‐314‐653‐C009 A 23 RD JAN '09
2082 CIVIL CW PUMP HOUSE ‐ DESIGN OF FOREBAY SLAB AND WALL PE‐DC‐314‐653‐C010 A 28TH MAY '09
2083 CIVIL CW PUMP HOUSE ‐ PLAN AND SECTIONS PE‐DG‐314‐653‐C001 A 19TH FEB '09
2084 CIVIL CW PUMP HOUSE ‐ ELEVATIONS PE‐DG‐314‐653‐C002 A 19TH MARCH '09
2085 CIVIL CW PUMP HOUSE ‐ MISC DETAILS PE‐DG‐314‐653‐C003 I 27TH JULY '09
2086 CIVIL CW PUMP HOUSE ‐ GA AND RC DETAILS OF SUMP RAFT PE‐DG‐314‐653‐C004 A 23 RD JAN '09
2087 CIVIL CW PUMP HOUSE ‐ GA AND RC DETAIL OF WALLS PE‐DG‐314‐653‐C005 A 19TH MARCH '09
2088 CIVIL CW PUMP HOUSE ‐ GA AND RC DETAIL OF COLUMNS ,BEAMS ,MISC FLOOR SLAB OF PUMP HOUSE
PE‐DG‐314‐653‐C006 A 19TH FEB '09
2089 CIVIL CW PUMP HOUSE ‐ GA AND RC DETAIL OF BEAMS AND MISC FLOOR SLABS OF MAINT BAY
PE‐DG‐314‐653‐C007 A 16TH APRIL '09
2090 CIVIL CW PUMP HOUSE ‐ GA AND RC DETAIL OF COLUMN FOUNDATION & COLUMN OF MAINT BAY
PE‐DG‐314‐653‐C008 A 16TH APRIL '09
2091 CIVIL CW PUMP HOUSE ‐ DETAILS OF GATES AND SCREENS PE‐DG‐314‐653‐C009 I 27TH JULY '09
2092 CIVIL CW PUMP HOUSE ‐ C.W. PIPE DET. OF THRUST BLOCK AND MANHOLES
PE‐DG‐314‐653‐C010 A 7TH JULY '09
2093 CIVIL CW PUMP HOUSE ‐ GA AND RC DETAIL OF BEAMS AND MISC FLOOR SLABS OF ELECTRICAL BAY
PE‐DG‐314‐653‐C011 A 16TH APRIL '09
2094 CIVIL CW PUMP HOUSE ‐ GA AND RC DETAIL OF COLUMN FOUNDATION & COLUMN OF ELECTRICAL BAY
PE‐DG‐314‐653‐C012 A 26TH MARCH '09
2095 CIVIL CW PUMP HOUSE ‐ GA & RC DETAIL OF OPERATING FLOOR SLAB OF PUMP HOUSE
PE‐DG‐314‐653‐C013 A 5TH JUNE '09
2096 CIVIL CW PUMP HOUSE ‐ GA AND RC DETAIL OF ROOF SLAB OF PUMP HOUSE
PE‐DG‐314‐653‐C014 I 15TH MAY '09
2097 CIVIL CW PUMP HOUSE ‐ GA & RC DETAILS OF FOREBAY PE‐DG‐314‐653‐C015 A 28TH MAY '09
2098 CIVIL CW PUMP HOUSE ‐ DETAILS OF GANTRY GIRDER PE‐DG‐314‐653‐C016 I 10TH FEB '09
2099 CIVIL CW PUMP HOUSE ‐ MISC. DETAIL FOR RCC ITEMS IN CW SUMP & FOREBAY
PE‐DG‐314‐653‐C017 I 27TH JULY '09
2100 CIVIL RAW WATER PH ‐DESIGN OF RAW WATER PUMP HOUSE PE‐DC‐314‐654‐C001 A 9TH JUNE '09
2101 CIVIL RAW WATER PH ‐ DESIGN OF SUMP RAFT AND WALL PE‐DC‐314‐654‐C002 I 17TH JUNE '09
2102 CIVIL RAW WATER PH ‐ DESIGN OF COLUMS AND BEAMS AND CRANE PE‐DC‐314‐654‐C003 I 28TH MAY '09
2103 CIVIL RAW WATER PH ‐ DESIGN OF FLOOR AND ROOF SLAB PE‐DC‐314‐654‐C004 I 17TH JULY '09
2104 CIVIL RAW WATER RESERVOIR ‐ DESIGN OF RESERVOIR RAFT AND WALL PE‐DC‐314‐654‐C006 A 28TH MARCH'09
Page 38 of 49
12/12/20082105 CIVIL RAW WATER PH ‐ GA & RC DETAILS OF RESERVOIR PE‐DG‐314‐654‐C001 A 28TH MAY '09
2106 CIVIL RAW WATER PH ‐ GA & RC DETAILS OF SUMP WALL, RAFT & COLUMN FDNS
PE‐DG‐314‐654‐C002 I 17TH JUNE '09
2107 CIVIL RAW WATER PH ‐ GA & RC DETAILS OF OPERATING FLOOR SLAB PE‐DG‐314‐654‐C003 I 27TH JULY '09
2108 CIVIL RAW WATER PH ‐ GA AND RC DETAIL OF SUPER STR COLUMN , BEAMS AND WALL
PE‐DG‐314‐654‐C004 A 28TH MAY '09
2109 CIVIL RAW WATER PH ‐ GA & RC DETAIL OF PUMP HOUSE ROOF PE‐DG‐314‐654‐C005 I 17TH JULY '09
2110 CIVIL RAW WATER PH ‐ GA & RC DETAIL OF MAINTANCE BAY/ELECT ANNEXI
PE‐DG‐314‐654‐C006 A 17TH JULY '09
2111 CIVIL RAW WATER PH ‐ MISC AND CRANE/MONORAIL DETAIL PE‐DG‐314‐654‐C007 I 27TH MAY '09
2112 CIVIL POTABLE WATER PH ‐ ANALYSIS AND DESIGN PE‐DC‐314‐671‐C001 I 22TH JULY '09
2113 CIVIL POTABLE WATER PH ‐ DESIGN OF SUMP RAFT AND WALL PE‐DC‐314‐671‐C002 I 7TH AUGUST '09
2114 CIVIL POTABLE WATER PH ‐ DESIGN OF COLUMS AND BEAMS OF PUMPHOUSE AND CRANE
PE‐DC‐314‐671‐C003 I 19TH AUGUST '09
2115 CIVIL POTABLE WATER PH ‐ DESIGN OF FLOOR AND ROOF SLAB OF PUMP HOUSE
PE‐DC‐314‐671‐C004 I 25TH AUGUST '09
2116 CIVIL POTABLE WATER PH ‐ PLAN ELEVATIONS AND SECTIONS PE‐DG‐314‐671‐C001 I 7TH AUGUST '09
2117 CIVIL POTABLE WATER PH ‐ ARCHITECTURAL ELEVATIONS & MISC DETAILS
PE‐DG‐314‐671‐C002 I 8TH SEPTEMBER '09
2118 CIVIL POTABLE WATER PH ‐ GA & RC DETAILS PE‐DG‐314‐671‐C003 I 7TH AUGUST '09
2119 CIVIL POTABLE WATER PH ‐ GA & RC DETAIL OF MAINTANCE BAY/ELECT ANNEXI
PE‐DG‐314‐671‐C004 I 8TH SEPTEMBER '09
2120 CIVIL POTABLE WATER PH ‐ CRANE/MONORAIL AND MISC DETAIL PE‐DG‐314‐671‐C005 I 19TH AUGUST '09
2121 CIVIL STORM WATER PH ‐ ANALYSISI AND DESIGN PE‐DC‐314‐672‐C001 I 25TH AUGUST '09
2122 CIVIL STORM WATER PH ‐ DESIGN OF SUMP RAFT , WALL AND SLABS PE‐DC‐314‐672‐C002 I 4TH SEPTEMBER '09
2123 CIVIL STORM WATER PH ‐ DESIGN OF COLUMS AND BEAMS AND CRANE PE‐DC‐314‐672‐C003 I 17TH SEPTEMBER '09
2124 CIVIL STORM WATER PH ‐ ARCHITECTURAL PLANS PE‐DG‐314‐672‐C001 I 4TH SEPTEMBER '09
2125 CIVIL STORM WATER PH ‐ ARCHITECTURAL ELEVATIONS & MISC DETAILS PE‐DG‐314‐672‐C002 I 30TH SEPTEMBER '09
2126 CIVIL STORM WATER PH ‐ GA & RC DETAILS OF SUMP WALL, RAFT & COLUMN FDNS
PE‐DG‐314‐672‐C003 I 4TH SEPTEMBER '09
2127 CIVIL STORM WATER PH ‐ GA & RC DETAILS OF OP. FLOOR /ROOF SLAB OF PUMP HOUSE
PE‐DG‐314‐672‐C004 I 24TH SEPTEMBER '09
2128 CIVIL STORM WATER PH ‐ GA AND RC DETAIL OF SUPER STR COLUMN , BEAMS AND WALL
PE‐DG‐314‐672‐C005 I 17TH SEPTEMBER '09
2129 CIVIL STORM WATER PH ‐ GA & RC DETAIL OF MAINTANCE BAY/ELECT ANNEXI
PE‐DG‐314‐672‐C006 I 30TH SEPTEMBER '09
2130 CIVIL STORM WATER PH ‐ MISC AND CRANE/MONORAIL DETAIL PE‐DG‐314‐672‐C007 I 30TH SEPTEMBER '09
2131 CIVIL HRSG AREA : PIPE & CABLE RACK ‐ 3D ANALYSIS OF STRUCTURAL FRAMING MODEL
PE‐DC‐314‐675‐C001 A 17TH JUNE '09
Page 39 of 49
12/12/20082132 CIVIL HRSG AREA : PIPE & CABLE RACK ‐ DESIGN OF COLUMNS ,BASE PLATE,SUPER STR AND BRACING
PE‐DC‐314‐675‐C002 I 25TH JUNE '09
2133 CIVIL HRSG AREA : PIPE & CABLE RACK ‐ DESIGN OF FOUNDATION PE‐DC‐314‐675‐C003 I 7TH JULY '09
2134 CIVIL WATER TREATMENT AREA : PIPE & CABLE RACK ‐ 3D ANALYSIS OF STRUCTURAL FRAMING MODEL
PE‐DC‐314‐675‐C004 A 17TH SEPTEMBER '09
2135 CIVIL WATER TREATMENT AREA : PIPE & CABLE RACK ‐ DESIGN OF COLUMNS ,BASE PLATE,SUPER STR AND BRACING
PE‐DC‐314‐675‐C005 I 24TH SEPTEMBER '09
2136 CIVIL WATER TREATMENT AREA : PIPE & CABLE RACK ‐ DESIGN OF FOUNDATION
PE‐DC‐314‐675‐C006 I 8TH OCTOBER '09
2137 CIVIL GT AND STG AREA : PIPE & CABLE RACK ‐ 3D ANALYSIS OF STRUCTURAL FRAMING MODEL
PE‐DC‐314‐675‐C007 A 7TH AUGUST '09
2138 CIVIL GT AND STG AREA : PIPE & CABLE RACK ‐ DESIGN OF COLUMNS ,BASE PLATE,SUPER STR AND BRACING
PE‐DC‐314‐675‐C008 I 19TH AUGUST '09
2139 CIVIL GT AND STG AREA : PIPE & CABLE RACK ‐ DESIGN OF FOUNDATION PE‐DC‐314‐675‐C009 I 25TH AUGUST '09
2140 CIVIL HRSG AREA : PIPE & CABLE RACK ‐ STEEL FRAMING PLAN AND ELEVATION SH‐1
PE‐DG‐314‐675‐C001 A 17TH JUNE '09
2141 CIVIL HRSG AREA : PIPE & CABLE RACK ‐ COLUMN FOUNDATION SH‐1 PE‐DG‐314‐675‐C002 I 25TH JUNE '09
2142 CIVIL HRSG AREA : PIPE & CABLE RACK ‐ STEEL FRAMING PLAN AND ELEVATION SH‐2
PE‐DG‐314‐675‐C003 I 7TH JULY '09
2143 CIVIL HRSG AREA : PIPE & CABLE RACK ‐ COLUMN FOUNDATION SH‐2 PE‐DG‐314‐675‐C004 I 7TH JULY '09
2144 CIVIL WATER TREATMENT AREA : PIPE & CABLE RACK ‐ STEEL FRAMING PLAN AND ELEVATION SH‐1
PE‐DG‐314‐675‐C005 A 17TH SEPTEMBER '09
2145 CIVIL WATER TREATMENT AREA : PIPE & CABLE RACK ‐ COLUMN FOUNDATION SH‐1
PE‐DG‐314‐675‐C006 I 24TH SEPTEMBER '09
2146 CIVIL WATER TREATMENT AREA : PIPE & CABLE RACK ‐ STEEL FRAMING PLAN AND ELEVATION SH‐2
PE‐DG‐314‐675‐C007 I 8TH OCTOBER '09
2147 CIVIL WATER TREATMENT AREA : PIPE & CABLE RACK ‐ COLUMN FOUNDATION SH‐2
PE‐DG‐314‐675‐C008 I 28TH OCTOBER '09
2148 CIVIL GT AND STG AREA : PIPE & CABLE RACK ‐ STEEL FRAMING PLAN AND ELEVATION SH‐1
PE‐DG‐314‐675‐C009 A 7TH AUGUST '09
2149 CIVIL GT AND STG AREA : PIPE & CABLE RACK ‐ COLUMN FOUNDATION SH‐1
PE‐DG‐314‐675‐C010 I 19TH AUGUST '09
2150 CIVIL GT AND STG AREA : PIPE & CABLE RACK ‐ STEEL FRAMING PLAN AND ELEVATION SH‐2
PE‐DG‐314‐675‐C011 I 25TH AUGUST '09
2151 CIVIL GT AND STG AREA : PIPE & CABLE RACK ‐ COLUMN FOUNDATION SH‐2
PE‐DG‐314‐675‐C012 I 25TH SEPTEMBER '09
2152 CIVIL DESIGN OF MISCELLENEOUS SUMPS AND PITS PE‐DC‐314‐674‐C001 I 19THOCTOBER '09
2153 CIVIL G.A OF MISCELLENEOUS SUMPS AND PITS PE‐DG‐314‐674‐C001 I 19THOCTOBER '09
2154 CIVIL R.C DETAILS OF MISCELLENEOUS SUMPS AND PITS PE‐DG‐314‐674‐C002 I 19THOCTOBER '09
2155 CIVIL CHEMICAL ROOM‐ANALYSIS AND DESIGN PE‐DC‐314‐673‐C001 I 12TH SEPTEMBER '09
2156 CIVIL EFFLUENT TREATMENT PLANT‐DESIGN OF MISCELLENEOUS FOUNDATIONS
PE‐DC‐314‐673‐C002 I 12TH SEPTEMBER '09
2157 CIVIL EFFLUENT TREATMENT PLANT ‐ GA & RC DETAILS OF CHEMICAL ROOM
PE‐DG‐314‐673‐C001 I 12TH SEPTEMBER '09
2158 CIVIL EFFLUENT TREATMENT PLANT ‐ GA & RC DETAILS OF MISCELLENEOUS FOUNDATIONS SH 1
PE‐DG‐314‐673‐C002 I 12TH SEPTEMBER '09
Page 40 of 49
12/12/20082159 CIVIL EFFLUENT TREATMENT PLANT ‐ GA & RC DETAILS OF MISCELLENEOUS FOUNDATIONS SH 2
PE‐DG‐314‐673‐C003 I 12TH SEPTEMBER '09
2160 CIVIL EFFLUENT TREATMENT PLANT ‐ GA & RC DETAILS OF CMB PE‐DG‐314‐673‐C004 I 12TH SEPTEMBER '09
2161 CIVIL SEWAGE TREATMENT PLANT‐DESIGN OF SUMP RAFT AND WALL PE‐DC‐314‐673‐C003 I 19THOCTOBER '09
2162 CIVIL SEWAGE TREATMENT PLANT‐DESIGN SEWAGE PIPELINE PE‐DC‐314‐673‐C004 I 23THOCTOBER '09
2163 CIVIL SEWAGE TREATMENT PLANT‐DESIGN OF MISCELLENEOUS FOUNDATIONS
PE‐DC‐314‐673‐C005 I 23THOCTOBER '09
2164 CIVIL SEWAGE TREATMENT PLANT ‐ GA & RC DETAILS OF SUMP SH 1 PE‐DG‐314‐673‐C005 I 23THOCTOBER '09
2165 CIVIL SEWAGE TREATMENT PLANT ‐ GA & RC DETAILS OF SUMP SH 2 PE‐DG‐314‐673‐C006 I 23THOCTOBER '09
2166 CIVIL SEWAGE TREATMENT PLANT ‐ GA & RC DETAILS OF SUMP SH 3 PE‐DG‐314‐673‐C007 I 23THOCTOBER '09
2167 CIVIL SEWAGE TREATMENT PLANT ‐ GA & RC DETAILS OF MISCELLENEOUS FOUNDATIONS
PE‐DG‐314‐673‐C008 I 23THOCTOBER '09
2168 CIVIL SEWAGE TREATMENT PLANT ‐ GA & RC DETAILS OF SEWAGE PIPE LINE
PE‐DG‐314‐673‐C009 I 23THOCTOBER '09
2169 CIVIL DESIGN OF DRAINAGE , SANITARY AND PLUMBING SYSTEM PE‐DC‐314‐673‐C002 I 23THOCTOBER '09
2170 CIVIL G.A AND R.C DETAIL OF DRAINAGE , SANITARY AND PLUMBING SYSTEM
PE‐DG‐314‐673‐C001 I 23THOCTOBER '09
2171 CIVIL CHEMICAL HOUSE ‐ ANALYSIS AND DESIGN PE‐DC‐314‐646‐C001 I 7TH JULY '09
2172 CIVIL CHEMICAL HOUSE. ‐ GA AND RC DETAILS OF COLUMN FOUNDATION
PE‐DG‐314‐646‐C001 I 7TH JULY '09
2173 CIVIL CHEMICAL HOUSE. ‐ RC DETAIL OF COLUMNS ,BEAMS AND SLABS PE‐DG‐314‐646‐C002 I 7TH JULY '09
2174 CIVIL CHEMICAL HOUSE. ‐ GA & RC DETAILS OF ROOF/GROUND FLOOR PE‐DG‐314‐646‐C003 I 7TH JULY '09
2175 CIVIL DESIGN OF FILTERS , CHANNELS PE‐DC‐314‐652‐C001 I 19TH SEPTEMBER '09
2176 CIVIL G.A OF FILTERS AND CHANNELS PE‐DG‐314‐652‐C001 I 19TH SEPTEMBER '09
2177 CIVIL R.C DETAILS OF FILTERS AND CHANNELS PE‐DG‐314‐652‐C002 I 19TH SEPTEMBER '09
2178 CIVIL CHEMICAL LABORATORY BIULDING ‐ ANALYSIS AND DESIGN PE‐DC‐314‐646‐C003 I 25TH AUGUST '09
2179 CIVIL CHEMICAL LABORATORY BUILDING ‐ PLANS, SECTIONS , ELEVATIONS AND MISCELLENEOUS DETAILS
PE‐DG‐314‐646‐C004 I 25TH AUGUST '09
2180 CIVIL CHEMICAL LABORATORY BUILDING ‐ GA AND RC DETAIL OF COLUMN FOUNDATION AND COLUMNS
PE‐DG‐314‐646‐C005 I 25TH AUGUST '09
2181 CIVIL CHEMICAL LABORATORY BUILDING ‐ GA AND R.C OF BEAMS AND ROOF SLAB
PE‐DG‐314‐646‐C006 I 25TH AUGUST '09
2182 CIVIL CHEMICAL LABORATORY BUILDING ‐ RC DETAIL OF MISC FOUNDATION/STR
PE‐DG‐314‐646‐C008 I 5TH SEPTEMBER '09
2183 CIVIL DESIGN OF CW DUCT PE‐DC‐314‐651‐C001 I 17TH JUNE '09
2184 CIVIL G.A OF C.W DUCT PE‐DG‐314‐651‐C001 I 17TH JUNE '09
2185 CIVIL R.C DETAIL OF C.W DUCT PE‐DG‐314‐651‐C002 I 17TH JUNE '09
Page 41 of 49
12/12/20082186 CIVIL DESIGN OF CW PIPELINE PE‐DC‐314‐651‐C002 I 17TH JUNE '09
2187 CIVIL G.A AND R.C DETAIL OF C.W PIPELINE PE‐DG‐314‐651‐C003 I 17TH JUNE '09
2188 CIVIL HRSG AREA ‐ DESIGN OF PAVING FOR HRSG AREA PE‐DC‐314‐617‐C006 I 9THOCTOBER '09
2189 CIVIL HRSG AREA ‐ DETAIL OF PAVING PE‐DG‐314‐617‐C0013 I 9THOCTOBER '09
2190 CIVIL DESIGN OF FOUNDATION FOR SERVICE WATER TANK PE‐DC‐314‐671‐C001 I 6TH NOVEMBER '09
2191 CIVIL G.A OF SERVICE WATER TANK FOUNDATION PE‐DG‐314‐671‐C001 I 6TH NOVEMBER '09
2192 CIVIL R.C OF SERVICE WATER TANK FOUNDATION PE‐DG‐314‐671‐C002 I 6TH NOVEMBER '09
2193 CIVIL FIRE WATER PH ‐ ANALYSIS AND DESIGN PE‐DC‐314‐649‐C001 I 15TH SEPTEMBER '09
2194 CIVIL FIRE WATER PH ‐ DESIGN OF COLUMS AND BEAMS PE‐DC‐314‐649‐C002 I 15TH SEPTEMBER '09
2195 CIVIL FIRE WATER PH ‐ DESIGN OF FLOOR AND ROOF SLAB PE‐DC‐314‐649‐C003 I 15TH SEPTEMBER '09
2196 CIVIL FIRE WATER PH ‐ PLAN,SECTION , ELEVATION AND MISC DETAILS PE‐DG‐314‐649‐C001 I 15TH SEPTEMBER '09
2197 CIVIL FIRE WATER PH ‐ GA & RC DETAILS OF COLUMN FDNS PE‐DG‐314‐649‐C002 I 15TH SEPTEMBER '09
2198 CIVIL FIRE WATER PH ‐ GA & RC DETAILS OF SUPERSTRUCTURE PE‐DG‐314‐649‐C003 I 15TH SEPTEMBER '09
2199 CIVIL FIRE WATER PH ‐ GA & RC DETAIL OF MAINTANCE BAY/ELECT ANNEXI
PE‐DG‐314‐649‐C004 I 15TH SEPTEMBER '09
2200 CIVIL DESIGN OF FOUNDATION FOR FIRE WATER TANK PE‐DC‐314‐649‐C006 I 4THOCTOBER '09
2201 CIVIL G.A AND R.C DETAIL OF FIRE WATER TANK FOUNDATION PE‐DG‐314‐649‐C007 I 4THOCTOBER '10
2202 CIVIL FIRE STATION BUILDING ‐ ANALYSIS AND DESIGN PE‐DC‐314‐650‐C001 I 27TH JULY '09
2203 CIVIL ARCH FIRE STATION BLDG. ‐ PLAN , SECTION ,ELEVATIONS AND MISC DETAILS
PE‐DG‐314‐650‐C001 I 27TH JULY '09
2204 CIVIL FIRE STATION BLDG. ‐ GA AND RC DETAILS OF COLUMN FOUNDATION
PE‐DG‐314‐650‐C002 I 27TH JULY '09
2205 CIVIL FIRE STATION BLDG. ‐ G.A AND RC DETAIL OF COLUMNS ,BEAMS AND SLABS
PE‐DG‐314‐650‐C003 I 27TH JULY '09
Page 42 of 49
BHEL PSNRID Area Title Drg_No Purpose Sch. Sub
1319 CIVIL GRID & BENCHMARK PILLAR DRAWING GEL/70356/5325/GPD I 30/04/2008
1320 CIVIL PHYSICAL SURVEY DRAWING GEL/70356/5325/P I 30/04/2008
1321 CIVIL CONTOUR SURVEY DRAWING GEL/5325/11112008/C I 30/04/2008
05 December 2008 Page 43 of 49
BHEL RDPRID Area Title Drg_No Purpose Sch. Sub
438 IPBD Layout of IP Busduct 0 5 61 08 2 0521 A 26/11/2008
439 IPBD Foundation plan for busduct support 0 5 61 08 2 0522 A 10/12/2008
440 IPBD OGA of SPVT Cubicle 0 5 61 08 2 0523 A 03/12/2008
441 IPBD GA of NG cubicle 0 5 61 08 2 0524 I 03/12/2008
442 IPBD GA of HAB equipment 0 5 61 08 2 0525 I 12/11/2008
443 IPBD Wiring diagram of SPVT cubicle 0 5 61 08 2 0526 A 03/12/2008
444 IPBD Wiring diagram of NG cubicle 0 5 61 08 2 0527 A 03/12/2008
445 IPBD Wiring diagram of CTs 0 5 61 08 2 0528 A 26/11/2008
446 IPBD Single line diagram 0 5 61 08 2 0529 I 03/12/2008
447 SPBD Lay Out of SPB 0 6 61 08 2 0530 A 29/10/2008
448 SPBD Foundation plan for busduct support 0 6 61 08 2 0531 A 05/11/2008
05 December 2008 Page 44 of 49
BHEL RPTID Area Title Drg_No Purpose Sch. Sub
449 RO/DM Process Flow Diagram 1-BW-220-00229 A 30/07/2008
450 RO/DM RO DM Plant Layout drawing 1-BW-220-00222 A 31/10/2008
451 RO/DM Process & Instrumentation A 30/04/2008
452 RO/DM Diagram A 31/10/2008
453 RO/DM PLC architectural drawing 3-BW-310-00861 A 30/07/2008
454 RO/DM Single line diagram (SLD) A 30/11/2008
455 RO/DM Design Philosophy I 30/09/2008
456 RO/DM Cable Schedule I 30/11/2008
457 RO/DM Instrument Schedule I 31/12/2008
458 RO/DM PLC GA drawing I 31/03/2009
459 RO/DM MCC drawing I 31/03/2009
460 RO/DM PG test procedure I 30/09/2009
05 December 2008 Page 45 of 49
BHEL TBGID Area Title Drg_No Purpose Sch. Sub
633 LAYOUT&SLD SINGLE LINE DIAGRAM 400kV TB-3-314-510 A 30/06/2008
634 LAYOUT&SLD LAYOUT PLAN 400kV TB-3-314-316-002 A 30/07/2008
635 LAYOUT&SLD SECTIONAL ELEVATION 400KV TB-3-314-316-003 A 30/07/2008
636 LAYOUT&SLD EARTH MAT LAYOUT TB-XXX-316-004 I 15/10/2008
637 LAYOUT&SLD CABLE TRENCH LAYOUT TB-XXX-316-005 A 24/11/2008
638 LAYOUT&SLD STRUCTURE LOADING DIAGRAM TB-0-316-314-006 I 15/08/2008
639 LAYOUT&SLD SAG / SWING CALCULATION TB-314-316-101 I 30/09/2008
640 LAYOUT&SLD SHORT CIRCUIT FORCE CALCULATION ON FLEXIBLE CONDUCTOR
TB-314-316-102 I 15/08/2008
641 LAYOUT&SLD DESIGN CALCULATION FOR THE EARTHING TB-XXX-316-103 A 15/09/2008
642 LAYOUT&SLD DSLP CALCULATION TB-314-316-104 A 15/08/2008
643 LAYOUT&SLD ERECTION KEY DIAGRAM TB-XXX-316-007 I 30/04/2009
644 LAYOUT&SLD EQUIPMENT EARTHING DETAILS TB-314-316-008 I 30/10/2008
645 LAYOUT&SLD SLD FOR AC & DC DISTRIBUTION BOARD TB-XXX-316-009 A 15/10/2008
646 PROT&SLD PROTECTION KEY DIAGRAM TB-XXX-510-010 A 30/12/2008
647 PROT&SLD RELAY SETTINGS TB-XXX-510-012 I 30/10/2009
648 PROT&SLD POWER & CONTROL CABLE SCHEDULE TB-XXX-510-013 I 30/09/2009
649 CT OGA DRAWING FOR 400KV CT A 15/03/2009
650 CT RATING PLATE FOR 400KV CT A 15/03/2009
651 DISC INSU UNIT DIAGRAM FOR DISC INSULATOR/GTP A 15/06/2009
652 DISC INSU INSULATOR HARDWARE DRAWING A 15/06/2009
653 400KV CB OGA DRAWING 3-518-46-99901 A 28/02/2009
654 400KV CB SCHEME 3-518-46-99903 A 28/02/2009
655 400KV CB RATING PLATE 3-518-46-99906 A 28/02/2009
656 400KV CVT OGA DRAWING A 30/03/2009
657 400KV CVT RATING PLATE A 30/03/2009
658 BOI OGA DRAWING FOR CR PANEL & AUTOMATION A 15/04/2009
659 BOI SCHEMATIC DRAWING FOR CR PANEL & AUTOMATION
A 15/04/2009
660 BOI OGA DRAWING FOR 400kV ISOLATORS & EARTH SWITCH
A 05/05/2009
661 BOI SCHEME FOR 400kV ISOLATORS & EARTH SWITCH A 05/05/2009
662 BOI RATING PLATE FOR 400kV ISOLATORS & EARTH SWITCH
A 05/05/2009
663 BOI OGA OF 390kV LIGHTNING ARRESTOR A 15/05/2009
664 BOI OGA / GTP 400kV POST INSULATOR 400-SC-A-0010 A 15/06/2009
665 BOI OGA DRAWINGS FOR MARSHALLING KIOSK/JBs A 15/07/2009
666 BOI SCHEME FOR MARSHALLING KIOSK/JBs A 15/07/2009
05 December 2008 Page 46 of 49
667 BOI OGA DRAWING FOR 220V BATTERIES A 30/06/2009
668 BOI GTP FOR 220V BATTERIES A 30/06/2009
669 BOI OGA FOR 220V BATTERY CHARGER A 30/06/2009
670 BOI GTP FOR 220V BATTERY CHARGER A 30/06/2009
671 BOI OGA FOR LT SWITCHGEAR A 30/08/2009
672 BOI GTP FOR LT SWITCHGEAR A 30/08/2009
673 BOI DESIGN DOC FOR OUTDOOR ILLUMINATION A 30/10/2009
674 BOI GTP/CATALOGUE FOR OUTDOOR ILLUMINATION A 30/10/2009
675 BOI YARD LIGHTNING LAYOUT FOR OUTDOOR ILLUMINATION
A 30/10/2009
676 BOI OGA FOR CLAMPS & CONNECTORS A 30/06/2009
677 BOI GTP & DRG FOR AL TUBE I 15/06/2009
678 BOI GTP FOR ACSR CONDUCTOR I 15/06/2009
679 BOI DRUM DRG FOR ACSR CONDUCTOR I 15/06/2009
680 BOI GTP FOR GT SHIELD WIRE I 15/06/2009
681 BOI GTP FOR POWER & CONTROL CABLES I 30/05/2009
682 BOI GTP FOR MS ROD I 30/11/2008
683 BOI GTP FOR GI FLAT I 30/07/2009
684 BOI GTP FOR CABLE TRENCH MATERIAL I 15/08/2009
685 DESIGN DESIGN OF BEAM (400KV) TB-299-618-011 I 30/10/2008
686 DESIGN DESIGN OF TOWER INCL. FOUNDATION BOLT(400KV)
TB-XXX-618-012 I 15/11/2008
687 DESIGN DESIGN OF EQUIP. SUPPORT STRUCTURE INCL FND BOLTS(400KV)
TB-XXX-618-013 I 30/06/2009
688 DESIGN DESIGN OF TOWER FOUNDATION (400KV) TB-XXX-607-019 I 30/11/2008
689 DESIGN DESIGN OF EQUIP. FOUNDATION (400KV) TB-XXX-607-020 I 30/07/2009
690 DESIGN DESIGN OF CABLE TRENCHES TB-XXX-607-024 I 01/05/2009
691 CIVIL DRG YARD DETAILS OF FOUNDATION BOLTS FOR 400KV TOWERS
TB-X-XXX-607-601-1 I 15/12/2008
692 CIVIL DRG YARD DETAILS OF FOUNDATION BOLTS 400KV EQUIP. STRUCTURES
TB-X-XXX-607-601-2 I 15/07/2009
693 CIVIL DRG YARD FOUNDATION LAYOUT FOR 400KV SWITCHYARD TB-X-XXX-607-603 I 15/11/2008
694 CIVIL DRG YARD RCC DETAILS OF TOWER FOUNDATION (400KV) TB-X-XXX-607-605 I 15/12/2008
695 CIVIL DRG YARD RCC DETAILS OF EQUIP. FOUNDATION (400KV) TB-X-XXX-607-607 I 15/07/2009
696 CIVIL DRG YARD RCC DETAILS OF CABLE TRENCHES TB-X-XXX-607-609 I 30/05/2009
697 CIVIL DRG YARD DETAILS OF ROAD TB-X-XXX-607-613 I 30/12/2008
698 CIVIL DRG YARD DETAILS OF FENCING & GATES TB-X-XXX-607-614 I 30/12/2008
699 CIVIL DRG YARD LAYOUT & DETAILS OF DRAINAGE TB-X-XXX-607-620 I 31/07/2009
1284 DESIGN DESIGN OF STRUCTURE FOR 400kV BEAM MKD. B1 TB-278-618-011-1 A 30/04/2008
1285 DESIGN DESIGN OF STRUCTURE FOR 400kV BEAM MKD. B2 TB-278-618-011-2 A 30/04/2008
1286 DESIGN DESIGN OF STRUCTURE FOR 400kV TOWER MKD. T1 TB-278-618-012-1 A 30/04/2008
05 December 2008 Page 47 of 49
1287 DESIGN DESIGN OF STRUCTURE FOR 400kV TOWER MKD. T2 TB-278-618-012-2 A 30/04/2008
1288 DESIGN DESIGN OF STRUCTURE FOR 400kV TOWER MKD. T3 TB-278-618-012-3 A 30/04/2008
1289 DESIGN DESIGN OF STRUCTURE FOR 400kV TOWER MKD. T4 TB-278-618-012-4 A 30/04/2008
1290 CIVIL DRG YARD DESIGN CRITERION FOR SWITCHYARD STRUCTURES & CIVIL WORKS
TB-314-607-029 A 30/04/2008
1291 BOI SIZING CALCULATION FOR 220V BATTERY & CHARGER
TB-314-316-010 A 30/04/2008
1292 BOI SHED PROFILE FOR 400KV SOLID CORE POST INSULATOR
SIL-MC-8044 A 30/04/2008
1293 BOI CORONA GRADING RING FOR 400KV SOLID CORE POST INSULATOR
SIL-MC-8004-T A 30/04/2008
1301 BOI GUARANTEED TECHNICAL PARTICULARS OF ACSR MOOSE CONDUCTOR
BHEL/87003 A 30/04/2008
1302 BOI WOODEN DRUM DRAWING FOR ACSR MOOSE CONDUCTOR
HAL/ACSM/BHEL/PGCI A 30/04/2008
1311 CIVIL DRG YARD DESIGN OF FOUNDATION FOR 400kV TOWER T1 MKD. FT1
TB-314-607-014-1 A 30/04/2008
1312 CIVIL DRG YARD DESIGN OF FOUNDATION FOR 400kV TOWER T2 MKD. FT2
TB-314-607-014-2 A 30/04/2008
1313 CIVIL DRG YARD DESIGN OF FOUNDATION FOR 400Kv TOWER T3 MKD. FT3
TB-314-607-014-3 A 30/04/2008
1314 CIVIL DRG YARD DESIGN OF FOUNDATION FOR 400Kv TOWER T4 MKD. FT4
TB-314-607-014-4 A 30/04/2008
1315 CIVIL DRG YARD RCC DETAILS OF FOUNDATION FOR 400Kv TOWER T1 MKD. FT1
TB-3-314-607-604-1 A 30/04/2008
1316 CIVIL DRG YARD RCC DETAILS OF FOUNDATION FOR 400Kv TOWER T2 MKD. FT2
TB-3-314-607-604-2 A 30/04/2008
1317 CIVIL DRG YARD RCC DETAILS OF FOUNDATION FOR 400Kv TOWER T3 MKD. FT3
TB-3-314-607-604-3 A 30/04/2008
1318 CIVIL DRG YARD RCC DETAILS OF FOUNDATION FOR 400Kv TOWER T4 MKD. FT4
TB-3-314-607-604-4 A 30/04/2008
1325 BOI DRG FOR 4" IPS (EXTRA HEAVY DUTY) TUBE PG2568 I
1326 BOI GTP FOR 4" IPS AL TUBE GTP-4"9EH) I
1328 400KV CB SUPPORT STRUCTURE 3-518-46-99902 A
1329 400KV CB WIRING DIAGRAM OF CONTROL UNIT 3-518-46-99904 A
1330 400KV CB OGA & DATA OF CONTROL UNIT 3-518-46-99905 A
1331 400KV CB SF6 GAS & OIL SCHEME LINE DIAGRAM 3-518-46-99907 A
1332 400KV CB TYPE TEST REPORTS FOR 420KV SF6 CB SGE/TTTP/031 A
05 December 2008 Page 48 of 49
BHEL TRYID Area Title Drg_No Purpose Sch. Sub
720 HRSG GA OF BOILER ELEVATION 170 A 23/07/2008
721 HRSG GA OF BOILER PLAN 170 A 23/07/2008
722 HRSG FLOOR PLANS 186 I 20/08/2008
723 HRSG BOILER FOUNDATION PLAN(GROUND FLOOR PLAN & LOADING DETAILS)
174 I 17/09/2008
724 HRSG GA OF HRSG CHIMNEY 206 I 20/08/2008
725 HRSG FOUNDATION LOADING OF HRSG CHIMNEY 2-87-010-80720 I 17/09/2008
726 HRSG SCHEME OF WATER AND STEAM CIRCUIT WITH VALVES,FITTINGS AND INSTRUMENTATION
164 A 17/09/2008
727 HRSG SCHEME OF FLUE GAS PATH WITH INSTRUMENTATION
2-97-400-80094 I 17/09/2008
728 HRSG GA OF HRSG-EROSS SECTION IN PLAN 171 I 15/10/2008
729 HRSG GA OF HRSG-EROSS SECTION IN ELEVATION 172 I 15/10/2008
730 HRSG GA OF HRSG-EROSS SECTION IN FRONT VIEW 173 I 15/10/2008
731 HRSG INSTALLATION OF PRIMARY INSTRUMENTS 223 I 15/10/2008
732 HRSG VALVES SCHEDULE 179 I 15/10/2008
733 HRSG LEGEND FOR CONTROL SYSTEM 167 I 29/10/2008
734 HRSG DRUM LEVEL CONTROL SYSTEM 167,214,218,219 I 29/10/2008
735 HRSG MAIN STEAM TEMPERATURE CONTROL AND WRITE UP
167,214,217 I 29/10/2008
736 HRSG RECOMMENDED HRSG PROTECTION LOGIC 221,233 I 19/11/2008
737 HRSG LIST OF ALARM AND TRIP SET POINTS 220,236 I 24/12/2008
738 HRSG INSTRUMENT MASTER DATA SHEET 215 I 24/12/2008
739 HRSG BOILER ELECTRICAL SCOPE DIAGRAM I 19/11/2008
740 HRSG SAFETY VALVE SETTING DIAGRAM 180,235 I 19/11/2008
741 HRSG RECOMMENDED QUALITY OF FEED WATER I 17/09/2008
742 HRSG RECOMMENDED QUALITY OF BOILER WATER AND STEAM PURITY
I 17/09/2008
743 HRSG RECOMMENDED QUALITY OF BLOW DOWN 168 I 17/09/2008
744 HRSG BOILER WATER VOLUME I 17/09/2008
745 HRSG JUNCTION BOX GROUPING WITH CABLE SCHEDULE 169,225,226,231 I 04/03/2009
746 HRSG O&M MANUAL 203 I 31/03/2010