![Page 1: Maria Campos Emmanuela Neba Gabriella Fragoso CIS 1020-126 Fall 2011](https://reader035.vdocuments.us/reader035/viewer/2022062720/56649f045503460f94c18c6a/html5/thumbnails/1.jpg)
![Page 2: Maria Campos Emmanuela Neba Gabriella Fragoso CIS 1020-126 Fall 2011](https://reader035.vdocuments.us/reader035/viewer/2022062720/56649f045503460f94c18c6a/html5/thumbnails/2.jpg)
Unload-n-lock Committee
Maria Campos
Emmanuela Neba
Gabriella Fragoso
CIS 1020-126 Fall 2011
![Page 3: Maria Campos Emmanuela Neba Gabriella Fragoso CIS 1020-126 Fall 2011](https://reader035.vdocuments.us/reader035/viewer/2022062720/56649f045503460f94c18c6a/html5/thumbnails/3.jpg)
For
President BioteauSalt Lake Community College
![Page 4: Maria Campos Emmanuela Neba Gabriella Fragoso CIS 1020-126 Fall 2011](https://reader035.vdocuments.us/reader035/viewer/2022062720/56649f045503460f94c18c6a/html5/thumbnails/4.jpg)
Proposal
• We would like funding to provide students and professors with their own personal lockers in each building. To keep their belongings such as; Books, Files, Lunch, Important Papers, and Projects.
![Page 5: Maria Campos Emmanuela Neba Gabriella Fragoso CIS 1020-126 Fall 2011](https://reader035.vdocuments.us/reader035/viewer/2022062720/56649f045503460f94c18c6a/html5/thumbnails/5.jpg)
Benefits
• Students will be able to keep books and important things at school.
• Easier for students to be prepared for class. • Less of a strain on students backs and
shoulders.
![Page 6: Maria Campos Emmanuela Neba Gabriella Fragoso CIS 1020-126 Fall 2011](https://reader035.vdocuments.us/reader035/viewer/2022062720/56649f045503460f94c18c6a/html5/thumbnails/6.jpg)
Lockers
Buildings # in Buildings Cost of each locker Total Cost
AD Building 192 $ 23.00 $ 4,416.00
AT Building 58 $ 23.00 $ 1,334.00
ATC Building 56 $ 23.00 $ 1,288.00
Buisness Building 116 $ 23.00 $ 2,668.00
CDL Building 28 $ 23.00 $ 644.00
CT Building 76 $ 23.00 $ 1,748.00
LAC Building 300 $ 23.00 $ 6,900.00
Science Building 192 $ 23.00 $ 4,416.00
Student Center 200 $ 23.00 $ 4,600.00
TB Building 240 $ 23.00 $ 5,520.00
![Page 7: Maria Campos Emmanuela Neba Gabriella Fragoso CIS 1020-126 Fall 2011](https://reader035.vdocuments.us/reader035/viewer/2022062720/56649f045503460f94c18c6a/html5/thumbnails/7.jpg)
Graph
Ad Building
AT Building
ATC Building
Business
Building
CDL Build
ing
CT Building
LAC Build
ing
Science
Building
Student C
enter
TB Building
10
100
1000
10000
19258 56 116
2876
300192 200 240
44161334 1288 2668
6441748
69004416 4600 5520
Lockers
# In buildings Cost in each
Am
ount
![Page 8: Maria Campos Emmanuela Neba Gabriella Fragoso CIS 1020-126 Fall 2011](https://reader035.vdocuments.us/reader035/viewer/2022062720/56649f045503460f94c18c6a/html5/thumbnails/8.jpg)
Total CostBuildings Total Cost
CDL Building $ 644.00
ATC Building $ 1,288.00
AT Building $ 1,334.00
CT Building $ 1,748.00
Buisness Building $ 2,668.00
AD Building $ 4,416.00
Science Building $ 4,416.00
Student Center $ 4,600.00
TB Building $ 5,520.00
LAC Building $ 6,900.00
![Page 9: Maria Campos Emmanuela Neba Gabriella Fragoso CIS 1020-126 Fall 2011](https://reader035.vdocuments.us/reader035/viewer/2022062720/56649f045503460f94c18c6a/html5/thumbnails/9.jpg)
Graph
CDL Building
ATC Building
AT Building
CT Building
Buisness Building
AD Building
Science Building
Student Center
TB Building
LAC Building
$- $2,000.00 $4,000.00 $6,000.00 $8,000.00
Total Cost
Total Cost
Total Cost For each Building
Build
ings
![Page 10: Maria Campos Emmanuela Neba Gabriella Fragoso CIS 1020-126 Fall 2011](https://reader035.vdocuments.us/reader035/viewer/2022062720/56649f045503460f94c18c6a/html5/thumbnails/10.jpg)
Result
The total cost for lockers $33,534.00
![Page 11: Maria Campos Emmanuela Neba Gabriella Fragoso CIS 1020-126 Fall 2011](https://reader035.vdocuments.us/reader035/viewer/2022062720/56649f045503460f94c18c6a/html5/thumbnails/11.jpg)
Lighter loads is such a relief!
![Page 12: Maria Campos Emmanuela Neba Gabriella Fragoso CIS 1020-126 Fall 2011](https://reader035.vdocuments.us/reader035/viewer/2022062720/56649f045503460f94c18c6a/html5/thumbnails/12.jpg)
I hope you consider funding the Unload-n-Lock Committee because it will help students.
Thank you