TASK FORCE MEETING #2 – 5/21/14 – HONAN LIBRARY, ALLSTON
I-90 ALLSTON INTERCHANGE
A MULTIMODAL TRANSPORTATION PROJECT
TASK FORCE MEETING #2MAY 21, 2014 – HONAN LIBRARY, ALLSTON
![Page 2: MassDOT Allston Interchange Improvement Project - Task Force meeting #2 presentation](https://reader030.vdocuments.us/reader030/viewer/2022033109/577cc9d41a28aba711a4bc85/html5/thumbnails/2.jpg)
TASK FORCE MEETING #2 – 5/21/14 – HONAN LIBRARY, ALLSTON
MassDOT Priorities
2
Improve Safety, Access & Connections for All ModesInterchan
geCambridg
e StTransit Neighborh
ood• Replace Viaduct• Realign I-90• Implement
AET• Context
Sensitive Design
• Redesign C-bridge St• Revitalize C-
bridge St• Reconfigure
Local Roadway Connections• Context
Sensitive Design
• Support S. Station Expansion, C-Rail, DMU, etc.• Context
Sensitive Design
• Avoid/minimize ROW/property displacements• Minimize
local impacts during construction• Context
Sensitive Design
The Bottom
LineUse available financial resources within timeframe
allotted
![Page 3: MassDOT Allston Interchange Improvement Project - Task Force meeting #2 presentation](https://reader030.vdocuments.us/reader030/viewer/2022033109/577cc9d41a28aba711a4bc85/html5/thumbnails/3.jpg)
TASK FORCE MEETING #2 – 5/21/14 – HONAN LIBRARY, ALLSTON
Taskforce Priorities
3
Improve Safety, Access & Connections for All ModesInterchan
geCambridg
e StTransit Neighborh
ood• Realign I-90• Minimize
interchange presence • Safe
connections to C-bridge St.• Increase
permeability across interchange• Context
Sensitive Design
• Safe connections to interchange• Less
interchange impact to C-bridge St.• Reconfigure
Local Roadway Connections• Improve safety• Context
Sensitive Design
• Connections between C-bridge St. & W. Station• Context
Sensitive Design
• Minimize local impacts during construction• Avoid new cut-
thru traffic• Reconnect
Allston• Foster local
business • Context
Sensitive DesignThe
Bottom Line
Improve safety, respect the neighborhood, reconnect Allston to itself & the Charles
![Page 4: MassDOT Allston Interchange Improvement Project - Task Force meeting #2 presentation](https://reader030.vdocuments.us/reader030/viewer/2022033109/577cc9d41a28aba711a4bc85/html5/thumbnails/4.jpg)
TASK FORCE MEETING #2 – 5/21/14 – HONAN LIBRARY, ALLSTON
Shared Priorities Improve safety for all modes:
walking, cycling, driving, transitRealign I-90Context sensitive design or:
Lessen impact of interchangeAvoid inducing cut-through traffic with
new configurationReconnect sections of Allston to each
other and the RiverProtect the neighborhood during
constructionA more vibrant Cambridge Street that
serves all modesAccessibility to transit at future West
Station
4
![Page 5: MassDOT Allston Interchange Improvement Project - Task Force meeting #2 presentation](https://reader030.vdocuments.us/reader030/viewer/2022033109/577cc9d41a28aba711a4bc85/html5/thumbnails/5.jpg)
TASK FORCE MEETING #2 – 5/21/14 – HONAN LIBRARY, ALLSTON
Traffic Analysis Area
5
![Page 6: MassDOT Allston Interchange Improvement Project - Task Force meeting #2 presentation](https://reader030.vdocuments.us/reader030/viewer/2022033109/577cc9d41a28aba711a4bc85/html5/thumbnails/6.jpg)
TASK FORCE MEETING #2 – 5/21/14 – HONAN LIBRARY, ALLSTON
Existing Highway Volumes
6
70,000
DAILY
55,000
56,000 73,000
75,000
72,000
![Page 7: MassDOT Allston Interchange Improvement Project - Task Force meeting #2 presentation](https://reader030.vdocuments.us/reader030/viewer/2022033109/577cc9d41a28aba711a4bc85/html5/thumbnails/7.jpg)
TASK FORCE MEETING #2 – 5/21/14 – HONAN LIBRARY, ALLSTON
Existing Ramp Volumes
7
15,000
DAILY
19,00016,000
16,000U-TURN = 1,000
![Page 8: MassDOT Allston Interchange Improvement Project - Task Force meeting #2 presentation](https://reader030.vdocuments.us/reader030/viewer/2022033109/577cc9d41a28aba711a4bc85/html5/thumbnails/8.jpg)
TASK FORCE MEETING #2 – 5/21/14 – HONAN LIBRARY, ALLSTON
1 ,500
5,600
Existing Highway & Ramp Volumes – AM Peak
8
7,100
I-90 EB OFF
![Page 9: MassDOT Allston Interchange Improvement Project - Task Force meeting #2 presentation](https://reader030.vdocuments.us/reader030/viewer/2022033109/577cc9d41a28aba711a4bc85/html5/thumbnails/9.jpg)
TASK FORCE MEETING #2 – 5/21/14 – HONAN LIBRARY, ALLSTON
1,300
4,100
Existing Highway & Ramp Volumes – AM Peak
9
5,400
I-90 WB OFF
![Page 10: MassDOT Allston Interchange Improvement Project - Task Force meeting #2 presentation](https://reader030.vdocuments.us/reader030/viewer/2022033109/577cc9d41a28aba711a4bc85/html5/thumbnails/10.jpg)
TASK FORCE MEETING #2 – 5/21/14 – HONAN LIBRARY, ALLSTON
1,1004,100
Existing Highway & Ramp Volumes – AM Peak
10
5,200
I-90 WB ON
![Page 11: MassDOT Allston Interchange Improvement Project - Task Force meeting #2 presentation](https://reader030.vdocuments.us/reader030/viewer/2022033109/577cc9d41a28aba711a4bc85/html5/thumbnails/11.jpg)
TASK FORCE MEETING #2 – 5/21/14 – HONAN LIBRARY, ALLSTON
1,8005,600
Existing Highway & Ramp Volumes – AM Peak
11
7,400
I-90 EB ON
![Page 12: MassDOT Allston Interchange Improvement Project - Task Force meeting #2 presentation](https://reader030.vdocuments.us/reader030/viewer/2022033109/577cc9d41a28aba711a4bc85/html5/thumbnails/12.jpg)
TASK FORCE MEETING #2 – 5/21/14 – HONAN LIBRARY, ALLSTON
1,300
3,900
Existing Highway & Ramp Volumes – PM Peak
12
5,200
I-90 EB OFF
![Page 13: MassDOT Allston Interchange Improvement Project - Task Force meeting #2 presentation](https://reader030.vdocuments.us/reader030/viewer/2022033109/577cc9d41a28aba711a4bc85/html5/thumbnails/13.jpg)
TASK FORCE MEETING #2 – 5/21/14 – HONAN LIBRARY, ALLSTON
1,400
4,500
Existing Highway & Ramp Volumes – PM Peak
13
5,900
I-90 WB OFF
![Page 14: MassDOT Allston Interchange Improvement Project - Task Force meeting #2 presentation](https://reader030.vdocuments.us/reader030/viewer/2022033109/577cc9d41a28aba711a4bc85/html5/thumbnails/14.jpg)
TASK FORCE MEETING #2 – 5/21/14 – HONAN LIBRARY, ALLSTON
1,5004,500
Existing Highway & Ramp Volumes – PM Peak
14
6,000
I-90 WB ON
![Page 15: MassDOT Allston Interchange Improvement Project - Task Force meeting #2 presentation](https://reader030.vdocuments.us/reader030/viewer/2022033109/577cc9d41a28aba711a4bc85/html5/thumbnails/15.jpg)
TASK FORCE MEETING #2 – 5/21/14 – HONAN LIBRARY, ALLSTON
1,6003,900
Existing Highway & Ramp Volumes – PM Peak
15
5,500
I-90 EB ON
![Page 16: MassDOT Allston Interchange Improvement Project - Task Force meeting #2 presentation](https://reader030.vdocuments.us/reader030/viewer/2022033109/577cc9d41a28aba711a4bc85/html5/thumbnails/16.jpg)
TASK FORCE MEETING #2 – 5/21/14 – HONAN LIBRARY, ALLSTON
70%
30%
Existing Ramp Distribution – AM Peak
16
EB OFF
1,500
![Page 17: MassDOT Allston Interchange Improvement Project - Task Force meeting #2 presentation](https://reader030.vdocuments.us/reader030/viewer/2022033109/577cc9d41a28aba711a4bc85/html5/thumbnails/17.jpg)
TASK FORCE MEETING #2 – 5/21/14 – HONAN LIBRARY, ALLSTON
30%
70%
Existing Ramp Distribution – AM Peak
17
WB OFF
1,300
![Page 18: MassDOT Allston Interchange Improvement Project - Task Force meeting #2 presentation](https://reader030.vdocuments.us/reader030/viewer/2022033109/577cc9d41a28aba711a4bc85/html5/thumbnails/18.jpg)
TASK FORCE MEETING #2 – 5/21/14 – HONAN LIBRARY, ALLSTON
30%70%
Existing Ramp Distribution – AM Peak
18
FROM CAMBRIDGE
ST
1,300
![Page 19: MassDOT Allston Interchange Improvement Project - Task Force meeting #2 presentation](https://reader030.vdocuments.us/reader030/viewer/2022033109/577cc9d41a28aba711a4bc85/html5/thumbnails/19.jpg)
TASK FORCE MEETING #2 – 5/21/14 – HONAN LIBRARY, ALLSTON
45%55%
Existing Ramp Distribution – AM Peak
19
FROM S.F.
ROAD1,300
![Page 20: MassDOT Allston Interchange Improvement Project - Task Force meeting #2 presentation](https://reader030.vdocuments.us/reader030/viewer/2022033109/577cc9d41a28aba711a4bc85/html5/thumbnails/20.jpg)
TASK FORCE MEETING #2 – 5/21/14 – HONAN LIBRARY, ALLSTON
60%
40%
Existing Ramp Distribution – PM Peak
20
EB OFF
1,300
![Page 21: MassDOT Allston Interchange Improvement Project - Task Force meeting #2 presentation](https://reader030.vdocuments.us/reader030/viewer/2022033109/577cc9d41a28aba711a4bc85/html5/thumbnails/21.jpg)
TASK FORCE MEETING #2 – 5/21/14 – HONAN LIBRARY, ALLSTON
35%
65%
Existing Ramp Distribution – PM Peak
21
WB OFF
1,400
![Page 22: MassDOT Allston Interchange Improvement Project - Task Force meeting #2 presentation](https://reader030.vdocuments.us/reader030/viewer/2022033109/577cc9d41a28aba711a4bc85/html5/thumbnails/22.jpg)
TASK FORCE MEETING #2 – 5/21/14 – HONAN LIBRARY, ALLSTON
25%75%
Existing Ramp Distribution – PM Peak
22
FROM CAMBRIDGE
ST
1,100
![Page 23: MassDOT Allston Interchange Improvement Project - Task Force meeting #2 presentation](https://reader030.vdocuments.us/reader030/viewer/2022033109/577cc9d41a28aba711a4bc85/html5/thumbnails/23.jpg)
TASK FORCE MEETING #2 – 5/21/14 – HONAN LIBRARY, ALLSTON
40%
60%
Existing Ramp Distribution – PM Peak
23
FROM S.F.
ROAD1,800
![Page 24: MassDOT Allston Interchange Improvement Project - Task Force meeting #2 presentation](https://reader030.vdocuments.us/reader030/viewer/2022033109/577cc9d41a28aba711a4bc85/html5/thumbnails/24.jpg)
TASK FORCE MEETING #2 – 5/21/14 – HONAN LIBRARY, ALLSTON
Existing Local Roadway Volumes – AM Peak
24
300400
300325
800
1,400800
1,200
550
![Page 25: MassDOT Allston Interchange Improvement Project - Task Force meeting #2 presentation](https://reader030.vdocuments.us/reader030/viewer/2022033109/577cc9d41a28aba711a4bc85/html5/thumbnails/25.jpg)
TASK FORCE MEETING #2 – 5/21/14 – HONAN LIBRARY, ALLSTON
Existing Local Roadway Volumes – PM Peak
25
450400
425450
1,200
1,4001,200
1,300
500
![Page 26: MassDOT Allston Interchange Improvement Project - Task Force meeting #2 presentation](https://reader030.vdocuments.us/reader030/viewer/2022033109/577cc9d41a28aba711a4bc85/html5/thumbnails/26.jpg)
TASK FORCE MEETING #2 – 5/21/14 – HONAN LIBRARY, ALLSTON
Local Roadway Bicycle Volumes – AM (PM) Peak
26
1 (2)1 (4)
1 (7)3 (3)
1 (1)
4 (3)
2 (4)
2 (2)
1 (1)
2 (2)
![Page 27: MassDOT Allston Interchange Improvement Project - Task Force meeting #2 presentation](https://reader030.vdocuments.us/reader030/viewer/2022033109/577cc9d41a28aba711a4bc85/html5/thumbnails/27.jpg)
TASK FORCE MEETING #2 – 5/21/14 – HONAN LIBRARY, ALLSTON
Local Roadway Pedestrian Volumes – AM (PM) Peak
27
20 (10)25 (15)
6 (7)
20 (40)15 (15)
![Page 28: MassDOT Allston Interchange Improvement Project - Task Force meeting #2 presentation](https://reader030.vdocuments.us/reader030/viewer/2022033109/577cc9d41a28aba711a4bc85/html5/thumbnails/28.jpg)
TASK FORCE MEETING #2 – 5/21/14 – HONAN LIBRARY, ALLSTON
Cambridge St/S.F. Rd – AM Peak Hour Volumes
28
55
TOTAL VOLUME2,455
1,200430
1,250
330
440
![Page 29: MassDOT Allston Interchange Improvement Project - Task Force meeting #2 presentation](https://reader030.vdocuments.us/reader030/viewer/2022033109/577cc9d41a28aba711a4bc85/html5/thumbnails/29.jpg)
TASK FORCE MEETING #2 – 5/21/14 – HONAN LIBRARY, ALLSTON
Cambridge St/S.F. Rd – PM Peak Hour Volumes
29
45
TOTAL VOLUME3,260
1,000740
1,530
675
800
![Page 30: MassDOT Allston Interchange Improvement Project - Task Force meeting #2 presentation](https://reader030.vdocuments.us/reader030/viewer/2022033109/577cc9d41a28aba711a4bc85/html5/thumbnails/30.jpg)
TASK FORCE MEETING #2 – 5/21/14 – HONAN LIBRARY, ALLSTON
Cambridge St/S.F. Rd – Traffic Signal Phasing
30
1.I-90 Off Ramps
![Page 31: MassDOT Allston Interchange Improvement Project - Task Force meeting #2 presentation](https://reader030.vdocuments.us/reader030/viewer/2022033109/577cc9d41a28aba711a4bc85/html5/thumbnails/31.jpg)
TASK FORCE MEETING #2 – 5/21/14 – HONAN LIBRARY, ALLSTON
Cambridge St/S.F. Rd – Traffic Signal Phasing
31
1.I-90 Off Ramps2.Cambridge Street
![Page 32: MassDOT Allston Interchange Improvement Project - Task Force meeting #2 presentation](https://reader030.vdocuments.us/reader030/viewer/2022033109/577cc9d41a28aba711a4bc85/html5/thumbnails/32.jpg)
TASK FORCE MEETING #2 – 5/21/14 – HONAN LIBRARY, ALLSTON
Cambridge St/S.F. Rd – Traffic Signal Phasing
32
1.I-90 Off Ramps2.Cambridge Street3.Hotel Exit
![Page 33: MassDOT Allston Interchange Improvement Project - Task Force meeting #2 presentation](https://reader030.vdocuments.us/reader030/viewer/2022033109/577cc9d41a28aba711a4bc85/html5/thumbnails/33.jpg)
TASK FORCE MEETING #2 – 5/21/14 – HONAN LIBRARY, ALLSTON
Cambridge St/S.F. Rd – Traffic Signal Phasing
33
1.I-90 Off Ramps
2.Cambridge Street
3.Hotel Exit4.S.F. Road WB
Off Ramp
![Page 34: MassDOT Allston Interchange Improvement Project - Task Force meeting #2 presentation](https://reader030.vdocuments.us/reader030/viewer/2022033109/577cc9d41a28aba711a4bc85/html5/thumbnails/34.jpg)
TASK FORCE MEETING #2 – 5/21/14 – HONAN LIBRARY, ALLSTON
Cambridge St/S.F. Rd – PM Peak Hour Volumes
34
1.I-90 Off Ramps
2.Cambridge Street
3.Hotel Exit4.S.F. Road WB
Off Ramp 5.S.F. Road EB
Frontage Road
![Page 35: MassDOT Allston Interchange Improvement Project - Task Force meeting #2 presentation](https://reader030.vdocuments.us/reader030/viewer/2022033109/577cc9d41a28aba711a4bc85/html5/thumbnails/35.jpg)
TASK FORCE MEETING #2 – 5/21/14 – HONAN LIBRARY, ALLSTON
Interchange Concept Development – Traffic Considerations• Simplify the Cambridge
Street/Soldiers Field Road intersection
• Provide system that disperses rather than concentrates traffic flows
• Reduce traffic on Cambridge Street by providing multiple connection points
• Determine need for 2-lane ramps vs. 1-lane ramps
35
![Page 36: MassDOT Allston Interchange Improvement Project - Task Force meeting #2 presentation](https://reader030.vdocuments.us/reader030/viewer/2022033109/577cc9d41a28aba711a4bc85/html5/thumbnails/36.jpg)
TASK FORCE MEETING #2 – 5/21/14 – HONAN LIBRARY, ALLSTON
Project/Site Constraints
36
Operational(During
Construction)
Operational(Final
Configuration)
Physical Regulatory
Fiscal/Schedul
e
![Page 37: MassDOT Allston Interchange Improvement Project - Task Force meeting #2 presentation](https://reader030.vdocuments.us/reader030/viewer/2022033109/577cc9d41a28aba711a4bc85/html5/thumbnails/37.jpg)
TASK FORCE MEETING #2 – 5/21/14 – HONAN LIBRARY, ALLSTON
Project/Site Constraints
37
Operational(During
Construction)•Maintain all local connections•Maintain 8 lanes of travel on I-90•Maintain all rail service
Operational(Final
Configuration)
Physical Regulatory
Fiscal/Schedul
e
![Page 38: MassDOT Allston Interchange Improvement Project - Task Force meeting #2 presentation](https://reader030.vdocuments.us/reader030/viewer/2022033109/577cc9d41a28aba711a4bc85/html5/thumbnails/38.jpg)
TASK FORCE MEETING #2 – 5/21/14 – HONAN LIBRARY, ALLSTON
Project/Site Constraints
38
Operational(During
Construction)•Maintain all local connections•Maintain 8 lanes of travel on I-90•Maintain all rail service
Operational(Final
Configuration)•Rail yard location south of I-90•Future Commuter Rail Station location• I-90 design
speed of 65 mph•On/off ramps lengths sufficient for acceleration/ deceleration and queuing
Physical Regulatory
Fiscal/Schedul
e
![Page 39: MassDOT Allston Interchange Improvement Project - Task Force meeting #2 presentation](https://reader030.vdocuments.us/reader030/viewer/2022033109/577cc9d41a28aba711a4bc85/html5/thumbnails/39.jpg)
TASK FORCE MEETING #2 – 5/21/14 – HONAN LIBRARY, ALLSTON
Project/Site Constraints
39
Operational(During
Construction)•Maintain all local connections•Maintain 8 lanes of travel on I-90•Maintain all rail service
Operational(Final
Configuration)•Rail yard location south of I-90•Future Commuter Rail Station location• I-90 design
speed of 65 mph•On/off ramps lengths sufficient for acceleration/ deceleration and queuing
Physical•Limited distance between River and BU property
Regulatory
Fiscal/Schedul
e
![Page 40: MassDOT Allston Interchange Improvement Project - Task Force meeting #2 presentation](https://reader030.vdocuments.us/reader030/viewer/2022033109/577cc9d41a28aba711a4bc85/html5/thumbnails/40.jpg)
TASK FORCE MEETING #2 – 5/21/14 – HONAN LIBRARY, ALLSTON
Existing Section Near Buick Street
40
![Page 41: MassDOT Allston Interchange Improvement Project - Task Force meeting #2 presentation](https://reader030.vdocuments.us/reader030/viewer/2022033109/577cc9d41a28aba711a4bc85/html5/thumbnails/41.jpg)
TASK FORCE MEETING #2 – 5/21/14 – HONAN LIBRARY, ALLSTON
Project/Site Constraints
41
Operational(During
Construction)•Maintain all local connections•Maintain 8 lanes of travel on I-90•Maintain all rail service
Operational(Final
Configuration)•Rail yard location south of I-90•Future Commuter Rail Station location• I-90 design
speed of 65 mph•On/off ramps lengths sufficient for acceleration/ deceleration and queuing
Physical•Limited distance between River and BU property•Clearance over rail yard –possible connections
Regulatory
Fiscal/Schedul
e
![Page 42: MassDOT Allston Interchange Improvement Project - Task Force meeting #2 presentation](https://reader030.vdocuments.us/reader030/viewer/2022033109/577cc9d41a28aba711a4bc85/html5/thumbnails/42.jpg)
TASK FORCE MEETING #2 – 5/21/14 – HONAN LIBRARY, ALLSTON
Preliminary Section Near Malvern Street
42
![Page 43: MassDOT Allston Interchange Improvement Project - Task Force meeting #2 presentation](https://reader030.vdocuments.us/reader030/viewer/2022033109/577cc9d41a28aba711a4bc85/html5/thumbnails/43.jpg)
TASK FORCE MEETING #2 – 5/21/14 – HONAN LIBRARY, ALLSTON
Project/Site Constraints
43
Operational(During
Construction)•Maintain all local connections•Maintain 8 lanes of travel on I-90•Maintain all rail service
Operational(Final
Configuration)•Rail yard location south of I-90•Future Commuter Rail Station location• I-90 design
speed of 65 mph•On/off ramps lengths sufficient for acceleration/ deceleration and queuing
Physical•Limited distance between River and BU property•Clearance over rail yard –possible connections•Right-of-way
Regulatory
Fiscal/Schedul
e
![Page 44: MassDOT Allston Interchange Improvement Project - Task Force meeting #2 presentation](https://reader030.vdocuments.us/reader030/viewer/2022033109/577cc9d41a28aba711a4bc85/html5/thumbnails/44.jpg)
TASK FORCE MEETING #2 – 5/21/14 – HONAN LIBRARY, ALLSTON
Project/Site Constraints
44
Operational(During
Construction)•Maintain all local connections•Maintain 8 lanes of travel on I-90•Maintain all rail service
Operational(Final
Configuration)•Rail yard location south of I-90•Future Commuter Rail Station location• I-90 design
speed of 65 mph•On/off ramps lengths sufficient for acceleration/ deceleration and queuing
Physical•Limited distance between River and BU property•Clearance over rail yard –possible connections•Right-of-way•Length required for street connections from Cambridge St over I-90
Regulatory
Fiscal/Schedul
e
![Page 45: MassDOT Allston Interchange Improvement Project - Task Force meeting #2 presentation](https://reader030.vdocuments.us/reader030/viewer/2022033109/577cc9d41a28aba711a4bc85/html5/thumbnails/45.jpg)
TASK FORCE MEETING #2 – 5/21/14 – HONAN LIBRARY, ALLSTON
Schematic Connector Location Limit
45
No Connections from Cambridge St over I-90 are Possible
750’
Proposed I-90Rail Yard
and Commuter Rail
![Page 46: MassDOT Allston Interchange Improvement Project - Task Force meeting #2 presentation](https://reader030.vdocuments.us/reader030/viewer/2022033109/577cc9d41a28aba711a4bc85/html5/thumbnails/46.jpg)
TASK FORCE MEETING #2 – 5/21/14 – HONAN LIBRARY, ALLSTON
Schematic Connector Profile
46
![Page 47: MassDOT Allston Interchange Improvement Project - Task Force meeting #2 presentation](https://reader030.vdocuments.us/reader030/viewer/2022033109/577cc9d41a28aba711a4bc85/html5/thumbnails/47.jpg)
TASK FORCE MEETING #2 – 5/21/14 – HONAN LIBRARY, ALLSTON
Project/Site Constraints
47
Operational(During
Construction)•Maintain all local connections•Maintain 8 lanes of travel on I-90•Maintain all rail service
Operational(Final
Configuration)•Rail yard location south of I-90•Future Commuter Rail Station location• I-90 design
speed of 65 mph•On/off ramps lengths sufficient for acceleration/ deceleration and queuing
Physical•Limited distance between River and BU property•Clearance over rail yard –possible connections•Right-of-way•Length required for street connections from Cambridge St over I-90•Potential subsurface contamination
Regulatory
Fiscal/Schedul
e
![Page 48: MassDOT Allston Interchange Improvement Project - Task Force meeting #2 presentation](https://reader030.vdocuments.us/reader030/viewer/2022033109/577cc9d41a28aba711a4bc85/html5/thumbnails/48.jpg)
TASK FORCE MEETING #2 – 5/21/14 – HONAN LIBRARY, ALLSTON
Project/Site Constraints
48
Operational(During
Construction)•Maintain all local connections•Maintain 8 lanes of travel on I-90•Maintain all rail service
Operational(Final
Configuration)•Rail yard location south of I-90•Future Commuter Rail Station location• I-90 design
speed of 65 mph•On/off ramps lengths sufficient for acceleration/ deceleration and queuing
Physical Regulatory•Historic
impacts Section 106•Parkland impacts Section 4(f)•Stormwater treatment
Fiscal/Schedul
e•Limited distance between River and BU property•Clearance over rail yard –possible connections•Right-of-way•Length required for street connections from Cambridge St over I-90•Potential subsurface contamination
![Page 49: MassDOT Allston Interchange Improvement Project - Task Force meeting #2 presentation](https://reader030.vdocuments.us/reader030/viewer/2022033109/577cc9d41a28aba711a4bc85/html5/thumbnails/49.jpg)
TASK FORCE MEETING #2 – 5/21/14 – HONAN LIBRARY, ALLSTON
Project/Site Constraints
49
Operational(During
Construction)•Maintain all local connections•Maintain 8 lanes of travel on I-90•Maintain all rail service
Operational(Final
Configuration)•Rail yard location south of I-90•Future Commuter Rail Station location• I-90 design
speed of 65 mph•On/off ramps lengths sufficient for acceleration/ deceleration and queuing
Physical Regulatory•Historic
impacts Section 106•Parkland impacts Section 4(f)•Stormwater treatment
Fiscal/Schedul
e•Funds identified from Capital Improvement Plan (CIP) FY14-FY18 (approx $160M)•Schedule linked to AET coming on-line 2016
•Limited distance between River and BU property•Clearance over rail yard –possible connections•Right-of-way•Length required for street connections from Cambridge St over I-90•Potential subsurface contamination
![Page 50: MassDOT Allston Interchange Improvement Project - Task Force meeting #2 presentation](https://reader030.vdocuments.us/reader030/viewer/2022033109/577cc9d41a28aba711a4bc85/html5/thumbnails/50.jpg)
TASK FORCE MEETING #2 – 5/21/14 – HONAN LIBRARY, ALLSTON
Preliminary Interchange Concept Design
50
GROUP 1Suburban Type• One
intersection for on-ramps
• One intersection for off-ramps
GROUP 2Suburban Type• One
intersection for EB on-ramps & WB off-ramps
• One intersection for WB on-ramps & EB off-ramps
GROUP 3Urban Type
• Split diamond configuration
![Page 51: MassDOT Allston Interchange Improvement Project - Task Force meeting #2 presentation](https://reader030.vdocuments.us/reader030/viewer/2022033109/577cc9d41a28aba711a4bc85/html5/thumbnails/51.jpg)
TASK FORCE MEETING #2 – 5/21/14 – HONAN LIBRARY, ALLSTON
Option 1A
51
![Page 52: MassDOT Allston Interchange Improvement Project - Task Force meeting #2 presentation](https://reader030.vdocuments.us/reader030/viewer/2022033109/577cc9d41a28aba711a4bc85/html5/thumbnails/52.jpg)
TASK FORCE MEETING #2 – 5/21/14 – HONAN LIBRARY, ALLSTON
Option 1B
52
![Page 53: MassDOT Allston Interchange Improvement Project - Task Force meeting #2 presentation](https://reader030.vdocuments.us/reader030/viewer/2022033109/577cc9d41a28aba711a4bc85/html5/thumbnails/53.jpg)
TASK FORCE MEETING #2 – 5/21/14 – HONAN LIBRARY, ALLSTON
Option 1C
53
![Page 54: MassDOT Allston Interchange Improvement Project - Task Force meeting #2 presentation](https://reader030.vdocuments.us/reader030/viewer/2022033109/577cc9d41a28aba711a4bc85/html5/thumbnails/54.jpg)
TASK FORCE MEETING #2 – 5/21/14 – HONAN LIBRARY, ALLSTON
Option 1D
54
![Page 55: MassDOT Allston Interchange Improvement Project - Task Force meeting #2 presentation](https://reader030.vdocuments.us/reader030/viewer/2022033109/577cc9d41a28aba711a4bc85/html5/thumbnails/55.jpg)
TASK FORCE MEETING #2 – 5/21/14 – HONAN LIBRARY, ALLSTON
Option 2A
55
![Page 56: MassDOT Allston Interchange Improvement Project - Task Force meeting #2 presentation](https://reader030.vdocuments.us/reader030/viewer/2022033109/577cc9d41a28aba711a4bc85/html5/thumbnails/56.jpg)
TASK FORCE MEETING #2 – 5/21/14 – HONAN LIBRARY, ALLSTON
Option 2B
56
![Page 57: MassDOT Allston Interchange Improvement Project - Task Force meeting #2 presentation](https://reader030.vdocuments.us/reader030/viewer/2022033109/577cc9d41a28aba711a4bc85/html5/thumbnails/57.jpg)
TASK FORCE MEETING #2 – 5/21/14 – HONAN LIBRARY, ALLSTON
Option 3A
57
![Page 58: MassDOT Allston Interchange Improvement Project - Task Force meeting #2 presentation](https://reader030.vdocuments.us/reader030/viewer/2022033109/577cc9d41a28aba711a4bc85/html5/thumbnails/58.jpg)
TASK FORCE MEETING #2 – 5/21/14 – HONAN LIBRARY, ALLSTON
Option 3B
58
![Page 59: MassDOT Allston Interchange Improvement Project - Task Force meeting #2 presentation](https://reader030.vdocuments.us/reader030/viewer/2022033109/577cc9d41a28aba711a4bc85/html5/thumbnails/59.jpg)
TASK FORCE MEETING #2 – 5/21/14 – HONAN LIBRARY, ALLSTON
Option 3C
59
![Page 60: MassDOT Allston Interchange Improvement Project - Task Force meeting #2 presentation](https://reader030.vdocuments.us/reader030/viewer/2022033109/577cc9d41a28aba711a4bc85/html5/thumbnails/60.jpg)
TASK FORCE MEETING #2 – 5/21/14 – HONAN LIBRARY, ALLSTON
Option 3D
60
![Page 61: MassDOT Allston Interchange Improvement Project - Task Force meeting #2 presentation](https://reader030.vdocuments.us/reader030/viewer/2022033109/577cc9d41a28aba711a4bc85/html5/thumbnails/61.jpg)
TASK FORCE MEETING #2 – 5/21/14 – HONAN LIBRARY, ALLSTON
Option 3E
61
![Page 62: MassDOT Allston Interchange Improvement Project - Task Force meeting #2 presentation](https://reader030.vdocuments.us/reader030/viewer/2022033109/577cc9d41a28aba711a4bc85/html5/thumbnails/62.jpg)
TASK FORCE MEETING #2 – 5/21/14 – HONAN LIBRARY, ALLSTON
Option 3F
62
![Page 63: MassDOT Allston Interchange Improvement Project - Task Force meeting #2 presentation](https://reader030.vdocuments.us/reader030/viewer/2022033109/577cc9d41a28aba711a4bc85/html5/thumbnails/63.jpg)
TASK FORCE MEETING #2 – 5/21/14 – HONAN LIBRARY, ALLSTON
Parcel Ownership Map
63
![Page 64: MassDOT Allston Interchange Improvement Project - Task Force meeting #2 presentation](https://reader030.vdocuments.us/reader030/viewer/2022033109/577cc9d41a28aba711a4bc85/html5/thumbnails/64.jpg)
TASK FORCE MEETING #2 – 5/21/14 – HONAN LIBRARY, ALLSTON
Project Locus
64