![Page 1: Malabar Road (SR 514) PD&E - Space Coast Transportation ... · Malabar Road (SR 514) – East of Babcock Street 18,000 Average Annual Daily Traffic (AADT) 28,000 AADT Malabar Road](https://reader033.vdocuments.us/reader033/viewer/2022042211/5eb29ec026c54b0daf7d77eb/html5/thumbnails/1.jpg)
Malabar Road (SR 514) PD&EProject Development & Environment Study
Space Coast TPO – Board Meeting May 14, 2015
![Page 2: Malabar Road (SR 514) PD&E - Space Coast Transportation ... · Malabar Road (SR 514) – East of Babcock Street 18,000 Average Annual Daily Traffic (AADT) 28,000 AADT Malabar Road](https://reader033.vdocuments.us/reader033/viewer/2022042211/5eb29ec026c54b0daf7d77eb/html5/thumbnails/2.jpg)
Project Location Map
2
![Page 3: Malabar Road (SR 514) PD&E - Space Coast Transportation ... · Malabar Road (SR 514) – East of Babcock Street 18,000 Average Annual Daily Traffic (AADT) 28,000 AADT Malabar Road](https://reader033.vdocuments.us/reader033/viewer/2022042211/5eb29ec026c54b0daf7d77eb/html5/thumbnails/3.jpg)
Purpose and Need
• Improve traffic flow and relieve congestion
3
Location Existing Traffic (2015)
Future Traffic (2045)
Malabar Road (SR 514) –East of Babcock Street
18,000 Average Annual Daily Traffic (AADT)
28,000 AADT
Malabar Road (SR 514) –East of Corey Road
15,000 AADT 22,000 AADT
Malabar Road (SR 514) –West of US 1
13,000 AADT 19,000 AADT
![Page 4: Malabar Road (SR 514) PD&E - Space Coast Transportation ... · Malabar Road (SR 514) – East of Babcock Street 18,000 Average Annual Daily Traffic (AADT) 28,000 AADT Malabar Road](https://reader033.vdocuments.us/reader033/viewer/2022042211/5eb29ec026c54b0daf7d77eb/html5/thumbnails/4.jpg)
Engineering Analysis
• Traffic Projections
• Typical Sections
• Roadway Alternatives
– 4-laning
– Minimize right of way (ROW)
– Intersection improvements
• Access Management
• Traffic Operations/Safety
– Enhanced bike and pedestrian facilities
• Stormwater Management
4
![Page 5: Malabar Road (SR 514) PD&E - Space Coast Transportation ... · Malabar Road (SR 514) – East of Babcock Street 18,000 Average Annual Daily Traffic (AADT) 28,000 AADT Malabar Road](https://reader033.vdocuments.us/reader033/viewer/2022042211/5eb29ec026c54b0daf7d77eb/html5/thumbnails/5.jpg)
Recommended Alternative
5
• Selected based on:
– Community and stakeholder input
– Engineering analysis
– Minimization of sensitive environmental
impacts
5
![Page 6: Malabar Road (SR 514) PD&E - Space Coast Transportation ... · Malabar Road (SR 514) – East of Babcock Street 18,000 Average Annual Daily Traffic (AADT) 28,000 AADT Malabar Road](https://reader033.vdocuments.us/reader033/viewer/2022042211/5eb29ec026c54b0daf7d77eb/html5/thumbnails/6.jpg)
6
Malabar Road Segments
![Page 7: Malabar Road (SR 514) PD&E - Space Coast Transportation ... · Malabar Road (SR 514) – East of Babcock Street 18,000 Average Annual Daily Traffic (AADT) 28,000 AADT Malabar Road](https://reader033.vdocuments.us/reader033/viewer/2022042211/5eb29ec026c54b0daf7d77eb/html5/thumbnails/7.jpg)
Segment 1- 4 Lane Urban
7
Babcock Street to Weber Road
• Four-lane divided urban
• 11’ travel lanes
• 114 feet minimum width
• Best fit to minimize impacts
• 7’ bike lanes
7
![Page 8: Malabar Road (SR 514) PD&E - Space Coast Transportation ... · Malabar Road (SR 514) – East of Babcock Street 18,000 Average Annual Daily Traffic (AADT) 28,000 AADT Malabar Road](https://reader033.vdocuments.us/reader033/viewer/2022042211/5eb29ec026c54b0daf7d77eb/html5/thumbnails/8.jpg)
Segment 2 - Suburban
8
8
Weber Road to east of Corey Road
• Four-lane divided suburban
• 55 mph design speed
• 150 feet minimum width
• 6’ Bicycle lanes
![Page 9: Malabar Road (SR 514) PD&E - Space Coast Transportation ... · Malabar Road (SR 514) – East of Babcock Street 18,000 Average Annual Daily Traffic (AADT) 28,000 AADT Malabar Road](https://reader033.vdocuments.us/reader033/viewer/2022042211/5eb29ec026c54b0daf7d77eb/html5/thumbnails/9.jpg)
Segment 2 - No Build
9
Corey Road to Marie Street
• Partial no build east of Corey Road up to Marie Street
• 10’ multi-use path
• Meets future traffic demand
• Avoids environmental impacts
9
![Page 10: Malabar Road (SR 514) PD&E - Space Coast Transportation ... · Malabar Road (SR 514) – East of Babcock Street 18,000 Average Annual Daily Traffic (AADT) 28,000 AADT Malabar Road](https://reader033.vdocuments.us/reader033/viewer/2022042211/5eb29ec026c54b0daf7d77eb/html5/thumbnails/10.jpg)
Segment 3 – Marie St. to US 1
10
Marie Street to US 1
• Three-lane with center turn lane
• 35 mph design speed
• 78’ feet minimum width
• Best fit to minimize impacts
• 7’ Bike lanes and sidewalks
10
![Page 11: Malabar Road (SR 514) PD&E - Space Coast Transportation ... · Malabar Road (SR 514) – East of Babcock Street 18,000 Average Annual Daily Traffic (AADT) 28,000 AADT Malabar Road](https://reader033.vdocuments.us/reader033/viewer/2022042211/5eb29ec026c54b0daf7d77eb/html5/thumbnails/11.jpg)
Environmental Evaluations
• Wildlife – Recent wildlife surveys
• Parks – Section 4(f)
• Cultural and historic resources
• Wetlands and floodplains
• Noise impacts & air quality
• Contamination
11
![Page 12: Malabar Road (SR 514) PD&E - Space Coast Transportation ... · Malabar Road (SR 514) – East of Babcock Street 18,000 Average Annual Daily Traffic (AADT) 28,000 AADT Malabar Road](https://reader033.vdocuments.us/reader033/viewer/2022042211/5eb29ec026c54b0daf7d77eb/html5/thumbnails/12.jpg)
Environmental – Section 4(f)
• Department of Transportation Act of 1966
• Cannot approve the use of land from
publicly owned parks, recreational areas
unless:
– There is no feasible and prudent alternative to
the use of land for the transportation facility.
– The action includes all possible planning to
minimize harm to the property resulting from
the use.
12
![Page 13: Malabar Road (SR 514) PD&E - Space Coast Transportation ... · Malabar Road (SR 514) – East of Babcock Street 18,000 Average Annual Daily Traffic (AADT) 28,000 AADT Malabar Road](https://reader033.vdocuments.us/reader033/viewer/2022042211/5eb29ec026c54b0daf7d77eb/html5/thumbnails/13.jpg)
Environmental
13
Section 4(f) Lands
![Page 14: Malabar Road (SR 514) PD&E - Space Coast Transportation ... · Malabar Road (SR 514) – East of Babcock Street 18,000 Average Annual Daily Traffic (AADT) 28,000 AADT Malabar Road](https://reader033.vdocuments.us/reader033/viewer/2022042211/5eb29ec026c54b0daf7d77eb/html5/thumbnails/14.jpg)
Preliminary Costs
14
• Design– Approximately $3.6M
– Funded in fiscal year 2019
• Right-of-Way– Preliminary ROW estimate - $22M
– Currently not funded
• Construction– Preliminary construction cost - $24.5M
– Currently not funded
![Page 15: Malabar Road (SR 514) PD&E - Space Coast Transportation ... · Malabar Road (SR 514) – East of Babcock Street 18,000 Average Annual Daily Traffic (AADT) 28,000 AADT Malabar Road](https://reader033.vdocuments.us/reader033/viewer/2022042211/5eb29ec026c54b0daf7d77eb/html5/thumbnails/15.jpg)
Safety Improvement Project
15
• FDOT Project No. 413761-1-32-01
– Improve intersections of Weber and Corey Road
– Funded for design, right-of-way and construction
– Design scheduled to begin October 2014
– Project will Let for construction June 2019
– FDOT Design Contact Person:Name: Jerald Marks
Tel: 386-943-5161
Email: [email protected]
![Page 16: Malabar Road (SR 514) PD&E - Space Coast Transportation ... · Malabar Road (SR 514) – East of Babcock Street 18,000 Average Annual Daily Traffic (AADT) 28,000 AADT Malabar Road](https://reader033.vdocuments.us/reader033/viewer/2022042211/5eb29ec026c54b0daf7d77eb/html5/thumbnails/16.jpg)
Next Steps
• Public Hearing (Summer of 2015)
• Complete environmental and engineering
reports
• Location Design Concept Approval (LDCA)
from Federal Highway (Fall of 2015)
16
![Page 17: Malabar Road (SR 514) PD&E - Space Coast Transportation ... · Malabar Road (SR 514) – East of Babcock Street 18,000 Average Annual Daily Traffic (AADT) 28,000 AADT Malabar Road](https://reader033.vdocuments.us/reader033/viewer/2022042211/5eb29ec026c54b0daf7d77eb/html5/thumbnails/17.jpg)
Contact Information
Lance Decuir, PE
Atkins
Deputy Project Manager
482 South Keller Road
Orlando, FL 32810
407-806-4482
Vic Poteat, PE
Atkins
Project Manager
482 South Keller Road
Orlando, FL 32810
407-806-4129
Jazlyn Heywood, PE
Florida Department of Transportation
FDOT Project Manager
719 S Woodland Blvd., MS 501
Deland, FL 32720
386-943-5388
17www.sr514malabar.com