Infrastructure Program Mega Project Monster Management

August 2013

Overview

• 10,393,185 residents

• 88 incorporated cities

• South portion heavily urbanized

• North portion is mostly desert

• Population larger than 42 states

• Land area similar to Connecticut

• Population similar to Michigan

• Would rank within the 20 largest

countries`

• County budget $25 Billion

LOS ANGELES COUNTY

Page 2: LOS ANGELES COUNTY - APWA Home · Presentation By: LA County Public Works Docent: Pamela Manning Los Angeles County: Marina del Rey Infrastructure Program Mega Project Monster Management

8/26/2013

2

Overview

• 3,416 miles of road

• 15 major dams

• 284 debris basins

• 2,500 miles of drains

• 33 pump plants

• 50,000 street name signs

• 107,500 traffic signs/lights

• 5,287 miles of sewer lines

• 117,587 manhole structures

• 64,000 water meters

• DPW budget $1.9 Billion

DEPARTMENT OF PUBLIC WORKS

Overview

• Area: 1 .5 sq. miles

• Population: 8,866

• Median income:

$86,326

• Median Age: 40 yrs.

• Revenue from lessee

= $60,000,000

MARINA DEL REY: THE COMMUNITY

Page 3: LOS ANGELES COUNTY - APWA Home · Presentation By: LA County Public Works Docent: Pamela Manning Los Angeles County: Marina del Rey Infrastructure Program Mega Project Monster Management

8/26/2013

3

PAUL DEVILLE – CI

GREG WEISS - CI

MARINA DEL REY-

INFRASTRUCTURE MAP

Page 4: LOS ANGELES COUNTY - APWA Home · Presentation By: LA County Public Works Docent: Pamela Manning Los Angeles County: Marina del Rey Infrastructure Program Mega Project Monster Management

8/26/2013

4

PAUL DEVILLE – CI

DOMINIC OSMENA - PM

PUBLIC OUTREACH

Page 5: LOS ANGELES COUNTY - APWA Home · Presentation By: LA County Public Works Docent: Pamela Manning Los Angeles County: Marina del Rey Infrastructure Program Mega Project Monster Management

8/26/2013

5

DEPUTY DIRECTOR:

BILL WINTER

DEPUTY DIRECTOR:

BILL WINTER

Page 6: LOS ANGELES COUNTY - APWA Home · Presentation By: LA County Public Works Docent: Pamela Manning Los Angeles County: Marina del Rey Infrastructure Program Mega Project Monster Management

8/26/2013

6

WHAT WAS THE EXECUTIVE RECIPE FOR

SUCCESS

CM – is a Relay Race

• Programmed &Budgeted

– PDD

• Designed – DES/TNL/AED

• Communicated to Public

– PDD

• Solicitation/Award – CON

• CM managed and

accepted- CON

• Final Bills paid - PDD

PM – is a marathon

• Programmed & Budgeted-

client division

• Designed – PMD

• Contract award – PMD

• CM managed-PMD

• Field acceptance – Client

Div. & PMD

• Final Bills paid – PMD

&Client Div.

CONSTRUCTION MGT. VS. PROJECT MGT.

Page 7: LOS ANGELES COUNTY - APWA Home · Presentation By: LA County Public Works Docent: Pamela Manning Los Angeles County: Marina del Rey Infrastructure Program Mega Project Monster Management

8/26/2013

7

SALIM SIOUFI - PM

18 roadway, water, sewer, watershed & landscape projects

between 5/2011- 4/2014 within 1.5 square miles. What should

we do?

One Lead person internally with big experience

One outside person with big experience

A PROGRAMMATIC APPROACH

Page 8: LOS ANGELES COUNTY - APWA Home · Presentation By: LA County Public Works Docent: Pamela Manning Los Angeles County: Marina del Rey Infrastructure Program Mega Project Monster Management

8/26/2013

8

PROGRAM MANAGER:

BRITTANY BARKER

CAROLINA HERNANDEZ - PM

SEAN GILL - CONSULTANT

Page 9: LOS ANGELES COUNTY - APWA Home · Presentation By: LA County Public Works Docent: Pamela Manning Los Angeles County: Marina del Rey Infrastructure Program Mega Project Monster Management

8/26/2013

9

A FEW MINUTES ON THE PROJECTS

SEAN GILL – CONSULTANT

Page 10: LOS ANGELES COUNTY - APWA Home · Presentation By: LA County Public Works Docent: Pamela Manning Los Angeles County: Marina del Rey Infrastructure Program Mega Project Monster Management

8/26/2013

10

ODOR CONTROL PROJECT

Status:

Completed

Project Scope:

• To control odors from a sewer force main

outlet MH at Admiralty Way

• Installation of a scrubber unit & cabinet,

80 ft. of pipe, electrical work, and

landscaping replacement.

18-INCH WATERLINE REPLACEMENT

PHASE II PROJECT

Status:

Completed

Page 11: LOS ANGELES COUNTY - APWA Home · Presentation By: LA County Public Works Docent: Pamela Manning Los Angeles County: Marina del Rey Infrastructure Program Mega Project Monster Management

8/26/2013

11

TIDE GATE PROJECT

Status:

Under Construction

BOATHOUSE PROJECT

Project Scope:

• Renovation of two-story Boathouse

to meet ADA compliance,

including installation of elevator

• Seismic upgrade to existing

building structure and elevated

pile foundation system

Status:

Under Construction

Anticipated Completion Date:

December 2013

Page 12: LOS ANGELES COUNTY - APWA Home · Presentation By: LA County Public Works Docent: Pamela Manning Los Angeles County: Marina del Rey Infrastructure Program Mega Project Monster Management

8/26/2013

12

ADMIRALTY WAY SETTLEMENT

REPAIR PROJECT

Status:

Completed

BEFORE

AFTER

ADMIRALTY WAY SETTLEMENT

REPAIR PROJECT

Page 13: LOS ANGELES COUNTY - APWA Home · Presentation By: LA County Public Works Docent: Pamela Manning Los Angeles County: Marina del Rey Infrastructure Program Mega Project Monster Management

8/26/2013

13

ADMIRALTY WAY SETTLEMENT

REPAIR PROJECT-TRAFFIC DETOUR

Phase 1 Traffic Detour

Legend

Construction Area

Traffic Detour

SEWER MANHOLE LINING PROJECT -

PHASE III

Status:

Completed

Page 14: LOS ANGELES COUNTY - APWA Home · Presentation By: LA County Public Works Docent: Pamela Manning Los Angeles County: Marina del Rey Infrastructure Program Mega Project Monster Management

8/26/2013

14

FERNANDO VILLALUNA - PM

18-INCH WATERLINE REPLACEMENT

PHASE III: A-C PROJECT

Page 15: LOS ANGELES COUNTY - APWA Home · Presentation By: LA County Public Works Docent: Pamela Manning Los Angeles County: Marina del Rey Infrastructure Program Mega Project Monster Management

8/26/2013

15

SEAWALL REFURBISHMENT PROJECT

Project Scope:

• To ensure the prolonged integrity of the

Marina by performing crucial

maintenance and repairs on the 7.3 miles

of seawall at various locations Status:

Under Construction

ADMIRALTY WAY STREET

IMPROVEMENT PROJECT

Status:

Construction Started in July 2013

Page 16: LOS ANGELES COUNTY - APWA Home · Presentation By: LA County Public Works Docent: Pamela Manning Los Angeles County: Marina del Rey Infrastructure Program Mega Project Monster Management

8/26/2013

16

BEFORE

AFTER

ADMIRALTY WAY STREET

IMPROVEMENT PROJECT

BURTON CHACE PARK TRANSIENT

DOCK REPLACEMENT PROJECT

Status:

• Burton Chace Park: Construction to Start in October 2013

• Anchorage 47 Dock: Construction to Start in December 2013

Page 17: LOS ANGELES COUNTY - APWA Home · Presentation By: LA County Public Works Docent: Pamela Manning Los Angeles County: Marina del Rey Infrastructure Program Mega Project Monster Management

8/26/2013

17

PARKING LOTS 5 & 7 PARKWAY

IMPROVEMENT PROJECT

Status:

Construction to Start in April 2014

OXFORD RETENTION BASIN MULTI-USE

ENHANCEMENT PROJECT

Status:

Construction to

Start in April 2014

Page 18: LOS ANGELES COUNTY - APWA Home · Presentation By: LA County Public Works Docent: Pamela Manning Los Angeles County: Marina del Rey Infrastructure Program Mega Project Monster Management

8/26/2013

18

FIJI WAY ROADWAY

IMPROVEMENT PROJECT

Status:

Construction to Start in January 2015 Before

After

Fij

iW

ay

VIA MARINA STREET

IMPROVEMENT PROJECT

Before Status:

Construction to Start in January 2015

After

Page 19: LOS ANGELES COUNTY - APWA Home · Presentation By: LA County Public Works Docent: Pamela Manning Los Angeles County: Marina del Rey Infrastructure Program Mega Project Monster Management

8/26/2013

19

ADMIRALTY WAY AT VIA MARINA

ROADWAY PROJECT

Status:

Construction to Start in November 2014

DEPUTY DIRECTOR:

BILL WINTER

Page 20: LOS ANGELES COUNTY - APWA Home · Presentation By: LA County Public Works Docent: Pamela Manning Los Angeles County: Marina del Rey Infrastructure Program Mega Project Monster Management

8/26/2013

20

PROGRAM MANAGER:

BRITTANY BARKER

LA COUNTY & BEACHES AND HARBOR

Page 21: LOS ANGELES COUNTY - APWA Home · Presentation By: LA County Public Works Docent: Pamela Manning Los Angeles County: Marina del Rey Infrastructure Program Mega Project Monster Management

8/26/2013

21

PROGRAM MANAGER:

BRITTANY BARKER

PROGRAM MANAGER:

BRITTANY BARKER

Page 22: LOS ANGELES COUNTY - APWA Home · Presentation By: LA County Public Works Docent: Pamela Manning Los Angeles County: Marina del Rey Infrastructure Program Mega Project Monster Management

8/26/2013

22

TURNING POINT WITH CONSULTANT

PROGRAM MANAGER:

BRITTANY BARKER

Page 23: LOS ANGELES COUNTY - APWA Home · Presentation By: LA County Public Works Docent: Pamela Manning Los Angeles County: Marina del Rey Infrastructure Program Mega Project Monster Management

8/26/2013

23

JOSHUA SVENSSON - PM

EDWARDS ANDREWS - PM

Page 24: LOS ANGELES COUNTY - APWA Home · Presentation By: LA County Public Works Docent: Pamela Manning Los Angeles County: Marina del Rey Infrastructure Program Mega Project Monster Management

8/26/2013

24

PROGRAM MANAGER:

BRITTANY BARKER

BABY BARKER

Page 25: LOS ANGELES COUNTY - APWA Home · Presentation By: LA County Public Works Docent: Pamela Manning Los Angeles County: Marina del Rey Infrastructure Program Mega Project Monster Management

8/26/2013

25

TRUST YOUR INSTINCTS

KNOW WHAT YOU KNOW – KNOW WHAT YOU DON’T

CHECK YOUR EGO

SHARED POOL OF KNOWLEDGE SAVES TIME AND $

EXECUTIVE SPONSORSHIP IS PRECIOUS – DON’T LOSE IT

TELL YOUR STORY

LESSONS LEARNED

THANK YOU!

Pamela Manning [email protected]

(626) 458-7131

Brittany Barker [email protected]

(626) 458-4971

Los Angeles County Website:

www.dpw.lacounty.gov/go/md

Page 26: LOS ANGELES COUNTY - APWA Home · Presentation By: LA County Public Works Docent: Pamela Manning Los Angeles County: Marina del Rey Infrastructure Program Mega Project Monster Management

8/26/2013

26

TREE MATRIX

Design:

Install several 7 f t. wide Bio-Retention systems.

Each Bio-retention will be sloped at 2.5:1, which will create a 5 f t. to 4in. base.

The system will be composed of: Plants

Mulch Cover

Sandy loam soil or engineered planting soil

Open graded gravel wrapped in Geotextile filter fabric

Constituents Targeted:

Trash and Debris

Sediment

Metals

Bacteria

Nutrients

Organics

Oil and grease

TSS

BIO-RETENTION SYSTEM

Page 27: LOS ANGELES COUNTY - APWA Home · Presentation By: LA County Public Works Docent: Pamela Manning Los Angeles County: Marina del Rey Infrastructure Program Mega Project Monster Management

8/26/2013

27

Admiralty Way looking west

(current)

OXFORD BASIN

Admiralty Way looking west (proposed)


Top Related